This document is Section M of a solicitation that establishes the evaluation factors for contract award for a Royal Thai Air Force (RTAF) spare parts and training procurement.

The Government intends to award one C-type contract using a Lowest Price Technically Acceptable (LPTA) evaluation methodology. Award will be made to the lowest-priced offeror whose proposal passes the Entry Gate Criteria and is determined technically acceptable. The evaluation process stops upon identification of the first technically acceptable proposal, with no further consideration of other offers unless the lowest-priced proposal is rejected. The Government reserves the right to award without negotiations based on initial proposals, though negotiations may occur if deemed in the Government's interest. Offerors must meet all solicitation requirements, terms, conditions, representations, and certifications; failure to comply may result in ineligibility for award.

The Entry Gate requires offerors to demonstrate relevant performance history by providing evidence of (1) a prior USG contract exceeding $1 million in total value within the past five years and (2) international delivery of components outside North America, both within a single contract. Failure to meet these criteria results in elimination without further evaluation. Technical evaluation covers two subfactors on a pass/fail basis: Bill of Material Compliance, requiring adherence to specified brand names and part numbers, and Delivery Schedule Approach, requiring sound delivery planning to the required destination with full operational functionality by the required delivery date. Any "Unacceptable" technical rating renders the entire proposal unawardable. Price proposals are evaluated for completeness, reasonableness, unbalanced pricing, and Total Evaluated Price (TEP), with incomplete or unreasonable pricing resulting in ineligibility for award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4

SECTION M

EVALUATION FACTORS FOR AWARD

1. GENERAL

1.1 - Basis for Contract Award

This is a Lowest Price Technically Acceptable (LPTA) accordance with Revolutionary FAR Overhaul (RFO) Part 15, Contracting by Negotiation, as supplemented by the RFO Defense Federal Acquisition Regulation Supplement (R-DFARS) Part 215, and DoD Source Selection Procedures, Appendix C, 20 Aug 22.

Award will be made to the lowest priced Offeror whose proposal conforms to the solicitation requirements and who is found to be Technically Acceptable. The Government will organize the proposals in order of Total Evaluated Price (TEP) from lowest to highest. The Government will evaluate the Entry Gate Criteria and the technical approach of the lowest-priced Offeror first. If the lowest-priced proposal passes the Entry Gate Criteria and is determined to be technically acceptable, the evaluation process will stop, and award will be made to that Offeror without further consideration of any other offers. If the lowest-priced proposal is not technically acceptable, the Government will evaluate the next lowest-priced proposal, continuing this process until one (1) technically acceptable proposal is identified for award. While the Government will strive for maximum objectivity, the source selection process, by its nature, is subjective; therefore, professional judgment is implicit throughout the entire process.

1.2 – Number of Contracts to be awarded

The Government intends to award one (1) C-type contract for the Royal Thai Air Force (RTAF) spare parts/training procurement.

1.3 – Correction Potential of Proposals

The Government will consider, throughout the evaluation, the "correction potential" of any deficiency. The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of an Offeror's proposal does not meet the Government's requirements and is not considered correctable, the Offeror may be eliminated from the competitive range.

1.4 – Negotiations

The Government reserves the right and fully intends to award this acquisition without negotiations based on the initial proposal received. If, during the evaluation period, it is determined to be in the best interest of the Government to hold negotiations, a competitive range will be established in accordance with RFO 15.204. In that event, Offeror responses to discussion Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision. If the Offeror’s proposal has been evaluated as Acceptable at the time negotiations are closed, any changes or exceptions in the FPR are subject to evaluation and may introduce risk that the Offeror’s proposal be determined Unacceptable, and thus, ineligible for award.

The Government may reject any proposal from this competition prior to evaluating the proposal against the Evaluation Factors if an initial assessment of the proposal shows the proposal to be grossly deficient. A grossly deficient proposal is a proposal that fails to address essential requirements of the RFP or fails to furnish information demonstrating compliance with mandatory requirements set forth in the RFP and does not represent a reasonable initial effort by the Offeror to address the requirements of the RFP.

1.5 – Solicitation Requirements, Terms, and Conditions

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors or subfactors. Failure to comply with the terms and conditions of the solicitation may result in an Offeror’s being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable and the proposal, therefore, ineligible for award.

2. EVALUATION FACTORS

2.1 – Overview

The following entry gate, evaluation factors, and subfactors will be used to evaluate proposals as needed. The Government will evaluate Technical subfactors for acceptability.

Entry Gate: Relevant Performance History

Factor 1: Technical Subfactor 1: Bill of Material Compliance Subfactor 2: Delivery Schedule Approach Factor 2: Price

3. ENTRY GATE

3.1 – Entry Gate Overview:

The entry gate evaluates whether the Offeror has relevant performance history in accordance with the Measure of Merit below.

3.2 – Entry Gate Measure of Merit

This entry gate is passed when the proposal provides evidence demonstrating that they have completed the following two criteria within a single contract:

A. A prior contract (any USG effort) greater than $1M in total value within the past five (5) years of the date of this RFP.

and B. International delivery of components outside of North America.

IF AN OFFEROR FAILS TO PROVIDE EVIDENCE OF THE ABOVE, THE OFFEROR WILL

BE CONSIDERED INELIGIBLE FOR CONTRACT AWARD AND ELIMINATED

WITHOUT FURTHER EVALUATION OF ITS PROPOSAL

4. FACTOR 1, TECHNICAL

4.1 – Technical Overview

The Government’s technical evaluation team will evaluate the technical proposals on a pass/fail basis, assigning one of the ratings described below for each subfactor. Proposals must meet the Measure of Merit within a given subfactor in order for the subfactor to be rated “Acceptable.” Any subfactor evaluated as “Unacceptable” will render the entire proposal unacceptable and, therefore, unawardable. Only those proposals determined to be technically acceptable, either initially or as a result of negotiations, will be considered for award. However, the Offeror is reminded that the Government intends to award this effort based on the initial proposal, as received, without negotiations.

4.2 – Technical Ratings Table

TECHNICAL RATINGS TABLE

Rating Description

Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

4.3 –Subfactor 1: Bill of Material Compliance

Description: This subfactor assesses whether the Offeror’s proposal is in conformance with the Bill of Materials (BOM).

Measure of Merit: This requirement is met when the Offeror’s proposal describes a sound approach to obtaining all brand name items and part numbers that strictly adhere to the BOM located as attachment 1.

4.4 –Subfactor 2: Delivery Schedule Approach

Description: This subfactor evaluates the Offeror’s approach to deliver all required components and support equipment.

Measure of Merit: This requirement is met when the Offeror’s proposal describes a sound approach to deliver all required components and support equipment to the required destination with full operational functionality no later than the required delivery date.

5. FACTOR 2, PRICE

5.1 - Price Overview

Price proposals will be evaluated for (1) completeness, (2) reasonableness, (3) unbalanced pricing, and (4) Total Evaluated Price (TEP). Offerors whose price is determined to be incomplete or unreasonable will not be considered for award. If the Procuring Contracting Officer (PCO) determines that the lack of balance poses an unacceptable risk to the Government, the Offeror may not be eligible for award.

5.2 – Completeness

The Government will review the pricing submissions for completeness and compliance with Section L of the solicitation.

5.3 - Reasonableness

The Offeror’s Price proposal will be evaluated, using one or more of the techniques defined in RFO 15.404, in order to determine if it is reasonable. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through price analysis techniques as described in RFO 15.404. For additional information see RFO 31.201-3.

5.4 Unbalanced Pricing

The Government will conduct an analysis for unbalanced pricing in accordance with RFO 15.404-6. Unbalanced pricing exists when, despite an acceptable TEP, a proposed line item is significantly overstated or understated as indicated by the application of price analysis techniques. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. The burden of proof for demonstrating balance pricing rests with the Offeror.

5.6 Total Evaluated Price (TEP)

The Offeror’s Price proposal will be evaluated based upon the Pricing Matrix (Attachment 1).

The Total Evaluated Price will be the summation of all items listed on the BOM. The TEP will be used for evaluation purposes only, and does not necessarily reflect an actual award value of any ensuing contract.

SOURCE SELECTION PLAN FOR
Source Selection Authority (SSA)
Contracting Officer
Program Manager / SSEB Chair
TABLE OF CONTENTS
1.0 BACKGROUND AND OBJECTIVES
2.0 ACQUISITION STRATEGY
3.0 SOURCE SELECTION TEAM (SST)
3.1. Source Selection Authority (SSA)
3.2. Source Selection Advisory Council (SSAC)
3.3 Source Selection Evaluation Board (SSEB)
3.4 Source Selection Evaluation Board (SSEB)
3.5 Source Selection Team Roles and Responsibilities
4.0 COMMUNICATIONS
5.0 EVALUATION FACTORS AND SUBFACTORS
5.1 Entry Gate
5.2 Solicitation Provisions
5.3 Evaluation Process
5.3.1 Technical Ratings
5.3.1 Price
6.0 DOCUMENTATION
7.0 SCHEDULE OF EVENTS
8.0 NON-GOVERNMENT ADVISORS
8.1 Non-government Advisors
8.2 Organizational Conflict of Interest (OCI)
9.0 Plan and Procedures for Filing, Protection, Handling Maintenance, Retention, and Disposition of Source Selection Documents
Terminology:
Purpose of SSD:
Records Custodian (for SSD):
Generation, Retention, and Disposition of SSD:
SSP Attachment 1 – Source Selection Organization Chart
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
1. OVERVIEW
1.1 - Program Information
1.2 – General Instructions and Information
1.3 – Points of Contact
1.4 – Debriefing
1.5 – Discrepancies
1.6 - Electronic Reference Documents
1.7 - Communications
2. PROPOSAL PREPERATION INSTRUCTIONS
2.1 – Organization/Number of Copies/Page Limits
2.2 – Page Limitations
2.3 – Cross Referencing
2.4 – Indexing
2.5 – Electronic Offers
2.6 – Distribution
3. VOLUME 1, EXECUTIVE SUMMARY
4. VOLUME 2, TECHNICAL VOLUME
4.1 – General
4.2 - Format and Specific Content
4.3 - Technical
4.4 - Volume Organization
4.5 - Gate Criteria
4.6 – Factor 1, Technical
5. VOLUME 3, PRICE VOLUME
5.1 General Instructions and Information –
5.2 Price Data –
5.3 Pricing Data Requirements –
5.4 Volume Organization –
5.5 Total Evaluated Price (TEP) Instructions –
6. VOLUME 4, CONTRACT DOCUMENTATION
6.1 Model Contract/Representations and Certifications –
6.2 Section A, Solicitation/Contract Form –
6.3 Section B - Supplies or Services and Prices -
6.7 Section J – Attachments –
6.8 Section K – Certifications, and other Statements of Offerors –
6.9 Exceptions to Solicitation Requirements –
6.10 Other Information Required -
EVALUATION FACTORS FOR AWARD
1. GENERAL
2. EVALUATION FACTORS
3. ENTRY GATE
4. FACTOR 1, TECHNICAL
5. FACTOR 2, PRICE

File details come from the government source that posted it. Updated .