FD2020-24-50083_DD1423Pkg_2024Aug29-Signed.pdf

PDF 1 MB Posted

Attached to
BBU-48A/B Impulse Cartridge Federal contract opportunity
Solicitation number
FA8213-24-R-B012
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document is a Contract Data Requirements List (CDRL) that details the data items required for a contract to produce the BBU-48A/B Impulse Cartridge. The key details are:

The contract opportunity is a pre-solicitation for the production of the BBU-48A/B Impulse Cartridge, solicitation number FA8213-24-R-B012. The government intends to award contracts to qualified sources through a split award, but reserves the right to award no contract or a winner-take-all. Qualified sources are limited to Valor Tactical (Cage Code 04099) and Decryptor (Cage Code 98K83). The CDRL includes 26 data items covering areas such as reports, test plans, analysis, and documentation. Delivery requirements, distribution, and other specifications are provided for each data item. The contract requires compliance with export control regulations.

View the file

Other files for this federal contract opportunity

Other files attached to BBU-48A/B Impulse Cartridge, newest first.
File Type Posted
Section L Instructions Conditions and Notices to Offerors.pdf PDF
Attachment 3 ES7035 Description Sheets.docx DOCX document
Air Spec BBU-48 FD2020-24-50083.docx DOCX document
BBU-48 Pricing Table.xlsx XLSX spreadsheet
BBU-48 Pricing Table Example.xlsx XLSX spreadsheet
Attachment 5 - ES7034 (Rework Repair).docx DOCX document
Attachment 4 - ES6200 (End Item Component ADC) BBU 48.docx DOCX document
JQR BBU-48 May 2019 signed.pdf PDF
ATTACHMENT 8 - FAT (Contractor Testing).docx DOCX document
Draft Solicitation - FA821324RB012.pdf PDF
Section M Evaluation Factors for Award.pdf PDF
Attachment 9 ES6925 MSE BBU 48.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Government Furnished Material (GFM) Consumption Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80438B

5. CONTRACT REFERENCE

Airmunition Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Following format and content requirements as stated in the Data Item Description.

BLK 7: The Letter of Transmittal shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal. The Letter of Transmittal shall be used only for this data item; do not combine other data item submittals with this requirement.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.438

BLK 10, 12, 13: Reporting to commence upon receipt of GFM and then every 30 days thereafter until end of contract.

BLK 14: Submit report electronically via e-mail in Microsoft Office software or PDF format to the email recipient(s) listed below. Refer to contract for e-mail address of the Government Contracting Officer(EBHKC).

juan.gutierrez.23.ctr@us.af.mil (AFLCMC/EBHCC)

FOB DESTNATION

EBH 23-341-001

AFLCMC/Terry McCurdy/EBHEC, 586-0535

Contr. Officer 1 1 0

AFLCMC/EBHCC 1 1 0

DCMA/QAR 1 1 0

DCMA/ACO 1 1 0

15. TOTAL 4 4 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE GROUP

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Ammunition Data Card (ADC)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80043B

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 7: The electronic receiving report shall be annotated with Lot Number, National Stock Number and Nomenclature. The electronic receiving report shall also be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at: https://wawf.eb.mil.

BLK 8: Within 30 calendar days of receipt, Government Engineer thru WAWF notice of notice of approval/disapproval. If disapproved, Government Engineer response thru WAWF will include instruction for remediation.

BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology)(Date of Contract Award). Other requests for this document shall be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 10, 12, 13: Submit after successful Lot Acceptance Test and prior to delivery of each production lot. Submit within 30 calendar days after completion of each Lot Acceptance Test.

BLK 14: A sample ADC or "draft" will be generated and submitted using the Worldwide Ammunition-data Repository Program (WARP) system to ensure general format and content is acceptable. For the final submittals, one hard copy of ADCs shall be generated from the WARP and submitted with the electronic receiving report via WAWF to AFLCMC/EBHCC. The final ammo data card shall be uploaded in WAWF under DoDAAC FA8213.

FOB DESTINATION

EBH 23-341-001

Terry McCurdy/AFLCMC/EBHEC/586-0535

WAWF 0 1 0

DoDAAC FA8213

Sample ADC via

WARP sys only 0 1 0

15. TOTAL 0 2 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER PACK

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Performance Oriented Packaging (POP) Test Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-PACK-81059C

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Follow format and submission of the Performance Oriented Packaging Test Report in accordance with requirements stated in the Data Item Description.

BLK 7: Acceptance/Rejection of final report will be within 7 days from date of receipt. Electronic receiving report required via internet Wide Area Work Flow (WAWF, DoDAAC FA8213) at https://wawf.eb.mil. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.

BLK 9: DISTRIBUTION STATEMEN B. Distribution authorized to U.S.

Government agencies (Critical Technology) (Date of Contract Award).

Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 11, 12 & 13: Test report due 30 days prior to shipment. For Multi-year contracts, the contractor shall re-perform the POP testing at a U.S Government approved Performance-Oriented Packaging (POP) test laboratory IAW CFR 49 if:

(a) The initial POP test report expires before the end of the contract (single pack certification is valid for a period of 1 year;

combination pack POP certification is valid for a period of 2 years).

(b) There is a change in container manufacturer, design, or manufacturing processes of the container.

EXCEPTION TO POP MARKINGS: If the container is manufactured outside the USA, the contractor/container manufacturer shall be responsible to perform the POP certification tests IAW the United Nations Recommendations on the Transport of Dangerous Goods and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.

FOB DESTINATION

EBH 23-341-001

Terry McCurdy, AFLCMC/EBHEC, 586-0535

WAWF 0 1 0

DoDAAC, FA8213

15. TOTAL 0 1 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Engineering Change Proposal (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80639E

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Data delivery description for content of Engineering Change Proposal via applicable DD Form 1692 shall be in accordance with para. 3.3.2.(1) of EIA-649-1A and the principles of EIA-649-C.

BLK 7: The Letter of Transmittal shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data. The Letter of Transmittal shall be used only for this data item; do not combine other data item submittals with this requirement.

BLK 8: Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation. Notification of approval of the proposed engineering change shall be by signed contract modification.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C) Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 14: Submit reports electronically via e-mail in Microsoft Office or PDF format to the following e-mail recipients listed below. Refer to contract for e-mail address of the Government Contracting Officer

(AFLCMC/EBHKC).

robert.morgan.27@us.af.mil (AFLCMC/EBHEC)

Terry McCurdy, AFLCMC/EBHEC, 586-0535

AFLCMC/EBHCC 1 1 0

AFLCMC/EBHEC 1 1 0

AFLCMC/EBHKC 1 1 0

DCMA/QAR 1 1 0

DCMA/ACO 1 1 0

15. TOTAL 5 5 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Notice of Revision (NOR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80642E

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Follow format requirements listed under paragraph 2 of Data Item Description. Data deliverable contents of Notice of Revision shall contain all information required by DD Form 1695.

BLK 8: Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation. Notification of approval of the proposed notice of revision shall be by signed contract modification (AFLCMC/EBHKC).

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 14: Submit reports electronically via email in Microsoft Office or PDF format to the e-mail recipients listed below. Refer to contract for email address of the Government Contracting Officer

(AFLCMC/EBHKC).

robert.morgan.27@us.af.mil (AFLCMC/EBHEC)

Terry McCurdy, AFLCMC/EBHEC, 586-0535

AFLCMC/EBHCC 1 1 0

AFLCMC/EBHEC 1 1 0

AFLCMC/EBHKC 1 1 0

DCMA/QAR 1 1 0

DCMA/ACO 1 1 0

15. TOTAL 5 5 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Request for Variance (RFV)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80640E

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Follow format requirements listed under paragraph 2 of Data Item Description. Data deliverable contents of Request for Variance (RFV) shall contain all information required by DD Form 1694.

BLK 7: Government engineer will perform review of the RFV.

Notification of approval shall be signed RFV (AFLCMC/EBHKC).

BLK 8: Within 30 days of receipt, the Government Engineer thru the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response thru the Government Contracting Officer will include instruction for remediation.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C) Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 14: Submit reports electronically via e-mail in Microsoft Office or PDF format to the following e-mail recipient(s) listed below.

Refer to contract for e-mail address of the Government Contracting Officer (AFLCMC/EBHKC).

robert.morgan.27@us.af.mil (AFLCMC/EBHEC)

FOB DESTINATION

EBH 23-341-001

Terry McCurdy, AFLCMC/EBHEC, 586-0535

AFLCMC/EBHCC 1 1 0

AFLCMC/EBHEC 1 1 0

DCMA/QAR 1 1 0

DCMA/ACO 1 1 0

15. TOTAL 4 4 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Supplier's Configuration Management Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80858D

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4: : Supplier's Configuration Management plan shall be prepared in Supplier format. Follow content as stated in paragraph 3.

BLK 7: Electronic receiving report required via internet Wide Area Work Flow (WAWF) at: https://wawf.eb.mil under DoDAAC, FA8213. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.

BLK 8: Government Comments/Approval/Disapproval will be submitted within 30 working days of receipt, by the Government Engineer.

Failure to comment/approve/disapprove within 30 calendar days does not constitute full/final acceptance by the Government.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 14: Submit the report electronically in Microsoft Office software or PDF format. Submit report via e-mail to the addressee listed below:

blake.bradford.1@us.af.mil (AFLCMC/EBHCC)

Terry McCurdy, AFLCMC/EBHEC, 586-0535

WAWF 0 1 0

DoDAAC, FA8213

AFLCMC/EBHCC 1 1 0

15. TOTAL 1 2 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER QCIC

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Acceptance Test Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-80553A

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Contractor format is acceptable. Follow content preparation instructions as specified in the Data Item Description.

BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:

https://wawf.eb.mil. The electronic receiving report shall be used only for this data item, do not combine other data item submittals with this requirement.

BLK 8: Comments/approval/disapproval will be submitted within 30 working days of receipt by AFLCMC/EBHCC.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 10,11, 12, 13: The contractor shall provide a Acceptance Test Plan after contract award and at least 90 days prior to Lot Acceptance Testing allowing for 30 day approval time. No changes to previously approved government Acceptance Test Plans shall be made without prior notification of AFLCMC/EBHCC Engineering approval in accordance with Airmunitions Specification.

BLK 14: Report shall be in Microsoft Office or PDF format. Submit through WAWF, DoDAAC, FA8213.

Terry McCurdy, AFLCMC/EBHEC, 586-0535

WAWF 0 1 0

DoDAAC, FA8213

15. TOTAL 0 1 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Lead-Free Control Plan (LFCP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81772

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A Draft

Final

Reg Repro

16. REMARKS

BLK 4: Contractor's format required. Follow content preparation instruction and requirements listed in the Data Item Description.

BLK 7: Receiving report shall be submitted electronically via the internet through Wide Area Work Flow (WAWF) at: https://wawf.eb.mil under DoDAAC FA 8213.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 14: Submit reports electronically via e-mail in Microsoft Office software or PDF format to the e-mail recipient (s) listed below.

Refer to contract for e-mail address of the Government Contracting Officer (AFLCMC/EBHKC).

blake.bradford.1@us.af.mil (AFLCMC/EBHCC)

Terry McCurdy/AFLCMC/EBHEC/586-0535

AFLCMC/EBHKC 1 1 0

(ref blk 16)

LT 0 1 0

DCMA QAR 1 1 0

DCMA ACO 1 1 0

15. TOTAL 3 4 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A010

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

Lot Acceptance Test

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Contractor format is acceptable.

BLK 7: The electronic receiving report shall be annotated with the Lot Number, National Stock Number and Nomenclature. Electronic receiving report required via internet Wide Area Work Flow (WAWF) at:

https://wawf.eb.mil. The electronic receiving report shall be used only for that data item; do not combine other data item submittals with this requirement.

BLK 8: Comments/approval/disapproval will be submitted within 30 working days of receipt by AFLCMC/EBHCC.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 10,12,13: Submit within 30 calendar days after completion of each Lot Acceptance Test.

BLK 14: Report shall be in Microsoft Office software or PDF format.

Submit through WAWF, DoDAAC, FA8213.

Terry McCurdy, AFLCMC/EBHEC, 586-0535

WARP 0 1 0

WAWF 1 0 1

DoDAAC, FA8213

15. TOTAL 1 1 1

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A011

2. TITLE OF DATA ITEM

Failure Summary and Analysis Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80255B

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Contractor's format required for both the Preliminary and Final report.

BLK 7: The Letter of Transmittal shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data. The Letter of Transmittal shall be used only for this data item; do not combine other data item submittals with this requirement.

BLK 8: Comments/approval/disapproval will be submitted within 30 calendar days after receipt by AFLCMC/EBHCC.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 10, 12, 13: Submit within 7 calendar days of each failure.

Final with 15 calendar days after receipt of AFLCMC/EBHCC comments.

BLK 14: Report shall be in Microsoft Office or PDF format. Submit via e-mail to cognizant Hill AFB Contracting Officer.

Terry McCurdy, AFLCMC/EBHEC, 586-0535

Contr. Officer 0 1 0

Hill AFB, UT

15. TOTAL 0 1 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A012

2. TITLE OF DATA ITEM

Acceptance and Description Sheets

3. SUBTITLE

Propellants and Explosives

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81978

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Format and content shall be in accordance with MIL-STD-1171 and the WARP User's Manual. This manual can be accessed at https://mphwarp.redstone.army.mil.

BLK 7: Electronic receiving report required via internet Wide Area Work Flow (WAWF, DoDAAC FA8213) at: https://wawf.eb.mil.The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING -This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 10,12,13: Acceptance and Description sheets will be prepared for each lot of propellants, explosive, and chemicals as specified in the contract or specification. The sheets shall be electronic files as specified in MIL-STD-1171 and the on-line WARP User's Manual. Submit 90 calendar days prior to initial use of new original material.

Waiver for this 90 calendar day period must be approved by AFLCMC/EBHCC. No changes to previously approved Acceptance and Description sheets shall be made without prior notification of and approval from AFLCMC/EBHCC.

BLK 14: The Contractor shall prepare and store Acceptance and Description sheets in the Worldwide Ammunition-data Repository Program (WARP). See Addendum A for Interim instructions. Report shall be in Microsoft Office software or PDF format. Submit through WAWF under DoDAAC, FA8213.

FOB DESTINATION

EBH 23-341-001

Terr McCurdy/AFLCMC/EBHEC, 56-86-0535

WAWF 0 1 0

DoDAAC, FA8213

WARP 0 1 0

15. TOTAL 0 2 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER QCIC

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A013

2. TITLE OF DATA ITEM

Quality Assurance Program Plan (QAPP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-81794A

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4 : Contractor's format is acceptable. Follow content instructions stated in the Data Item Description.

BLK 7: The electronic receiving report required via internet Wide Area Work Flow (WAWF, DoDAAC FA8213) at: https://wawf.eb.mil. The electronic receiving report shall be used only for this data item; do not combine other data item submittals with this requirement.

Electronic receiving report shall be annotated to reflect if additional submittals are to be furnished or if this is the final submittal of data.

BLK 8: Within 30 calendar days of receipt, the Government Engineer through the Government Contracting Officer will respond with notification of approval/disapproval. If disapproved, Government Engineer response through the Government Contracting Officer will include instructions for remediation.

BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award ). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 10, 12, 13: The Contractor shall provide a Quality Assurance Program Plan 30 calendar days after contract award. No changes to previously approved QAPP shall be made without prior approval from AFLCMC/EBHCC Engineering, in accordance with Airmunitions Specification.

Submit through WAWF under DoDAAC FA8213.

Terry McCurdy, AFLCMC/EBHEC, 586-0535

WAWF 0 1 0

DoDAAC, FA8213

15. TOTAL 0 1 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER QCIC

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A014

2. TITLE OF DATA ITEM

Measurement System Evaluation (MSE)

3. SUBTITLE

Measurement and Inspection Equipment System Design Documentation for Acceptance of Product4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-81960

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

1TIME

12. DATE OF FIRST SUBMISSION

BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

BLK16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK 16

Draft

Final

Reg Repro

16. REMARKS

BLK 4: Contractor's format is acceptable. The plan shall be in accordance with content requirements listed in paragraph 3 of the Data Item Description.

BLK 7: Receiving report shall be submitted electronically via the internet through Wide Area Work Flow (WAWF) at: https://wawf.eb.mil under DoDAAC FA8213. The electronic receiving report shall be used only for this data item, do not combine other data item submittals with this requirement.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only (Critical Technology) (Date of Contract Award). Other requests for this document must be referred to AFLCMC/EBHCC.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, U.S.C.) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50 U.S.C). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

BLK 10,11,12, & 13: The Contractor shall submit a completed AIE package no later than 120 days after contract award and no later than 60 calendar days prior to First Article Testing (if FAT is required), production, and/or all acceptance of product under the contract. The Government will furnish disposition within 30 calendar days of final AIE package receipt. If further revisions are necessary, the Contractor shall have 30 calendar days to generate them and the Government shall have 30 calendar days to review and respond to them.

The approved AIE shall be available for First Article Testing (if FAT is required), production, and/or all acceptance of product under the contract. If Contractor revises a previously Government accepted AIE for this contract, the revised AIE must be submitted to the Government for review and approval. Approval must be granted before AIE is used for acceptance of product. The Government will respond within 30 calendar days.

BLK 14: Report shall be submitted electronically in Microsoft Office software or PDF format to the e-mail recipients listed below.

seth.ollis.1@us.af.mil (AFLCMC/EBHCC) blake.bradford.1@us.af.mil (AFLCMC/EBHCC)

FOB DESTINATION

EBH 23-341-001

Terry McCurdy, AFLCMC/EBHEC, 586-0535

WAWF 1 1 0

DoDAAC, FA8213

AFLCMC/EBHCC

6033 Elm Lane

Bldg. 1256

HILL AFB, UT

84056

15. TOTAL 1 1 0

G. PREPARED BY

MCCURDY.TERRY.D.1075978215

H. DATE

2023/12/12

I. APPROVED BY

HARGROVE.ERIC.V.1167016843

J. DATE

2023/12/13

18. ESTIMATED

TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

1377016407205

E. CONTRACT/PR NO.

FD2020-24-50083

F. CONTRACTOR

1. DATA ITEM NO.

A015

2. TITLE OF DATA ITEM

Technical Data Package Review Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80750

5. CONTRACT REFERENCE

Airmunitions Specification

6. REQUIRING OFFICE

AFLCMC/EBHCC

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

BLK 4: The Technical Data package Review shall be contractor selected. Unless effective presentation would be degraded, the initially used format arrangement shall be used for all subsequent submissions.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .