PART I—THE SCHEDULE

SECTION C—DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1 PROJECT DESCRIPTION AND LOCATION

(a) Description of Work.

Major components of work include improvements to paved and gravel roads, parking areas and associated medians; well, water system and reservoir improvements; well control building construction; minor building repairs; replacement of drainage structures and culverts; repairs to two observation decks, and associated work per the plans and specifications.

Specific work items include but are not limited to: construction survey and staking, soil erosion and pollution control, clearing and grubbing, selective demolition, roadway excavation and embankment, aggregate placement and compaction, asphalt paving, concrete curbing, concrete flatwork, waterline construction, wellhead completion, concrete masonry unit building construction, masonry veneer, well control building electrical and plumbing; minor building repairs consisting of rough and finish carpentry, metal fabrication, and and moisture protection; seeding; planting, mulching and fertilizing; and all other items necessary to complete the project in accordance with the plans and specifications.

(b) Project Location

The project site is the Roan Mountain Recreation Area. The site address is 147 Gardens Rd, Bakersville, NC 28705.

LAT/LONG for the site is (36.102110, -82.134996).

(c) Price Range. $1,000,000 – $5,000,000?

(d) Pre-bid Tour. Yes

(e) Start Work. It is estimated that once the contract is awarded, a notice to proceed will be issued soon after. Contract time will run continuously with no shutdown.

(f) Period of Performance. Contract is to be completed within 365 days from Notice to Proceed issuance.

(g) Safety Plan. A written and approved safety plan in accordance with applicable regulations such as FARS, OSHA, etc. is required prior to commencement of project work. Contractor shall provide adequate safety briefings and ensure safe practices are followed from all personnel involved in the project. Emergency contact numbers shall be readily available on site.

(h) Submittals. Contractor is responsible for and shall submit, at a minimum and at addressed times, all items listed within FSSS (Forest Service Supplemental Specification) and CSI Specifications.

(j) Permits. The Forest Service will obtain the necessary stream preservation permits for this project and the contractor is responsible for adhering to the stipulations of these permits.

C-2 FP-14 SPECIFICATIONS

This project makes use of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) U.S. Customary Units, for portions of the work as detailed below. FP-14 is included by reference only and can be found on the internet at the following website: https://flh.fhwa.dot.gov/resources/specs/

FP-14 Specifications and the below Supplemental Specifications shall pertain to all work related to roadway excavation and embankment, asphalt pavement and curbing demolition, removal and installation of drainage structures and culverts, roadway grading, subbase preparation, base course placement and compaction, asphalt placement, curbing, and sealing and striping.

C-3 – FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS) to the FP-14

The following Forest Service Supplemental Specifications are a part of this solicitation and any resulting contract and are made a separate attachment. Supplemental Specifications (FSSS) include additions and revisions to the Standard Specifications (FP-14).

FSSS No.
DESCRIPTION

Preface

101
Terms, Format, and Definitions
102
Bid, Award, and Execution of Contract
103
Scope of Work
104
Control of Work
105
Control of Material
106
Acceptance of Work
108
Prosecution and Progress
109
Measurement and Payment
153
Contractor Quality Control
155
Schedules for Construction Contracts
203
Removal of Structures and Obstructions
204
Excavation and Embankment
209
Structure Excavation and Backfill
213
Subgrade Stabilization
301
Untreated Aggregate Courses
401
Asphalt Concrete Pavement
411
Asphalt Prime Coat
412
Asphalt Tack Coat
602
Culverts and Drains

C-5 CSI SPECIFICATIONS

This project additionally makes use of Custom CSI Specifications. The following CSI Specifications shall pertain to all non-roadway portions of work including completion of existing water well, water and power lines and associated appurtenances, construction of water control building, minor building repairs, water reservoir repairs, Gardens and High Bluff observation decks repairs, concrete flatwork, signage, erosion control and prevention, and revegetation.

CSI Section
DESCRIPTION
01010
Summary of Work
01050
Field Engineering
01300
Submittals
01350
Government Furnished Materials
02110
Clearing
02210
Site Grading
02220
Structural Excavation
02221
Trenching, Backfilling and Compaction for Utilities
02250
Compaction Control and Testing
02400
Sheeting, Shoring, and Bracing
02530
Dewatering
02540
Erosion and Sedimentation Control
02821
Seeding Fertilizing and Mulching
03100
Concrete Formwork
03200
Concrete Reinforcement
03300
Cast-in-Place Concrete
03310
Concrete from Packaged Dry Mix for Minor Structures
03100
Concrete Formwork
04150
Masonry Accessories
04220
Concrete Unit Masonry
04410
Stone Masonry
05500
Metal Fabrication
06100
Rough Carpentry
06200
Finish Carpentry
073110
Membrane Waterproofing
073210`
Building Insulation
073113
Fiberglass Asphalt Shingles
073920
Sealants and Caulking
08210
Metal Doors
08710
Finish Hardware
09800
Special Wall Covering
09900
Painting
15060
Pipe and Pipe Fittings
15100
Building Valves
15145
Submesible Potable Water Pumps and related Controls
15213
Waterlines
15214
Disinfection of Waterlines
15254
Pipe Insulation
15261
Chlorinating Equipment
16010
Basic Electrical Requirements
16100
Basic Materials and Methods
16231
Standby Power Generators