Self-Performed and Subcontracted Worksheet.docx
DOCX document 20 KB Posted
- Attached to
- Z1DA--554-26-106 Replace DW Valves.
- Solicitation number
- 36C25926R0057
About this file
This is a Self-Performed and Subcontracted Work Worksheet for a general construction contract with service-disabled veteran-owned small business (SDVOSB) requirements. Offerors must demonstrate that at least 15 percent of total contract performance costs for personnel will be performed by the prime contractor's employees or other eligible SDVOSB concerns (25 percent for specialty trade NAICS codes). The worksheet requires offerors to provide a detailed breakdown of personnel costs and material/equipment costs organized by specification division, clearly identifying which work will be self-performed versus subcontracted to SDVOSB vendors. Home office overhead, profit/fee, and bond costs are calculated separately and added after personnel and material/equipment subtotals.
The calculation methodology requires offerors to list total personnel costs for the prime and all subcontractors, subtract non-SDVOSB subcontractor personnel costs, and calculate the resulting self-performed work percentage. Personnel costs include direct project labor, mechanics, tradesmen, and office personnel such as project managers, superintendents, and estimators. The completed worksheet must be signed and certified by an authorized representative, attesting to the accuracy of the representations provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment B - DWS Valves.xlsx | XLSX spreadsheet | |
| SOW 554-26-106 Replace DW Valves revised.docx | DOCX document | |
| 36C25926R0057 0002.docx | DOCX document | |
| Attachment A - 01-PP-100-set r1.pdf | ||
| 554-26-106 Water valves RFI - w responses.docx | DOCX document | |
| S04- Site Visit Attendance_FE.pdf | ||
| Site Visit Meeting Doc.docx | DOCX document | |
| 36C25926R0057 0001.pdf | ||
| Prime and Sub Contractor Construction Breakdown.xlsx | XLSX spreadsheet | |
| Attachment A - 01-PP-100-set.pdf | ||
| 852.219- 75 LOS Certification.docx | DOCX document | |
| Specifications 554-26-106 Replace Domestic Water Valves.pdf | ||
| 36C25926R0057.docx | DOCX document | |
| ICRA 554-26-106 Replace DW Valves.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
| Specification Division and name |
| SDVOSB Vendor (Y or N) |
| Personnel Cost |
| Material/Equipment Costs |
Division 01
| $ |
| $ |
Division 02
| $ |
| $ |
Division 03
| $ |
| $ |
(Add additional lines as necessary for each Division applicable to this project)
| $ |
| $ |
| $ |
| $ |
| Sub Total (Personnel Costs, Material/Equipment Costs) |
| $ |
| Profit |
| $ |
| Home Office Overhead |
| $ |
| Bond |
| $ |
| Grand Total |
| $ |
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $_________________
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________
3. Remainder is ‘Total amount of work to be self-performed under the
| Contract’: | $__________________ | |
| 4. Self-performed work = Line 3/Line 1 x 100 = | ________________% |
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.
| ________________________________________________ | ___________ |
| (Signature and Typed Name of Authorized Representative) | Date |
(Title of Authorized Representative)