This solicitation requests proposals for the GAOA Roan Mountain Water System and Road Improvements project located in the National Forests of North Carolina. The solicitation number is 1116528 and was issued by the Department of Agriculture Forest Service. The work includes improvements to the existing water system infrastructure as well as repairs and upgrades to roads accessing the Roan Mountain area. Offerors should submit proposals in response to the requirements set forth in this solicitation no later than the date specified in the associated documents. The award is expected to be granted in the fiscal quarter following proposal evaluations and negotiations being finalized.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REF: 12445224R0005, ATTACHMENT 1, AMENDMENT 1

RFIs:

RFI 1 - Where can we place the organic material removed from the overflow parking lot?

RESPONSE: The COR will identify an on-site disposal location within the immediate vicinity of the overflow lot - around the lot itself or directly off the loop road.

RFI 2- I saw this solicitation posted and wanted to inquire about the construction materials testing QA/QC scope of the contract. Will the awarded GC be responsible for hiring testing for a QC program and/or will the Dept of Agriculture retain QA services?

RESPONSE: The contractor is responsible for Construction Materials Testing QA/QC, and results will be a submittal to the COR to be verified and approved if it meets the project specifications.

RFI 3- We have looked through the plans and specs for the type of striping required for this project to get a quote. We have been unable to determine whether we need thermo or some other type of striping. Do you know what we need or am I just overlooking it in the plans?

RESPONSE: Pavement Markings shall be Type H per FP-14 Section 634.

RFI 4: The design plans call for “scarifying existing gravel surfacing 6” min. depth and mix with 6” loose depth NC DOT ABC Stone”. If the road is being graded, will that re-shaping suffice as scarifying?

RESPONSE: No, the existing gravel must be “ripped” or “scarified” as specified prior to grading or placement of new ABC.

RFI 5: Can I submit an alternative approach to the concrete curbing, which would utilize the existing cut stone?

RESPONSE: Alternative proposals are allowable per the Solicitation per FAR 452.215-71, but contractors must also provide a proposal for the current design.

PLAN CORRECTION:

Disregard the note on Page 19 – EXISTING VIEWING DECK LAYOUT & DEMOLITION PLAN which states “Install matching floor joists between existing floor joists.” No additional floor joists will be required for the repairs to this viewing deck.