Section C 13Apr2026.docx

DOCX document 66 KB Posted

Attached to
Request for Feedback - RFAAP Competition RFP Sections C, L&M, Attchs 0019, 0035 & 0036
Solicitation number
W519TC-26-R-0003
Issued by

About this file

This is Section C (Specifications and Standards) of a Request for Proposal for the Radford Army Ammunition Plant (RFAAP) Competition, detailing technical data package (TDP) requirements, facility modernization obligations, and operational management expectations. The document specifies 38 line items (CLINs) covering various propellants and energetic materials including propellant charges for 155mm ammunition, nitrocellulose grades, rocket motor propellant grains, and related chemical compounds, each with corresponding National Stock Numbers (NSNs), TDP numbers, and military specifications. TDPs are accessible electronically via SAM.gov and may be restricted or export-controlled, requiring appropriate security clearances (SECRET level facility security clearance mandatory), DD 2345 agreements, and use/non-disclosure agreements for access.

The contract encompasses Direct Funded Performance Work Statements and Production Base Support (PBS) modernization projects with task orders potentially structured as Fixed Price, Fixed Price Incentive, Cost Reimbursable, Cost Plus Fixed Fee, or Cost Plus Incentive Fee arrangements. The contractor must develop and execute a comprehensive Facility Investment and Modernization Plan with four components: (1) a Firm-Fixed-Price Legacy Waste Management project requiring 25% annual reduction of nitrocellulose fines with 100% elimination by year four; (2) Strategic Facility Self-Investment projects financed entirely by the contractor; (3) an Integrated Facility Upgrade and Reset Program (FFP, co-funded up to $660M Government gap) with safety modernization as top priority, completed within three years with initial improvements demonstrated within six months; and (4) a 10+ year long-range modernization strategy based on notional $3.5B-$4.5B budget. Additional requirements include Research and Development capabilities for propellant development and scale-up, key personnel identification, configuration change management via Engineering Change Proposals and Requests for Variance, safeguarding permanent records with Government Purpose Rights, and quarterly progress reporting on all investment components with intellectual property assertions.

View the file

Other files

File Type Posted
Section M 13Apr2026.docx DOCX document
Attachment 0035 - RFAAP Phase I Self-Scoring Matrix - 20260409.xlsx XLSX spreadsheet
Attachment 0036 - Project Reference Template.pdf PDF
Attachment 19 - RFAAP Price Matrix.xlsx XLSX spreadsheet
Section L 13Apr2026.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C as of 13 Apr 2026

C-01 TECHNICAL DATA PACKAGES

The following drawings and specifications are applicable to this solicitation. Exceptions can be found at Attachment 0020 TDP Section C Exceptions.

CLIN NOMENCLATURE NSN TDP #_________________

0001 COAI-PROP PAP7993 F/CHRG,PROP,155MM,M231 1376-01-489-1519 12991140:19200

0002 COAI-PRPLT M31A2,CHG,PROP,155MM, M232A1 1376-01-526-6467 13010119:19200

0003 COAI-PRPLLANT M30A1 CHG,PROP,155MM, M232 1376-01-489-1755 12993885:19200

0004 PROPELLANT, M1 SP 1376-00-009-0041 MIL-DTL-60318-T2:19200

0005 PROPELLANT, M1 MP 1376-00-009-0042 MIL-DTL-60318-T1:19200

0006 PROPELLANT M6, CHG,PROP,155MM,M1192A 1376-01-053-9370 MIL-P-63404:19200

0007 PROPELLANT, M10 1376-01-055-8598 MIL-P-48099:19200

0008 COAI - PROPELLANT M64 SINGLE-PERFORATED 1376-01-546-3736 13015504:19200

0009 COAI - PROPELLANT M64 MULTI-PERFORATED 1376-01-546-3733 13015503:19200

0010 PROPELLANT GRAIN F/MK126 RKT MTR-APOBS 1376-01-590-0313 87012A1115

0011 PROPELLANT, DOUBLE-BASE SHEET, TYPE N-5 1376-01-055-5971 MIL-P-17689:19200

0012 PROPELLANT, M9 FLAKE 9999-99-999-9999 MIL-DTL-32322:19200

0013 PROPELLANT, M5 FOR USE IN SPECIAL APPLI 1376-01-053-9368 MIL-P-48089:19200

0014 PROPELLANT, JA2 7-PERF GRANULAR, CYLINDR 9999-99-999-9999 13053606:19200

0015 PROPELLANT, SCDB 1376-01-D01-3479 13051227:19200

0016 PROPELLANT, STICK, DEGN 1376-01-D01-6160 13051228:19200

0017 PROPELLANT, RPD-596 M1002 1376-01-725-8540 13033596-1:19200

0018 PROPELLANT, RPD-596 M865 1376-01-725-9406 13074472:19200

0019 PROPELLANT, M14 M865 & M724A2 1376-01-373-5883 12956320-1:19200

0020 BENITE STRANDS 1376-00-764-8063 MIL-B-45451:19200

0021 FILM, INHIBITING 1340-01-055-2782 9240825:19203

0022 AA-2 NAVY 1376-01-055-0994 AS2543:30003

0023 MK90 ROCKET GRAIN NAVY 1376-01-160-3075 233AS106:30003

0024 AA-6, PROPELLANT DOUBLE-BASE 1376-01-122-5290 AS3028

0025 PROPELLANT AFP-001 FOR THE GAU-8 SERIE 9999-99-999-9999 200610330

0026 PROPELLANT MK44, AFP-001 9999-99-999-9999 28081855

0027 PROPELLANT, M2 1376-01-085-7243 MIL-P-60989:19200

0028 COAI F/PROPELLANT M9,FLAKE(FOR USE IN 40 1376-01-587-6080 13021760:19200

0029 NITROCELLULOSE, GRD A TYPE I 1376-01-130-6392 MIL-DTL-244-A-T1:19200

0030 NITROCELLULOSE, GRD A TYPE II 9999-99-999-9999 MIL-DTL-244-A-T2:19200

0031 NITROCELLULOSE, GRD B TYPE I 1376-01-185-5467 MIL-DTL-244-B-T1:19200

0032 NITROCELLULOSE, GRD B TYPE II 9999-99-999-9999 MIL-DTL-244-B-T2:19200

0033 NITROCELLULOSE, GRD B TYPE III 9999-99-999-9999 MIL-DTL-244-B-T3:19200

0034 NITROCELLULOSE, GRD C TYPE I 1376-01-185-5468 MIL-DTL-244-C-T1:19200

0035 NITROCELLULOSE, GRD C TYPE II 1376-01-185-5470 MIL-DTL-244-C-T2:19200

0036 NITROCELLULOSE, GRD D 9999-99-999-9999 MIL-DTL-244-D:19200

0037 NITROCELLULOSE, GRD E 9999-99-999-9999 MIL-DTL-244-E:19200

0038 NITROCELLULOSE, GRD F 9999-99-999-9999 MIL-DTL-244-F:19200

TDPs for the items identified above can be found on SAM.gov in the Virtual Technical Library. It is the Offeror's responsibility to ensure it has obtained the most recent specifications that the Government has made available in the Virtual Technical Library to support proposal development.

The Government will incorporate approved engineering change proposals (ECPs) into the resulting contract as they are submitted, reviewed, and approved.

(a) TDPs will be obtained electronically via the Contracting Opportunities posting for this requirement on the SAM.Gov website. You must have an account prior to accessing any TDP(s). To register for an account in SAM.Gov, please visit https://secure.login.gov/?request_id=d84abb0e-1664-4378-afa0-f29595aefb72 and select create account. The toll free helpdesk phone number is (866)606-8220 and for International (334) 206-7828. Vendors are responsible for placing correct information in SAM.Gov.

(b) You may need to use special software to view the documents that are posted on SAM.Gov. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require ImageR or Lucent viewers to view the TDP(s) and are available as freeware at:

ImageR Viewer: http://g6msd.redstone.army.mil Lucent Viewer: http://www.ec-edi.com/

(c) The TDP(s), TDPL(s) and their corresponding outstanding Engineering Exceptions for this solicitation will be accessible via the solicitation posting in Contracting Opportunities (as described below) from the date of issue through the time specified on the solicitation for receipt of offers.

(d) FOR UNRESTRICTED TDP(s):

(1) TDPs for this solicitation are unrestricted and can be accessed electronically via the solicitation posting. The TDP and all necessary TDP documents will be posted under the Attachments / Links tab. You must have a SAM.Gov account prior to accessing the TDP.

(2) To access the TDP(s), click directly on the document you want to view under the Attachments / Links tab. You will be prompted for your username and password prior to gaining access to the TDP.

CLIN: N/A

TDPL Date: N/A

(e) FOR RESTRICTED TDP(s):

TDPs and any other related documents, if applicable, for this solicitation are restricted and can be accessed electronically via the solicitation posting, with valid Contractor login credentials. TDPs and any other related documents are posed with various options, such as Restricted and Export Control. These additional controls are described below:

(1) Access to RESTRICTED TDP(s):

TDP(s) that have been marked as Restricted can be accessed electronically via the solicitation posting, with valid Contractor login credentials. TDP(s) that have been marked as Restricted will require U.S. Government approval prior to gaining access to the requested information. To request access log in to SAM.Gov, go to the applicable solicitation under Contracting Opportunities within SAM.Gov, select the Attachments / Links tab, and then click on the Request Explicit Access button. Completion of a Use and Non-Disclosure Agreement form may be required prior to gaining access to the TDP. Please allow 2-3 working days to process your request. You will receive a system generated email from donotrely@sam.gov saying A Notice Manager from ACC-RI has updated your access to Controlled Documents. Click here to sign in and view the request details or go to the notice to access the Controlled Documents. If your request is denied you will be able to see further details of why you were and how to proceed.

(2) Access to EXPORT CONTROL TDP(s)

(i) TDP(s) that have been marked as Export Control can be accessed electronically via the solicitation posting, with valid Contractor login credentials. In addition, to obtain access to these TDP(s), vendors and Contractors must have a current DD 2345, Military Critical Technical Data Agreement on file with the Defense Logistics Information Service (DLIS). If you do not have an approved DD 2345, Military Critical Technical Data Agreement on file with DLIS, then you will not be able to access the TDP. To obtain certification, go to https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/DD2345Instructions/ click on Documents and follow the instructions provided. Processing time is estimated at five (5) working days after receipt.

(ii) TDP(s) that have been marked Export Control will require U.S. Government approval prior to gaining access to the requested information. To request access log in to SAM.Gov, go to the applicable solicitation under Contracting Opportunities within SAM.Gov, select the Attachments / Links tab, and then click on the Request Explicit Access button. The requestor MUST BE the data custodian that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes, the user will be required to verify the MPIN again to gain access to the Export Control TDP(s). Completion of a Use and Non-Disclosure Agreement form may be required prior to gaining access the TDP. You will receive a system generated email from donotrely@sam.gov saying A Notice Manager from ACC-RI has updated your access to Controlled Documents. Click here to sign in and view the request details or go to the notice to access the Controlled Documents. If your request is denied you will be able to see further details of why you were and how to proceed.

(iii) If multiple individuals in your company need access to the Export Control TDP for solicitation, it can be obtained from your data custodian listed on the DD 2345.

(iv) TDP(s) that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq.

CLIN: Various TDPL Date: Various

(3) Further dissemination of Restricted TDP(s) must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(4) Upon completion of the purposes for which the restricted technical data has been provided, the Contractor is REQUIRED to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning or melting any physical copies of the TDP and/or deletion of removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

(f) Questions related to registration in SAM.Gov should be directed to https://fsd.gov/fsd-gov/home.do . The helpdesk phone number is (866)606-8820. Vendors are responsible for placing correct information in SAM.Gov. A user guide for SAM.Gov can be found here: https://dodprocurementtoolbox.com/site-pages/contract-opportunities

C-02 MODERNIZATION AND DIRECT SERVICES

This contract encompasses Direct Funded Performance Work Statements (PWSs) and any separately funded modernization project requirements referred to as Production Base Support (PBS). The PBS Industrial Facilities (IF) program to modernize/rehabilitate Government-owned production facilities that are used for making Department of Defense munitions. In certain instances, construction of facilities occurs which utilize the Corps of Engineers (COE) as the design agency and construction project manager. The Operator may have to work directly with other agencies as a result of any orders issued under this agreement. Projects may also include demolition and relocation of facilities. The execution of any project is subject to availability of funding. The PBS requirements may be very broad in scope and could include, as examples: fixing a roof, removing a building, or upgrading a piece of machinery.

Resultant Task Orders can be Fixed Price, Fixed Price Incentive, Cost Reimbursable, Cost Plus Fixed Fee, or Cost Plus Incentive Fee. The proposed pricing in the successful Offeror’s Price Matrix (Attachment 0019) will be used for the prices in which the Government has agreed to pay the Operator for the performance of those Direct Funded PWSs and for the NC Facility.

The Operator shall provide all management, supervision, personnel, labor, generalized or specialized equipment necessary to perform the functions detailed in each Task Order. This is to be done in strict accordance with all the terms, conditions, general and special provisions specified by Task Order. Schedules for work not already proposed will be negotiated along with Price.

The Operator's work and responsibility shall include all contractor planning, programming, administration, and management necessary to provide all repairs, construction, design build and any related services as specified in each individual Task Order. The work shall be conducted by the Operator in strict accordance with all applicable laws, regulations, and/or any changes, revisions thereto. The Operator shall ensure that work meets or exceeds the specifications in the Task Order. The Operator shall perform its own administrative services necessary to accomplish the work; i.e., supply, procurement, quality control, job order shop operation, financial controls, maintenance of accurate, complete records, files, and libraries of documents such as Federal, State, and local regulations, technical manuals, manufacturer's instructions and recommendations, and any other similar documents. The work shall meet or exceed the most current industry leading benchmarks and conform to federal, state and local codes for the applicable scope of work. The work shall conform to military and civil works regulations to the maximum extent practicable where equivalent industry standards cannot be applied. In addition to the above, the Operator shall comply with any local codes or RFAAP Plant specific codes.

Facilities and scope will be identified in each Task Order. Work will vary from project to project and will require extensive knowledge of the functional operation relating to the efficient use of the facility, equipment, and facility support systems, and building structures. Since the facilities may be in full operation, the Operator shall be required to minimize interference with the daily operation of the facilities when performing requirements.

The Operator must assume the responsibility for performance of any facilities managed, designed, erected, and constructed under any Task Orders awarded to it under this contract.

C-03 RESPONSIVENESS TO GOVERNMENT

The Operator will be required to coordinate work with the Contracting Officer and his/her designees, as required. This includes Request for Proposal/Request for Quote response timelines, which are binding as identified within the respective letters/requests to the Operator, unless otherwise agreed to in advance by the Government Contracting Officer.

The Operator shall maintain cooperative and businesslike relations with other facilities support contractors and Government workers with whom he/she comes in contact.

The Operator shall respond, in a reasonable period of time agreed to by both parties, to all Government requests for information necessary to accomplish the inherently governmental function of managing this contract.

NOTE: Although the Government will enlist the assistance of Subject Matter Experts (SMEs) including COE Staff, Administrative Contracting Officer (ACO) Staff as well as other Government SMEs, the Contracting Officer is the ONLY person who is able to bind the US Government in any way. Any change orders, schedule and/or design modifications, or other changes that may alter the requirements of the individual Task Orders, even minimally, shall be authorized by the cognizant Contracting Officer on a case-by-case basis.

C-04 PROGRAM MANAGEMENT REVIEWS (PMR)

The Contractor shall support/host periodic onsite Program Management Reviews (PMRs) at the request of Capability Program Executive Ammunition & Energetics, RFAAP Government Staff, or Army Sustainment Command (ASC) (minimum of three times per year) in accordance with paragraph 2.1.5.1 of PWS 2 - Facility Planning.

C-05 MATERIAL SAFETY DATA SHEETS

FAR 52.223-3, Hazardous Material Identification and Material Safety Data, indicates failure to submit the Material Safety Data Sheet (MSDS) prior to award may result in the apparently successful Offeror being considered non-responsive and ineligible for award. However, MSDSs are not required to be submitted with the Offerors' proposals but will be required from the successful Offeror subsequent to award.

C-06 FACILITY SECURITY CLEARANCE REQUIREMENT

Requirements of this contract will require the contractor to have access to classified material up to and including the SECRET level. As such, a Facility Security Clearance at the SECRET level is required. Classified material must be handled in accordance with the current National Industrial Security Program Operating Manual (NISPOM), DoD 5220.22-M, Department of the Army Information Security Program, AR 380-5, and any local security classification guidance and source documents. Remaining security requirements, to include handling of sensitive information, are stated on Attachment 0023, DD 254 - Contract Security Classification Specification.

C-07 SAFEGUARDING PERMANENT AND ENDURING RECORDS

(a) The contractor shall implement a process to, and shall capture, catalog, retain, and preserve records (which includes, but is not limited to data, technical data and documents) that are necessary for the operation and maintenance of RFAAP facilities, equipment, and systems (to include present/past Research and Development activities); and contribute to the safety of RFAAP personnel and protection of RFAAP property. Permanent records from this contract and from prior contracts shall be organized, maintained and archived in designated locations for use by both the Government and contractor representatives during this contract; and retained for use during successor contracts. The contractor shall maintain and provide an index (in electronic format) upon Government request in accordance with CDRL XXXXX describing the structure of records by type, title, designated storage media and locations. Records shall be organized such that they are recoverable; either through cataloging, indexing, and/or arrangement by building, area, equipment number, or other functional grouping. The requirement to comply with this narrative will be effective upon contract award. Preservation of historical records will include any documentation provided by the Government and/or transitioned by the incumbent to the successful awardee, as necessary.

(b) Permanent records shall include, but not be limited to, the following:

(1) Manuals, specification sheets, spare parts lists, maintenance procedures, engineering drawings and two and three dimensional computer-aided design models, supplied by vendors or original equipment manufacturers with new equipment, facility or utility systems and components.

(2) Procedures and drawings developed by the contractor and prior contractors or provided to the contractor or prior contractors for operation and maintenance of RFAAP property (real and personal) and processes to include production; drawings for construction, fabrication, and modification of property, including design analyses and records of significant deviations of as-built configurations from designs. This includes, but is not limited to: standard operating procedures (SOPs), manufacturing instructions, process instructions, engineering standards, process change equipment change records, calibration settings, detailed maintenance procedures, maintenance job aids, corrective and preventative maintenance logs, preventative maintenance tasks and schedules, plant protection standards, control systems documents and source code, test procedures, analytical test procedures, analytical compatibility test results, analytical test data, electrical transient analyzer program (ETAPS) models, geospatial information systems (GIS) data, inventory control system data and any equivalents.

(3) Safety data, analyses and test results supporting safety site plans and establishment of safe operating conditions (e.g., hazard analyses, results of barricade/hopper tests, sensitivity testing of energetics, testing of physical/software safeguards/interlocks, design or structural analyses). This includes, but is not limited to: relief calculations, Safety Action Logs, Process Hazards Analyses (PHAs) (current and prior), Safety Data Sheets (SDS) Electrical Area Classifications and any equivalents.

(4) Manufacturing process and inspection equipment performance testing related to equipment capabilities, quality inspection and AAIE.

(5) Results of compliance monitoring/testing/inspections required by federal, state, and local laws or regulations; permits; or stipulated in PWSs and/or clauses in this contract. This includes, but is not limited to: Environmental Action Logs and any equivalents.

(6) Analytical data, certificates of conformance, batch records and any equivalents.

(c) Designated representatives authorized by the Contracting Officer shall have access to permanent records during the course of this contract. Upon request by the ACO or Contracting Officer, the contractor shall provide copies of permanent records for use by the Government.

(d) Procedures shall be established by the contractor to instruct personnel involved in receiving, developing, using or storing records on proper records accession and handling. Records stored electronically in software systems or file sharing sites shall not be degraded or lost due to software, server, or storage system migration/replacement.

(e) Consistent with other rights in technical data provisions of this contract (e.g., Narrative H-01, Ownership of Property and Rights to Intellectual Property), the Government shall have no less than Government Purpose Rights to all permanent records defined in this clause.

(f) The contractor shall provide access to data pursuant to this narrative to the Contracting Officer and representatives designated by the Contracting Officer during the course of this contract. The contractor must deliver all applicable technical data to the Government on an annual basis by no later than 31 December of each year and certify that it is free of all proprietary information. After the initial full transfer to the Government, subsequent transfers on the one-year cycle shall only be updated or new documents. Data shall be delivered in its current form as of the date of submission. The form/media to be used for data delivery (e.g., electronic, flat file) will be specified by the Contracting Officer at that time and must facilitate its transfer to, and use by, the Government. The contractors support and performance of this data deliverable will be provided at no additional cost to the Government and requests for data pursuant to the terms of this clause will not be subject to the changes clause.

(g) Data under this narrative shall be provided at the end of the contract and is authorized for release to prospective bidders.

C-08 CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION

(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, NORs, and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notices of Revision (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.

(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.

(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor will not impact the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the contract.

(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

C-09 RFAAP RESEARCH AND DEVELOPMENT CAPABILITY REQUIREMENTS

The RFAAP contractor shall be capable of providing on-site Research & Development (R&D) capabilities at RFAAP to support new product development initiatives, scale-up of newly developed processes, and improvements to current production processes. This capability shall address required disciplines to perform R&D related activities related to nitrocellulose and propellants.

Development and Scale Up: The contractor shall be capable of providing the personnel, knowledge, and processes to successfully execute the development of new propellant formulations, ingredients, manufacturing methodologies and processes. This includes the scale-up of production processes for propellants and other critical ingredients, as well as propellant development (e.g., grain geometry, perforations), rheology and die design. The Contractor will engage with various DoD and third-party R&D customers, as necessary, and be capable of responding to solicitations for externally funded R&D activities.

Support to Production Operations: The Contractor shall be capable of supporting production of legacy energetic/propellant formulations and ingredients using legacy processes. This may include improvements to legacy process, modifications to current formulations, technology insertion opportunities, and investigative functions when necessary.

Analytical, Performance, and Hazards Testing: The Contractor shall be capable of performing analytical testing in support of RFAAP manufacturing operations, investigative functions, and direct funded customer requests. These requirements may include energetic performance, thermal stability, sensitivity, identification/qualification, and physical measurement testing.

C-10 KEY PERSONNEL

The Contractor shall provide an organizational chart that clearly delineates lines of authority and responsibility for all key personnel involved. CDRL XXXX Prior to replacing any key personnel as outlined in the offeror’s proposal, Volume 1 Production & Operations, the contractor shall notify the Contracting Officer of the change and provide information regarding the proposed replacement, including a resume. Key personnel positions may not remain vacant for more than 90 days. The USG may provide feedback on the replacement’s qualifications, but the contractor retains full responsibility for the selection and performance of key personnel.

C-11 TECHNICAL DATA PACKAGE BASELINE

The contractor shall provide a TDP Baseline Report identifying the TDP configuration of each individual item produced under the resultant contract (i.e. the production items included in Attachment 00XX). The TDP configuration is defined by the contract and any subsequent modifications to the contract that result in configuration changes. The report shall be prepared as required by Exhibit X, CDRL ZZ-XXX, and shall describe the TDP configuration (i.e., ECPs) in effect on the date that the report is issued. The TDP Baseline shall be for informational purposes only. The contract and any subsequent modifications shall take precedence. Exceptions to TDP requirements shall not be included without approval from the Contracting Officer.

C-12 MANAGEMENT AND DISPOSITION OF CONTRACTOR-CONTROLLED MATERIALS

1. Responsibility and Ownership

The Contractor shall be solely responsible for the ownership, management, control, and disposition of all propellant, materials, production by-products, chemicals, intermediates, off-specification materials, NC Fines, residual materials, residual products, and production excess materials (hereinafter collectively "Contractor-Controlled Materials") generated or acquired during the performance of this contract. The Contractor is responsible for all inventory and waste management decisions related to these materials.

2. Storage and Time Limitations The Contractor shall store Contractor-Controlled Materials in strict compliance with all applicable federal, state, and local environmental and safety regulations and permits. The on-site storage period for any Contractor-Controlled Materials shall not exceed the duration permitted by such regulations. In no event shall the storage time for any such materials exceed a maximum of two (2) years from its date of generation or acquisition.

3. Disposition at Contract Expiration The Contractor is required to ensure that all inventories of Contractor-Controlled Materials are at zero (0) upon the expiration or termination of this contract. The Contractor shall be responsible for all costs associated with the removal, disposal, or transfer of these materials in accordance with all applicable laws and regulations.

C-13 FACILITY INVESTMENT and MODERNIZATION

1. General Requirement The Contractor shall develop, manage, and execute a comprehensive Facility Investment and Modernization Plan. This Plan shall be a single, integrated "living document" that governs all initiatives designed to accelerate the transformation of RFAAP. All activities within the Plan shall directly support the Army’s strategic objectives, including but not limited to: legacy waste management, increasing safety compliance and readiness, enhancing resiliency, improving sustainability, reducing operational costs, and expanding capabilities.

2. Plan Components and Requirements The Plan shall be structured into the following four distinct components.

2.1. Component 1: Legacy Waste Management Project (Firm-Fixed-Price) This component is a single, discrete Firm-Fixed-Price (FFP) project awarded at the time of the main contract award. The Contractor’s proposed price shall encompass all labor, materials, equipment, and activities required to achieve the following:

2.1.1. Objective: The Contractor shall manage and achieve the final elimination of all legacy waste materials, including Nitrocellulose Fines, existing at the start of the contract’s Period of Performance (as detailed in Attachment XXX).

2.1.2. Performance Requirement: The Contractor shall reduce the total inventory of legacy waste by no less than 25% annually from the initial baseline, achieving 100% elimination of all legacy waste by the end of the fourth year of the contract.

2.1.3. Reporting: The Contractor shall track and document all reduction activities via an annual “Legacy Waste Reduction Report" submitted in accordance with CDRL XXX-XXX.

2.2. Component 2: Strategic Facility Self-Investment

This component governs projects that are 100% financed by the Contractor and are not otherwise required by the contract.

2.2.1. Project Criteria: To qualify, a proposed project must demonstrably reduce long-term operating costs, increase production flexibility or surge capacity, add capabilities, or otherwise improve the strategic viability of RFAAP.

2.2.2. Funding and Cost: All project costs shall be financed exclusively by the Contractor. Such costs shall not be recovered from the Government, and no Government matching funds will be provided.

2.2.3. Intellectual Property (IP): The Government acquires no IP rights resulting from these projects unless separately negotiated.

2.3. Component 3: Integrated Facility Upgrade and Reset Program (Firm-Fixed-Price, Co-funded)

The Contractor shall execute a single, integrated program to rapidly modernize RFAAP, enhance operational readiness, and ensure a safe production environment.

2.3.1. Funding: The Government will co-invest up to a total program gap of $660M. The Contractor’s cost-share portion is not recoverable from the Government. This FFP CLIN may be re-baselined post-award, subject to Government fund availability.

2.3.2. Intellectual Property (IP): The Government shall acquire Unlimited Rights for all IP resulting from any project under this program.

2.3.3. Performance Period: The program must be executed on an accelerated schedule:

2.3.3.1. Initial Improvements: Demonstrated improvements in safety and operational efficiency must be realized within the first six (6) months of the operational control start date.

2.3.3.2. Program Completion: All projects within this program must be completed within three (3) years of the operational control start date.

2.3.4. Prioritized Scope of Work: The Contractor shall execute a prioritized, integrated plan with a “Safety First” approach. The foundational element must be a comprehensive overhaul of safety systems, followed by facility and production upgrades. The scope includes, but is not limited to:

2.3.4.1. Safety Modernization (Top Priority): Modernize all safety equipment, processes, and management systems (e.g., interlocks, OSHA guarding, training, PPE, egress).

2.3.4.2. Facility and Production Upgrades: Perform major maintenance beyond the PWS baseline; update employee support and production facilities; implement energy conservation; optimize the Modernized NC Facility to remove legacy dependencies; upgrade core infrastructure; execute demolition and surge removal of excess equipment; and implement modern security technologies.

2.3.4.3. Explosive Safety Compliance: The plan must incorporate an Explosive Site Safety strategy compliant with DoDM 4145.26.

2.4. Component 4: Long-Term Modernization Strategy

The Contractor shall develop and maintain a comprehensive, long-range (10+ year) modernization strategy for RFAAP.

2.4.1.1. Purpose: This strategy will serve as the primary input to inform the Government’s prioritization, planning, budgeting, and awarding of future, fully Government-funded modernization projects.

2.4.1.2. Planning Assumptions: The strategy shall be based on a notional budget of $3.5B to $4.5B over a 10-year period, with the assumption that no single year will exceed $1B in funding.

3. Deliverables and Administration The Contractor shall manage all proposals, progress reporting, intellectual property assertions, and closeout actions for all four components of the Facility Investment and Modernization Plan through the following integrated deliverables:

3.1. Facility Investment and Modernization Plan [CDRL XXX-001]: The initial, comprehensive Plan containing detailed processes for all four components for the first year of performance.

3.2. Annual Plan Update [CDRL AXX-002]: On an annual basis, the Contractor shall submit a complete update to the Facility Investment and Modernization Plan to the Contracting Officer for review and acceptance. This update will serve as the formal mechanism to:

3.2.1.1. Propose all new projects for the upcoming year for all four investment components.

3.2.1.2. Provide any necessary revisions to the long-term strategy and roadmap.

3.2.1.3. Re-baseline long-range schedules and priorities for ongoing efforts.

3.2.2. Quarterly Investment and Modernization Progress Report [CDRL AXX-003]: The Contractor shall submit a single, comprehensive quarterly report detailing progress against the currently accepted Plan. This report shall include, for all active projects across all four components,:

3.2.2.1. A summary of work performed and progress against milestones.

3.2.2.2. Current financial status, including expenditure tracking for both Contractor and Government funds.

3.2.2.3. Auditable documentation demonstrating the Contractor’s cost-share portion has not been amortized or recovered.

3.2.2.4. Schedule performance and risk updates.

3.2.2.5. A formal assertion of any Intellectual Property (IP) generated from projects completed during the quarter, granting the Government the contractually required rights (e.g., Limited, Unlimited).

3.2.3. Final Facility Upgrade and Reset Completion Report [CDRL AXX-004]: Upon completion of the three (3)-year reset period, the Contractor shall submit a final, one-time report summarizing the accomplishments, final costs, and overall outcomes of the Facility Reset component. This report shall include a final assertion of all IP generated during the reset and grant the Government Unlimited Rights.