GAOA Roan Mountain Water System & Road Improvements, National Forests in North Carolina
Solicitation number
1116528
Issued by

View the file

Other files

File Type Posted
Amendment 3 Attachment 1.docx DOCX document
12445224R0005 Amendment 3.pdf PDF
Amendment 3 Attachment 2 SOI.pdf PDF
Amendment No. 2 Attachment 2.pdf PDF
Amendment No. 2 Attachment 1.docx DOCX document
12445224R0005 Amendment No. 2.pdf PDF
Attachment 1 Amendment 1.docx DOCX document
Roan Pre Bid Sign In Attachment 2.pdf PDF
12445224R0005 Amend No. 1.pdf PDF
Construction Plans_RoanMtn_12.8.2023.pdf PDF
CSI Specs_ROAN IMPROVEMENTS.pdf PDF
Section C_Roan.docx DOCX document
12445224R0005.pdf PDF
FP14 Supplemental Specs_Roan Improvements.pdf PDF
Wage Determination (2).pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

Roan Mountain Water System and Site Reconstruction

1/18/2024

National Forests in North Carolina

PAY

ITEM

NO.

DESCRIPTION

METHOD

OF

MEASURE

EST.

QTY.

PAY

UNIT

UNIT PRICE TOTAL PRICE

1 Mobilization and Bonding LSQ 1 LS

2 Survey and Layout LSQ 1 LS

3 Clearing, Grubbing and Disposal LSQ 1 LS

4.A.

Selective Demolition Work

Consisting of the removal of wheel stops, designated signs, wooden fence and other items shown on the drawings

LSQ 1 LS

4.B.

Saw cutting, removal and disposal of Asphalt

Pavement

AQ 33 TON

4.C.

1‐1/2” thk. Bituminous Pavement overlay including replacing removed pavement

AQ 360 TON

4.D. Plastic Wheel Stops DQ 52 EA

4.E.

Erection of Fence

Per drawing details and location

AQ 416 LF

4.F. Accessibility Signs DQ 3 EA

4.G. Pressure Wash and Paint Fee Booth LSQ 1 LS

Appalachian Ranger District

National Forests in North Carolina Madison County

BASE BID SCHEDULE

GENERAL

SUBTOTAL GENERAL PAY ITEMS 1‐3

4. CLOUDLAND PARKING LOT PAVEMENT OVERLAY

SUBTOTAL CLOUDLAND PARKING LOT PAVEMENT OVERLAY PAY ITEMS, 4.A. ‐ 4.G.

U. S. Forest Service Confidential 1/18/2024 Page 1 of 11 and Site Reconstruction

1/18/2024

National Forests in North Carolina

5.A.

Selective Demolition Work

Consisting of the removal of Wheel Stops, designated signs, bituminous pavement and othe items shown on the drawings

LSQ 1 LS

5.B.

NCDOT ABC Stone Base

Compacted to 95% per AASHTO T‐180 Method D

AQ 450 TON

5.C.

Concrete C&G

Machine placed and installed per detail

AQ 195 LF

5.D.

Header Curb

Machine placed and installed per detail

AQ 165 LF

5.E.

Concrete Sidewalk

(4‐ft and 5‐ft)

AQ 1512 SF

5.F. Ramped Crosswalk DQ 40 SF

5.G.

NCDOT S9.5C Bituminous Pavement Surfacing

2" compacted depth

AQ 190 TON

5.H. Plastic Wheel Stops DQ 25 EA

5.I. Accessibility Signs DQ 2 EA

5.J. Catch Basins #1, #2, and #3 LSQ 1 LS

5.K. 24" Dia Galv. Aluminized Culvert AQ 128 LF

5.L. Rip‐Rap Lined V‐Ditch to Daylight LSQ 1 LS

5.M. Parking Lot Striping LSQ 1 LS

5. GARDENS PARKING LOT IMPROVEMENTS

SUBTOTAL GARDENS PARKING LOT IMPROVEMENTS PAY ITEMS, 5.A. ‐ 5.M.

U. S. Forest Service Confidential 1/18/2024 Page 2 of 11 and Site Reconstruction

1/18/2024

National Forests in North Carolina

6.A.

NC DOT ABC stone base

Inc. scarification of existing gravel surface to a depth of 6 inches, placement of ABC 6‐inch loose depth , blending and compacting to 95% of AASHTO

T‐180 Method D

AQ 1500 TON

6.B.

NCDOT S9.5C Bituminous Pavement Surfacing

2" compacted depth

AQ 700 TON

6.C.

Replacement of 24" Dia MH Rings & Covers and

Septic Tank Risers and Covers

Includes grade adjusting rings as needed

DQ 6 EA

6.D. Catch Basin #2 LSQ 1 LS

6.E. 24" Dia Galv. Aluminized Culvert AQ 16 LF

6.F.

Road Striping

Shoulders, Centerline, Stop Bars, and Directional

Arrows

LSQ 1 LS

6. PAVING OF EXISTING ACCESS ROAD STA 0+00 ‐ STA 25+30

SUBTOTAL PAVING OF EXISTING ACCESS ROAD STA 0+00 ‐ STA 25+25 PAY ITEMS, 6.A. ‐ 6.F.

U. S. Forest Service Confidential 1/18/2024 Page 3 of 11 and Site Reconstruction

1/18/2024

National Forests in North Carolina

7.A.

Demolition

Inlcudes removal of drainage culverts, signs and other items as shown on the drawings

LSQ 1 LS

7.B.

NCDOT ABC Stone Base

Compacted to 95% per AASHTO T‐180 Method D

AQ 900 TON

7.C. Catch Basin #5 LSQ 1 LS

7.D. 24" Dia Galv. Aluminized Culvert AQ 160 LF

7.E. 24" Size 16 Ga. Culvert Flared End Section DQ 2 EA

7.F. Rip‐Rap Lined V‐Ditch to Daylight DQ 1 LS

7.G.

Re‐setting of all stone curbing

Per plans and details

LSQ 1 LS

7.H.

Erection of Fence

Per drawing details and location

AQ 104 LF

7.I.

Imported Topsoil

Within island interior

AQ 100 CY

7. OVERFLOW PARKING LOT IMPROVEMENTS

SUBTOTAL OVERFLOW PARKING LOT IMPROVEMENTS PAY ITEMS, 7.A.‐7.I.

U. S. Forest Service Confidential 1/18/2024 Page 4 of 11 and Site Reconstruction

1/18/2024

National Forests in North Carolina

8.A.

Remove and dispose of existing culverts and catchbasins, where applicable

(9) Locations total

LSQ 1 LS

8.B. NCDOT ABC Stone Loose Culvert Bedding AQ 80 TON

8.C.

24" Dia 16 Ga. Aluminized Culverts

Includes catch basins ‐ See Culvert Schedule

AQ 426 LF

8.D. 24" Size 16 Ga. Culvert Flared End Section DQ 2 EA

8.E. Catch Basin #4 LSQ 1 LS

8.F.

Subsurface Perforated Drainage Pipe and Class A

Rip Rap

AQ 60 LF

9.A.

NCDOT ABC Stone Base

Compacted to 95% per AASHTO T‐180 Method D

AQ 55 TON

9.B.

NCDOT S9.5C Bituminous Pavement Surfacing

2" compacted depth

AQ 26 TON

9.C. Plastic Wheel Stops DQ 8 EA

9.D. Parking Space Striping LSQ 1 LS

8. DRAINAGE CULVERTS INSTALLATION (STA ‐0+12 ‐ STA 43+36)

SUBTOTAL DRAINAGE CULVERTS INSTALLATION PAY ITEMS, 8.A. ‐ 8.F.

9. LOOP ROAD ROADSIDE PARKING CONSTRUCTION

SUBTOTAL LOOP ROAD ROADSIDE PARKING CONSTRUCTION, 9.A. ‐ 9.D.

U. S. Forest Service Confidential 1/18/2024 Page 5 of 11 and Site Reconstruction

1/18/2024

National Forests in North Carolina

10.A. Building Foundation DQ 8.5 CY

10.B. Reinforced Masonry Walls DQ 590 SF

10.C. Specified Metal Doors and Hardware DQ 2 EA

10.D. Extruded Aluminum Block Vents DQ 7 EA

10.E. Rough Finish Carpentry Work LSQ 1 LSQ

10.F. Roofing Installation DQ 3 SQ

10.G. Roof Skylights as specified DQ 2 EA

10.H. Field Stone Rock Veneer DQ 385 SF

10.I. Building Electrical Work LSQ 1 LS

10. WATER SYSTEM CONTROL BUILDING CONSTRUCTION

U. S. Forest Service Confidential 1/18/2024 Page 6 of 11 and Site Reconstruction

1/18/2024

National Forests in North Carolina

10.J. Building Plumbing Work LSQ 1 LS

10.K. Building Painting LSQ 1 LS

10.L.

Liquid‐cooled, Commercial, Electrical Generator, LP‐

Gas Tank and related

LSQ 1 LS

10.M.

2" Dia. HDPE Supply Waterline and Electrical

Conduit from Control Building to Reservoir

Common trench.

AQ 750 LF

10.N. 2" Dia. HDPE Drainline to daylight AQ 75 LF

10.O. 2" Curbstop Valve with Valve Box Per Detail AQ 1 EA

‐$ SUBTOTAL WATER SYSTEM CONTROL BUILDING CONSTRUCTION PAY ITEMS, 10.A. ‐ 10.O.

U. S. Forest Service Confidential 1/18/2024 Page 7 of 11 and Site Reconstruction

1/18/2024

National Forests in North Carolina

11.A.

Pressure wash exterior of reservoir including valves compartment

LSQ 1 LS

11.B. Repair spalled concrete and cold joints, per detail LSQ 1 LS

11.C.

Application of (2) coats specified sealer to reservoir exterior, including valves compartment

LSQ 1 LS

11.D. 3" Dia. HDPE Drain to Daylight AQ 32 LF

11.E. Installation of Float Switch, per detail LSQ 1 LS

11. RESERVOIR REPAIRS

SUBTOTAL RESERVOIR REPAIRS PAY ITEMS, 11.A. ‐ 11.E.

U. S. Forest Service Confidential 1/18/2024 Page 8 of 11 and Site Reconstruction

1/18/2024

National Forests in North Carolina

12.A Remove existing Submersible Pump, Drop Pipe and

Submersible Cable

LSQ 1 LS

12.A.1 CREDIT, for Materials in 12.A. LSQ 1 LS

12.B. Installtion of Pitless Adaptor and Well Cap LSQ 1 LS

12.C.

Submersible Pump, PVC Drop Pipe, and 3‐wire submersible power cable

LSQ 1 LS

12.D.

2" Dia. HDPE Supply Waterline and Electrical

Conduit from Well to Control Building

Common trench.

AQ 330 LF

12.E. Concrete Slab around Well Casing LSQ 1 LS

12.F. Well Protective Cover LSQ 1 LS

12. WATERWELL COMPLETION

SUBTOTAL WATERWELL COMPLETION PAY ITEMS, 12.A. ‐ 12.F.

U. S. Forest Service Confidential 1/18/2024 Page 9 of 11 and Site Reconstruction

1/18/2024

National Forests in North Carolina

13.A.

Selective Demolition and Disposal

Decking, Steps & Railings

LSQ 1 LS

13.B. Installation of Deck Post Steel Tube Sleeves LSQ 1 LS

13.C. PT Floor Joists, matching existing LSQ 1 LS

13.D. Metal Railings between Sleeved Posts LSQ 1 LS

13.E. Trex Decking DQ 265 SF

13.F. Steps, per detail LSQ 1 LS

14.A.

Replacement of damaged, round steel railing pickets

Approximately 50

LSQ 1 LS

14.B.

Pressure washing

Includes entire viewing deck structure

LSQ 1 LS

14.C. Priming and Painting of All Deck Components LSQ 1 LS

14.D.

Removal and Disposal of Designated Walkway

Sections

AQ 456 SF

14.E.

Construction of 5" Thich Concrete Walkway

Sections, per detail

AQ 456 SF

13. HIGH BLUFF VIEWING DECK REPAIRS

SUBTOTAL HIGH BLUFF VIEWING DECK REPAIRS PAY ITEMS, 13.A ‐ 13.F.

14. GARDENS VIEWING DECK and ACCESS WALKWAY REPAIRS

SUBTOTAL GARDENS VIEWING DECK and ACCESS WALKWAY REPAIRS PAY ITEMS, 14.A ‐ 14.E.

U. S. Forest Service Confidential 1/18/2024 Page 10 of 11 and Site Reconstruction

1/18/2024

National Forests in North Carolina

15.A.

Pressure Wash Entire Building, Replace Soffits and

Eaves, Remove Window and Patch Opening, Install

Bulleitin Board, Replace Exterior Floor Tiles, Prime and Paint Building Exterior, Other Minor Work as detailed on Construction Drawings

LSQ 1 LS

16.A. Installation and Maintenance of Silt fence per Detail AQ 850 LF

16.B. Installation and Maintenance of Hay Bales LSQ 1 LS

16.C Seeding, Planting, Fertilizer and Mulch LSQ 1 LS

All work defined in the constructions plans and specifications shall be considered incidental to the above.

SUBTOTAL EROSION & SEDIMENTATION CONTROL PAY ITEMS, 15.A.

16. EROSION & SEDIMENTATION CONTROL

SUBTOTAL EROSION & SEDIMENTATION CONTROL PAY ITEMS, 16.A. ‐ 16.C

TOTAL PRICE ‐‐ FOR BASE BID PAY ITEMS

15. GARDENS RESTROOM/INFORMATION BUILDING REPAIRS

U. S. Forest Service Confidential 1/18/2024 Page 11 of 11