Self-Performed and Subcontracted Worksheet.docx
DOCX document 20 KB Posted
- Solicitation number
- 36C25926Q0880
About this file
This is a Self-Performed and Subcontracted Work Worksheet designed for general construction contractors on federal contracts, specifically applicable to NAICS code 236220 (general construction) and specialty trade contractors. The worksheet establishes compliance requirements that contractors must meet 15 percent self-performed work for general construction or 25 percent for specialty trade NAICS codes, with self-performed work defined as costs incurred for personnel employed by the prime contractor or other eligible Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. The form requires offerors to provide a detailed breakdown of personnel and material/equipment costs organized by specification division, clearly identifying which costs are self-performed versus subcontracted, and designating whether subcontractors are SDVOSB vendors.
The worksheet includes a structured calculation methodology requiring contractors to list total personnel costs (prime and all subcontractors), subtract all non-SDVOSB subcontractor personnel costs, and calculate the resulting percentage of self-performed work. Personnel costs include direct project labor, mechanics, tradesmen, and office personnel such as project managers, superintendents, and administrative staff. After calculating the personnel and material/equipment subtotal by division, contractors must add home office overhead, profit/fee, and bond costs to reach a grand total. The form requires certification by an authorized representative and is directly tied to the Lightning Protection Update project (Solicitation Number 36C25926Q0880) at Sheridan VA Medical Center in Wyoming, where SDVOSB participation requirements apply to the contract performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25926Q0880_1.docx | DOCX document | |
| 1989-04-06 - 71 - Bldg 71 Outpatient-Clinical Addition.pdf | ||
| Construction Safety Handout.doc | DOC document | |
| LOS Certification 852.219-75 JAN 2023 DEVIATION.docx | DOCX document | |
| Prime and Subcontractor Construction Breakdown.xlsx | XLSX spreadsheet | |
| Specs Guarantee Period.docx | DOCX document | |
| Past Performance Questionnaire_Blank.docx | DOCX document | |
| Lightning Protection Update Building 71N Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
| Specification Division and name |
| SDVOSB Vendor (Y or N) |
| Personnel Cost |
| Material/Equipment Costs |
Division 01
| $ |
| $ |
Division 02
| $ |
| $ |
Division 03
| $ |
| $ |
(Add additional lines as necessary for each Division applicable to this project)
| $ |
| $ |
| $ |
| $ |
| Sub Total (Personnel Costs, Material/Equipment Costs) |
| $ |
| Profit |
| $ |
| Home Office Overhead |
| $ |
| Bond |
| $ |
| Grand Total |
| $ |
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $_________________
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________
3. Remainder is ‘Total amount of work to be self-performed under the
| Contract’: | $__________________ | |
| 4. Self-performed work = Line 3/Line 1 x 100 = | ________________% |
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.
| ________________________________________________ | ___________ |
| (Signature and Typed Name of Authorized Representative) | Date |
(Title of Authorized Representative)