S04 - Site Visit Meeting Doc.docx
DOCX document 20 KB Posted
- Solicitation number
- 36C25926Q0880
About this file
This is a Pre-Bid Meeting Construction Project document for a lightning protection system repair and upgrade project at the Sheridan VA Medical Center. The contractor must provide all labor, tools, materials, equipment, and supervision to repair and upgrade the lightning protection system on Building 71N located at 1898 Fort Road, Sheridan, Wyoming 82801 in compliance with OSHA, EPA, and federal/state environmental regulations. The existing lightning protection system, installed in 1989, requires repairs due to detached air terminals and must be upgraded to meet current NFPA 780 and UL96A standards. Work includes addressing issues such as reattaching air terminals, identifying and creating equipotential grounding connections, and potentially installing Transient Voltage Surge Suppression (TVSS) devices. The project is estimated between $25,000 and $100,000.
Key dates include a question submission deadline of November 10, 2025 at 10:00 AM MT, with questions submitted after this time not to be reviewed. Bid proposals are due December 15, 2026 at 10:00 AM MT and must be submitted via email to Elia-Laritza.Ruiz-Manzo@va.gov. The contractor must begin performance within 10 days of Notice to Proceed and complete all work within 120 days. Bid and Payment/Performance Bonds are required, and contractors must submit OSHA and EMR ratings, a signed copy of VAAR clause 852.219-75 (Limitation on Subcontracting), and weekly certified payrolls with monthly invoices. Davis-Bacon wage compliance is mandatory. The pre-bid site visit is not mandatory; prospective bidders are prohibited from inquiring about the project with VA employees except through written questions to the Contracting Officer. The Contracting Officer is Sylwia Zak and the COR is Thomas Hatch.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25926Q0880 0001.pdf | ||
| S04-Pre Construction Site Visit attendance..pdf | ||
| 36C25926Q0880_1.docx | DOCX document | |
| 1989-04-06 - 71 - Bldg 71 Outpatient-Clinical Addition.pdf | ||
| Construction Safety Handout.doc | DOC document | |
| LOS Certification 852.219-75 JAN 2023 DEVIATION.docx | DOCX document | |
| Prime and Subcontractor Construction Breakdown.xlsx | XLSX spreadsheet | |
| Specs Guarantee Period.docx | DOCX document | |
| Past Performance Questionnaire_Blank.docx | DOCX document | |
| Lightning Protection Update Building 71N Specifications.pdf | ||
| Self-Performed and Subcontracted Worksheet.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Meeting Construction Project 666-27-102 Lightning Protection Update B71N.
The contractor is to provide all labor, tools, materials, equipment, and supervision required to repair the Lightning Protection at the Sheridan VA Medical Center as outlined in the Statement of Work and associated documents.
All work must be done in compliance with applicable OSHA, EPA and federal/state environmental regulations and policies. Contractor is responsible for proper handling and disposal of debris, waste and excess fuel generated during completion of this work.
Location: Building 71 located at 1898 Fort Road, Sheridan, WY 82801.
Introductions: Sylwia Zak CO and Thomas Hatch COR Site Visit:
· The pre-bid meeting/site walk is not mandatory.
· Questions during site visit must be written down and submitted to the Contracting Officer to provide answers in an amendment to all interested parties.
Pertinent Dates:
· Questions are due by November 10, 2025, before 10 am, MT. Any questions submitted after this time will not be reviewed or answered. Please submit to Elia-Laritza.Ruiz-Manzo@va.gov
· Bids are due on December 15, 2026, no later than 10:00 AM MT. Submit via email to Elia-Laritza.Ruiz-Manzo@va.gov.
Site Visit Guidelines:
· Prospective bidders are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.
· Prospective bidders are prohibited from visiting site other than through formal invitation by Contracting Officer.
· Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded.
Solicitation Information:
· Confirmation of construction range: between $25,000 and $100,000.
· Bid Guarantee & Payment/Performance Bonds: are required as outlined in the solicitation.
· Special Standards of Responsibility: Please note solicitation requirements for submittal of OSHA and EMR ratings.
· VAAR clause 852.219-75 Limitation on Subcontracting: please ensure you provide a signed copy of this clause with your bid package.
· Contractor shall begin performance within 10 days after Notice to Proceed (NTP) and complete within 120 days.
Post Award Compliance:
· Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor shall submit their weekly certified payrolls with their monthly invoice.