Attachment 5 - ES7034 (Rework Repair).docx

DOCX document 18 KB Posted

Attached to
BBU-48A/B Impulse Cartridge Federal contract opportunity
Solicitation number
FA8213-24-R-B012
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document is an attachment titled "Attachment 5 - ES7034 (Rework Repair)" that outlines the requirements and procedures for rework and repair of nonconforming material under a federal contract.

The attachment defines rework as reprocessing nonconforming material to make it fully conform to drawings, specifications, or contract requirements, and repair as reprocessing to reduce but not eliminate nonconformance in order to make the item usable. It requires the contractor to document rework and repair procedures and submit them to the Government Quality Assurance Representative or Contracting Officer for review and approval prior to implementation. The attachment also stipulates that the contractor must include a description of the cause and corrective actions for the nonconformance when submitting rework or repair procedures. Additionally, the rework or repair procedure must include a provision for reinspection that takes precedence over the Technical Data Package requirements.

View the file

Other files for this federal contract opportunity

Other files attached to BBU-48A/B Impulse Cartridge, newest first.
File Type Posted
BBU-48 Pricing Table.xlsx XLSX spreadsheet
BBU-48 Pricing Table Example.xlsx XLSX spreadsheet
Attachment 4 - ES6200 (End Item Component ADC) BBU 48.docx DOCX document
Section L Instructions Conditions and Notices to Offerors.pdf PDF
FD2020-24-50083_DD1423Pkg_2024Aug29-Signed.pdf PDF
Attachment 3 ES7035 Description Sheets.docx DOCX document
Air Spec BBU-48 FD2020-24-50083.docx DOCX document
Draft Solicitation - FA821324RB012.pdf PDF
Section M Evaluation Factors for Award.pdf PDF
Attachment 9 ES6925 MSE BBU 48.pdf PDF
JQR BBU-48 May 2019 signed.pdf PDF
ATTACHMENT 8 - FAT (Contractor Testing).docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment #5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of attachment)