Section_E_-_Specifications.pdf

PDF 115 KB Posted

Attached to
Guardrail along Keystone Road
Solicitation number
23-0114-ITB-CONSTRUCTION
Issued by
Pinellas County, Clewiston City, Florida

About this file

This document is a Section E Supplemental Specifications file for road and street construction, prepared by Pinellas County, Florida, in conjunction with the Florida Department of Transportation (FDOT) standard specifications. The project involves installing guardrail along Keystone Road from East Lake Road to the Hillsborough County Line, with the primary aim of enhancing pedestrian and bicycle safety. The specifications outline special provisions for survey and layout, including staking out the right of way every 100 feet and protecting property corners, as well as requirements for clearing and grubbing within the county right-of-way.

The document details two specific pay items: Water for Dust Control (Pay Item No. 102-5000), which covers the furnishing and application of water to control dust during construction, and Irrigation (Sprinkler) Repair or Replace (Pay Item No. 800-1615), which requires the contractor to repair or replace existing irrigation systems to their pre-construction condition or better. The water for dust control will be paid at a contract unit price per thousand gallons, while irrigation repairs will be compensated at a contract unit price per linear foot. The specifications emphasize the contractor's responsibilities, including notifying property owners about item removal, verifying irrigation system functionality, and maintaining the construction site according to the engineer's directions.

View the file

Other files

File Type Posted
Guardrail_along_Keystone_Road.pdf PDF
Appendix_1-Permits.pdf PDF
Appendix_6_-_UWS.pdf PDF
Plans.pdf PDF
Section_I_-_Agreement.pdf PDF
Topographic_Survey.pdf PDF
Invitation_to_Bid_(ITB).pdf PDF
Section_F_-_Bid_Submittal_Sheet-protected.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION E SUPPLEMENTAL SPECIFICATIONS

ROAD AND STREET CONSTRUCTION

P.I.D. No. 005210A

Guardrail Along Keystone Rd from East Lake Rd to the Hillsborough County Line.

In Pinellas County, Florida

TO ACCOMPANY PINELLAS COUNTY STANDARD TECHNICAL SPECIFICATIONS FOR

ROADWAY AND RELATED CONSTRUCTION (APRIL 2022 EDITION), AND FLORIDA

DEPARTMENT OF TRANSPORTATION (FDOT) STANDARD SPECIFICATIONS FOR ROAD AND

BRIDGE CONSTRUCTION – DIVISIONS II AND III ONLY (JULY 2022):

SPECIAL PROVISIONS

Section 005-0701 of the Pinellas County Roadway Std. Tech. Specs. Survey and Layout The specification for Survey, Construction Layout shall be amended to include:

• The right of way shall be staked out with a stake or marker every 100 feet on both sides of the road.

• All property corners and section corners shall be protected through the contract period by the contractor, if a property corner is damaged, they will be restored by a Florida registered Professional Land Surveyor at no additional cost to the County.

PAY ITEM NO. 005-0701, Survey and Layout the work specified under this Section must be one Lump Sum (LS) quantity.

Section 110 of the Pinellas County Roadway Std. Tech. Specs. Clearing & Grubbing

B. Items in County Right-of-Way:

The Contractor must notify in writing all property owners to remove any items (landscaping, signs, lighting, etc.) from the County Right-of-Way that owners wish to salvage a minimum of fourteen (14) calendar days in advance of construction activities. After the notification period, it is the Contractor’s responsibility to remove said items that conflict with construction activities prior to construction. The contractor must place a temporary cap on the pipe that feeds into the irrigation system conflicting with construction activities within County Right of Way. The price and payment for capping and removal of irrigation systems, and removal of other items must be included in the payment item of Clearing and Grubbing.

SUPPLEMENTAL SPECIFICATIONS

PAY ITEM NO. 102-5000 Water for Dust Control

Description: The work specified under this Section consists of the furnishing and application of Water on the construction area including but not limited to sub-grade, un-surfaced base, or other un-surfaced traveled ways, or areas of cleared vegetation, in order to control dust resulting from construction operations. The locations and frequency of application must be as directed by the Engineer.

Water used for controlling moisture content of surfaces to meet compaction requirements, mixture and/or working of material, etc. is at the expense of the contractor, included in the work being performed and not paid as “Water For Dust Control”. The water used may be obtained from any approved source that meets Federal, State and local requirements.

Measurement and Payment: The work specified under this Section must be paid for at the contract unit price per thousand gallons of Water for Dust Control.

PAY ITEM NO 800-1615 IRRIGATION (SPRINKLER) REPAIR OR REPLACE, Including Fittings, Heads, and Related Appurtenances

Description: The work consists of all labor, equipment, and materials to repair or replace the existing system to an equal or better pre-construction condition. The Contractor must verify the proper working order of irrigation systems affected by construction, both prior to and after construction. The limit of the repair shall be as directed by the Engineer.

Measurement: The work specified in this Section will be paid at the contract unit price per Linear Foot

(LF).

Payment shall be made under:

Item No. 800-1615 IRRIGATION (SPRINKLER) REPAIR OR REPLACE, Including Fittings, Heads, and Related Appurtenances