Appendix_1-Permits.pdf

PDF 102 KB Posted

Attached to
Guardrail along Keystone Road
Solicitation number
23-0114-ITB-CONSTRUCTION
Issued by
Pinellas County, Clewiston City, Florida

About this file

This document is an Appendix 1 Permits file for a guardrail project in Pinellas County, Florida, specifically for the Guardrail Along Keystone Road from East Lake Road to the Hillsborough County Line (Project Identification Number 005210A). The permit index outlines three key permits required for the project: Pinellas County Habitat Management Permit, Dewatering Permit, and National Pollutant Discharge Elimination System (NPDES) Permit. Each permit will be issued to the contractor following the pre-construction meeting, as applicable or directed by the county, with no permit charges associated.

The document provides a comprehensive overview of the permit requirements, emphasizing that the contractor will be responsible for obtaining these permits through the pre-construction meeting process. A web link is included for additional information regarding Pinellas County's permit procedures, specifically referencing the county's code of ordinances related to habitat management and permit approvals. The project appears to be focused on installing guardrails to enhance road safety, with careful attention to environmental and regulatory compliance through the specified permit process.

View the file

Other files

File Type Posted
Guardrail_along_Keystone_Road.pdf PDF
Section_E_-_Specifications.pdf PDF
Appendix_6_-_UWS.pdf PDF
Plans.pdf PDF
Section_I_-_Agreement.pdf PDF
Topographic_Survey.pdf PDF
Invitation_to_Bid_(ITB).pdf PDF
Section_F_-_Bid_Submittal_Sheet-protected.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 1

PERMITS

Guardrail Along Keystone Road from East Lake Road to the Hillsborough County Line

P.I.D. No. 005210A

PERMIT INDEX

AGENCY PERMIT No. PERMIT FEE / OTHER

Pinellas County Habitat Management Permit

Issued to Contractor following the Pre-construction Meeting if applicable or as directed by the County No permit charge

Dewatering Permit Issued to Contractor following the Pre-construction Meeting if applicable or as directed by the County No permit charge

National Pollutant Discharge Elimination System (NPDES) Permit

Issued to Contractor following the Pre-construction Meeting if applicable or as directed by the County No permit charge

Information regarding Pinellas County’s permits:

https://library.municode.com/fl/pinellas_county/codes/code_of_ordinances?nodeId=PTIIILADECO_CH166ENNAREPR_ARTIIHAMAPR_DIV2PE_S166-

81GEPEAPPR

https://library.municode.com/fl/pinellas_county/codes/code_of_ordinances?nodeId=PTIIILADECO_CH166ENNAREPR_ARTIIHAMAPR_DIV2PE_S166-81GEPEAPPR https://library.municode.com/fl/pinellas_county/codes/code_of_ordinances?nodeId=PTIIILADECO_CH166ENNAREPR_ARTIIHAMAPR_DIV2PE_S166-81GEPEAPPR