Section J Att 001 - Contract Price Schedule.pdf

PDF 816 KB Posted

Attached to
REHAB CLOVER CREEK WASTEWATER TREATMENT PLANT
Solicitation number
140P8620R0010
Issued by

About this file

This document contains a contract price schedule for rehabilitating the Clover Creek Wastewater Treatment Plant, dump stations, and vault toilets in Sequoia National Park. The schedule lists 35 line items including base requirements such as replacing pumps and tanks at the wastewater treatment plant and dump stations, and installing new vault toilets. It also includes 13 options that could be awarded such as rehabilitating additional aeration basins and digesters at the treatment plant, replacing mechanical components, and repaving areas. Offerors are required to submit pricing for all base line items and options. The National Park Service Pacific West Region is the contracting agency.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEKI – 184193, 184197, 244956, & 245567 CONTRACT PRICE SCHEDULE - 2

CONTRACT PRICE SCHEDULE

PARK - PMIS: 184193, 184197 - Phase 2 & 3 Treatment Facilities; 244956 - Dump Stations; and 245567 - Vault Toilets

DEVELOPED AREA: Sequoia National Park – SEKI CCWWTP

PROJECT TITLE: Rehabilitate Clover Creek Wastewater Treatment Plant & Dump Stations & Install Vault Toilets

Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of an error in the calculation of extended prices, the unit price governs. In case of an error in summation, the total of the corrected amount governs. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of the award. At the option of the Government, the period for the exercise of options at the proposed prices shall extend 180 calendar days from the date of the award.

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI)

TITLE QUANTITY UNIT OF

MEASURE

UNIT

PRICE

TOTAL

PRICE

1 Mobilization/Demobilization 1 Lump-Sum

WWTP Aeration Systems Rehabilitation – All Basins 1 Lump-Sum

3 WWTP Mechanical System Rehabilitation – All Basin Rooms 1 Lump-Sum

WWTP Electrical & HVAC System Rehabilitation – All Basin Rooms

1 Lump-Sum

5 WWTP Exterior Improvements 1 Lump-Sum

6 WWTP Sludge Drying Bed Rehabilitation 1 Lump-Sum

7 WWTP Lighting Rehabilitation – All Rooms Except Basins 1 Lump-Sum

8 WWTP Electrical Rehabilitation – All Rooms Except Basins 1 Lump-Sum

Rehabilitate Clogged Filtrate Line from WWTP to Sludge Drying Beds

1 Lump-Sum

RFP No. 140P8620R0010 Section J - Attachment No. 001

SEKI – 184193, 184197, 244956, & 245567 CONTRACT PRICE SCHEDULE - 3

10 WWTP Replacement of RAS/WAS Pumps 3 EA

11 WWTP Replacement of Sludge Transfer Pump 1 Lump-Sum

12 WWTP Replace Media and Liner in four Sludge Drying Beds 1 Lump-Sum

13 Dorst Dump Station Tank Replacement 1 Lump-Sum

14 Dorst Dump Station Mechanical Component Replacement 1 Lump-Sum

15 Dorst Dump Station Paving 220 Sq. Yd.

16 Lodgepole Dump Station Tank Replacement 1 Lump-Sum

Lodgepole Dump Station Mechanical Component Replacement

1 Lump-Sum

Potwisha Dump Station Mechanical Component Replacement

1 Lump-Sum

19 Potwisha Dump Station Tank Replacement 1 Lump-Sum

Giant Forest Museum Vault Toilet Unit 1 Lump-Sum

Giant Forest Museum Site Work & Installation 1 Lump-Sum

22 Giant Forest Museum Paving 1,115 Sq. Yd.

TOTAL BASE PRICE (Contract Line Item Number 1 through 22) -----------------------

Bid Option A: WWTP Extra Aeration Basin (#4) Rehabilitation

1 Lump-Sum

Bid Option B: WWTP Extra Digester Basins (# 2 & 3) Rehabilitation

1 Lump-Sum

Bid Option C: WWTP Additional Clarifier Mechanism & Motor (Unit 3)

1 Lump-Sum

SEKI – 184193, 184197, 244956, & 245567 CONTRACT PRICE SCHEDULE - 4

Bid Option D: WWTP Clean, Inspect and Test MCC’s 1 Lump-Sum

Bid Option E: WWTP Replacement of Aeration Basin Sump Pumps

1 Lump-Sum

Bid Option F: WWTP Replacement of Digester Basin Sump Pumps

1 Lump-Sum

Bid Option G: WWTP Replacement of Chlorination Room System

1 Lump-Sum

30 Bid Option H: Potwisha Dump Station Additional Paving

940 Sq. Yd.

31 Bid Option I: Dorst Dump Station Additional Paving 280 Sq. Yd.

Bid Option J: Lodgepole Dump Station Additional Paving 240 Sq. Yd

Bid Option K: Giant Forest Museum Lower Kaweah Second Vault Toilet Installation

1 Lump-Sum

Bid Option L: Giant Forest Museum Lower Kaweah Parking Lot Entrance Repavement

920 Sq. Yd.

Bid Option M: Giant Forest Museum Lower Kaweah Interior Parking Lot Repavement

1,060 Sq. Yd.

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 23 through 35) --------------

TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 35) ---------------------------------------------------------------------

All measurement and payment information is included in the project specifications, Section 01 27 00.

END OF SECTION

B. If any fencing, barriers, staking or marking, which designates protected areas, limits of demolition or work limits, is knocked down, moved or destroyed by the Contractor, the Contractor will immediately move the work operation to another area, who...
C. Parking vehicles and storing materials or supplies shall be confined to areas designated as staging areas on the plans or as specifically approved by the Contracting Officer. Vehicle and material storage activities are strictly prohibited from prot...
D. Fastening ropes, cables, or guys to existing trees and disposing of materials including, but not limited to paint, paint thinner, fiberglass materials, fiberglass thinners, concrete or cement residue, washings from cement or concrete mixers or any ...
E. Do not remove, injure, or destroy trees or other plants without prior approval of the Contracting Officer. Consult with the Contracting Officer and remove agreed upon roots and branches that interfere with excavation or pipe placement. All pruning ...
F. If within the critical root zone, excavate with hand tools.
G. At project completion, the Contractor shall remove all protections and be properly disposed of or recycled.
Semi crushed (mechanically)
Whole
Refrigerators
Ranges
Compacted/baled
12 in. stack

File details come from the government source that posted it. Updated .