Section L Instructions Conditions and Notices to Offerors.pdf

PDF 129 KB Posted

Attached to
BBU-48A/B Impulse Cartridge Federal contract opportunity
Solicitation number
FA8213-24-R-B012
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document is the Section L Instructions, Conditions, and Notices to Offerors for a federal contract opportunity. It provides instructions for preparing and submitting proposals in response to Solicitation FA8213-24-R-B012 for the production of BBU-48 A/B Impulse Cartridges.

The key details are:

  • This is a limited competition, requiring offerors to be qualified sources. A qualification package is required for new sources, and non-qualified offerors will not be considered.
  • The contracting officer will determine if adequate price competition exists, and may require additional cost and pricing data if necessary.
  • The government intends to award contracts to each successful offeror through a split-award, but reserves the right to award no contract or a winner-take-all.
  • Evaluation criteria include being a qualified source, submitting a detailed manufacturing plan, and completing the pricing table.
  • Offerors must meet all solicitation requirements and identify any exceptions with accompanying rationale.

View the file

Other files for this federal contract opportunity

Other files attached to BBU-48A/B Impulse Cartridge, newest first.
File Type Posted
BBU-48 Pricing Table.xlsx XLSX spreadsheet
BBU-48 Pricing Table Example.xlsx XLSX spreadsheet
Attachment 5 - ES7034 (Rework Repair).docx DOCX document
Attachment 4 - ES6200 (End Item Component ADC) BBU 48.docx DOCX document
JQR BBU-48 May 2019 signed.pdf PDF
ATTACHMENT 8 - FAT (Contractor Testing).docx DOCX document
Draft Solicitation - FA821324RB012.pdf PDF
Section M Evaluation Factors for Award.pdf PDF
Attachment 9 ES6925 MSE BBU 48.pdf PDF
FD2020-24-50083_DD1423Pkg_2024Aug29-Signed.pdf PDF
Attachment 3 ES7035 Description Sheets.docx DOCX document
Air Spec BBU-48 FD2020-24-50083.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1.0. GENERAL INSTRUCTIONS

1.1. This acquisition is limited to qualified sources: a qualification package is required for new sources. See FAR Clause 52.209-1 for qualification requirements.

PROPOSALS FROM NON-QUALIFIED SOURSES WILL NOT BE CONSIDERED IF A

QUALIFICATION PACKAGE IS NOT SUBMITTED AND ACCEPTED BY THE AIR

FORCE ENGINEER PRIOR TO AWARD, CONTRACT AWARD WILL NOT BE

DELAYED FOR QUALIFICATION.

1.2. The Contracting Officer (“CO”) has determined there is a probability of adequate price competition in this acquisition. Upon examination of the initial offers, the CO will review this determination, and if in the CO’s opinion, adequate price competition exists, no additional cost and pricing data will be requested, and certification under FAR 15.406-2 will not be required. However, if at any time during this competition, the CO determines that adequate price competition no longer exists; offerors may be required to submit information to the extent necessary for the CO to determine the price fair and reasonable IAW DFARS 252.215-7008. The government intends to award a contract to each successful offeror through a split-award of available funds; however, the government reserves the right to award no contract at all or winner-take-all; depending on the number of adequate proposals and reasonableness of prices submitted.

2.0 SPECIFIC INSTRUCTIONS

2.1. Instructions to the Offerors (ITO):

This section of the ITO provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements as stated in this solicitation.

2.2. Include Sufficient Detail:

The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims.

2.3. Proposal Acceptance and Validity Dates:

The proposal acceptance period is specified in Section A of the model contract/solicitation. The offer shall make a clear statement in Section A of the proposal documentation that the proposal is valid until this date.

3.0 GENERAL INFORMATION

3.1. Point of Contact:

The contracting officer (CO) and contract specialist (buyer) are the sole points of contact for this acquisition. Address any questions or concerns you may have to the CO and buyer.

3.2. Discrepancies:

If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the buyer/CO in writing with supporting rationale. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions.

3.3. Debriefings:

The CO will promptly notify offerors of any decision to exclude them from the competition IAW FAR 15.503, whereupon they may request and receive a debriefing.

Offerors desiring debriefing must make their request IAW the requirements of FAR

15.505 or 15.506, as applicable.

4.0 EVALUTION CRITERIA

4.1. Factor 1| Qualified Source Proposal:

The contractor must be a qualified source prior to contract award in order to be considered. See paragraph 1.1 above and the source qualification requirements referenced in Section J of the solicitation.

4.2. Factor 2| Manufacturing Plan

Offerors must submit a manufacturing plan in sufficient detail to outline how the contractor will meet production requirements of the BBU-48. The plan shall include: equipment, personnel, and manufacturing processes employed in sufficient detail to demonstrate an understanding of the requirement. The plan shall be submitted as a pdf and limited to no more than 10 pages.

4.2. Factor 3| Price Proposal

Completion of the BBU-48 pricing table, will represent the price proposal. All offerors must complete requested quantity and price cells for the respective buy to dollar and FMS amounts. The proposed production units must be divisible by 180 to make full ammo cans and all prices expressed in $x.xx format. Additionally, submission of unit pricing for First Article Production is required for all offerors.

5.0 CONTRACT DOCUMENTATION

5.1 Solicitation/Representation and Certifications:

The purpose of this section is to provide information to the Government for preparing the contract document and supporting file. The offeror’s proposal shall include a signed copy of the solicitation, and Sections A through K. This includes:

Section A – Solicitation/Contract Form: Completion of blocks 13 and 27 of the SF1447. Signature by the offeror on the SF 1447 constitutes an offer, which the Government may accept.

Section B – Supplies or Services and Costs/Prices: Pricing information of Section B – The Schedule of the RFP, shall be submitted on the BBU-48 pricing table in lieu of Section B.

Section F – Deliveries or Performance: Completion of Section B delivery requirements by providing an accurate, realistic delivery date for each CLIN/Sub-CLIN as required by Clause 52.211-8.

Section K – Complete Representations and Certifications

Section I – Contract Clauses: Complete Clause, all clauses requiring contractor fill-in.

5.2 Exceptions to Terms and Conditions:

Offerors are required to meet all solicitation requirements, including terms and conditions, and representations and certifications. Failure to meet a requirement MAY result in an offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost and specific requirements of the solicitation.

SECTION L
3.0 GENERAL INFORMATION
4.0 EVALUTION CRITERIA

File details come from the government source that posted it. Updated .