This is a solicitation for repair of fire suppression and automatic transfer switch systems at Buildings B154 and B155. The solicitation was issued by the Department of the Air Force Air Mobility Command. Products and services required include repair of fire suppression systems and automatic transfer switches. The response date is not provided in the document. The anticipated award date is also not included. Pricing terms, set asides, incumbents, and other salient contracting details are not specified in this amended solicitation notice.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA442724R00040003.pdf | ||
| Amendment 0003 SF 30.pdf | ||
| Solicitation - FA442724R00040002.pdf | ||
| Amendment 0002 SF 30.pdf | ||
| Work Completed SOW B154-B155.pdf | ||
| Solicitation - FA442724R0004 0001.pdf | ||
| Amendment 0001 SF 30.pdf | ||
| SOW XDAT18-1083 REPAIR BUILDINGS B154 B155.pdf | ||
| Davis Beacon Wage Determination Dated 16NOV23.pdf | ||
| Security Clause (1).pdf | ||
| SECTION 01 56 00_Environmental Specifications April 2019.pdf | ||
| Solicitation - FA442724R0004.pdf | ||
| Travis Facilities Excellence Guide.pdf | ||
| SECTION 01 03 00 PROJECT CLOSEOUT AUG 13.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Travis AFB, CA 03/22/19
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01000
22 Mar 2019
1.1 PRINCIPAL FEATURES
1.2 DEMOLITION, REMOVALS, AND EXCESS MATERIALS
1.3 EXCAVATION
1.4 UTILITY OUTAGES
1.4.1 Electrical Distribution System
1.5 CONTRACTOR’S STORAGE AREA
1.6 CONTRACTOR SECURITY OF JOB SITE
1.7 CONTRACTOR WORK TRAILER (ON SITE OFFICE)
1.8 WORKING HOURS
1.9 FIRE PREVENTION
1.9.1 Fire Prevention Rules
1.9.1.1 Smoking
1.9.1.2 Fire Reporting
1.9.1.3 Heating
1.9.1.4 Electrical
1.9.1.5 Housekeeping
1.9.1.6 Flammable Liquids
1.9.1.7. Liquid Powered Equipment
1.9.1.8 ARC Welding, Torch Welding, Cutting, and Brazing
1.9.1.9 Asphalt and Tar Kettles
1.10 SUBMITTAL REQUIREMENTS
1.11 REVIEW OF SUBMITTALS
1.11.1 Channel of Submission
1.11.2 Shop Drawings
1.11.3 Approvals of Substitutions
1.12 TRADE NAMES
1.13 PROTECTION
1.14 MAINTENANCE
1.15 SPECIFICATIONS
1.16 CALL FOR FINAL INSPECTION
1.17 PROGRESS CHART
1.18 CONTRACTOR DAILY REPORT TO INSPECTOR
1.19 FLIGHTLINE ACCESS
1.20 EQUIPMENT LIST AND MAINTENANCE MANUALS
1.21 AS-BUILT DRAWINGS
1.21.1 GeoBase Spatial Data Requirements
1.22 QUALITY CONTROL
1.23 BASE REGULATIONS
1.24 PEST MANAGEMENT
1.25 LEAD BASED PAINT REMOVAL, CONTAINMENT AND DISPOSAL
1.25.1 Contractor to Provide
1.25.2 Containment of LBP
1.25.3 Safety and Health Compliance
1.25.4 Removal of LBP
1.25.5 Disposal and Transportation
1.25.6 Daily Cleanup
1.26 ASBESTOS CONTAINING MATERIAL REMOVAL, CONTAIMENT AND DISPOSAL
1.26.1 Demolition
1.26.2 Compliance
1.26.3 Management of ACM
1.26.4 Submittals
1.26.4.1 Health and Safety Plan
1.26.4.2 Materials
1.26.4.3 Additional Requirements (If Required):
1.27 SPECIAL WORKING CONDITIONS AND WORK SCHEDULE
1.28 Street Closures and Traffic Control
1.29 CONTRACTOR’S RESPONSIBILITIES:
1.29.1 Contractor Site Visit Prior to Closing
1.29.2 Advanced Notification
1.29.3 Emergency Telephone Number of Contractor’s Representative
1.30 ENVIRONMENTAL MANAGEMENT
1.30.1 Contractor’s Responsibilities for Regulatory Compliance
1.30.2 Hazardous Materials Registration
1.30.3 Recycling and Solid Waste
1.30.5 Air Quality
1.30.6 Building Demolition, Asbestos, Lead, PCB (Polychlorinated Biphenyl)
1.30.7 Hazardous Materials and Hazardous Wastes Handling
1.30.8 Hazardous and Non-Hazardous Wastes Manifesting
1.30.9 Water
1.30.10 Spills
1.31 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY - DD FORM 1354 ...28
1.30.11 Environmental Impact Analysis Program
1.30.12 Natural and Cultural Resources Management
1.31 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY - DD FORM 1354... 28
-- End of Section Table of Contents --
DIVISION 1 - GENERAL
SECTION 01000
SPECIAL PROVISIONS
1.1 PRINCIPAL FEATURES
The principal features are defined in the Scope of Work for Each delivery order as assorted pavement projects across Travis AFB, CA.
1.2 DEMOLITION, REMOVALS, AND EXCESS MATERIALS
All materials, equipment, and refuse generated through the demolition work required by this contract shall become the property of the contractor and shall be disposed of by the contractor off base at the contractor's expense unless specifically listed otherwise in the drawings or demolition section of the specifications. The contractor should be aware that within the confines of Fairfield, California, including Travis Air Force Base, if the contractor subcontracts for the removal of debris/refuse that the City of Fairfield has an exclusive franchise agreement with Solano Garbage Company,
(707) 422-4244, to perform such service. Hazardous material removal and disposal shall be accomplished in accordance with all applicable codes and regulations and shall be the sole responsibility of the contractor.
1.3 EXCAVATION
Excavation of any kind is prohibited prior to processing a duly executed Excavation Permit 60 AMW Form 55. Excavation Permits are only valid for a 90 calendar day period and only as much excavation work that can be accomplished in 90 days shall be processed on any individual Excavation Permit. The contractor shall mark the area to be excavated at the site in white chalk paint prior to processing the Excavation Permit and shall provide a drawing/sketch of the area to be excavated along with the Excavation Permit form. The contractor shall maintain the utility markings for the 90 days or until all excavation is completed. Excavation prior to completion of such permit shall be at the contractor’s risk. Any damage to utilities or other government property as a result of such excavation shall be repaired or replaced by the contractor at no additional cost to the government. Any damage to utilities owned or maintained by other companies will be repaired by the contractor or will be paid for by the contractor for the company to repair the utility at the company’s option. Processing the permit is the responsibility of the contractor and will require the contractor to take the drawings and permit to Bldg 878 Conference Room on Tuesday at 1000 hours for coordination. It must be submitted no later than 0900 hours that morning to be considered for the 1000 hours coordination.
In addition, the contractor shall contact Underground Service Alert for review and coordination by commercial telephone, gas, and electrical companies before submitting the Excavation Permit. Depending on personnel availability, complete processing may be expected to take up to 10 working days. The contractor will be notified when the Excavation Permit is signed and ready.
Environmental Element, 60 CES/CEIE - If the evidence of possible soil contaminants is found in the process of excavation and/or soil removal, Natural Resources
Management, 60 CES/CEAN, shall be notified immediately by submitting notification through the Contracting Officer.
1.4 UTILITY OUTAGES
Outages for utility tie-ins/shut downs require prior approval of the Contracting Officer. All requests for outages shall be submitted in writing to the Contracting Officer at least 21 calendar days in advance of the proposed date unless specifically indicated otherwise elsewhere in the contract documents.
1.4.1 Electrical Distribution System
(a) Overview. The electrical distribution utility system at Travis AFB is owned and operated by City Light & Power (“system owner”) as part of the USAF utilities privatization (UP) program. The electrical distribution system includes but is not limited to all electrical manholes and lids, hand holes, access points, overhead distribution poles, distribution lines, transformers, switchboxes and any other connecting facility.
(b) Access. In order to gain access to the electrical distribution system, permission must be granted by the system owner in writing prior to the contract start date. Access to the electrical distribution system includes but is not limited to: The uncovering of manholes and hand holes or any other access points, the capping of or tapping into service feeders, transformers, switchboxes and any other connecting facilities. For questions regarding access to these systems the system owner can be contacted at:
City Light & Power, Inc.
260 Hangar Ave.
Travis AFB, CA 94535 bge@clpinc.com
(c) Permanent connections, and disconnections. The contractor is responsible for contacting, coordinating, compensating, and establishing a contract with the system owner for new installations, or for the removal of connecting facilities. A point of demarcation is to be identified by the Government and the requested scope of work will be performed by the system owner up to that point of demarcation.
Permanent connections to the electrical distribution system are to include but are not limited to: The disconnection from, the capping off of, or otherwise altering or splicing of a service feeder. The addition and the removal of transformers, switchgear, panelboards, and other facilities connected to the distribution system.
(d) Modifications to existing infrastructure. The contractor is responsible for contracting, coordinating, compensating, and establishing a contract with the system owner to construct new installations, or for the removal of existing infrastructure. A point of demarcation is to be identified by the Government and the requested scope of work will be performed by the system owner up to that point of demarcation.
Modifications to existing infrastructure are to include but are not limited by: The raising/lowering of manholes and hand holes or other adjustment of their location. The removal or adjustment of light and utility poles.
mailto:bge@clpinc.com
(e) Contract between system owner and Contractor. The system owner will develop the SOW and a cost proposal for the project. Once the SOW and proposal are agreed upon, the Contractor shall sign the proposal and issue a purchase order to the system owner. System owner is operating under the UP electrical contract and is not obligated by the requirements, terms or conditions that were included in the contract with the Government. Furthermore, the system owner is not responsible for submittal requirements regarding materials, schedules, insurance, design drawings, certified payroll, safety plans, or testing results.
Additionally, the system owner is not a subcontractor to the Contractor and will not sign a subcontract agreement.
1.5 CONTRACTOR’S STORAGE AREA
At the time of contract award, the Government may assign an outside area to the contractor for the storage of his supplies and equipment. The contractor shall provide an identification sign posted at the area, stating contract title (S), contract number (S), contractor’s name, original contract completion date (s), and emergency phone number for all contracts currently in progress at TAFB. The contractor shall be responsible for his own security and weatherproofing. Missing or damaged material shall be replaced by the contractor at no additional cost to the Government at the completion of the contract. The location of the contractor storage area will be determined by the Contracting Officer. Base policy is to locate all contractor storage areas in a confined area off of Hangar Avenue behind David Grant Medical Center. Contractors are required to perform basic housekeeping within the designated area on a regular basis, to include repairing fence material, subject to quality assurance inspection by base personnel.
1.6 CONTRACTOR SECURITY OF JOB SITE
The Contractor shall be required to fence off the construction site and have all access gates secured with keyable locks. The fence shall be of chain link with brown fabric and be 6 feet high minimum. The Contractor shall furnish the duplicate gate keys to the base fire chief, and the designated construction inspector.
a. All temporary fences and structures that the contractor uses to protect his materials shall be removed at project completion.
b. The storage area shall be cleaned of all debris and demolition material and repaired as required to bring the site back to its original condition.
1.7 CONTRACTOR WORK TRAILER (ON SITE OFFICE)
The Contractor may provide an on site office trailer as necessary for the accomplishment of the work. The trailer shall conform to the following criteria: Trailer shall be well maintained, and not appear in a condition requiring extensive repair, trailer color shall be light beige for the body, with optional medium to dark brown trim. In no case shall a trailer be permitted on the work site unless color is approved by the Contracting Officer. It may be required to locate contractor work trailer in an area not adjacent to the construction site. Location of the contractor work trailer must be approved by the Contracting Officer.
1.8 WORKING HOURS
Work shall be performed during normal work-week, 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding Federal Legal Holidays and/or days not worked by the Government in observance of such Federal Legal Holidays. Work shall not be performed at any time other than the normal work-week without obtaining written approval of the Contracting Officer at least seven (7) calendar days in advance.
1.9 FIRE PREVENTION
Responsibility: The Base Fire Chief or his representative will attend pre-construction conferences to brief contractors on pertinent fire regulations and to provide guidance for fire safe operations during contract performance. Fire prevention guidance will be furnished to the contractor for briefing his personnel.
1.9.1 Fire Prevention Rules
1.9.1.1 Smoking
a. Use of cigars, cigarettes, matches, and mechanical lighters is prohibited in buildings used for storage, repair, processing, or servicing except in areas designated as “Authorized Smoking” as approved by the Base Fire Chief or his designated representative. Areas so designated shall be marked by suitable signs.
b. Discarded smoking materials shall be placed in special non-combustible receptacles. At the close of business, or upon cessation of operations each day, these receptacles shall be removed from the building and the contents disposed of in a fire-safe manner.
c. Smoking is prohibited in any facility or area where any painting is being done. Smoking is prohibited within 50 ft of storage, repair, servicing, processing. Smoking is prohibited within 100ft of any hazardous vapors or materials being used.
1.9.1.2 Fire Reporting
Any person who discovers a fire shall report it immediately, even when it is extinguished without the aid of the Fire Department. This shall be done by:
a. Sounding the alarm locally be activating the installed fire alarm or by shouting to notify the occupants.
b. Telephone reporting of fires:
1. All base phones: Dial 424-4911.
2. To report a fire using a cell phone: Dial 707-424-4911.
c. Giving the Fire Department the following information:
1. Building number or physical address.
2. Type of fire (building, grass, automobile, electrical, metals, fuels, etc.)
3. Exact location of the fire in the building (1st, 2nd, 3rd floor, north end, south end, etc.)
4. Name of person reporting the fire.
1.9.1.3 Heating
Non-explosion proof electrical heaters and all open flame heaters are prohibited for use in any facility or area where volatile vapors are present or may accumulate.
1.9.1.4 Electrical
a. During Fire Prevention inspections, all appliances deemed unsafe and connected to an electrical distribution system shall be disconnected from the electrical system until approved by a competent electrician.
b. In buildings where volatile liquids are used and/or stored, only vapor-proof type drop cords shall be used.
c. All flexible cords on appliances shall be UL listed and rated for the type of working being accomplished. Cords shall be continuous lengths and kept in good condition without splice tape.
1.9.1.5 Housekeeping
a. Trash shall not be allowed to remain in any area or building overnight.
b. Only non-combustible trash containers and waste paper containers shall be used.
c. Trash shall not be allowed to accumulate on the floors, in attics, or underneath stairwells or buildings. Attics and the area underneath stairwells shall not be used for storage without prior written approval of the Base Fire Chief by submitting request through the Contracting Officer.
d. Outdoor trash receptacles shall be located at a reasonable safe distance from buildings. Trash and litter, including scrap lumber, shall not be stacked less than twenty (20) feet from any building.
e. Rags shall be kept in a metal container with metal lid. Oily rags shall be removed from the building at the end of each work day. All containers shall be properly labeled with contents.
1.9.1.6 Flammable Liquids
a. Flammable liquids shall be stored only in designated buildings and areas with “FLAMMABLE” AND “NO SMOKING” signs prominently posted.
b. Gasoline shall not be stored in any building on Travis AFB without written approval from the Base Fire Chief by submitting request through the Contracting Officer.
c. A supplemental supply of flammable liquids kept on the premises shall be limited to the amount necessary for one day’s use. This supply shall be kept in approved safety cans stenciled with the name of contents and the word “FLAMMABLE”.
d. All paint storage sheds shall be at least fifty (50) feet from any building.
e. All spray painting shall be done in compliance with established industry safety practices and current regulations.
f. Blow torches or any type of open flame are prohibited for removing paint or tile from any type of surface.
g. The tanks on any small gasoline powered engine shall be drained and purged before storing in any building on Travis AFB unless a specific building is designated for this purpose and approved in writing by the Base Fire Chief by submitting request through the Contracting Officer.
1.9.1.7. Liquid Powered Equipment
a. In all areas where an accumulation of explosive gases is likely to occur from the use of power equipment, adequate ventilation shall be maintained.
b. Privately owned vehicles shall not be parked in any building or structure other than those designated and approved in writing for this purpose.
1.9.1.8 ARC Welding, Torch Welding, Cutting, and Brazing
a. Welding, cutting, or brazing permit is needed regardless of proximity to facility, other than approved welding shops, will require permission from the Fire Department and the issuance of a Welding Permit.
Any open flame (welding, tar kettles, etc.) will require a welding permit.
Call 424-2328 to have a permit issued.
b. Backflow protection shall be provided by an approved device that shall prevent oxygen from flowing into the fuel gas supply system or fuel gas from flowing into the oxygen supply system.
c. Flashback protection shall be provided by an approved device that shall prevent the flame from passing into the fuel gas supply system.
d. Only certified welders shall operate welding equipment.
e. All equipment shall be inspected daily for damage, loose connections, and unsafe conditions. Repair or replacement shall be made if required.
f. When precautionary measures have been taken and fire hazards continue to exist, a fireguard provided with suitable fire extinguishing equipment shall be stationed near the welding location.
g. During any work in which a concentration of flammable vapors or dust is likely, all open flames shall be extinguished and the building shall be adequately ventilated. Precautions shall be taken to insure that electrical circuits are not activated.
h. Do not shut off water mains and fire hydrants or perform any maintenance that will interfere with the water supply on the Base without first notifying the Base Fire Protection Branch, 424-3886.
i. For all potential fire hazards and actual emergencies not specifically covered in this section, the exercise of good common sense will usually suffice. When in doubt, call the Fire Prevention Section for assistance, 424-2328 or 424-3683.
1.9.1.9 Asphalt and Tar Kettles
a. Asphalt and tar kettles shall be located a minimum of twenty (20) feet from any building. Kettles in use shall be continuously supervised.
b. Asphalt and tar kettles shall be equipped with a temperature gauge.
The temperature gauge shall be kept visible and in good working order.
c. Containers of compressed gas for heating tar shall be secured to prevent falling.
d. Two (2) portable fire extinguishers shall be provided. Each extinguisher shall have a minimum rating of 10 BC. These extinguishers shall be fully charged and within fifteen (15) feet of the tar kettle during kettle operations.
e. For all potential fire hazards, call the Fire Department for assistance at 424-3886.
f. For actual emergencies not specifically covered in this guide, call 424-4911 from Base phones.
1.10 SUBMITTAL REQUIREMENTS
For submittal requirements refer to the contract documents and the technical specifications. If exact products are specified in the contract documents, and the contractor intends to use those same products in the construction work, submittal requirements in Section J, Attachment 4, and the technical specifications for catalogue cuts, manufacturer’s literature, and samples are waived. The contractor shall provide a list of products that fall into this “intended use of exact product specified” category along with the manufacturer’s installation/application instruction for each product on the list. This list and manufacturer’s installation/application instructions shall be provided at the pre-construction conference for review and approval by the Contracting Officer.
1.11 REVIEW OF SUBMITTALS
The Government’s review will be limited to determination of the submittals’ conformance with design concept and general requirements of the project.
Approval by the Government shall not absolve the contractor from his responsibilities for specific performance of the item or items submitted.
Time allowed for original and any subsequent reviews shall be ten (10) working days after receipt by the Contracting Officer, except for substitutions. Submittals consist of the following:
a. Shop drawings (4 copies).
b. Catalog cuts and manufacturer’s literature (4 copies).
c. Samples (2 copies).
d. Manufacturer’s Installation Instructions.
1.11.1 Channel of Submission
Submittals will be accepted only from the contractor (not sub-contractor or material supplier). Contractor shall check submittals for completeness, accuracy for construction purposes, and conformance with contract requirements. Contractor shall indicate his approval on each submittal. All material submittals shall be provided to the Contracting Officer for approval utilizing AF Form 3000.
1.11.2 Shop Drawings
Shop drawings shall be prepared by persons competent and experienced in trade involved. Drafting skill is not a requirement but accuracy and completeness are. Drawings shall reflect field measurements and conditions and shall show the relationship of the item to adjacent materials.
1.11.3 Approvals of Substitutions
With any request for approval of substitutions, the contractor shall submit to the Government complete data including performance and chemical makeup for both specified and proposed item. For all products that differ from those specified, the word “substitution” shall be clearly indicated in the element description of AF Form 3000. Approvals of substitutions will require 20 working days for review after submittal to the Contracting Officer.
1.12 TRADE NAMES
Trade names of specific products in this specification are used only for purposes of defining general quality and performances. They are not used to preclude the use of products of equal characteristics by other manufacturers. The Government reserves the right to determine equality.
Physical dimensions, color, and texture will also be considered in determining equality. All items will be submitted one time for approval.
1.13 PROTECTION
Contractor shall be solely responsible for furnishing, erecting, maintaining, and removing all protective barriers, signs, temporary lighting, etc., required for protection of persons and property. Open flame devices of any kind are prohibited. Driving vehicles on grassed areas is prohibited during construction unless a request has been submitted in writing and approved by the Contracting Officer.
1.14 MAINTENANCE
During the construction period, all vegetation at the construction site and the storage area shall be maintained by the contractor. Maintenance shall include mowing grass and/or weeds at least weekly. All damaged or dead vegetation shall be replaced as directed by the Contracting Officer at no additional cost to the Government.
1.15 SPECIFICATIONS
These specifications are divided into several trade sections for convenience and not to establish the limits of the work required of any trade. It shall be the contractor’s responsibility to allocate the work between appropriate trades. In the event of a discrepancy between the contents of the accompanying drawings and specification(s), the specifications shall govern.
1.16 CALL FOR FINAL INSPECTION
To assure that all members of the inspection party can be notified and can make necessary arrangements to be available, the contractor shall provide the Contracting Officer with the proposed date for final inspection not less than seven (7) calendar days in advance. A pre-inspection will be made by the inspector prior to the scheduled final inspection. If the contract is not deemed complete, the final inspection will be postponed until the Government is satisfied that the project is ready. If construction deficiencies are identified, request for re-inspection shall be given at least two (2) working days in advance of the proposed date.
1.17 PROGRESS CHART
Reference FAR 52-236.15. The salient features of the Progress Schedule shall consist of a minimum of one item for each division of the specification. The divisions shall follow the CSI format below. The contractor need list only divisions that are used in the specifications. He may further subdivide each division as to best suit his needs. On the Progress Schedule, the contractor shall also provide columns breaking down labor and material percentages for each element of work so that they total the percentage in Column “C” on the schedule.
CSI Format:
1. Environmental 10. Doors and Windows
2. Submittals 11. Finishes
3. General 12. Specialties
4. Site Work 13. Equipment
5. Concrete 14. Furnishings
6. Masonry 15. Special Construction
7. Metals 16. Conveying Systems
8. Wood & Plastic 17. Mechanical
9. Thermal & Moisture Protection 18. Electrical
1.18 CONTRACTOR DAILY REPORT TO INSPECTOR
The Contractor shall provide a daily report to the Civil Engineering Construction Inspector through the Base Contracting Officer, or his designated representative. The daily report may be turned in on a weekly basis to the Base Contracting Office.
1.19 FLIGHTLINE ACCESS
a. General: For entry of contractor-owned vehicles to Travis AFB flightline, the contractor shall comply with the following procedures in accordance with TAFBI 13-103, Vehicle Operations on the Flightline.
b. Application and Approval Procedures for Commercial Vehicular Entry
Into Travis AFB Flightline:
1. Applications shall be prepared in letter form (3 copies) on company letterhead stationery, signed by the senior company representatives on Travis AFB, and submitted to the Chief, Airfield Management, 60 OSS/OSAA through the Contracting Officer. As a minimum, applications shall include the following information:
(a) Total number of vehicles requiring entry.
(b. Type, make, state of registration, and license number of each contractor vehicle.
(c) Location of company/firm name on each vehicle.
(d) Air Force contract number, type, and expiration date of contract.
(e) Frequency of entry into flightline areas on official business and justification therefore.
(f) An approval by the contract monitoring military unit/agency indicating mission necessity.
2. Approved applications (originals) will be returned through channels to the applicant. Applicant shall retain this letter for the duration of the contract period. The second copy will be forwarded to 60 SFS/SFA and the third copy will be retained by Base Operations, 60 OSS/OSAA. Base Operations shall be notified by letter immediately of any changes to paragraph 1.19.B.1.
1.20 EQUIPMENT LIST AND MAINTENANCE MANUALS
a. The contractor shall provide an equipment listing for all installed equipment. The listing shall be sequentially numbered and, as a minimum, contain the following information for each equipment item:
Type/description, date installed, date warranty expires, installed location, manufacturer, model number, serial number, Hp, volts and amps.
b. For all equipment required by this contract, the contractor shall also provide four (4) copies of complete maintenance and repair manuals including parts listings, flow diagrams, and control diagrams. Equipment list and maintenance manuals shall be provided and approved prior to final acceptance of work under this contract.
c. Install or replacement of bathroom equipment/dispensers or suitable substitute (i.e. toilet paper dispensers, paper towel dispensers, and wall mounted devices).
1.21 AS-BUILT DRAWINGS
a. By definition, the as-built drawings are an accurate record of the construction as actually installed and completed including all the information shown on the original set of contract drawings, unless work was deleted by modification or additive bid, and a record of all deviations, modifications or additions to the contract drawings however minor, which were incorporated in the work from notice to proceed until final acceptance.
b. Throughout the course of the work, the Contractor shall keep two
RECORD SETs of drawings and specifications. They shall be marked in red showing changes and deviations from the original contract set. Each change shall be dated and initialed by the Contractor and the Contracting Officer.
Changes shall be drawn as accurately as possible given field conditions and shall show all changes. Where changes were due to an approved change order or a field order, enter at the location of change, the change order number or field order number. Prior to final inspection, the Contractor shall submit a RECORD SET to the Government for review. The Project Inspector and Project Engineer will compare the RECORD SET with actual construction conditions for accuracy. The drawings shall include but not be limited to the following information:
1. The location and description of any utility lines or other installations of any kind or description known to exist within the construction area. The location includes dimensions of permanent features.
2. The location and dimensions of any changes within the building or structure.
3. Correct grade or alignment of structures or utilities if any changes were made from contract plans.
4. Changes in details of design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor including but not limited to fabrication, erection, installation plans and placing details, bolt sizes, dimensions of equipment foundations, etc.
5. All changes and modifications which result from the final inspection.
c. After receipt of the Government approved RECORD SET (red lines) along with a CD containing the original electronic design drawings, the Contractor shall prepare and submit an AS BUILT - redrawn in AutoCAD (,dwg) with actual construction conditions - set of drawings on 24" x 36" (D size) sheets. All site and building drawings will be to scale. All dimensions shall be expressed in inch-pound (English Imperial) and Standard International (SI) metric units. Travis AFB is presently using AutoCAD Map 2000 and utilizing Paper Space and Model Space in its drawing files. All drawing files must be compatible with Travis AFB CADD system. All files shall be DWG (AutoCAD) format. All drawings shall be drawn full size (1 to 1). Model Spaces shall be identical to the hard copy and only contain the data shown in the Model Space for that file. Also submit two CDs with digital AS BUIlT - sets of drawings on CD prepared using AutoCAD, version 2000 or higher, for Windows and in pdf format. All CDs and electronic and hardcopy drawings shall be labeled with the building number, drawing number, project number, project name, company name, and the date the CD/drawing was made. The drawing sheets shall be numbered consecutively starting with the cover sheet as sheet number 1. Sheet numbering shall be reflected as, for example, l of 8, 2 of 8, 3 of 8, etc. All electronic and hardcopy drawings shall be marked "AS BUILT" on each sheet with revision date. Show all changes that have been made and noted on the Government approved RECORD SET of drawings. Submit the final "AS BUILT" drawings on CD and hardcopy not later than 30 days after project completion. The Project Manager and Construction Inspector shall QC "AS BUILT" electronic files for correct data before submission to Engineering Technicians to archive. Electronic and hardcopy "AS BUILT" drawings shall be developed and delivered in the format specified by the latest version of the Tri-Service Spatial Data Standards (TSSDS). The TSSDS can be downloaded from the Tri-Service Center's Internet website at tsc.wes.army.mil.
d. All electronic drawings shall be in the following format:
1. Digital data files shall be provided in Vector format (modifiable drawings) and saved as a DWG file utilizing AutoCAD 2014, Release 15 platform or higher and pdf format in separate folders.
2. CADD data shall be provided on CD-ROM labeled "AS BUILT" with the building number, drawing number, project number, project name, company name, and the date the CD was made.
3. No zipped, compressed or spliced files will be accepted.
4. Drawing files may contain only one drawing per filename.
5. Electronic drawings must include an index specifying file names as they correspond to sheet names, i.e. for 0397M3.dwg, 03-97 is the assigned drawing number and M3 is the sheet name.
6. The Contractor shall ensure that the drawings which use external file references (XFREF's) shall be attached without device or directory specifications.
7. After design completion and Government acceptance the
Contractor shall retain a copy of a digital media (with all files included) for at least one year and during this period of time, will provide up to 2 additional copies of each to the Government at no additional cost.
8. Upon delivery of the final design drawings the Contractor shall provide a CD with the electronic CADD files for the government to review to ensure the files are completed and correct. The A-E shall submit two copies of the approved final design drawings on CD.
9. All software and electronic files shall be virus free.
e. The Contractor is encouraged to have the original Architect-Engineer complete the work under this section, as they will be most familiar with the drawings and requirements.
1.21.1 GeoBase Spatial Data Requirements
a. Work outside the boundary of existing footprints of buildings and structures shall require the submission of geospatial/mapping data. This includes, but is not limited to, building and structure footprints, utilities, infrastructure, survey data, etc. Contract requirements for the collection and delivery of georeferenced geospatial data shall specify either mapping or survey grade Global Positioning System (GPS) or traditional survey methods of data collection. The use of either mapping or survey grade GPS technology will depend on the precision requirements of the data. Deliverables that involve digital maps or other geospatial data must be delivered in a georeferenced Geographic Information System (GIS) format which would include Environmental Systems Research Institute’s (ESRI) shapefile and geodatabase formats. Detailed specifications for data precision, data collection, attribution, and file format delivery should be included in each contract.
b. All deliverables that involve maps or other geospatial data must meet the following requirements:
1. All maps and associated data must comply with the latest version of Spatial Data Standards for Facilities, Infrastructure, and Environmental (SDSFIE) available from the Air Force GeoBase website at https://www.sdsfieonline.org/Components/USAF. These data will be organized using SDSFIE 3.1.0.1 specifications (latest available as of February 2019) for file, feature class and attribute nomenclature.
Guidance on the latest version of SDSFIE is available from the Installation’s Geo Integration Office (GIO), 60 CES/CENME. Information must be collected at no less than 1:1200 scale for base cantonment areas and 1:4800 for large undeveloped base areas. Spatial data will meet or exceed National Map Accuracy Standards at those scales. Class and Feature level metadata will be provided in accordance with Air Force GeoBase Guidance and Governance and will use Federal Geographic Data Committee (FGDC), Content Standards for Digital Geospatial Metadata (CSDGM) for organization. Further guidance regarding data and metadata standards is available from the Installation GIO.
2. Geospatial data must be delivered in a georeferenced GIS format (feature-based file structures including one-to-one cardinality between spatial records and attribute records). All attribute data as specifically outlined in the contract must be included either in the GIS data file or as a separate table with a SDSFIE key variable that may be used to relationally join the separate table with the GIS data file. All geospatial data must be delivered in the Geographic Coordinate System WGS 1984. Further guidance on mapping units, coordinate systems, and projections is available from the Installation
GIO.
https://www.sdsfieonline.org/Components/USAF
3. Mapping or Survey Grade GPS or comparable traditional survey methods will be used to collect geospatial data. The use of mapping or survey grade GPS will depend on the precision requirements of the data.
These requirements will be identified in the specifications for all activities where geospatial data are involved. In the case of specifications involving utility construction, location and attribute data will be obtained at the time of excavation. Further information about precision requirements should be obtained from the Installation
GIO.
1.22 QUALITY CONTROL
The contractor shall maintain strict quality control during the construction period. The contractor shall provide a full time construction superintendent IAW FAR 52.236-6 Superintendence by the Contractor at all times during the period of construction. The construction superintendent shall maintain daily construction logs identifying daily progress. The construction logs shall be made available to the Government Inspector when requested by the Government.
1.23 BASE REGULATIONS
The contractor shall conform to all Base Regulations and directive (as specifically identified at the pre-Construction conference) that pertain to security, safety, traffic, fire, and personnel clearance, insofar as they apply to the contractor’s activities.
1.24 PEST MANAGEMENT
a. Terms explained:
1. PESTICIDE - Any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, any substance or mixture of substance used as a plant regulator, defoliant or desiccant.
2. PEST MANAGEMENT - Pest control or prevention by a comprehensive approach that considers various suppression techniques, the habitat of the pest, and relationship between the pest populations and the ecosystem.
3. PESTS - Includes numerous insects and related lower animals, terrestrial and aquatic plants (weeds), domestic and feral rodents, birds, feral predatory animals, snakes, nematodes, snails, algae, fungal plant diseases, marine wood borers, and other organisms, other than domestic animals, THAT ARE NOT DESIRABLE.
b. All pest management work shall comply with all federal, state, and local statutes and regulations regarding the application, transfer, treatment, storage, and disposal of pesticides. All pest management work shall also comply with Air Force Instruction 32-1053.
c. All pesticide applicators shall possess current state certifications. All applications shall be made under the direct supervision of certified personnel.
d. Certification and licensing documentations shall be submitted to the Contracting Officer within fourteen (14) days after the contract has been awarded and prior to start of work.
e. Plan of pest management operation (including names of pesticides to be used) shall be submitted to the Air Force for review at least ten (10) calendar days before starting work.
f. Contractor shall furnish the Contracting Officer labels of all pesticides used and the dates when used. This information will be used for the completion of the RCS: DO-M(A&AR) 1080, The Installation Pest Control Summary Report.
g. All pesticides shall be stored, transported and disposed of in accordance with all applicable federal, state, and local statutes, regulations, and ordinances.
h. Protective clothing and equipment shall be provided for and used by all persons engaged in the mixing and application of pesticides.
1.25 LEAD BASED PAINT REMOVAL, CONTAINMENT AND DISPOSAL
Work includes all labor, material and equipment for removal of lead based paint (LBP) as specified herein. The Government requires that the contractor be aware of the need for worker health and safety requirements, and the special handling of LBP on surfaces of material being painted, renovated and removed under this project. The contractor is responsible for establishing control measures to preclude any adverse effects to workers, health, public health or the environment. The contractor is also responsible for complying with all applicable rules or regulations of local, state, or federal regulatory agencies.
1.25.1 Contractor to Provide
The contractor and any subcontractor shall provide the following submittals at the pre-construction meeting unless otherwise specified. Each submittal will include as a minimum, sections to address each item listed under the respective plan:
a. Health and Safety Plan: This includes all protective equipment requirements, training, posting of signs, personal hygiene, decontamination, medical surveillance, emergency response, organization work plans and controls regarding the removal of LBP, painting preparation and the control of lead paint debris:
1. The governing Permissible Exposure Level (PEL) for all work under this contract involving the potential exposure to lead is fifty micrograms per cubic meter of air averaged over an 8-hour period (50 ug/m3 or .05 mg/m3). The contractor shall assure that workers will not be exposed to concentrations greater than this PEL without proper personnel protective equipment. This is a minimum standard set by the government for this work which does not absolve the contractor of complying with all applicable regulations.
2. In addition, this plan will include provisions that all employees involved with lead based paint shall be tested for lead content in their blood before they begin work involving the removal or handling of lead based paint. Blood testing of all contractor and subcontractor employees shall be conducted on a monthly basis during the duration of the contract. All results of employees’ blood tests shall be submitted to Contracting, 60 CONS/LGCA, within ten (10) working days of the sample being taken for Natural Resources Management, 60 CES/CEAN, to review and use.
b. Work Practices and Engineering Controls Plan: This plan will outline the following requirements:
1. Required training (including but not limited to Hazard Communication).
2. Posting of Signs as prescribed in California Code of Regulations Title 22, 22264.14.
3. On the exterior, the establishment of 10-foot zone of control for lead paint dust and debris shall be established.
4. Sealing of critical barriers (minimum 2 layers 6 mil).
5. Ground covers shall be placed over the established zone of control.
6. Containment and storage of paint debris.
7. Any necessary housekeeping to assure that no paint debris is left unattended during the performance of the contract.
c. LBP Management: The contractor shall be required to submit a hazardous waste management plan within twenty (20) calendar days after issuance of Notice to Proceed for Contracting Officer’s approval. The hazardous waste management plan shall comply with applicable requirements of federal, state, and local hazardous waste regulations and shall address:
1. Identification of LBP associated with the work.
2. Estimated quantities of wastes to be generated and disposed of.
3. Names and qualifications of each contractor that will be transporting, treating, and disposing of the wastes. Include the facility location and a 24-hour point of contact. Furnish two copies of EPA, state, and local hazardous waste permits and EPA identification numbers to the Contracting Officer. Also furnish copies of any required notification to EPA, state, or local agencies to the Contracting Officer.
4. Names and qualifications (experience and training) of personnel who will be working on-site with LBP.
5. List of waste handling equipment to be used in performing the work, to include cleaning, volume reduction, and transport equipment.
6. Spill prevention, containment, and cleanup contingency measures to be implemented, including spills that may occur on Travis Air Force Base. The government will not be responsible for spills that occur on Travis Air Force Base.
7. Work plan and schedule for waste containment, removal and disposal. Wastes shall be cleaned up and contained daily.
8. Cost for LBP disposal according to this plan.
1.25.2 Containment of LBP
The contractor shall conduct the LBP removal in accordance with the Contracting Officer approved Health and Safety Plan and the Environmental Release Safety Plan. The contractor shall be responsible for correct packaging of hazardous waste which is generated during the project. The contractor shall assume that all dust and debris generated during the removal of LBP items and finishes in the areas listed above are hazardous waste and shall be handled, containerized and stored as such. Provisions must be made for inclement weather. The contractor shall be responsible for cleaning all soil contamination attributed to his failure to contain the lead dust and debris. The contractor shall utilize every precaution to not allow LBP debris to enter the Sanitary Sewer or Storm Drain System. Under no circumstances shall the contractor dispose of any waste water contaminated with LBP as a result of construction activities into a storm drainage system. The waste water may be disposed into the sanitary sewer system after being tested by the contractor and approved by Natural Resources Management, 60 CES/CEAN.
1.25.3 Safety and Health Compliance
In addition to the minimum requirements of this specification, the contractor shall comply with the laws, ordinances, rules, and regulations of federal, state, and local authorities regarding removing, handling, storing, transporting and disposing of LBP materials. The contractor shall comply with the applicable requirements of the current issue of 29 CFR 1910. and applicable 29 CFR 1926. The contractor shall submit matters regarding interpretation of standards to the Contracting Officer for resolution before starting work. The contractor shall make all required notifications and shall provide the Contracting Officer with a copy of same. Where specification requirements and the referenced documents vary, the most stringent requirement shall apply. The contractor shall comply with all federal, state, regional, and local laws, regulations, ordinances and other directives. All health and safety plans should be reviewed and coordinated on by 60 AMDS/SGPB.
For occupational safety related mishaps, immediately notify the Contract Office Rep (COR) of any US government property damage sustained by contract activities which may occur at any geographic point on TAFB. The COR will in-turn notify Wing Safety. Request hazard information from Wing Safety through the COR when contract activities occur in/around confined spaces.
Notify all affected US government employees when hazardous energy control procedures may be implemented to support equipment moves. The notification must include expectations of the affected US government employees.
1.25.4 Removal of LBP
The contractor shall provide any drums or other appropriate devices to containerize the waste in accordance with Title 22 of the California Code of Regulations or other applicable rules and regulations. Hazardous waste can be stored on base for no longer than ninety (90) days, at a designated accumulation point approval by the Contracting Officer.
1.25.5 Disposal and Transportation
The contractor shall provide drums or other appropriate devices to containerize the waste in accordance with federal, state, and local directives. The contractor shall properly transport and dispose of all LBP generated from this project. The contractor shall properly label and placard all drums, vehicles and tanks used to transport LBP from this project. The contractor shall provide a correctly prepared shipping manifest for all shipments of LBP to Natural Resources Management, 60
CES/CEAN. The contractor shall be responsible for complying with all federal, state, and local permitting regulations when handling, transporting, and disposing of LBP. The contractor shall provide the name and location of the permitted disposal facility to the Contracting Officer.
1.25.6 Daily Cleanup
In accordance with the Contracting Officer approved Health and Safety Plan and the Environmental Release Control Plan, all plastic wrapped items, bags and debris shall be containerized and placed in the LBP container(s). The contractor will exercise extra precaution to assure that no paint chips are left on the job site at the end of each day’s performance. The contractor shall clean all soil contamination attributed to his failure to contain the LBP dust and debris.
1.26 ASBESTOS CONTAINING MATERIAL REMOVAL, CONTAIMENT AND DISPOSAL
Exposure to asbestos contaminants is a recognized hazard of human health.
Therefore, the Government has determined that work under this contract may involve exposure to friable Asbestos Containing Material (ACM) exceeding the regulatory limit of one percent. All friable Asbestos Containing Material (ACM) exceeding the regulatory limit is to be considered as hazardous waste.
The Government will provide all known asbestos data to the contractor upon request to the Contracting Officer. Information provided by the Government concerning known asbestos data has been derived from a previously prepared non-intrusive survey, and shall be used for guidance purpose only. All test results available to the Government to date will be provided upon request.
1.26.1 Demolition
During the course of demolition of Category 1 nonfriable asbestos-containing material (asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products) that has or will become friable, or Category 1 nonfriable asbestos-containing material that may become or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation, the provisions outlined in Bay…