This document is a set of Service Level Plumbing Piping Plans for a healthcare facility in Aurora, Colorado. The plans represent as-built conditions as of March 8, 2024, and detail the plumbing infrastructure across multiple service areas (Areas A through F) of what appears to be a medical facility.
The plans specify comprehensive plumbing systems including domestic cold water (DCW), domestic hot water (DHW), domestic hot water return (DHWR), medical gases (oxygen and nitrogen), natural gas (NG), irrigation water (IRW), and specialty connections for equipment such as air scrubbers, pneumatic systems, and solar thermal loops. Key infrastructure elements include 8-inch main DCW lines from a water entry point, reduced pressure backflow prevention devices with flood protection solenoid valves, swing check valves on vertical piping, water pressure reducing stations, and multiple submeters for monitoring consumption by area. The facility includes mechanical rooms, elevator machine rooms, data/telecommunications spaces, heating equipment rooms, male and female locker rooms, and various clinical and operational spaces. Piping sizes range from 1/2 inch for specialized connections to 8 inches for main distribution lines, with connections coordinated across multiple levels and requiring coordination with equipment suppliers and irrigation contractors. The plans include photographic documentation of actual installed piping systems and reference continuation sheets for detailed drawings of specific building sections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A - 01-PP-100-set r1.pdf | ||
| 554-26-106 Water valves RFI - w responses.docx | DOCX document | |
| Attachment B - DWS Valves.xlsx | XLSX spreadsheet | |
| SOW 554-26-106 Replace DW Valves revised.docx | DOCX document | |
| 36C25926R0057 0002.docx | DOCX document | |
| Site Visit Meeting Doc.docx | DOCX document | |
| 36C25926R0057 0001.pdf | ||
| S04- Site Visit Attendance_FE.pdf | ||
| ICRA 554-26-106 Replace DW Valves.pdf | ||
| Prime and Sub Contractor Construction Breakdown.xlsx | XLSX spreadsheet | |
| 852.219- 75 LOS Certification.docx | DOCX document | |
| Specifications 554-26-106 Replace Domestic Water Valves.pdf | ||
| 36C25926R0057.docx | DOCX document | |
| Self-Performed and Subcontracted Worksheet.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
LS-102
EQUIP STOR
06-SV-B1-01
06-SV-B1-02
WORK
LS-C01
VEST
06-SV-B2-01
01-SV-PGE2
ELEVCS-214
ELEV
01-SV-PGE1 CS-212
ELEV MACH RM
01-SV-E07-V2
CS-C01
CORRIDOR
01-SV-E1-01
CS-214
ELEV
01-SV-PGE1
CS-216
ELEV MACH RM
01-SV-E06-V1
8" COMBINATION
FIRE/DCW. RE: CIVIL
DWGS FOR
CONTINUATION.
8" FIRE RPBFP. RE: FIRE
SUPPRESSION DWGS.
8" DCW REDUCED PRESSURE
BFP WITH FLOOD PROTECTION
SOLENOID VALVE. RE:DETAIL
1 1/2"DCW
1 1/4"DHW
8"DCW
6"DHW
3"DHWR
8"FIRE. RE: FIRE
SUPPRESSION
DWGS.
8"DCW 6"DHW 3"DHWR
8"DCW
1 1/4"DHW
1"DHWR
4"O2 FROM BULK
OXYGEN SYSTEM AT
ENERGY CENTER
4"O2
8"DCW
6"DHW
3"DHWR
5"NG(2PSI)
5"NG(2PSI)
8"DCW
82.5' (5370.5' USGS)
CENTERLINE OF
PENETRATION
8"DCW
8" DCW REDUCED PRESSURE
BFP WITH FLOOD PROTECTION
SOLENOID VALVE. RE:DETAIL
SWING CHECK VALVE
ON VERTICAL PIPING
SWING CHECK VALVE
ON PIPING
3" IRRIGATION SUBMETER
& REDUCED PRESSURE
BFP WITH FLOOD
PROTECTION SOLENOID
VALVE. RE:DETAIL
CONNECT 3"IRW TO SITE IRRIGATION
SUPPLY MINIMUM 5FT BELOW FINISHED
GRADE. RE:IRRIGATION PLANS.
COORDINATE EXACT CONNECTION
LOCATION & SIZE W/ IRRIGATION
CONTRACTOR.
3"IRW
SWING CHECK VALVE ON
VERTICAL PIPING
1 1/4"IRW
RE: ENC
PLUMBING DWGS
FOR
CONTINUATION.
3"IRW
3"DCW
85.0' (5373.0' USGS)
CENTERLINE OF
PENETRATION
SHUT-OFF W/
DRAIN DN VALVE.
M A
T C
H L
IN
E A
R E
A A
M A
T C
H L
IN
E A
R E
A B
1 1/4"IA
1 1/2"IA
OIA
O
IA
O
O O
NG
NG
NG
NG
NG
CONNECT 3/4"DCW TO AIR
SCRUBBER. COORDINATE EXACT
CONNECTION REQUIREMENTS
W/ EQUIPMENT SUPPLIER, TYP.
OF 2.
1"REDUCED
PRESSURE BFP FOR
AIR SCRUBBERS.1"DCW
1"DCW
IA
IA1 1/2"IA
WATER PRESSURE REDUCING
STATION. RE: DETAIL
3"SOLAR
HWS/HWR
3"SOLAR
HWS/HWR
3"SOLAR
HWS/HWR
3/4"DCW
RE: ENC PLUMBING
DWGS FOR
CONTINUATION.
RE: PVN PLUMBING
DWGS FOR
CONTINUATION.
1 1/2"IA
IA
3/4"IA
CONNECT 1/2"IA TO PNEUMATIC
CHUTE DAMPER. COORDINATE
EXACT CONNECTIO N
REQUIREMENTS W/ EQUIPMENT
SUPPLIER.
3/4"IA
1 1/2"IA
3/4"DHWR
A
A
B
B
C
C
D
D
E
E
01-SV-B3-M1
HEATING EQUIP
RM
CS-239
ELEC
01-SV-B2-E1
CS-241
BLOWER RM
01-SV-B2-01
CS-243
DATA /
TELECOMM
01-SV-B1-T1
CS-245
PUMP ROOM
01-SV-B1-P1
LE-S01
ELEV
06-SV-SE16
LS-101
MALE LOCKERS
06-SV-B3-02
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-501REPLACEMENT MEDICAL CENTER
FACILITY, EASTERN COLORADO
HEALTH CARE SYSTEM
AURORA, COLORADO
N
C O
N
R E
S
D A
T
IB
S
IB
N
E N
C
C L C
C B
N
C B
C
C B
S
P S
N
P V
N
P V
S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e e ig h th i n c h o n e f o o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
/8
/2
:5
:4
P M
C
U s e rs \h a u n g
\D o c u m e n ts
\P L
-I F
O -s h e e ts h a u n g
G H
V P
.r v t
3/8/2024 3:59:40 PM
01.PP.100-A
SERVICE LEVEL PLUMBING PIPING
PLAN - AREA A
CONCOURSE
08/31/2012
0' 4' 8' 16' 32'0' 4' 8' 16' 32'
NORTH
1/8" = 1'-0"1
SERVICE LEVEL PLUMBING
PIPING PLAN - AREA A
FE
DBA C
VHAECHKAWAKS
Architect
VHAECHKAWAKS
Architect #25: NIC (valve good)
#26: DCW, SS316, 8"
#27: DCW, SS316, 8"
#28: DHW, SS316, 6"
VHAECHKAWAKS
Image
UP
TCP-
1 - FCU8
1 - FCU9
1 - AHU9
1 - AHU1
NA
NA
NB
NB
NC
NC
ND
ND
N8
N10
01-SV-PGE2
ELEV
CS-212
ELEV MACH RM
01-SV-E07-V2
STAIR
01-SV-ST2
ELEV
01-SV-SE18
ELEV
01-SV-PGE3
CS-183
ELEV
01-SV-PGE4
ELEV MACH RM
01-SV-C15-V3
CS-181
ELEV MACH RM
01-SV-C16-V4
ELEC
01-SV-C14-E4
DATA /
TELECOMM
01-SV-C10-T2
MECH
01-SV-C11-M5
MED GAS
STAGING RM
01-SV-C12-01
ELEV MACH RM
01-SV-A10-V18
5"DCW
3"DHW
2"DHWR
3/4"DCW
3"DCW
2"DHW
1 1/2"DHWR
5"DCW
3"DHW
2"DHWR
8"DCW 5"DHW
3"DCW
1 1/2"DHW
1"DHWR
4"O2
P-8046"DCW, 4"DHW,
3"DHWR, & 2
1/2"NG(2PSI)
VALVED & CAPPED
FOR FUTURE BLDG.
8"DCW 5"DHW 3"DHWR
8"DCW 5"DHW 3"DHWR
PROVIDE 4"O2
VALVED & CAPPED
FOR FUTURE
BLDG.
6"DHW
5"DHW
2 1/2"NG(2PSI)
5"NG(2PSI)
5"NG(2PSI)
8"DCW FROM
WATER ENTRY
AT IBN
8"DCW
8"DCW
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A A
M A
T C
H L
IN
E A
R E
A B
M A
T C
H L
IN
E A
R E
A B
3"DCW, 2"DHW, 1
1/2"DHWR UP TO
LEVEL ABOV E.
3"DCW, 1 1/2"DHW,
1"DHWR UP TO
LEVEL ABOVE.
5"DCW, 3"DHW,
2"DHWR UP TO IBN
AT LEVEL ABOVE.
1 1/2"O2 UP TO
IBN AT LEVEL
ABOVE.
2"DCW
O O
O O
O O
NGNGNGNG
NG
NG
NG
NG
NGNGNG1 1/2"IA
3/4"DHW
3/4"DHWR
1 1/4"DCW
1 1/4"DHW
3/4"DHWR
1 1/4"DHW
1 1/4"DCW
2 1/2"O2
OO
O O
4"O2
4"O2
8"DCW
RE: IBS PLUMBING
DWGS FOR
CONTINUATION.
RE: PVN PLUMBING
DWGS FOR
CONTINUATION.
1 1/4"IA
3/4"IA
1 1/2"IA
1 1/4"IA
1 1/4"IA1 1/4"IA
1"IA
1"IA
IA
IA
IAIA
IA
IA IA
IA
A
A
B
B
C
C
D
D
E
E
N7
N9
N11
N6.9
HE-P02
ELEV
04-SV-PE4
HE-P01
ELEV
04-SV-PE3
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-501REPLACEMENT MEDICAL CENTER
FACILITY, EASTERN COLORADO
HEALTH CARE SYSTEM
AURORA, COLORADO
N
C O
N
R E
S
D A
T
IB
S
IB
N
E N
C
C L C
C B
N
C B
C
C B
S
P S
N
P V
N
P V
S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e e ig h th i n c h o n e f o o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
/8
/2
:5
:5
P M
C
U s e rs \h a u n g
\D o c u m e n ts
\P L
-I F
O -s h e e ts h a u n g
G H
V P
.r v t
3/8/2024 3:59:55 PM
01.PP.100-B
SERVICE LEVEL PLUMBING PIPING
PLAN - AREA B
CONCOURSE
08/31/2012
0' 4' 8' 16' 32'0' 4' 8' 16' 32'
NORTH
1/8" = 1'-0"1
SERVICE LEVEL PLUMBING
PIPING PLAN - AREA B
FE
DBA C
VHAECHKAWAKS
Cloud
VHAECHKAWAKS
Callout #22: DHWR, copper, 2" #23: DHW, copper, 3"
#24: DCW, SS316, 5"
VHAECHKAWAKS
Cloud
VHAECHKAWAKS
Architect
#19: DCW, SS316, 5"
#20: DHW, copper, 3" #21: DHWR, copper, 2"
VHAECHKAWAKS
Image
DN
UP
UP
UP
1 - AHU3
1 - AHU2
1 - FCU19
NA
NA
CS-183
ELEV
01-SV-PGE4
CS-181
ELEV MACH RM
01-SV-C16-V4
CS-171
ELEV
01-SV-PGE5
CS-169
ELEV
01-SV-PGE6
CS-173
ELEV MACH RM
01-SV-C21-V5
CS-175
ELEC
01-SV-C19-E5
CS-167
ELEV MACH RM
01-SV-C21-V6
CS-C05
CORRIDOR
01-SV-A10-V7
4"DCW
4"DHW
1"DCW
5"DHW 3"DHWR
8"DCW
5"DHW3"DHWR
2"O2
3/4"O2
8"DCW
5"DHW3"DHWR
4"O2
4"O2
CBN DCW, DHW, DHWR,
DCWR SUBMETERS
LOCATED IN MECH RM.
1 1/2”DHWR
2 1/2”DHW
4”DCW
1 1/2”DHWR
2 1/2”DHW
4”DCW
P-804
1”DCW
P-804
8"DCW
5"NG(2PSI)
5"NG(2PSI)
4"O2
4"O2
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A D
M A
T C
H L
IN
E A
R E
A B
O O O
O O
O
NG
NG
O
NG
NG
NG
8"DCW
RE: CBN PLUMBING
DWGS FOR
CONTINUATION.
1"IA
3/4"IA
3/4"IA
1"IA1"IA
1"IAIA
IA
IA
IA
IA
IA
O I A
I A O
3/4"IA
3/4"IA
A
A
B
B
C
C
D
D
E
E
CS-C01
CORRIDOR
01-SV-E1-01
01-SV-C17-M1
MECH
CS-177
MECH
01-SV-C19-M1
01-SV-C20-P1
PIPE SPACE
CS-165
MECH
01-SV-C22-M2
GS-ST1
STAIR
08-SV-ST1
HE-P02
ELEV
04-SV-PE4
HE-P01
ELEV
04-SV-PE3
1 - AHU3
26 01
CS-157
ELEV
01-SV-PGE7
CS-155
ELEV
01-SV-PGE8
CS-149
ELEV
01-SV-PGE9
CS-147
ELEV
01-SV-PGE10
CS-145
ELEV MACH RM
01-SV-C29-V10
CS-153
ELEV MACH RM
01-SV-C26-V8
CS-159
ELEV MACH RM
01-SV-C25-V7
CS-161
ELEC
01-SV-C24-E6
CS-165
MECH
01-SV-C22-M2
CS-151
ELEV MACH RM
01-SV-C28-V9CS-C04
CORRIDOR
01-SV-C24-01
01-SV-C28-P1
PIPE SPACE
4"DCW 4"DHW
2"DHWR
4"DCW
4"DHW
2"DHWR
1"DCW
6"DCW
5"DHW
3"DHWR
2"O2
1 1/4"O2
4"O2
2”DHWR
3”DHW
4”DCW
CBC DCW, DHW, DHWR,
DCWR SUBMETERS
LOCATED IN MECH RM. 2”DHWR
3”DHW
4”DCW
5"DHW
6"DCW
5"NG(2PSI)
5"NG(2PSI)
4"O2
4"O2
4"O2
4"O2
4"O2
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A D
M A
T C
H L
IN
E A
R E
A D
M A
T C
H L
IN
E A
R E
A E
NG
O
NG
NG
O
O
NG
NG
O
NG
O
NG
O
1 1/4"O2
RE: DAT PLUMBING
DWGS FOR
CONTINUATION.
RE: DAT PLUMBING
DWGS FOR
CONTINUATION.
RE: CBC PLUMBING
DWGS FOR
CONTINUATION.
3/4"IA
3/4"IA3/4"IA
IA
IA
O
IA
O
3/4"IA
IA
IA
IA
IA
IA
3/4"IA
3/4" IA
3/4" IA
A
A
B
B
C
C
D
D
E
E
CS-C01
CORRIDOR
01-SV-E1-01
01-SV-C25-P1
PIPE SPACE
01-SV-C27-M1
MECH
CS-163
CART DEPOT
09-SV-C24-H2
ES-ST1
STAIR
09-SV-ST1
FS-C05
CORRIDOR
03-SV-C1-01
03-SV-B2-01
PRESCRIP
FILLING/ASSEMBLY
FS-121
PRESCRIP MAIL
OUT
03-SV-A2-01
03-SV-A2-02
CIRC
FS-100
STERILE FLUID
STOR
03-SV-A3-01
FS-121A
CONTROLLED
SUBS STOR
03-SV-A3-02
03-SV-A4-01
RECEIVING/VERIFY
03-SV-A4-02
RECEIVING/VERIFY
FS-100A
SECURE DRUG
WASTE
03-SV-A4-03
FS-C01
CORRIDOR
03-SV-C4-01
03-SV-A5-01
CORRIDOR
DS-C03
CORRIDOR
03-SV-A6-01
03-SV-B5
COURTYARD
DS-C02
CORRIDOR
03-SV-B7-02
DS-135
CLEAN/SOILED
DISPATCH
03-SV-A8-01
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-501REPLACEMENT MEDICAL CENTER
FACILITY, EASTERN COLORADO
HEALTH CARE SYSTEM
AURORA, COLORADO
N
C O
N
R E
S
D A
T
IB
S
IB
N
E N
C
C L C
C B
N
C B
C
C B
S
P S
N
P V
N
P V
S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e e ig h th i n c h o n e f o o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
/8
/2
:3
:1
P M
C
U s e rs \h a u n g
\D o c u m e n ts
\P L
-I F
O -s h e e ts h a u n g
G H
V P
.r v t
3/8/2024 3:34:16 PM
01.PP.100-C
SERVICE LEVEL PLUMBING PIPING
PLAN - AREA C/D
CONCOURSE
08/31/2012
0' 4' 8' 16' 32'0' 4' 8' 16' 32'
NORTH
1/8" = 1'-0"1
SERVICE LEVEL PLUMBING
PIPING PLAN - AREA C
FE
DBA C
1/8" = 1'-0"2
SERVICE LEVEL PLUMBING
PIPING PLAN - AREA D
0' 4' 8' 16' 32'0' 4' 8' 16' 32'
VHAECHKAWAKS
Architect
VHAECHKAWAKS
Architect
#16: DCW, SS316, 5"
#17: DHW, copper, 2-1/2" #18: DHWR, copper, 1-1/2"
VHAECHKAWAKS
Image
VHAECHKAWAKS
Architect
VHAECHKAWAKS
Architect
#10: DCW, SS316, 4"
#11: DHW, SS316, 4"
#12: DHWR, copper, 2"
VHAECHKAWAKS
Image
VHAECHKAWAKS
Architect
VHAECHKAWAKS
Architect #13: DHWR, copper, 2" #14: DHW, copper, 3"
#15: DCW, SS316, 4"
VHAECHKAWAKS
Architect
VHAECHKAWAKS
Architect
#7: DCW, SS316, 4"
#8: DHW, SS316, 4"
#9: DHWR, copper, 2"
VHAECHKAWAKS
Image
1 - AHU5
1 - AHU4
1 - AHU7
1 - AHU10
1 - AHU6
1 - AHU8
1-SAD6A
1-SWHX1
1 - FCU31
1-SAD5
1-SAD4A
SB
SB
SC
SC
S29.3
S30
S31
SD
SD
S32
S33
S34
S34.6
S35
S36
S37
S38
CS-147
ELEV
01-SV-PGE10
CS-145
ELEV MACH RM
01-SV-C29-V10
CE-S01
ELEV
01-SV-SE15
CS-ST1
STAIR
01-SV-ST5
CS-133
MECH
01-SV-C35-M4
CS-111
ELEC
01-SV-C37-E9
CS-141
MECH
01-SV-C31-M3CS-143
ELEC
01-SV-C29-E7
CS-119
ELEV MACH RM
01-SV-SB37-V15
01-SV-C32-M1
MECH
01-SV-C28-P1
PIPE SPACE
CS-127
SANITATION/RECYCLING
01-SV-A36-01
CS-125
NON-FOOD STOR
01-SV-A36-02
CS-123
DRY FOOD STOR
01-SV-A36-03
CS-117
FOOD PREP
01-SV-A37-04
CS-123B
REFR STOR
01-SV-A36-04
CS-121
STAFF TLT
01-SV-A37-05
CS-131
HAC
01-SV-A7-04
CS-123A
REFR STOR
01-SV-A36-05
CS-115
POT WASH
01-SV-A37-02
CS-115A
WASTE PULPER
01-SV-A38-01
CS-113
FOOD COURT
RECEIVING
01-SV-A37-01
3"DCW
3"DHW
1 1/2"DHWR
4"DCW
4"DHW
2 1/2"DHWR
1 1/2"DCW
3"DCW
6"DCW, 4"DHW, 3"DHWR, 2
1/2”NG(2PSI) CAPPED &
VALVED FOR FUTURE
BLDG CONNECTION.
1"DCW
4"DHW
2"DHWR
6"DCW
4"DHW
3"DHWR
6"DCW
4"DHW
2 1/2"DHWR
5"DCW
4"DHW
2 1/2"DHWR
5"DC
W
1 1/2"DHW
1"DHWR
P-101
P-418
1 1/2"DHWR
2"DHW
3"DCW
PROVIDE 3"O2
VALVED & CAPPED
FOR FUTURE.
01-DHX-2
01-DHX-1
01-DET-1
SOLAR
THERMAL LOOP
EXP TANK
SOLAR
THERMAL 2,000
GAL. STORAGE
TANK.
SOLAR STORAGE
TANKS THERMAL
EXP TANK
3" SOLAR
HWS/HWR
3”DCW, 2”DHW, 1
1/2”DHWR UP TO
LEVEL ABOVE.
P-804
P-804
3/4”DCW
3"DH
W
3"NG(2PSI)
4"NG(2PSI)
4"NG(2PSI)
5"NG(2PSI)
2 1/2"NG(2 PSI)
5"NG(2PSI)
P-502
RE: DAT PLUMBING
DWGS FOR
CONTINUATION.
4"O2
4"O2
4"O2
M A
T C
H L
IN
E A
R E
A D
M A
T C
H L
IN
E A
R E
A E
M A
T C
H L
IN
E A
R E
A E
M A
T C
H L
IN
E A
R E
A F
2 1/2"NG (2 PSI)
UP TO DAT AT
LEVEL ABOVE.
CAP
3/4"
1/2"
BALANCE
TO 1.0 GPM
1/2"
1"
1"
1"
1/2"
BALANCE
TO 0.5 GPM
3/4"DHWR
3"
3"
BALANCE
TO 0.5 GPM
1/2"
1"
1/2"
2"
NG
O
NG
NG
NG
NG
NG
NG
NG
2"DCW
2"MECHANICAL MAKE-UP
WATER ASSEMBLY W/ REDUCED
PRESSURE BFP & PRV. EXTEND
TO MECHANICAL MAKE-UP
WATER CONNECTIONS.
1"DCW & DHW
01-SCP-02
01-SCP-01
01-ST-01
01-ST-02
01-DET-02
NG
RE: SOLAR THERMAL DOMESTIC
HOT WATER PREHEAT DIAGRAM
ON SHEET 00.PS.105.
RE: DUPLEX
DOMESTIC HOT
WATER DETAIL.
3"DCW, 1 1/2"DHW,
1"DHWR UP TO
LEVEL ABOVE.
1"
1 1/2"
1/2"DHWR
3/4"
1/2"
1"3/4"
1/2"
1/2" 3/4"
1"
3/4"DCW
1"
3/4"DHWR
1/2"
1/2"
1/2"
1"
1/2"
3/4"DHWR
2"
2 1/2"DCW
1 1/4"DHW
1 1/2"DHW
1/4"D
HW
1 1/2"
1 1/4"
1"
3/4"IAIA
A
A
B
B
C
C
D
D
E
E
DS-135
CLEAN/SOILED
DISPATCH
03-SV-A8-01
CS-137
DATA /
TELECOMM
-SV-C20-P3
CS-135
ELEC
-SV-C20-P4
DS-112
SHELL
03-SV-D4-07
DS-137
SHELL
03-SV-D4-07A
DS-131B
MALE LOCKER
03-SV-B9-01
DS-131A
ARMORY
03-SV-A9-05
03-SV-A8-03
DECON STOR
DS-131F
FEMALE
SHOWER/TLT
03-SV-A9-04
DS-131E
FEMALE LOCKER
03-SV-A9-02
DS-131D
EQ/EVID
03-SV-A9-03
DS-131
STAFF LOUNGE
03-SV-A9-01
DS-131D
EQ/EVID
03-SV-A9-03
DS-102
MECH
03-SV-A9-M11
DS-C01
CORRIDOR
03-SV-C10-03
DS-104
CONF
03-SV-A10-01
DS-ST1
STAIR
03-SV-ST3
CS-C01
CORRIDOR
01-SV-E1-01
CS-C01
CORRIDOR
01-SV-E33-01
CS-123A
REFR STOR
01-SV-A36-05
CS-C01
CORRIDOR
01-SV-E33-01
S38
CS-111
ELEC
01-SV-C37-E9
CS-101
CONDENSATE
LIFT / STORM &
SAN
01-SV-C11-N
CS-103
DATA /
TELECOMM
01-SV-C11-OLOAD RM
01-SV-C39-02
CORRIDOR
01-SV-C40-01
CS-115A
WASTE PULPER
01-SV-A38-01
4"DCW
2 1/2""DHW
2"DHWR
4"DCW
2 1/2"DHW
2"DHWR
2 1/2"DHW
2 1/2"DHWR
3" SOLAR
HWS/HWR.
5"DCW
2 1/2"NG
GAS REGULATOR 2PSI TO
7"WC. (1604 MBH).EXTEND
RELIEF VENT FULLSIZE
TO EXTERIOR W/ ELBOW
DN & BUGSCREEN.
2"NG (2PSI)
4"NG(2PSI)
3"NG(2PSI)
ROUTE 3"SOLAR HWS/HWR TO
SOLAR COLLECTORS ON RES
SOUTH FACADE.
M A
T C
H L
IN
E A
R E
A E
M A
T C
H L
IN
E A
R E
A F
1"
1"
1"
NG
NG
N G
3/4" CA MAIN
1/2" CA
CONNECT 1/2" CA
DROP TO
PNEUMATIC
DOOR. SEE MFG.
TYP.
3/4" CA
NG
N G
3"NG
CBS GAS SUBMETER
RE: RES PLUMBING
DWGS FOR
CONTINUATION.
RE: CBS PLUMBING
DWGS FOR
CONTINUATION.
1"
01-AC-01
B
B
C
C
D
D
E
E
CS-C01
CORRIDOR
01-SV-E33-01
CS-105
CART DEPOT
01-SV-C39-01
CS-C02
CORRIDOR
01-SV-C40-01
CS-107
LOAD RM
01-SV-C39-02
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-501REPLACEMENT MEDICAL CENTER
FACILITY, EASTERN COLORADO
HEALTH CARE SYSTEM
AURORA, COLORADO
N
C O
N
R E
S
D A
T
IB
S
IB
N
E N
C
C L C
C B
N
C B
C
C B
S
P S
N
P V
N
P V
S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E o n e e ig h th i n c h o n e f o o t
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
Professional Seal
THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:
/8
/2
:0
:5
P M
C
U s e rs \h a u n g
\D o c u m e n ts
\P L
-I F
O -s h e e ts h a u n g
G H
V P
.r v t
3/8/2024 4:00:55 PM
01.PP.100-D
SERVICE LEVEL PLUMBING PIPING
PLAN - AREA E/F
CONCOURSE
08/31/2012
0' 4' 8' 16' 32'0' 4' 8' 16' 32'
NORTH
FE
DBA C
1/8" = 1'-0"1
SERVICE LEVEL PLUMBING
PIPING PLAN - AREA E
1/8" = 1'-0"2
SERVICE LEVEL PLUMBING
PIPING PLAN - AREA F
0' 4' 8' 16' 32'0' 4' 8' 16' 32'
VHAECHKAWAKS
Architect
VHAECHKAWAKS
Architect #29: DHWR, copper, 1-1/2" #30: DHW, copper, 2" #31: DCW, copper, 3"
VHAECHKAWAKS
Image
VHAECHKAWAKS
Architect
VHAECHKAWAKS
Architect #1: DHWR, copper, 2-1/2" #2: NIC (valve good)
#3: DCW, SS316, 5"
VHAECHKAWAKS
Image
VHAECHKAWAKS
Architect
VHAECHKAWAKS
Architect #4: DHWR, copper, 2" #5: DHW, copper, 2"
#6: DCW, SS316, 4"
File details come from the government source that posted it. Updated .