Secondary Clarifier Project Addendum 2.pdf
PDF 127 KB Posted
- Attached to
- East Secondary Clarifier Rebuild Project
- Solicitation number
- S-KN0040-00010683
- Issued by
- Union County, Oregon
About this file
This document is an Addendum No. 2 to the Contract Documents for the City of Pendleton, Oregon's Wastewater Treatment Plant Clarifier Rehabilitation project. The addendum provides revisions to the Technical Specifications, specifically Section 5 Secondary Clarifier Improvements. The key change is that the clarifier equipment specified shall be as designed and supplied by Evoqua Water Technologies, Ovivo, or an approved equal. The bid date for this project is July 2, 2024, with a bid closing and opening time of 2:00 p.m. and a disclosure deadline of 4:00 p.m. on the same day.
The related state and local contract opportunity is for the East Secondary Clarifier Rebuild Project, which involves the rehabilitation of an existing east secondary clarifier, including the replacement of various structural and mechanical components, as well as the installation of new groundwater floor relief valves and the extension of the non-potable utility water piping. The project is located in the state of Oregon.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid documents~21.pdf | ||
| 2934_001.pdf | ||
| East Secondary Clarifier Rebuild Project Addendum 1.pdf | ||
| Tech Specs.pdf | ||
| Drawings~2.pdf | ||
| 2936_001.pdf | ||
| addendum 3.pdf | ||
| 2024 GNA Heritage Surveys_Snowy Butte ITB_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6/17/2024 Page 1 of 1 Addendum2_Pendleton_Clarifier_77-67-046.docx
ADDENDUM NO. 2
To the Contract Documents
City of Pendleton, Oregon Wastewater Treatment Plant Clarifier Rehabilitation - 2024
June 17, 2024
Bid Date: July 2, 2024 Bid Closing: 2:00 p.m.
Bid Opening: 2:00 p.m.
Disclosure Deadline: 4:00 p.m.
The following additions, deletions, and modifications shall be made to the Contract Documents.
I. CONTRACT DOCUMENTS
A. TECHNICAL SPECIFICATIONS
1. SECTION 5 SECONDARY CLARIFIER IMPROVEMENTS, PART 1 - GENERAL,
1.7 Supplier, page 5-3. Delete the paragraph in its entirety and replace it with the following:
The clarifier equipment specified in this section shall be as designed and supplied by Evoqua Water Technologies, Ovivo, or approved equal.
- END OF ADDENDUM NO. 2 -
06/17/2024
DIGITALLY SIGNED