SF-30 Amendment 0001.pdf

PDF 143 KB Posted

Attached to
Supply and Installation of Fire-rated doors and walls fireproofing at U. S. Embassy Madrid, Spain
Solicitation number
19SP5026Q0013QuestionsAndAnswersAndAmendment1
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract issued by the General Services Office at the American Embassy in Madrid on May 4, 2026. The amendment modifies solicitation 19SP5026Q0013, originally dated April 10, 2026, and extends the offer receipt deadline to May 19, 2025 at 16:00 hours.

The amendment revises Section E (Deliveries and Performance) and Attachment 2 (Statement of Work) to include the following scope modifications: demolition of part of the locker room false ceiling with interior partition wall lined with EI 120 fire-rated material up to the slab; closure of the interior door in the UPS room with an EI 120 partition wall; allowance for standard door sizes; and contractor responsibility for patching and painting work as needed. Additionally, Attachment 4 (CAD drawings) and Attachment 5 (Additional pictures) are added to the solicitation. All other terms and conditions of the referenced solicitation remain unchanged and in full force and effect. The contracting officer is Jerad S. Tietz. Offerors must acknowledge receipt of this amendment prior to the extended deadline through completion of the amendment form, acknowledgment on each offer copy, or separate written correspondence.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 /1

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

05/04/2026

4. REQUISITION/PURCHASE REQ. NO.

PR15934854

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

CODE

General Services Office American Embassy Serrano, 75 28006 Madrid

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code) 9a. AMENDMENT OF SOLICITATION NO.

19SP5026Q0013

9b. DATED (SEE ITEM 11)

04/10/2026 10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [X] is extended, [] is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ___1____ copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [] is not, [X] is required to sign this document and return _1__ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Section E – Deliveries and Performance (c) is hereby changed as follows:

Attachment 2 – Statement of Work is hereby revised to include/modify the following:

-Part of the locker’s room false ceiling shall be demolished and the entire interior partition wall shall be lined with EI 120 material up to the slab.

- The interior door in the UPS room shall be closed off with an EI 120 partition wall.

- Standard door sizes are allowed.

- The contractor shall do patching and painting works as needed.

Attachment 4 – CAD drawings is hereby added.

Attachment 5 – Additional pictures is hereby added.

The hour and date specified for receipt the offers is extended to May 19, 2025 at 16:00.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME OF CONTRACTING OFFICER

Jerad S. Tietz

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C.DATE

SIGNED

16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C.DATE SIGNED