This is a Prime and Sub Contractor Construction Breakdown template in spreadsheet format used for federal construction project cost estimation. The template provides a standardized structure organized according to the MasterFormat classification system (Divisions 0-34) for documenting labor, materials, and total costs across all construction trade disciplines. Each division section includes columns for quantity, unit, unit price, and total calculations, with provisions for adjustments related to local market conditions and small business utilization percentages. The template accommodates multiple estimate types (new projects, preliminary design, final design, or other design specifications) and includes fields for project identification, location, estimator information, building numbers, and drawing references. The summation sheet at the top aggregates costs across all 28 divisions plus overhead, profit, and bonds to arrive at the total project cost. All line items and cost fields in the provided template are currently blank ($0 values), indicating this is an unfilled template ready for use on a specific construction project. The format supports detailed cost breakdown requirements typical of federal construction contracts, particularly those involving prime and subcontractor cost allocation documentation.

View the file

Other files

File Type Posted
Attachment B - DWS Valves.xlsx XLSX spreadsheet
SOW 554-26-106 Replace DW Valves revised.docx DOCX document
36C25926R0057 0002.docx DOCX document
Attachment A - 01-PP-100-set r1.pdf PDF
554-26-106 Water valves RFI - w responses.docx DOCX document
S04- Site Visit Attendance_FE.pdf PDF
Site Visit Meeting Doc.docx DOCX document
36C25926R0057 0001.pdf PDF
Attachment A - 01-PP-100-set.pdf PDF
Self-Performed and Subcontracted Worksheet.docx DOCX document
ICRA 554-26-106 Replace DW Valves.pdf PDF
852.219- 75 LOS Certification.docx DOCX document
Specifications 554-26-106 Replace Domestic Water Valves.pdf PDF
36C25926R0057.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMATION

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NEW PROJECTNO DESIGNPRELIMINARY
COMPLETEDDESIGN
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMNOTESTOTAL
ABCD
DIVISION 0-SPECIAL SECTIONS$ - 0
DIVISION 1-GENERAL REQUIREMENTS$ - 0
DIVISION 2-EXISTING CONDITIONS$ - 0
DIVISION 3-CONCRETE$ - 0
DIVISION 4-MASONRY$ - 0
DIVISION 5-METALS$ - 0
DIVISION 6-WOOD AND PLASTIC$ - 0
DIVISION 7-THERMAL AND MOISTURE PROTECTION$ - 0
DIVISION 8-DOORS AND WINDOWS$ - 0
DIVISION 9-FINISHES$ - 0
DIVISION 10-SPECIALTIES$ - 0
DIVISION 11-EQUIPMENT$ - 0
DIVISION 12-FURNISHINGS$ - 0
DIVISION 13-SPECIAL CONSTRUCTION$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0
DIVISION 22-PLUMBING$ - 0
DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING$ - 0
DIVISION 26-ELECTRICAL$ - 0
DIVISION 27-COMMUNICATIONS$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0
DIVISION 31-EARTHWORK$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0
DIVISION 33-UTILITIES$ - 0
DIVISION 34-TRANSPORTATION$ - 0
SUB-TOTAL$ - 0
OVERHEAD@$ - 0
PROFIT@$ - 0
BONDS@$ - 0
PROJECT TOTAL:$ - 0

&A

&D

Div 0 Special Sections

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 0 Special Sections
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 1 General Requirements

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Divison 1 General Requirements
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

Div 2 Existing Conditions

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 2 Existing Conditions
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 3 Concrete

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 3 Concrete
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 4 Masonry

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 4 Masonry
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 5 Metals

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 5 Metals
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization0.00%$0
SECTION TOTAL:$0

&A

&D

Div 6 Wood & Plastic

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 6 Wood & Plastic
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 7 Thermal & Moisture Protec

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 7 Thermal & Moisture Protection
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 8 Doors & Windows

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 8 Doors & Windows
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Div 9 Finishes

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 9 Finishes
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions10.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 10 Specialties

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 10 Specialties
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 11 Equipment

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 11 Equipment
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 12 Furnishings

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 12 Furnishings
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 13 Special Construction

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 13 Special Construction
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Division 14 Conveying Equipment

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 14 Conveying Equipment
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 21 Fire Suppression

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 21 Fire Suppression
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 22 Plumbing

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 22 Plumbing
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 23 HVAC

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 23 Heat, Ventilating, and Air Conditioning
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Div 26 Electrical

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 26 Electrical
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Div 27 Communications

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 27 Communications
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 28 Electronic Safety & Secu

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 28 Electronic Safety & Security
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 31 Earthwork

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 31 Earthwork
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 32 Exterior Improvements

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 32 Exterior Improvements
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 33 Utilities

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 33 Utilities
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 34 Transportation

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 34 Transportation
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

File details come from the government source that posted it. Updated .