This document is Section D-3 Supplemental Conditions for the Lone Madrone Corrals Replacement Project, issued by the Midpeninsula Regional Open Space District in San Mateo County, California. The project involves replacing cattle corrals and associated infrastructure on the Lone Madrone Grazing Unit within the La Honda Creek Open Space Preserve. The scope of work includes removing existing wooden corrals, infrastructure, and fencing, and constructing new wildlife-friendly livestock fencing, processing pens, an alley, "Bud box", lead-up, squeeze/chute, gooseneck and semi-truck load out areas, and associated gates. The project is scheduled for bid submission by 12:00 pm on June 4, 2025, with contract award on June 25, 2025, and construction to be completed by September 30, 2025. A mandatory pre-bid meeting and site visit is scheduled for May 16, 2025.

Bidders must be either a Class B-General Building Contractor or Class C-13 Fencing Contractor. The bid must be hand-delivered or mailed to Matthew Shapero at the District's Administrative Office in Los Altos. The project includes specific environmental considerations, such as a required worker education seminar on protected species in the region, and strict protocols for site access, noise control, and storm water management. Contractors will need to prepare a waste-stream diversion plan and are required to recycle 100% of concrete, non-treated wood, steel, metal, and cabling. The project emphasizes environmental sensitivity, with provisions for potential stand-down time if protected species are encountered and requirements for coordinating with district biologists and monitors throughout the construction process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lone Madrone Corrals Replacement Project Attachment F. Supplemental Conditions of the Agreement

D-3. SUPPLEMENTAL CONDITIONS

Of the Agreement

La Honda Creek Open Space Preserve San Mateo County, California

Date: April 29, 2025

D-3. Supplemental Conditions of the Agreement Page 2 of 8

(Page left intentionally blank)

D-3. Supplemental Conditions of the Agreement Page 3 of 8

SUPPLEMENTAL CONDITIONS

Of the Agreement

ARTICLE ONE

GENERAL PROJECT INFORMATION

A. General

These Supplemental Conditions provide project-specific supplementary information and Supplemental Conditions to the General Conditions of the Agreement. These Supplemental Conditions are Contract Documents and address site-specific factors relevant to the execution of the Work for the Lone Madrone Corrals Replacement Project. These Supplemental Conditions shall supersede any conflicting General Conditions. Where a portion of the General Conditions is altered by these Supplemental Conditions, the unaltered portions of the General Conditions shall remain in effect. Under no circumstances does the information herein override any of the Terms and Conditions set forth in the Agreement, nor alleviate the Contractor from executing the work in strict conformance with the Contract Documents.

B. Project Description

The proposed Lone Madrone Corrals Replacement Project is in the La Honda Creek Open Space Preserve in San Mateo County, CA. Refer to Attachment B, Project Maps, for the project location.

The purpose of the Lone Madrone Corrals Replacement Project is to provide construction services for the construction of corral facilities at the Lone Madrone Grazing Unit and associated fences and gates. Protected species are active in this region. The District’s qualified biologist consultant will provide the contractor training on-site to help the contractor avoid any potential interaction with protected species, as further described below in Article Four, paragraph J.

C. Site Information

Access: The Project site is located at 152 La Honda Road, Redwood City, CA approximately 3 miles west of Skylonda, CA. The Project property is accessed through a manual gate and a paved/rocked driveway. The property is shared with a primary house which will remain occupied throughout the project and a grazing operation. The project site is not accessible without prior District approval.

D-3. Supplemental Conditions of the Agreement Page 4 of 8

Site Utilities: Contractor should be aware that there may be live power and underground utilities at the project site. The contractor will need to supply their own portable toilet and wash station for contractor use. Contractor shall be responsible for providing any temporary electrical service, if required, for its work on site. Water is not available on site. There is no telephone service at the site.

Cellular service may be limited, dependent upon location on site and contractor’s cellular service provider.

ARTICLE TWO

CONTRACT DOCUMENTS

A. Supplemental Conditions.

All conditions set forth herein, and all Exhibits attached hereto, are part of the Contract Documents.

ARTICLE THREE

DISTRICT GENERAL REQUIREMENTS

A. District Representative: The District Representative designated for all correspondence and coordination regarding this Contract is the District Project Manager, Matthew Shapero, 5050 El Camino, Los Altos CA. 650-625-6510.

B. Public Involvement. The Contractor is not required to communicate with the public. The

Contractor shall not discuss the work with the public except when coordinated and approved by the District Representative. The public is not allowed within the project site. The Contractor shall conduct operations in a manner such that public access is not allowed. Should the public enter the site or attempt to access the site, Contractor shall immediately notify District Dispatch and the District Representative.

C. Communications. The Contractor shall not make available, or publicly disclose, any data or report unless provided herein or specifically authorized by the District Representative. If any person or entity requests information from the Contractor about the subject of this scope of work or work being conducted hereunder, the Contractor shall refer them to the District Representative. All reports and other information generated under this scope of work shall become the property of the District and distribution to any other source by the Contractor is prohibited unless authorized by the District Representative.

D. District Inspections and Monitoring. District will be providing environmental monitoring on site as further delineated in Article Four paragraph J. Contractor shall provide access to, coordinate with, and follow all directions provided by all District consultants, monitors and inspectors.

D-3. Supplemental Conditions of the Agreement Page 5 of 8

ARTICLE FOUR

CONTRACTOR’S PERFORMANCE OF THE WORK

A. Emergency Contact Information. In the event of an emergency, Contractor shall dial 911 or the 24-hour ranger dispatch number at 650-968-4411. Note that cell phone reception may be limited in the Preserve.

B. Noise Control. Contractor shall be aware that they are working in an area that is extremely quiet. Noise travels far due to no background noises and can appear amplified. Contractor shall adhere to all local noise ordinance requirements.

C. Herbicides & Pesticides. Herbicides / pesticides are not permitted for this Project, except under the direct written consent of the District. Disinfectants used for sanitation purposes shall only be allowed within the context of the Phyto-sanitation Plan.

D. Access. Access to the construction site is described in Article One, paragraph C. Contractor shall ensure that all materials & equipment planned for use on the project can be transported safely to the site, and that all permits, safety procedures, and regulatory compliances have been met for transport of material and equipment to the site. Access is through an manual gate that shall be kept closed at all times. The primary residence on site will remain occupied during construction and access to the property must be maintained at all times.

E. Site Access – Emergency response. Contractor shall ensure the site logistics plans, project execution plans, and all operations on site take into account the need for emergency response access to the site.

F. Site Security – Trespassing & Vandalism. Contractor shall be responsible for adequately securing all materials and equipment on site. The District assumes no responsibility for any loss or damage to Contractor property.

G. Fire Prevention – The site is surrounded by open space lands that have the potential to be a wildfire hazard. Contractor shall not engage in any activities that pose a fire threat. In addition, if requested, Contractor shall agree to meet with responding fire agencies to ensure they have incorporated all appropriate fire prevention measures (locations of fire extinguishers; activities requiring fire watch, etc.). No smoking is allowed on site, nor on any of the District preserve lands surrounding the site.

H. Working Hours – Regular working hours shall consist of a 10-hour period, between 07:00 and 17:00, Monday through Friday, excluding Government holidays. The County of San Mateo requires a start time no earlier than 07:00. The Contractor may arrive on site earlier, set up, and prepare for work, but the actual start of work at the site cannot commence until 07:00 hours. No construction shall be permitted on Saturdays, Sundays, or Holidays unless pre-approved in writing by the District Representative.

I. Contractor Personnel, Subcontractors, Vendors, Deliveries (personnel) – All personnel entering or leaving the site shall adhere to the following:

D-3. Supplemental Conditions of the Agreement Page 6 of 8

i. All personnel shall be made aware of site access conditions and abide with all applicable vehicle operation and safety requirements.

ii. Any traffic accidents shall be reported immediately.

iii. All personnel who will be working at or accessing the site must attend a Worker Education Seminar, which will be delivered onsite by qualified biologists. The District will coordinate with contractor to schedule the worker education seminar. Any personnel who have not attended a worker training seminar cannot access the site unless they are escorted by another personnel who has attended the worker training seminar. No one can do any work on site without receiving the Worker Training Seminar.

iv. A private residence is located within the La Honda Creek Open Space Preserve that utilizes the roadway for access. In addition, a grazing operation utilizes the Lone Madrone Grazing Unit. The gate leading into the site must be kept closed and access to the residence must be kept clear unless permission has been granted by the District project manager. Do not stage any equipment or vehicles in the roadway. Notify the District project manager at least 48 hours in advance of any construction activity that will impede access to the private residence.

J. Environmental Documents and Requirements

i. Contractor is responsible for conducting all Work in compliance with all local government, State, and Federal jurisdictions and regulations.

ii. Contractors’ schedule shall incorporate all regulatory coordination and permitting, District pre-surveys, inspections, site assessments, sampling and clearances. Contractor should be aware that some work is restricted at certain times of year, and the construction schedule shall incorporate these constraints. District will not entertain claims for time or cost associated with Contractors’ failure to address environmental constraints in the development of the Project Schedule.

iii. Any changes to the Project Schedule must be provided to the District as soon as possible and no more than four (4) hours after conditions require a change to insure the District is able to reschedule any additional monitoring, testing and/or inspection

K. Stand-Down Time. In order to facilitate construction in a sensitive environment, the Contractor may be eligible for additional compensation for Stand-Down time if work is stopped due to identification of species of interest as described in the environmental training. Additional compensation will be considered only under the following circumstances:

i. Work stoppage occurs with less than 24 hours notice.

ii. Work stoppage is due to the presence of special species or site conditions outside the control of the Contractor. Work stoppages due to Contractor’s negligence, disregard for the environmental concerns or regulatory documents, or insufficient planning are not eligible for additional compensation under this provision.

iii. Work stoppage is directed by Owner’s Representative.

iv. Stand-down time will be monitored on site by District staff or monitoring biologist(s).

Daily tracking sheets will be prepared by the Contractor and submitted to the District;

approved tracking sheets will be compiled at the end of each week into a change order.

District will review actual Stand-Down time and hourly rates against Contractor’s certified payroll.

D-3. Supplemental Conditions of the Agreement Page 7 of 8

L. Permitting Requirements. Nothing within these Supplemental Conditions shall relieve the

Contractor of the responsibility to comply with applicable laws and regulations. The District will obtain applicable building permits and the Contractor shall obtain and pay for all other permits, licenses, approvals, and/or certificates required, or necessary to accomplish the work.

M. Storm Water Compliance / SWPPP. The Project does not disturb more than an acre and does not create any additional impervious area, therefore there are no water Board permitting requirements under C-3. However, The Contractor shall be responsible for implementing appropriate and necessary erosion control measures as needed to minimize storm water runoff from the construction site. The following strategies to ensure that storm water pollution is prevented shall be employed:

i. Minimize erosion and sedimentation during construction.

ii. Eliminate pollution of storm runoff by chemicals and materials used in the construction process.

iii. All temporary erosion and sediment controls shall be in place prior to the commencement of construction and maintained continuously during construction. At a minimum, straw rolls, or equivalent apparatus, shall be installed at the entire perimeter of the construction site to prevent construction related run-off.

iv. The Contractor shall inspect all equipment and vehicles prior to leaving the site and, if necessary, shall clean them to prevent sediment transport off-site.

v. The Contractor shall maintain good construction site housekeeping controls and procedures e.g, clean up all leaks, drips and other spills immediately; keep materials covered and out of the rain; including covering exposed piles of soils and wastes; dispose of all wastes properly, place trash receptacles on site for that purpose, etc.

N. District Construction & Demolition Waste Stream Diversion Policy (C&D WSD). The District has a C&D WSD Policy (Policy). Contractor shall adhere to the C&D WSD requirements as set forth in the Policy. The District Representative is responsible for documenting conformance with the Policy. Refer to Attachment F for the Policy.

i. Waste-Stream Diversion: The Contractor shall prepare a waste-stream diversion plan describing how all non-hazardous demolished materials will be handled. Waste-stream diversion plan (WSDP) shall list all materials that will be sent to the landfill, with an explanation of why they cannot be recycled or salvaged. Contractor shall provide receipts for all materials disposed of offsite including a certified recycling center or salvage company. Contractor is required to recycle 100% of all concrete, non-treated wood, steel, metal, and cabling.

O. Schedule and Meetings. The Contractor’s Superintendent and/or Project Manager shall facilitate weekly Progress Update Meetings with the District Representative and District’s consultants either on-site or via teleconference. Meetings shall address the following:

i. Safety – Contractor shall document any and all safety incidents or “near misses”.

Contractor shall review work that is planned to occur over the next three weeks, and prepare and discuss the proposed safety,

ii. Schedule – Contractor shall provide an updated construction schedule that includes:

D-3. Supplemental Conditions of the Agreement Page 8 of 8

a. Overall project schedule

b. Current week

c. Two following weeks

d. Major deliveries or significant trucking days

e. Current and potential delays

f. Inspections by District, County, or others

iii. Work Progress – Updates on work progress, upcoming monitoring requirements, significant events, and project milestones.

iv. RFIs and Submittals – Meeting attendees shall review status of any pending RFI’s and submittals.

P. Traffic Control Plan. Contractor shall develop and implement a CalTrans- and/or County-approved traffic control plan while working within the public roadway.