Section_8.0_Contractor_s_Price_Proposal_5.4.26.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Campus Wayfinding Message Updates
- Solicitation number
- BPM056927
- Issued by
- Anne Arundel County, Maryland
About this file
This is a contractor's price proposal form for Anne Arundel Community College's Campus Wayfinding Message Updates project (C2026-21-P) located in Maryland. The project involves modifications to existing exterior wayfinding signage on the college's Arnold campus, necessitated by the renovation of the Florestano building into a new Student Services Center. The scope of work encompasses 64 line items addressing various signage types, including Building ID signs, Campus Map Directories, Vehicular Directional signs, Directional signs, Single Post Directional signs, and Smoke Free Campus signs distributed across multiple campus locations. Work tasks include removing existing vinyl messages, repainting sign fields in dark green or blank finishes, installing new vinyl messages, and in one instance providing a full replacement sign. All work must be completed in accordance with the RFP specifications and any issued addenda prior to proposal receipt.
The price proposal spreadsheet requires contractors to enter unit prices and calculate total costs for each of the 64 line items, with all entries currently showing $0.00 pending contractor completion. Contractors must sign page 36 of the RFP in addition to submitting this completed spreadsheet and are responsible for verifying that all cost calculations are accurate. The proposal does not specify pricing terms, set-asides, incumbent information, funding sources, or contract award and performance dates within this section, as these details would be contained in other sections of the RFP documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet
| Anne Arundel Community College |
| Project C2026-21-P Campus Wayfinding Message Updates |
| Section 8.0 - Contractor's Price Proposal (5/7/26) |
| Name of Contractor: | |
| Contractor Representative: | |
| Date: | |
| Please sign page 36 of the RFP in addition to completing this spreadsheet for Section 8.0 Contractor's Price Proposal. |
All work to be done in accordance with RFP Project No. C2026-21-P, including addenda issued prior to date of receipt of proposals.
| **Firm is responsible for confirming all totals are calculated correctly** | |||||||||||||
| ITEM NO. | SIGN TYPE | SIGN NUMBER | DESCRIPTION | SLP PAGE NO. | NEW MAP | • Remove existing vinyl messages | Vinyl Building Acronym Replacement | Z-clipped Removable Panels | Welded Panels | NOTES | QTY | UNIT PRICE | TOTAL COST |
| • Repaint dark green field of sign | |||||||||||||
| • Install new vinyl messages | |||||||||||||
| 1 | BID | 85 | Building ID | SLP.06 | Side A | x | 1 | $0.00 | |||||
| 2 | BID | 86 | Building ID | SLP.06 | Side A | x | 1 | $0.00 | |||||
| 3 | BID | 87 | Building ID | SLP.13 | Side A | x | Repaint Sign A so it's a blank face | 1 | $0.00 | ||||
| 4 | BID | 88 | Building ID | SLP.14 | Side A | x | 1 | $0.00 | |||||
| 5 | BID | 91 | Building ID | SLP.14 | Side A | x | 1 | $0.00 | |||||
| 6 | BID | 92 | Building ID | SLP.14 | Side A | x | 1 | $0.00 | |||||
| 7 | BID | 94 | Building ID | SLP.14 | Side A | x | Repaint Sign A so it's a blank face | 1 | $0.00 | ||||
| 8 | BID | 95 | Building ID | SLP.14 | Side A | x | 1 | $0.00 | |||||
| 9 | BID | 103 | Building ID | SLP.19 | Side A | x | 1 | $0.00 | |||||
| 10 | BID | 111 | Building ID | SLP.19 | Side A | x | 1 | $0.00 | |||||
| 11 | BID | 121 | Building ID | SLP.14 | Side A | x | 1 | $0.00 | |||||
| 12 | CM | 2 | Campus Map Directory | SLP.12 | Side A | x | 1 | $0.00 | |||||
| 13 | CM | 6 | Campus Map Directory | SLP.08 | Side A | x | 1 | $0.00 | |||||
| 14 | CM | 20 | Campus Map Directory | SLP.15 | Side A | x | 1 | $0.00 | |||||
| 15 | CM | 46 | Campus Map Directory | SLP.04 | Side A | x | 1 | $0.00 | |||||
| 16 | CM | 64 | Campus Map Directory | SLP.17 | Side A | x | 1 | $0.00 | |||||
| 17 | CM-2 | 81 | Campus Map Directory | SLP.03 | Side A | x | 1 | $0.00 | |||||
| 18 | CM-2 | 83 | Campus Map Directory | SLP.06 | Side A | x | 1 | $0.00 | |||||
| 19 | CM-2 | 97 | Campus Map Directory | SLP.15 | Side A | x | 1 | $0.00 | |||||
| 20 | CM-2 | 100 | Campus Map Directory | SLP.20 | Side A | x | 1 | $0.00 | |||||
| 21 | CM-2 | 101 | Campus Map Directory | SLP.20 | Side A & B | x | 1 | $0.00 | |||||
| 22 | CM-2 | 119 | Campus Map Directory | SLP.13 | Side A & B | x | 1 | $0.00 | |||||
| 23 | CM-2 | 134 | Campus Map Directory | SLP.18 | Side A & B | x | 1 | $0.00 | |||||
| 24 | LVD | 10 | Vehicular Directional | SLP.09 | Side A | Side A & B | x | Side B has Parking updates | 1 | $0.00 | |||
| 25 | LVD | 24 | Vehicular Directional | SLP.15 | Side A | x | 1 | $0.00 | |||||
| 26 | LVD | 45 | Vehicular Directional | SLP.07 | Side A & B | Side B | x | 1 | $0.00 | ||||
| 27 | LVD | 47 | Vehicular Directional | SLP.04 | Side A & B | Side B | x | 1 | $0.00 | ||||
| 28 | LVD | 51 | Vehicular Directional | SLP.03 | Side A & B | Side A & B | x | 1 | $0.00 | ||||
| 29 | LVD | 62 | Vehicular Directional | SLP.17 | Side A & B | x | 1 | $0.00 | |||||
| 30 | SD | 1 | Directional | SLP.12 | Side A & B | x | 1 | $0.00 | |||||
| 31 | SD | 3 | Directional | SLP.12 | Side A & B | x | Repaint both dark green & white fields of sign | 1 | $0.00 | ||||
| 32 | SD | 5 | Directional | SLP.08 | Side A | Side B | x | Side A has Parking updates | 1 | $0.00 | |||
| 33 | SD | 9 | Directional | SLP.08 | Side A & B | Side A | x | Side A has Parking updates | 1 | $0.00 | |||
| 34 | SD | 12 | Directional | SLP.14 | Side A | Side B | x | 1 | $0.00 | ||||
| 35 | SD | 15 | Directional | SLP.13 | Side A | Side A | x | 1 | $0.00 | ||||
| 36 | SD | 21 | Directional | SLP.21 | Side A & B | Side A & B | x | 1 | $0.00 | ||||
| 37 | SD | 26 | Directional | SLP.15 | Side A & B | Side A & B | x | 1 | $0.00 | ||||
| 38 | SD | 27 | Directional | SLP.21 | Side B | x | 1 | $0.00 | |||||
| 39 | SD | 28 | Directional | SLP.21 | Side A & B | Side B | x | 1 | $0.00 | ||||
| 40 | SD | 36 | Directional | SLP.27 | Side B | x | 1 | $0.00 | |||||
| 41 | SD | 44 | Directional | SLP.18 | Side A & B | Side B | x | Side B has Parking updates | 1 | $0.00 | |||
| 42 | SD | 50 | Directional | SLP.03 | Side B | Side B | x | 1 | $0.00 | ||||
| 43 | SD | 57 | Directional | SLP.22 | Side A | x | 1 | $0.00 | |||||
| 44 | SD | 61 | Directional | SLP.25 | Side B | Side B | x | Side B has Parking updates | 1 | $0.00 | |||
| 45 | SD | 63 | Directional | SLP.17 | Side A & B | x | 1 | $0.00 | |||||
| 46 | SD | 72 | Directional | SLP.10 | Side A & B | x | 1 | $0.00 | |||||
| 47 | SD | 76 | Directional | SLP.19 | Side B | Side B | x | 1 | $0.00 | ||||
| 48 | SD-2 | 55 | Directional | SLP.02 | Side A | x | 1 | $0.00 | |||||
| 49 | SPD | 16 | Single Post Directional | SLP.20 | Side A | Side B | x | 1 | $0.00 | ||||
| 50 | SPD | 58 | Single Post Directional | SLP.28 | Side A | x | 1 | $0.00 | |||||
| 51 | SPD | 59 | Single Post Directional | SLP.22 | Side A | x | 1 | $0.00 | |||||
| 52 | SPD | 73 | Single Post Directional | SLP.14 | Side A & B | x | 1 | $0.00 | |||||
| 53 | SPD | 96 | Single Post Directional | SLP.15 | Side A | x | 1 | $0.00 | |||||
| 54 | SPD | 120 | Single Post Directional | SLP.13 | x | New full replacement sign needed. | 1 | $0.00 | |||||
| 55 | SPD | 128 | Single Post Directional | SLP.08 | Side A & B | x | 1 | $0.00 | |||||
| 56 | SPD | 129 | Single Post Directional | SLP.12 | Side A & B | x | 1 | $0.00 | |||||
| 57 | SPD | 130 | Single Post Directional | SLP.13 | Side B | Side A | x | 1 | $0.00 | ||||
| 58 | SPD | 132 | Single Post Directional | SLP.18 | Side B | x | 1 | $0.00 | |||||
| 59 | SPD | 137 | Single Post Directional | SLP.26 | Side A & B | x | 1 | $0.00 | |||||
| 60 | SPD | 138 | Single Post Directional | SLP.13 | Side A & B | x | 1 | $0.00 | |||||
| 61 | SPD | 142 | Single Post Directional | SLP.13 | Side A | x | 1 | $0.00 | |||||
| 62 | SM | 114 | Smoke Free Campus Sign | SLP.01 | Side B | Side A | x | Replace logo on Side A without repainting | 1 | $0.00 | |||
| 63 | SM | 115 | Smoke Free Campus Sign | SLP.05 | Side B | Side A | x | Replace logo on Side A without repainting | 1 | $0.00 | |||
| 64 | SM | 116 | Smoke Free Campus Sign | SLP.16 | Side B | Side A | x | Replace logo on Side A without repainting | 1 | $0.00 | |||
| 65 | Other (specify): | ||||||||||||
| 66 | Other (specify): | ||||||||||||
| 67 | Other (specify): | ||||||||||||
| TOTAL COST FOR PROJECT WORK: | $0.00 |