Section_VII_-_Pressure_Sewer.pdf
PDF 1 MB Posted
- Attached to
- Area Water and Sewer House Connection
- Solicitation number
- 104581
- Issued by
- Prince George's County, Barclay Town, Maryland
About this file
This is a technical standards document from the Washington Suburban Sanitary Commission (WSSC) in Maryland detailing pressure sewer installation specifications and procedures. The document, dated September 2021, serves as Section VII of WSSC's standard details manual and provides comprehensive guidance for pressure sewer construction, maintenance, and connection work. The file contains a table of contents referencing 20 detailed specifications covering trench details for flexible PVC and HDPE pressure sewer pipes, service valve assemblies, flushing connections, blocking details, anchoring procedures, air/vacuum valve installations, house connections, in-line valve installations, mechanical couplings, transition manholes, mainline connections, abandonment procedures, and locator station installations. These standards are directly applicable to the related Area Water and Sewer House Connection contract opportunity, which requires construction of approximately 335 linear feet of 1-inch pressure sewer house connections as part of approximately 150 new service installations across Prince George's and Montgomery Counties, Maryland, with sealed responses due by 2:00 pm on Tuesday, May 26, 2026, via the WSSC eProcurement Portal.
The standards document does not address pricing, contract terms, or funding; however, it establishes the technical and construction requirements that contractors must follow when executing water and sewer house connection projects within WSSC's service area. Contractors responding to the Area Water and Sewer House Connection solicitation must comply with all applicable pressure sewer details and specifications outlined in this manual to ensure work meets WSSC's established standards for quality, safety, and operational requirements.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION VII
PRESSURE SEWER
DETAILS
SEPTEMBER 2021
Page PS-1
Table of Contents WSSC STANDARD DETAILS
SECTION VII-PRESSURE SEWER DETAILS
TABLE OF CONTENTS
TITLE NUMBER
Trench Detail – Flexible Pipe PVC and HDPE Pressure Sewer PS/1.0
Pressure SHC with Service Valve Assembly PS/1.1
Flushing Connection Less than 2-1/-inch PS/1.2
Flushing Connection 2-1/-inch through 4-inch PS/1.3
Pressure Sewer Blocking Details PS/1.4
Pressure Sewer and House Connection Blocking Details for Caps and Plugs PS/1.41
Anchoring Pressure Sewers (Upper Vertical Bends) PS/1.42
Sewage Air/Vacuum and Release Valve Installation PS/1.5
Sewage Air/Vacuum and Release Valve Installation PS/1.5a
Pressure Sewer House Connection to New or Existing Gravity Sewer PS/1.6
In-Line Valve Installation PS/1.8
Pressure Sewer Blocking Detail for HDPE Pipe PS/3.0
Restraining Seal Only Mechanical Couplings PS/3.1
Transition Manhole PS/4.0
Transition Manhole Section A-A PS/4.1
Transition Manhole Section B-B PS/4.2
Connection of New Mainline Pressure Sewer or PSHC to Existing Pressure Sewer PS/5.0
Abandonment of Existing Pressure Sewer House Connection PS/6.0
Locator Station Mounted in Manhole PS/8.0
Locator Station Underground Flush Mounted PS/8.1
| 1 - PS 1.0 |
| 2 - PS 1.1 |
| 3 - PS 1.2 |
| 4 - PS 1.3 |
| 5 - PS 1.4 |
| 6 - PS 1.41 |
| 7 - PS 1.42 |
| 8 - PS 1.5 |
| 9 - PS 1.5a |
| 10 - PS 1.6 |
| 11 - PS 1.8 |
| 12 - PS 3.0 |
| 13 - PS 3.1 |
| 14 - PS 4.0 |
| 15 - PS 4.1 |
| 16 - PS 4.2 |
| 17 - PS 5.0 |
| 18 - PS 6.0 |
| 19 - PS 8.0 |
| 20 - PS 8.1 |
File details come from the government source that posted it. Updated .