Attachment A - 01-PP-100-set.pdf

PDF 13 MB Posted

Attached to
Z1DA--554-26-106 Replace DW Valves.
Solicitation number
36C25926R0057
Issued by

About this file

This document is a set of Service Level Plumbing Piping Plans for a healthcare facility in Aurora, Colorado. The plans represent as-built conditions as of March 8, 2024, and detail the plumbing infrastructure across multiple service areas (Areas A through F) of what appears to be a medical facility.

The plans specify comprehensive plumbing systems including domestic cold water (DCW), domestic hot water (DHW), domestic hot water return (DHWR), medical gases (oxygen and nitrogen), natural gas (NG), irrigation water (IRW), and specialty connections for equipment such as air scrubbers, pneumatic systems, and solar thermal loops. Key infrastructure elements include 8-inch main DCW lines from a water entry point, reduced pressure backflow prevention devices with flood protection solenoid valves, swing check valves on vertical piping, water pressure reducing stations, and multiple submeters for monitoring consumption by area. The facility includes mechanical rooms, elevator machine rooms, data/telecommunications spaces, heating equipment rooms, male and female locker rooms, and various clinical and operational spaces. Piping sizes range from 1/2 inch for specialized connections to 8 inches for main distribution lines, with connections coordinated across multiple levels and requiring coordination with equipment suppliers and irrigation contractors. The plans include photographic documentation of actual installed piping systems and reference continuation sheets for detailed drawings of specific building sections.

View the file

Other files

File Type Posted
Attachment A - 01-PP-100-set r1.pdf PDF
554-26-106 Water valves RFI - w responses.docx DOCX document
Attachment B - DWS Valves.xlsx XLSX spreadsheet
SOW 554-26-106 Replace DW Valves revised.docx DOCX document
36C25926R0057 0002.docx DOCX document
Site Visit Meeting Doc.docx DOCX document
36C25926R0057 0001.pdf PDF
S04- Site Visit Attendance_FE.pdf PDF
ICRA 554-26-106 Replace DW Valves.pdf PDF
Prime and Sub Contractor Construction Breakdown.xlsx XLSX spreadsheet
852.219- 75 LOS Certification.docx DOCX document
Specifications 554-26-106 Replace Domestic Water Valves.pdf PDF
36C25926R0057.docx DOCX document
Self-Performed and Subcontracted Worksheet.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

LS-102

EQUIP STOR

06-SV-B1-01

06-SV-B1-02

WORK

LS-C01

VEST

06-SV-B2-01

01-SV-PGE2

ELEVCS-214

ELEV

01-SV-PGE1 CS-212

ELEV MACH RM

01-SV-E07-V2

CS-C01

CORRIDOR

01-SV-E1-01

CS-214

ELEV

01-SV-PGE1

CS-216

ELEV MACH RM

01-SV-E06-V1

8" COMBINATION

FIRE/DCW. RE: CIVIL

DWGS FOR

CONTINUATION.

8" FIRE RPBFP. RE: FIRE

SUPPRESSION DWGS.

8" DCW REDUCED PRESSURE

BFP WITH FLOOD PROTECTION

SOLENOID VALVE. RE:DETAIL

1 1/2"DCW

1 1/4"DHW

8"DCW

6"DHW

3"DHWR

8"FIRE. RE: FIRE

SUPPRESSION

DWGS.

8"DCW 6"DHW 3"DHWR

8"DCW

1 1/4"DHW

1"DHWR

4"O2 FROM BULK

OXYGEN SYSTEM AT

ENERGY CENTER

4"O2

8"DCW

6"DHW

3"DHWR

5"NG(2PSI)

5"NG(2PSI)

8"DCW

82.5' (5370.5' USGS)

CENTERLINE OF

PENETRATION

8"DCW

8" DCW REDUCED PRESSURE

BFP WITH FLOOD PROTECTION

SOLENOID VALVE. RE:DETAIL

SWING CHECK VALVE

ON VERTICAL PIPING

SWING CHECK VALVE

ON PIPING

3" IRRIGATION SUBMETER

& REDUCED PRESSURE

BFP WITH FLOOD

PROTECTION SOLENOID

VALVE. RE:DETAIL

CONNECT 3"IRW TO SITE IRRIGATION

SUPPLY MINIMUM 5FT BELOW FINISHED

GRADE. RE:IRRIGATION PLANS.

COORDINATE EXACT CONNECTION

LOCATION & SIZE W/ IRRIGATION

CONTRACTOR.

3"IRW

SWING CHECK VALVE ON

VERTICAL PIPING

1 1/4"IRW

RE: ENC

PLUMBING DWGS

FOR

CONTINUATION.

3"IRW

3"DCW

85.0' (5373.0' USGS)

CENTERLINE OF

PENETRATION

SHUT-OFF W/

DRAIN DN VALVE.

M A

T C

H L

IN

E A

R E

A A

M A

T C

H L

IN

E A

R E

A B

1 1/4"IA

1 1/2"IA

OIA

O

IA

O

O O

NG

NG

NG

NG

NG

CONNECT 3/4"DCW TO AIR

SCRUBBER. COORDINATE EXACT

CONNECTION REQUIREMENTS

W/ EQUIPMENT SUPPLIER, TYP.

OF 2.

1"REDUCED

PRESSURE BFP FOR

AIR SCRUBBERS.1"DCW

1"DCW

IA

IA1 1/2"IA

WATER PRESSURE REDUCING

STATION. RE: DETAIL

3"SOLAR

HWS/HWR

3"SOLAR

HWS/HWR

3"SOLAR

HWS/HWR

3/4"DCW

RE: ENC PLUMBING

DWGS FOR

CONTINUATION.

RE: PVN PLUMBING

DWGS FOR

CONTINUATION.

1 1/2"IA

IA

3/4"IA

CONNECT 1/2"IA TO PNEUMATIC

CHUTE DAMPER. COORDINATE

EXACT CONNECTIO N

REQUIREMENTS W/ EQUIPMENT

SUPPLIER.

3/4"IA

1 1/2"IA

3/4"DHWR

A

A

B

B

C

C

D

D

E

E

01-SV-B3-M1

HEATING EQUIP

RM

CS-239

ELEC

01-SV-B2-E1

CS-241

BLOWER RM

01-SV-B2-01

CS-243

DATA /

TELECOMM

01-SV-B1-T1

CS-245

PUMP ROOM

01-SV-B1-P1

LE-S01

ELEV

06-SV-SE16

LS-101

MALE LOCKERS

06-SV-B3-02

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key Plan

CONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R E

S

D A

T

IB

S

IB

N

E N

C

C L C

C B

N

C B

C

C B

S

P S

N

P V

N

P V

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E o n e e ig h th i n c h o n e f o o t

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:

Professional Seal

THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:

/8

/2

:5

:4

P M

C

U s e rs \h a u n g

\D o c u m e n ts

\P L

-I F

O -s h e e ts h a u n g

G H

V P

.r v t

3/8/2024 3:59:40 PM

01.PP.100-A

SERVICE LEVEL PLUMBING PIPING

PLAN - AREA A

CONCOURSE

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" = 1'-0"1

SERVICE LEVEL PLUMBING

PIPING PLAN - AREA A

FE

DBA C

VHAECHKAWAKS

Architect

VHAECHKAWAKS

Architect #25: NIC (valve good)

#26: DCW, SS316, 8"

#27: DCW, SS316, 8"

#28: DHW, SS316, 6"

VHAECHKAWAKS

Image

UP

TCP-

1 - FCU8

1 - FCU9

1 - AHU9

1 - AHU1

NA

NA

NB

NB

NC

NC

ND

ND

N8

N10

01-SV-PGE2

ELEV

CS-212

ELEV MACH RM

01-SV-E07-V2

STAIR

01-SV-ST2

ELEV

01-SV-SE18

ELEV

01-SV-PGE3

CS-183

ELEV

01-SV-PGE4

ELEV MACH RM

01-SV-C15-V3

CS-181

ELEV MACH RM

01-SV-C16-V4

ELEC

01-SV-C14-E4

DATA /

TELECOMM

01-SV-C10-T2

MECH

01-SV-C11-M5

MED GAS

STAGING RM

01-SV-C12-01

ELEV MACH RM

01-SV-A10-V18

5"DCW

3"DHW

2"DHWR

3/4"DCW

3"DCW

2"DHW

1 1/2"DHWR

5"DCW

3"DHW

2"DHWR

8"DCW 5"DHW

3"DCW

1 1/2"DHW

1"DHWR

4"O2

P-8046"DCW, 4"DHW,

3"DHWR, & 2

1/2"NG(2PSI)

VALVED & CAPPED

FOR FUTURE BLDG.

8"DCW 5"DHW 3"DHWR

8"DCW 5"DHW 3"DHWR

PROVIDE 4"O2

VALVED & CAPPED

FOR FUTURE

BLDG.

6"DHW

5"DHW

2 1/2"NG(2PSI)

5"NG(2PSI)

5"NG(2PSI)

8"DCW FROM

WATER ENTRY

AT IBN

8"DCW

8"DCW

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A A

M A

T C

H L

IN

E A

R E

A B

M A

T C

H L

IN

E A

R E

A B

3"DCW, 2"DHW, 1

1/2"DHWR UP TO

LEVEL ABOV E.

3"DCW, 1 1/2"DHW,

1"DHWR UP TO

LEVEL ABOVE.

5"DCW, 3"DHW,

2"DHWR UP TO IBN

AT LEVEL ABOVE.

1 1/2"O2 UP TO

IBN AT LEVEL

ABOVE.

2"DCW

O O

O O

O O

NGNGNGNG

NG

NG

NG

NG

NGNGNG1 1/2"IA

3/4"DHW

3/4"DHWR

1 1/4"DCW

1 1/4"DHW

3/4"DHWR

1 1/4"DHW

1 1/4"DCW

2 1/2"O2

OO

O O

4"O2

4"O2

8"DCW

RE: IBS PLUMBING

DWGS FOR

CONTINUATION.

RE: PVN PLUMBING

DWGS FOR

CONTINUATION.

1 1/4"IA

3/4"IA

1 1/2"IA

1 1/4"IA

1 1/4"IA1 1/4"IA

1"IA

1"IA

IA

IA

IAIA

IA

IA IA

IA

A

A

B

B

C

C

D

D

E

E

N7

N9

N11

N6.9

HE-P02

ELEV

04-SV-PE4

HE-P01

ELEV

04-SV-PE3

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key Plan

CONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R E

S

D A

T

IB

S

IB

N

E N

C

C L C

C B

N

C B

C

C B

S

P S

N

P V

N

P V

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E o n e e ig h th i n c h o n e f o o t

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:

Professional Seal

THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:

/8

/2

:5

:5

P M

C

U s e rs \h a u n g

\D o c u m e n ts

\P L

-I F

O -s h e e ts h a u n g

G H

V P

.r v t

3/8/2024 3:59:55 PM

01.PP.100-B

SERVICE LEVEL PLUMBING PIPING

PLAN - AREA B

CONCOURSE

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" = 1'-0"1

SERVICE LEVEL PLUMBING

PIPING PLAN - AREA B

FE

DBA C

VHAECHKAWAKS

Cloud

VHAECHKAWAKS

Callout #22: DHWR, copper, 2" #23: DHW, copper, 3"

#24: DCW, SS316, 5"

VHAECHKAWAKS

Cloud

VHAECHKAWAKS

Architect

#19: DCW, SS316, 5"

#20: DHW, copper, 3" #21: DHWR, copper, 2"

VHAECHKAWAKS

Image

DN

UP

UP

UP

1 - AHU3

1 - AHU2

1 - FCU19

NA

NA

CS-183

ELEV

01-SV-PGE4

CS-181

ELEV MACH RM

01-SV-C16-V4

CS-171

ELEV

01-SV-PGE5

CS-169

ELEV

01-SV-PGE6

CS-173

ELEV MACH RM

01-SV-C21-V5

CS-175

ELEC

01-SV-C19-E5

CS-167

ELEV MACH RM

01-SV-C21-V6

CS-C05

CORRIDOR

01-SV-A10-V7

4"DCW

4"DHW

1"DCW

5"DHW 3"DHWR

8"DCW

5"DHW3"DHWR

2"O2

3/4"O2

8"DCW

5"DHW3"DHWR

4"O2

4"O2

CBN DCW, DHW, DHWR,

DCWR SUBMETERS

LOCATED IN MECH RM.

1 1/2”DHWR

2 1/2”DHW

4”DCW

1 1/2”DHWR

2 1/2”DHW

4”DCW

P-804

1”DCW

P-804

8"DCW

5"NG(2PSI)

5"NG(2PSI)

4"O2

4"O2

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A D

M A

T C

H L

IN

E A

R E

A B

O O O

O O

O

NG

NG

O

NG

NG

NG

8"DCW

RE: CBN PLUMBING

DWGS FOR

CONTINUATION.

1"IA

3/4"IA

3/4"IA

1"IA1"IA

1"IAIA

IA

IA

IA

IA

IA

O I A

I A O

3/4"IA

3/4"IA

A

A

B

B

C

C

D

D

E

E

CS-C01

CORRIDOR

01-SV-E1-01

01-SV-C17-M1

MECH

CS-177

MECH

01-SV-C19-M1

01-SV-C20-P1

PIPE SPACE

CS-165

MECH

01-SV-C22-M2

GS-ST1

STAIR

08-SV-ST1

HE-P02

ELEV

04-SV-PE4

HE-P01

ELEV

04-SV-PE3

1 - AHU3

26 01

CS-157

ELEV

01-SV-PGE7

CS-155

ELEV

01-SV-PGE8

CS-149

ELEV

01-SV-PGE9

CS-147

ELEV

01-SV-PGE10

CS-145

ELEV MACH RM

01-SV-C29-V10

CS-153

ELEV MACH RM

01-SV-C26-V8

CS-159

ELEV MACH RM

01-SV-C25-V7

CS-161

ELEC

01-SV-C24-E6

CS-165

MECH

01-SV-C22-M2

CS-151

ELEV MACH RM

01-SV-C28-V9CS-C04

CORRIDOR

01-SV-C24-01

01-SV-C28-P1

PIPE SPACE

4"DCW 4"DHW

2"DHWR

4"DCW

4"DHW

2"DHWR

1"DCW

6"DCW

5"DHW

3"DHWR

2"O2

1 1/4"O2

4"O2

2”DHWR

3”DHW

4”DCW

CBC DCW, DHW, DHWR,

DCWR SUBMETERS

LOCATED IN MECH RM. 2”DHWR

3”DHW

4”DCW

5"DHW

6"DCW

5"NG(2PSI)

5"NG(2PSI)

4"O2

4"O2

4"O2

4"O2

4"O2

M A

T C

H L

IN

E A

R E

A C

M A

T C

H L

IN

E A

R E

A D

M A

T C

H L

IN

E A

R E

A D

M A

T C

H L

IN

E A

R E

A E

NG

O

NG

NG

O

O

NG

NG

O

NG

O

NG

O

1 1/4"O2

RE: DAT PLUMBING

DWGS FOR

CONTINUATION.

RE: DAT PLUMBING

DWGS FOR

CONTINUATION.

RE: CBC PLUMBING

DWGS FOR

CONTINUATION.

3/4"IA

3/4"IA3/4"IA

IA

IA

O

IA

O

3/4"IA

IA

IA

IA

IA

IA

3/4"IA

3/4" IA

3/4" IA

A

A

B

B

C

C

D

D

E

E

CS-C01

CORRIDOR

01-SV-E1-01

01-SV-C25-P1

PIPE SPACE

01-SV-C27-M1

MECH

CS-163

CART DEPOT

09-SV-C24-H2

ES-ST1

STAIR

09-SV-ST1

FS-C05

CORRIDOR

03-SV-C1-01

03-SV-B2-01

PRESCRIP

FILLING/ASSEMBLY

FS-121

PRESCRIP MAIL

OUT

03-SV-A2-01

03-SV-A2-02

CIRC

FS-100

STERILE FLUID

STOR

03-SV-A3-01

FS-121A

CONTROLLED

SUBS STOR

03-SV-A3-02

03-SV-A4-01

RECEIVING/VERIFY

03-SV-A4-02

RECEIVING/VERIFY

FS-100A

SECURE DRUG

WASTE

03-SV-A4-03

FS-C01

CORRIDOR

03-SV-C4-01

03-SV-A5-01

CORRIDOR

DS-C03

CORRIDOR

03-SV-A6-01

03-SV-B5

COURTYARD

DS-C02

CORRIDOR

03-SV-B7-02

DS-135

CLEAN/SOILED

DISPATCH

03-SV-A8-01

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key Plan

CONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R E

S

D A

T

IB

S

IB

N

E N

C

C L C

C B

N

C B

C

C B

S

P S

N

P V

N

P V

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E o n e e ig h th i n c h o n e f o o t

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:

Professional Seal

THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:

/8

/2

:3

:1

P M

C

U s e rs \h a u n g

\D o c u m e n ts

\P L

-I F

O -s h e e ts h a u n g

G H

V P

.r v t

3/8/2024 3:34:16 PM

01.PP.100-C

SERVICE LEVEL PLUMBING PIPING

PLAN - AREA C/D

CONCOURSE

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" = 1'-0"1

SERVICE LEVEL PLUMBING

PIPING PLAN - AREA C

FE

DBA C

1/8" = 1'-0"2

SERVICE LEVEL PLUMBING

PIPING PLAN - AREA D

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

VHAECHKAWAKS

Architect

VHAECHKAWAKS

Architect

#16: DCW, SS316, 5"

#17: DHW, copper, 2-1/2" #18: DHWR, copper, 1-1/2"

VHAECHKAWAKS

Image

VHAECHKAWAKS

Architect

VHAECHKAWAKS

Architect

#10: DCW, SS316, 4"

#11: DHW, SS316, 4"

#12: DHWR, copper, 2"

VHAECHKAWAKS

Image

VHAECHKAWAKS

Architect

VHAECHKAWAKS

Architect #13: DHWR, copper, 2" #14: DHW, copper, 3"

#15: DCW, SS316, 4"

VHAECHKAWAKS

Architect

VHAECHKAWAKS

Architect

#7: DCW, SS316, 4"

#8: DHW, SS316, 4"

#9: DHWR, copper, 2"

VHAECHKAWAKS

Image

1 - AHU5

1 - AHU4

1 - AHU7

1 - AHU10

1 - AHU6

1 - AHU8

1-SAD6A

1-SWHX1

1 - FCU31

1-SAD5

1-SAD4A

SB

SB

SC

SC

S29.3

S30

S31

SD

SD

S32

S33

S34

S34.6

S35

S36

S37

S38

CS-147

ELEV

01-SV-PGE10

CS-145

ELEV MACH RM

01-SV-C29-V10

CE-S01

ELEV

01-SV-SE15

CS-ST1

STAIR

01-SV-ST5

CS-133

MECH

01-SV-C35-M4

CS-111

ELEC

01-SV-C37-E9

CS-141

MECH

01-SV-C31-M3CS-143

ELEC

01-SV-C29-E7

CS-119

ELEV MACH RM

01-SV-SB37-V15

01-SV-C32-M1

MECH

01-SV-C28-P1

PIPE SPACE

CS-127

SANITATION/RECYCLING

01-SV-A36-01

CS-125

NON-FOOD STOR

01-SV-A36-02

CS-123

DRY FOOD STOR

01-SV-A36-03

CS-117

FOOD PREP

01-SV-A37-04

CS-123B

REFR STOR

01-SV-A36-04

CS-121

STAFF TLT

01-SV-A37-05

CS-131

HAC

01-SV-A7-04

CS-123A

REFR STOR

01-SV-A36-05

CS-115

POT WASH

01-SV-A37-02

CS-115A

WASTE PULPER

01-SV-A38-01

CS-113

FOOD COURT

RECEIVING

01-SV-A37-01

3"DCW

3"DHW

1 1/2"DHWR

4"DCW

4"DHW

2 1/2"DHWR

1 1/2"DCW

3"DCW

6"DCW, 4"DHW, 3"DHWR, 2

1/2”NG(2PSI) CAPPED &

VALVED FOR FUTURE

BLDG CONNECTION.

1"DCW

4"DHW

2"DHWR

6"DCW

4"DHW

3"DHWR

6"DCW

4"DHW

2 1/2"DHWR

5"DCW

4"DHW

2 1/2"DHWR

5"DC

W

1 1/2"DHW

1"DHWR

P-101

P-418

1 1/2"DHWR

2"DHW

3"DCW

PROVIDE 3"O2

VALVED & CAPPED

FOR FUTURE.

01-DHX-2

01-DHX-1

01-DET-1

SOLAR

THERMAL LOOP

EXP TANK

SOLAR

THERMAL 2,000

GAL. STORAGE

TANK.

SOLAR STORAGE

TANKS THERMAL

EXP TANK

3" SOLAR

HWS/HWR

3”DCW, 2”DHW, 1

1/2”DHWR UP TO

LEVEL ABOVE.

P-804

P-804

3/4”DCW

3"DH

W

3"NG(2PSI)

4"NG(2PSI)

4"NG(2PSI)

5"NG(2PSI)

2 1/2"NG(2 PSI)

5"NG(2PSI)

P-502

RE: DAT PLUMBING

DWGS FOR

CONTINUATION.

4"O2

4"O2

4"O2

M A

T C

H L

IN

E A

R E

A D

M A

T C

H L

IN

E A

R E

A E

M A

T C

H L

IN

E A

R E

A E

M A

T C

H L

IN

E A

R E

A F

2 1/2"NG (2 PSI)

UP TO DAT AT

LEVEL ABOVE.

CAP

3/4"

1/2"

BALANCE

TO 1.0 GPM

1/2"

1"

1"

1"

1/2"

BALANCE

TO 0.5 GPM

3/4"DHWR

3"

3"

BALANCE

TO 0.5 GPM

1/2"

1"

1/2"

2"

NG

O

NG

NG

NG

NG

NG

NG

NG

2"DCW

2"MECHANICAL MAKE-UP

WATER ASSEMBLY W/ REDUCED

PRESSURE BFP & PRV. EXTEND

TO MECHANICAL MAKE-UP

WATER CONNECTIONS.

1"DCW & DHW

01-SCP-02

01-SCP-01

01-ST-01

01-ST-02

01-DET-02

NG

RE: SOLAR THERMAL DOMESTIC

HOT WATER PREHEAT DIAGRAM

ON SHEET 00.PS.105.

RE: DUPLEX

DOMESTIC HOT

WATER DETAIL.

3"DCW, 1 1/2"DHW,

1"DHWR UP TO

LEVEL ABOVE.

1"

1 1/2"

1/2"DHWR

3/4"

1/2"

1"3/4"

1/2"

1/2" 3/4"

1"

3/4"DCW

1"

3/4"DHWR

1/2"

1/2"

1/2"

1"

1/2"

3/4"DHWR

2"

2 1/2"DCW

1 1/4"DHW

1 1/2"DHW

1/4"D

HW

1 1/2"

1 1/4"

1"

3/4"IAIA

A

A

B

B

C

C

D

D

E

E

DS-135

CLEAN/SOILED

DISPATCH

03-SV-A8-01

CS-137

DATA /

TELECOMM

-SV-C20-P3

CS-135

ELEC

-SV-C20-P4

DS-112

SHELL

03-SV-D4-07

DS-137

SHELL

03-SV-D4-07A

DS-131B

MALE LOCKER

03-SV-B9-01

DS-131A

ARMORY

03-SV-A9-05

03-SV-A8-03

DECON STOR

DS-131F

FEMALE

SHOWER/TLT

03-SV-A9-04

DS-131E

FEMALE LOCKER

03-SV-A9-02

DS-131D

EQ/EVID

03-SV-A9-03

DS-131

STAFF LOUNGE

03-SV-A9-01

DS-131D

EQ/EVID

03-SV-A9-03

DS-102

MECH

03-SV-A9-M11

DS-C01

CORRIDOR

03-SV-C10-03

DS-104

CONF

03-SV-A10-01

DS-ST1

STAIR

03-SV-ST3

CS-C01

CORRIDOR

01-SV-E1-01

CS-C01

CORRIDOR

01-SV-E33-01

CS-123A

REFR STOR

01-SV-A36-05

CS-C01

CORRIDOR

01-SV-E33-01

S38

CS-111

ELEC

01-SV-C37-E9

CS-101

CONDENSATE

LIFT / STORM &

SAN

01-SV-C11-N

CS-103

DATA /

TELECOMM

01-SV-C11-OLOAD RM

01-SV-C39-02

CORRIDOR

01-SV-C40-01

CS-115A

WASTE PULPER

01-SV-A38-01

4"DCW

2 1/2""DHW

2"DHWR

4"DCW

2 1/2"DHW

2"DHWR

2 1/2"DHW

2 1/2"DHWR

3" SOLAR

HWS/HWR.

5"DCW

2 1/2"NG

GAS REGULATOR 2PSI TO

7"WC. (1604 MBH).EXTEND

RELIEF VENT FULLSIZE

TO EXTERIOR W/ ELBOW

DN & BUGSCREEN.

2"NG (2PSI)

4"NG(2PSI)

3"NG(2PSI)

ROUTE 3"SOLAR HWS/HWR TO

SOLAR COLLECTORS ON RES

SOUTH FACADE.

M A

T C

H L

IN

E A

R E

A E

M A

T C

H L

IN

E A

R E

A F

1"

1"

1"

NG

NG

N G

3/4" CA MAIN

1/2" CA

CONNECT 1/2" CA

DROP TO

PNEUMATIC

DOOR. SEE MFG.

TYP.

3/4" CA

NG

N G

3"NG

CBS GAS SUBMETER

RE: RES PLUMBING

DWGS FOR

CONTINUATION.

RE: CBS PLUMBING

DWGS FOR

CONTINUATION.

1"

01-AC-01

B

B

C

C

D

D

E

E

CS-C01

CORRIDOR

01-SV-E33-01

CS-105

CART DEPOT

01-SV-C39-01

CS-C02

CORRIDOR

01-SV-C40-01

CS-107

LOAD RM

01-SV-C39-02

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key Plan

CONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R E

S

D A

T

IB

S

IB

N

E N

C

C L C

C B

N

C B

C

C B

S

P S

N

P V

N

P V

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E o n e e ig h th i n c h o n e f o o t

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:

Professional Seal

THESE ARE THE MOST CURRENT AS-BUILT CONDITIONS AS OF:

/8

/2

:0

:5

P M

C

U s e rs \h a u n g

\D o c u m e n ts

\P L

-I F

O -s h e e ts h a u n g

G H

V P

.r v t

3/8/2024 4:00:55 PM

01.PP.100-D

SERVICE LEVEL PLUMBING PIPING

PLAN - AREA E/F

CONCOURSE

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

FE

DBA C

1/8" = 1'-0"1

SERVICE LEVEL PLUMBING

PIPING PLAN - AREA E

1/8" = 1'-0"2

SERVICE LEVEL PLUMBING

PIPING PLAN - AREA F

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

VHAECHKAWAKS

Architect

VHAECHKAWAKS

Architect #29: DHWR, copper, 1-1/2" #30: DHW, copper, 2" #31: DCW, copper, 3"

VHAECHKAWAKS

Image

VHAECHKAWAKS

Architect

VHAECHKAWAKS

Architect #1: DHWR, copper, 2-1/2" #2: NIC (valve good)

#3: DCW, SS316, 5"

VHAECHKAWAKS

Image

VHAECHKAWAKS

Architect

VHAECHKAWAKS

Architect #4: DHWR, copper, 2" #5: DHW, copper, 2"

#6: DCW, SS316, 4"

File details come from the government source that posted it. Updated .