Sealed Plans - Updated Plans 10052023.pdf
PDF 974 KB Posted
- Solicitation number
- 2023-4600
- Issued by
- Kimble County, Sunray City, Texas
About this file
This document is a detailed set of sealed plans for the Jumbo Evans Sports Park Infield Artificial Turf Installation project in Comal County, Texas. The project involves comprehensive artificial turf installation across six baseball/softball fields (Fields A through F), with each field requiring specific sub-grade preparation, drainage system installation, and turf implementation. The scope of work includes excavating approximately 13,965-26,905 square feet per field to a 4-inch depth, installing 4-inch drainage trenches, placing a 6-millimeter plastic barrier, installing perforated pipes, and laser grading with limestone. Each field will receive 2" x 2" composite nailer boards, have white lines inlaid (not painted), and be filled with 1.5 lbs per square foot of SBR rubber infill and 2.5 lbs per square foot of silica sand infill.
The artificial turf specifications require KMTXProF 50 oz turf with a 1 ¾" pile height, featuring UV-stabilized polyethylene/polypropylene yarn, polyurethane backing, and specific technical requirements including water permeability over 30 in/hr and a 9.4 mil fiber thickness. The project includes installing base plugs for multiple base distances and adjusting existing irrigation systems. The turf installation comes with warranties, including a minimum 2-year warranty on seam work and base work, and an 8-year warranty on the artificial turf itself. The final drainage system exit points will require approval from Comal County, and the contractor must provide 6,000 lbs of SBR infill material for future maintenance on each field.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jumbo Evans Sports Park Infield Artificial Turf Installation
Artificial Turf Requirements:
• KMTXProF Artificial Turf 50 oz 1 ¾” pile height, or equivalent, as approved by Comal County.
• Thatch zoom required, slit-film PE
• Primary Yarn Polymer – Polyethylene / Polypropolene
• UV Stabalized
• Primary Backing – Polyurethane
• Perforated
• Denier/Ends – 4600/8 Texturized PP
• Total Yard Linear Density Tensiile – 12,600
• Stregnth Silt PE Tensile 8 lbs
• Strength Texturized PP Stitch3.7 lbs
• Machine Gauge 1/2 inch
• Water Permeability > 30 in/hr
• Fiber Thickness 9.4 mils fiber thickness
A
B
C
D
E
F
Field A Sub-Grade, Drainage and
Base Preparation
Exit Point for perforated drainage system.
Final location to be approved by Comal County.
• Excavate 10,085 SF to a depth of 4” centered on pitchers mound, located 50’ from home plate, standard 50-70 Little League field
• Where radius intersects foul line, excavation shall extend perpendicular to the fence line
• Compact and laser grade sub-grade to level surface
• Install 4” deep trenches every 20’ O.C. throughout excavated area
• Install 6 millimeter plastic barrier on top of compacted sub-grade and in trenches.
• Install 4” perforated pipes within trenches with outfall point at location identified.
• Install, compact and laser grade 2.5” of #57 and 1.5” of #67 clean limestone, including in drainage trenches. (Revised 10/5/23)
• Adjust, cap, and move existing irrigation lines/sprinkler heads/valve boxes, as needed, during excavation and reroute any necessary lines to ensure proper irrigation coverage of existing grass.
Excavation Area
Field A Turf Install
• Install 2” x 2” composite nailer boards around the perimeter of the infield to secure turf edges
• Install infield with the colors shown below. All white lines should be inlaid as part of installation; not painted
• Spread/broom 1.5 lbs per square foot of SBR rubber infill and 2.5 lbs per square foot of silica sand infill onto the turf
• Adjust/repair any portions of fence as needed to install nailer boards at the edges of the fence line
• Install base plugs for bases at both 60’ and 70’ as well as home plate
Turf Install
Field B
Base Preparation
Exit Point for perforated drainage system.
Final location to be approved by Comal County.
• Excavate 10,075 SF to a depth of 4” centered on pitchers mound located 50’ from home plate, standard 50-70 Little League field
• Where radius intersects foul line, excavation shall extend perpendicular to the fence line
• Compact and laser grade sub-grade to level surface
• Install 4” deep trenches every 20’ O.C. throughout excavated area
• Install 6 millimeter plastic barrier on top of compacted sub-grade and in trenches.
• Install 4” perforated pipes within trenches with outfall point at location identified.
• Install, compact and laser grade 2.5” of #57 and 1.5” of #67 clean limestone, including in drainage trenches. (Revised 10/5/23)
• Adjust, cap, and move existing irrigation lines/sprinkler heads/valve boxes, as needed, during excavation and reroute any necessary lines to ensure proper irrigation coverage of existing grass.
Excavation
Field B
Turf Install Area
• Install 2” x 2” composite nailer boards around the perimeter of the infield to secure turf edges
• Install infield with the colors shown below. All white lines should be inlaid as part of installation; not painted
• Spread/broom 1.5 lbs per square foot of SBR rubber infill and 2.5 lbs per square foot of silica sand infill onto the turf
• Adjust/repair any portions of fence as needed to install nailer boards at the edges of the fence line
• Install base plugs for bases at both 60’ and 70’ as well as home plate
Field C
Base Preparation
• Excavate 13,965 SF to a depth of 4” centered on pitchers mound located 46’ from home plate, standard Little League field
• Where radius intersects foul line, excavation shall extend perpendicular to the fence line
• Compact and laser grade sub-grade to level surface
• Install 4” deep trenches every 20’ O.C. throughout excavated area
• Install 6 millimeter plastic barrier on top of compacted sub-grade and in trenches.
• Install 4” perforated pipes within trenches with outfall point at location identified.
• Install, compact and laser grade 2.5” of #57 and 1.5” of #67 clean limestone, including in drainage trenches. (Revised 10/5/23)
• Adjust, cap, and move existing irrigation lines/sprinkler heads/valve boxes, as needed, during excavation and reroute any necessary lines to ensure proper irrigation coverage of existing grass.
Exit Point for perforated drainage system.
Final approval to be approved by Comal County.
Excavation
Field C
Turf Install Area
• Install 2” x 2” composite nailer boards around the perimeter of the infield to secure turf edges
• Install infield with the colors shown below. All white lines should be inlaid as part of installation; not painted
• Spread/broom 1.5 lbs per square foot of SBR rubber infill and 2.5 lbs per square foot of silica sand infill onto the turf
• Adjust/repair any portions of fence as needed to install nailer boards at the edges of the fence line
• Install base plugs for bases at both 60’ as well as home plate
Field D
Base Preparation
• Excavate 13,965 SF to a depth of 4” centered on pitchers mound located 46’ from home plate, standard Little League field
• Where radius intersects foul line, excavation shall extend perpendicular to the fence line
• Compact and laser grade sub-grade to level surface
• Install 4” deep trenches every 20’ O.C. throughout excavated area
• Install 6 millimeter plastic barrier on top of compacted sub-grade and in trenches.
• Install 4” perforated pipes within trenches with outfall point at location identified.
• Install, compact and laser grade 2.5” of #57 and 1.5” of #67 clean limestone, including in drainage trenches. (Revised 10/5/23)
• Adjust, cap, and move existing irrigation lines/sprinkler heads/valve boxes, as needed, during excavation and reroute any necessary lines to ensure proper irrigation coverage of existing grass.
Exit Point for perforated drainage system.
Final approval to be approved by Comal County.
Excavation Area
Excavation
Field D
Turf Install Area
• Install 2” x 2” composite nailer boards around the perimeter of the infield to secure turf edges
• Install infield with the colors shown. All white lines should be inlaid as part of installation; not painted
• Spread/broom 1.5 lbs per square foot of SBR rubber infill and 2.5 lbs per square foot of silica sand infill onto the turf
• Adjust/repair any portions of fence as needed to install nailer boards at the edges of the fence line
• Install base plugs for bases at both 60’ as well as home plate
Turf Install
Field E
Base Preparation
• Excavate 26,905 SF to a depth of 4” centered on pitchers mound located 60’-6” from home plate.
• Where radius intersects foul line, excavation shall extend perpendicular to the fence line
• Compact and laser grade sub-grade to level surface
• Install 4” deep trenches every 20’ O.C. throughout excavated area
• Install 6 millimeter plastic barrier on top of compacted sub-grade and in trenches.
• Install 4” perforated pipes within trenches with outfall point at location identified.
• Install, compact and laser grade 2.5” of #57 and 1.5” of #67 clean limestone, including in drainage trenches. (Revised 10/5/23)
• Adjust, cap, and move existing irrigation lines/sprinkler heads/valve boxes, as needed, during excavation and reroute any necessary lines to ensure proper irrigation coverage of existing grass.
Exit Point for perforated drainage system.
Final approval to be approved by Comal County.
Excavation
Field E
Turf Install Area
• Install 2” x 2” composite nailer boards around the perimeter of the infield to secure turf edges
• Install infield with the colors shown. All white lines should be inlaid as part of installation; not painted
• Spread/broom 1.5 lbs per square foot of SBR rubber infill and 2.5 lbs per square foot of silica sand infill onto the turf
• Adjust/repair any portions of fence as needed to install nailer boards at the edges of the fence line
• Install base plugs for bases at both 60’, 70’, 80’ and 90’ as well as home plate
Turf Install
Field F
Base Preparation
• Excavate 13,965 SF to a depth of 4” centered on pitchers mound located 46’ from home plate.
• Where radius intersects foul line, excavation shall extend perpendicular to the fence line
• Compact and laser grade sub-grade to level surface
• Install 4” deep trenches every 20’ O.C. throughout excavated area
• Install 6 millimeter plastic barrier on top of compacted sub-grade and in trenches.
• Install 4” perforated pipes within trenches with outfall point at location identified.
• Install, compact and laser grade 2.5” of #57 and 1.5” of #67 clean limestone, including in drainage trenches. (Revised 10/5/23)
• Adjust, cap, and move existing irrigation lines/sprinkler heads/valve boxes, as needed, during excavation and reroute any necessary lines to ensure proper irrigation coverage of existing grass.
Exit Point for perforated drainage system.
Final approval to be approved by Comal County.
Excavation
Field F Turf Install
• Install 2” x 2” composite nailer boards around the perimeter of the infield to secure turf edges
• Install infield with the colors shown. All white lines should be inlaid as part of installation; not painted
• Spread/broom 1.5 lbs per square foot of SBR rubber infill and 2.5 lbs per square foot of silica sand infill onto the turf
• Adjust/repair any portions of fence as needed to install nailer boards at the edges of the fence line
• Install base plugs for bases at both 60’ as well as home plate
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
File details come from the government source that posted it. Updated .