SF-30 Amendment 0001.pdf

PDF 161 KB Posted

Attached to
Construction of two ADA ramps at U. S. Embassy in Madrid
Solicitation number
19SP5026Q0011QuestionsAndAnswersAndAmendment1
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Form SF 30) issued by the General Services Office at the American Embassy in Madrid, Spain. Amendment 0001 is effective April 15, 2025, and modifies Solicitation 19SP5026Q0011 dated March 30, 2026, under Purchase Requisition PR15916068. The contracting officer is Jerad S. Tietz.

The amendment updates Attachment 2 – Statement of Work, specifically Section 2.3.8, to clarify that masonry construction for a new ramp is acceptable provided structural demonstration that it does not overload the existing structure. A revised Attachment 2 – Statement of Work is attached to this amendment. The hour and date specified for receipt of offers is not extended. Offerors must acknowledge receipt of this amendment prior to the deadline by completing and returning one copy of the amendment, acknowledging receipt on each copy of their offer submission, or providing separate written acknowledgment by letter or telegram referencing the solicitation and amendment numbers. The contractor is required to sign and return one copy of this document to the issuing office. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
Questions and Answers.pdf PDF
Amendment 1 - Attachment 2 - Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 24

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

04/15/2025

4. REQUISITION/PURCHASE REQ. NO.

PR15916068

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE

7. ADMINISTERED BY (If other than Item 6)

CODE

General Services Office American Embassy Serrano, 75 28006 Madrid

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)

9a. AMENDMENT OF SOLICITATION NO.

19SP5026Q0011

9b. DATED (SEE ITEM 11)

03/30/2026 10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [X] is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ___1____ copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [] is not, [X] is required to sign this document and return _1__ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Attachment 2 – Statement of Work is hereby changed to include/modify the following:

Section 2.3.8 has been updated to clarify that masonry construction for the new ramp is acceptable, provided structural demonstration that it does not overload the existing structure.

A revised Attachment 2 – Sstatement of Work is hereby attached.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME OF CONTRACTING OFFICER

Jerad S. Tietz

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C.DATE

SIGNED

16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C.DATE SIGNED

File details come from the government source that posted it. Updated .