Drawings~2.pdf
PDF 17 MB Posted
- Attached to
- East Secondary Clarifier Rebuild Project
- Solicitation number
- S-KN0040-00010683
- Issued by
- Union County, Oregon
About this file
This document appears to be a set of drawings related to the East Secondary Clarifier Rebuild Project, a state and local contract opportunity in Oregon. The project involves the rehabilitation of an existing east secondary clarifier, including replacement of the center pier, sweeps, motor, baffles, and other structural and mechanical components. It also includes the installation of new groundwater floor relief valves and the extension of the non-potable utility water piping.
The document does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient information beyond the project scope and location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid documents~21.pdf | ||
| 2934_001.pdf | ||
| East Secondary Clarifier Rebuild Project Addendum 1.pdf | ||
| Tech Specs.pdf | ||
| 2936_001.pdf | ||
| addendum 3.pdf | ||
| Secondary Clarifier Project Addendum 2.pdf | ||
| 2024 GNA Heritage Surveys_Snowy Butte ITB_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
INDEX
Corvallis
Eugene
Ashland
Gold Beach Grants Pass
North Bend
Coos Bay
Coquille
Waldport
Florence
Reedsport
Newport
Lincoln City
Hebo
Tillamook
Astoria
Seaside
Nyssa58
Klamath Falls
Medford
Oakridge
Roseburg
Paisley
Lakeview
395 Jordan
Valley
Burns
Biggs
Madras
Sisters
BEND
SALEM
Albany
McMinnville
Redmond Prineville
91 7
Hood RiverPORTLAND
The Dalles
Arlington
Elgin
Baker
Day
Unity
John
City
Ontario
Enterprise
Pendleton30
Adams
La Grande
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOCIATES, INC.
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
PENDLETON, OREGON
CITY OF
LA GRANDE, OR WALLA WALLA, WA REDMOND, OR HERMISTON, OR ENTERPRISE, OR
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-G
-0
.d w g c o v e r, /8 /2
:0
A
M lw ill h it e
Condon
FINAL ELECTRONIC DOCUMENTS AVAILABLE UPON REQUEST
CITY COUNCIL
CITY OFFICIALS
JOHN H. TURNER, Mayor
KEVIN MARTIN
CAROLE L. INNES
SALLY BRANDSEN
McKENNON McDONALD
LINDA K. NEUMAN
DALE PRIMMER
ADDISON SCHULBERG
STEVE CAMPBELL
BOB PATTERSON, Public Works Director
MARK MILNE, Wastewater Superintendent
KYLE WILLMAN, WWTRRF Technician
PROJECT
LOCATION
To La Grande
To Pilot Rock
To Boardman
214 E. Birch Street, Suite 1 - Walla Walla, WA 99362 Ph: (509) 529-9260 Fax: (509) 529-8102
SHEET TITLE PAGE
- COVER
G-001 LEGEND 1
G-101 EXISTING SITE PLAN 2
D-101 DEMOLITION PLAN 3
D-301 DEMOLITION SECTION 4
D-501 DEMOLITION DETAILS 5
C-101 IMPROVEMENTS PLAN 6
M-301 MECHANICAL SECTION 7
M-501 FLOOR RELIEF VALVE DETAIL SECTION 8
M-502 SLIDE GATE DETAIL PLAN AND SECTIONS 9
C-501 TYPICAL DETAILS I 10
C-502 TYPICAL DETAILS II 11
C-503 TYPICAL DETAILS III 12
05/10/2024
DIGITALLY SIGNED
UTILITIES
PLAN LEGEND
DRAFTING
EXISTING PROPOSED
SITE SURVEY
A
GENERAL NOTES
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-G
-0
.d w g
L a y o u t, /8
/2
:0
A M lw ill h it e
G-001
LEGEND AND GENERAL NOTES
EAST
SECONDARY
CLARIFIER
WEST
SECONDARY
CLARIFIER
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-G
-1
.d w g
L a y o u t1
/8 /2
:0
A
M lw ill h it e
G-101
EXISTING SITE PLAN
48321616
D-101
DEMOLITION PLAN
LEGEND
302010010
NOTES
EAST SECONDARY CLARIFIER DEMOLITION PLAN
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-D
-1
.d w g
L a y o u t1
/8 /2
:0
A
M lw ill h it e
A
D-301
DEMOLITION SECTION
0 151055
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-D
-3
.d w g
L a y o u t1
/8 /2
:0
A
M lw ill h it e
LEGEND
NOTES
EAST SECONDARY CLARIFIER DEMOLITION A
D-501
DEMOLITION DETAILS
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-D
-5
.d w g
L a y o u t1
/8 /2
:0
A
M lw ill h it e
PHOTO A
PHOTO D
PHOTO B PHOTO C
PHOTO E
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-C
-1
.d w g
L a y o u t1
/8 /2
:0
A
M lw ill h it e
C-101
IMPROVEMENTS PLAN
302010010
EAST SECONDARY CLARIFIER IMPROVEMENTS PLAN
NOTES
A
M-301
MECHANICAL SECTION
0 151055
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-M
-3
.d w g L a y o u t1
/8 /2
:0
A
M lw ill h it e
NOTESPAINTING SCHEDULE
EAST SECONDARY CLARIFIER SECTION A
M-501
FLOOR RELIEF VALVE DETAIL
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-M
-5
.d w g L a y o u t1
/8 /2
:0
A
M lw ill h it e
FLOOR RELIEF VALVE
SECTION
M-502
SLIDE GATE DETAILS
6"4"2"2"
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-M
-5
.d w g L a y o u t1
/8 /2
:0
A
M lw ill h it e
RAS STATION SLIDE GATE DETAIL
PLAN
SECTION A SECTION B
A
B
SECONDARY EFFLUENT COMBINER BOX SLIDE GATE DETAIL
A
SECTION A
PLAN
NOTES
C-501
TYPICAL DETAILS I
0 151055
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-C
-5
.d w g
L a y o u t1
/8 /2
:0
A
M lw ill h it e
NOTES
ALUMINUM STAIRWAY AND BRIDGE ANCHOR DETAIL ALUMINUM STEP DETAIL
PLAN
UPPER STAIR/BRIDGE ANCHOR CONNECTION DETAIL
C-502
TYPICAL DETAILS II
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-C
-5
.d w g
L a y o u t1
/8 /2
:0
A
M lw ill h it e
HOSE RACK
1" FROST-FREE YARD HYDRANT
NOTES
PAINTING SCHEDULE
CURB DETAILDOUBLE HYDRANT ASSEMBLY DETAIL
2" FROST-FREE HYDRANT
C-503
TYPICAL DETAILS III
COPYRIGHT 2024 BY ANDERSON PERRY & ASSOC., INC.
CITY OF PENDLETON
WASTEWATER TREATMENT PLANT
CLARIFIER REHABILITATION
X
C lie n ts
\P e n d le to n O
R \7
-6
W
W T
P I
C la ri fi e r R e h a b
\C A
D \7
-6
-C
-5
.d w g
L a y o u t1
/8 /2
:0
A
M lw ill h it e
TRENCH RESTORATION
ASPHALT SURFACES
TYPICAL TRENCH BACKFILL
(WITH LOCATING WIRE)
TRENCH RESTORATION
GRAVEL SURFACES
CONTINUOUS LOCATING WIRE DETAIL VALVE BOX DETAIL
PLAN
CONCRETE COLLAR DETAIL
IN GRAVEL STREETS OR NATURAL GROUND
File details come from the government source that posted it. Updated .