SDA-PS-22-02 Amendment 3
National Defense Space Architecture
Tranche 1 Tracking Layer
Program Solicitation
17 March 2022
Amendment 1 issued 25 March 2022
Amendment 2 issued 4 April 2022
Amendment 3 issued 6 April 2022
DISTRIBUTION STATEMENT A: Approved for public release: distribution unlimited.
1 Introduction
The Space Development Agency (SDA) is issuing this Other Transaction Authority (OT) solicitation for a prototyping effort of the National Defense Space Architecture (NDSA) Tranche 1
Tracking Layer. The T1 Tracking Layer prototyping effort will accelerate the capability to provide global, persistent indications, detection, warning, tracking, and identification of advanced missile threats, including hypersonic missile systems. The T1 Tracking Layer scope includes the procurement and deployment of 28 - and potentially more - space vehicles (SVs) with infrared (IR) sensors in four (4) highly inclined orbital planes. Additional prototyping of satellites and sensor payloads may also occur under this OT in order to inform requirements and constellation design.
The fully deployed Tracking Layer is estimated to include more than 100 SVs in low Earth orbit (LEO) across multiple planes. Based on the success of the T1 Tracking Layer OT, a follow-on production contract may be awarded for the Tranche 2 Tracking Layer to one or more of the prototyping Offerors for 28-48 SVs.
The NDSA’s operational utility is predicated on the availability of a ubiquitous data and communications Transport Layer provided by the Tranche 1 Transport Layer (T1TL). The T1TL will provide global communications access and deliver persistent regional encrypted connectivity in support of Warfighter missions around the globe by serving as the backbone for Joint All Domain
Command and Control (JADC2) built on low-latency data transport, sensor-to-shooter connectivity, and tactical satellite communications. The T1 Tracking Layer will leverage the T1TL for the low-latency transport of tracking data and interoperability across the NDSA.
All references in this solicitation to Attachment 1 – Statement of Work and Technical Requirements Document pertain to the Tranche 1 Tracking Layer Statement of Work and Technical Requirements
Document inclusive of its classified appendix.
1.1 Motivation
SDA has determined that the proliferation of various mission functions across the NDSA using commodity SVs is the most efficient and cost-effective means of evolving the Architecture. To accomplish this, SDA employs a capability-focused business model prioritizing speed and lowering costs by harnessing commercial development to achieve proliferation and enhance resilience of the architecture. The objective is to establish and demonstrate the ability to rapidly evolve development processes and field capability on a significantly faster timeline than traditional space systems acquisition. In pursuit of this objective, SDA requires each NDSA Contractor’s SVs and communications systems to be interoperable with the SVs and systems developed by all other NDSA
Contractors. Additionally, all SVs must operate in an integrated fashion through a common ground system.
1.2 Program Approach
This solicitation seeks Other Transaction (OT) proposals under the authority of 10 U.S.C. § 4003 (previously § 2371b) for U.S. space industry builder-operator teams that will engage with SDA to develop and operate the T1 Tracking Layer as part of the NDSA. The Government is purchasing a nominal constellation of 28 (or more) satellites that are sufficient to meet constellation coverage objectives for the T1 Tracking Layer. SDA anticipates purchasing these SVs divided into four (4) orbital planes, to be awarded to more than one vendor, subject to available funding. Each Offeror shall propose to develop and deliver half of a global constellation consisting of two (2) of the orbital planes, with the associated ground support and operations and sustainment capability. Each of the planes may be populated with SVs containing single sensor to multiple sensor payloads supporting the constellation coverage objectives so long each plane may be populated with a single launch with an Evolved Expendable Launch Vehicle-Medium (EELV-M) class launch vehicle (LV) available on the NSSL Phase 2 contract.
Note that for SDA to make an OT award to the Offeror, at least one of the following conditions must be met:
1. There is at least one nontraditional defense contractor or nonprofit research institution participating to a significant extent in the prototype project.
2. All significant participants in the transaction other than the Federal Government are small businesses (including small businesses participating in a program described under section 9 of the Small Business Act (15 U.S.C. 638)) or nontraditional defense contractors.
3. At least one third of the total cost of the prototype project is to be paid out of funds provided by sources other than the Federal Government.
For more information on Other Transactions please see:
https://www.dau.edu/guidebooks/Shared%20Documents/Other%20Transactions%20(OT)%20G uide.pdf
1.3 Program Plan and Schedule
The first plane of the T1 Tracking Layer constellation will be launched no later than 30 April 2025 with the launches of subsequent planes expected to follow on one-month intervals. The Offeror is expected to plan their program in accordance with the milestone dates and deliverables specified in Attachment 1 – Statement of Work and Technical Requirements Document of this solicitation.
1.4 T1 Tracking Layer Transition to Operations Overview
After launch, each plane has four (4) months to obtain its operational orbit and complete a Verification
On-Orbit Test and IR Mission Payload calibration using the Offeror’s facilities. The Offeror should assume that on-orbit calibration will be performed with little or no connection to the T1 Transport
Layer. After completion of the Verification On-Orbit Test, the SVs transition to operations utilizing the Government’s Operations Centers, including the Offeror’s installed NEBULA Operations –
Vendor Architecture (NOVA) ground system. At this point, the SVs have entered the security boundary of the Government Operations Centers and will no longer be allowed to connect to non-
Government ground stations, antennas, networks, or systems. The plane then completes a Functional On-Orbit Test utilizing the Government Operations Centers and antennas, the Offeror’s
NOVA, and the SDA Unified Planning Environment and Resources for NEBULA Operations –
Vendor Agnostic (SUPERNOVA) system. Upon successful completion of the Functional On-Orbit Test, the Government takes ownership of the SVs and they enter operations. The Offeror will continue to support the operations and sustainment of their vehicles for a period of up to five (5) years.
2 System Description
The T1 Tracking Layer is a 1000 km altitude pLEO constellation consisting of four (4) orbital planes with a government reference design consisting of seven (7) SVs in each plane.
https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=10-USC-1875391109-791309680&term_occur=999&term_src=title%3A10%3Asubtitle%3AA%3Apart%3AIV%3Achapter%3A139%3Asection%3A2371b https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=10-USC-2032561260-548934770&term_occur=999&term_src=title%3A10%3Asubtitle%3AA%3Apart%3AIV%3Achapter%3A139%3Asection%3A2371b https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=10-USC-308593337-791309681&term_occur=999&term_src=title%3A10%3Asubtitle%3AA%3Apart%3AIV%3Achapter%3A139%3Asection%3A2371b https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=10-USC-308593337-791309681&term_occur=999&term_src=title%3A10%3Asubtitle%3AA%3Apart%3AIV%3Achapter%3A139%3Asection%3A2371b https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=10-USC-308593337-791309681&term_occur=999&term_src=title%3A10%3Asubtitle%3AA%3Apart%3AIV%3Achapter%3A139%3Asection%3A2371b https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=10-USC-308593337-791309681&term_occur=999&term_src=title%3A10%3Asubtitle%3AA%3Apart%3AIV%3Achapter%3A139%3Asection%3A2371b https://www.law.cornell.edu/topn/small_business_act https://www.law.cornell.edu/uscode/text/15/638 https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=10-USC-1875391109-791309680&term_occur=999&term_src=title%3A10%3Asubtitle%3AA%3Apart%3AIV%3Achapter%3A139%3Asection%3A2371b https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=10-USC-2032561260-548934770&term_occur=999&term_src=title%3A10%3Asubtitle%3AA%3Apart%3AIV%3Achapter%3A139%3Asection%3A2371b http://www.dau.edu/guidebooks/Shared%20Documents/Other%20Transactions%20(OT)%20G http://www.dau.edu/guidebooks/Shared%20Documents/Other%20Transactions%20(OT)%20G http://www.dau.edu/guidebooks/Shared%20Documents/Other%20Transactions%20(OT)%20G
The nominal constellation parameters are defined in Table 1. Each SV is equipped with an IR mission payload, three (3) Optical Communications Terminals (OCTs), and a Ka-band communications payload.
This system includes on-orbit calibration capability, on-board processing of Tracking data, and minimization of solar outages. Each SV will have multiple pointing modes to include Nadir- and
Ram-Fixed, Off-Earth Inertial Point/Track, Sun Pointing, Solar Avoidance Pointing, and Safe. The SVs must be able to conduct continuous operations without power or thermal constraints.
The T1 Tracking Layer SVs will include OCTs to support crosslinks in-plane, cross-plane, and to the Transport Layer. Every T1 Tracking Layer SV will be interoperable with all T1TL SVs and all other T1 Tracking Layer SVs, regardless of vendor.
Table 1. Nominal T1 Tracking Layer Constellation
Parameter Value
Number of Planes 4
SVs per Plane 7
Altitude 1000 km
Inclination 81 deg +/- 1 deg
Nodal separation between planes ~50 deg
In-Plane Mean Anomaly Separation ~51 deg
Anomaly Phasing Between Consecutive Planes ~19 deg
Minimum Optical Links per SV 3
Mission Payload(s) IR Sensor(s)
Mission Data Downlink Ka
Navigation GPS
The system description and requirements can be found in Attachment 1 – Statement of Work and Technical Requirements Document of this solicitation.
3 Selection Process
Within this solicitation, the following definitions are used:
Prime: The Offeror
Major Teammate: A member of the Prime's development team with a different CAGE code from the prime Offeror, that either accounts for no less than five (5) percent of the proposed cost and/or develops one or more of the following subsystems or capabilities:
o IR Sensor(s) o Onboard IR Mission Data Processor o Optical Communications Terminals o Space Vehicle Bus o System Integration o Operations and Sustainment Personnel o NEBULA Operations – Vendor Architecture (NOVA) System o NOVA Ground Infrared Mission Data Processing
If the following subsystems are not procured as commercial off-the-shelf systems (COTS) and/or require significant modifications, then the developer of the subsystem shall be considered a major teammate:
o Networking and Data Routing o Encryption o Ka Mission Payload o Backup TT&C System
3.1 Proposal Preparation Instructions
The Offeror shall submit their Tranche 1 Tracking Layer proposal via six (6) volumes. Specific volume contents and associated page limits are detailed below.
Volume I – Governance (15-page limit) shall contain a detailed description of the
Offeror’s proposed program management, systems and mission engineering approaches, processes, and tools for executing the program on schedule and within the price proposed.
This volume shall also contain résumés for key personnel that will perform the T1
Tracking Layer program and a complete listing of data rights asserted by the Offeror and all of its subcontractors.
Volume II – Technical (40-page limit) shall contain a detailed description of the
Offeror’s proposed technical solution to accomplish the requirements defined in
Attachment 1 – Statement of Work and Technical Requirements Document. This attachment and other critical documentation is contained in the Bidders Library, and will be provided upon request by email to osd.pentagon.ousd-r-e.mbx.SDA-PS-22-
02@mail.mil. Email subject shall contain “SDA-PS-22-02 T1 Tracking Bidders Library
Request” along with Offeror’s CAGE code.
Volume III – Schedule (10-page limit) shall contain a full Integrated Master Schedule.
This volume shall also provide: an analysis of schedule risks; identification of key milestones; entrance criteria, key accomplishments and exit criteria for significant reviews and activities; and a clear presentation and analysis of the critical paths, at least primary and secondary, from contract award through space vehicle (SV) delivery.
Volume IV – Price and Rationale (no page limit) shall contain the Offeror’s Firm Fixed
Price and associated detail.
Volume V – Experience and Past Performance (page limit detailed below) should contain at least one (1) and may contain up to four (4) recent (within the last five (5) years), relevant examples of on-time, on-cost/price delivery of complex systems, subsystems, or components, preferably space- related hardware or software. Offerors should also include at least one (1) and up to two (2) past performance examples for each major teammate commensurate with their assigned roles within the T1 Tracking Layer program.
Volume VI – Draft Other Transaction (OT) Agreement (no page limit) mailto:osd.pentagon.ousd-r-e.mbx.SDA-PS-22-02@mail.mil
The font in normal text for all volumes shall be no smaller than Times New Roman 12 pt., while text in figures and tables shall be no smaller than Times New Roman 10 pt. A table shall consist of at least two columns in every row. Tables that are deemed attempts to circumvent these text formatting restrictions will be removed from the proposal and not evaluated. All margins (top, bottom, left, and right) shall be no smaller than one (1) inch. Single-line spacing shall be used for all text in paragraphs, bulleted lists, and tables. All pdf pages, in all volumes, formatted larger than
8.5 inches X 11 inches shall be counted as two (2) pages. Line numbers shall be applied to all text sections in all volumes and shall be set within the left margin of the page so as not to reduce the usable size of the page. Title pages and tables of contents, tables of figures, and tables of tables will not count against the page counts of the respective volumes and will not be evaluated for content. Note:
Nonconforming proposals may be rejected without review.
Offerors may submit up to two proposals; however, each proposal shall be a fully compliant proposal on its own. The Government expects to make one award per Offeror.
3.1.1 Volume I - Governance
Volume I shall not exceed fifteen (15) pages. Any pages in excess of this limit, other than those noted below as specifically excluded from the overall page limit, will be removed from the Offeror’s proposal and not evaluated.
3.1.1.1 Executive Summary
The Offeror shall present their proposed system governance solution for the T1 Tracking Layer, including their team construct and expected contributions by each major teammate. The Executive Summary should include a summary of the Offeror's programmatic and systems engineering approaches, to include the cost and risk management approaches.
3.1.1.2 Program Management
The Offeror shall detail the people, processes, and tools planned to manage and conduct the program to a successful completion on time and within the agreed upon price. The Offeror shall discuss their program, personnel, cost, and risk management approaches, including any processes and tools. The Offeror shall include a list of the primary risks on the project, the planned mitigations, and the approach for managing risks throughout the system life cycle. Schedule management shall be discussed in Volume III; however, the Offeror is free to cross-reference Volumes I and III if doing so will be of benefit in explaining the value and quality of their approach. The Offeror should describe its processes to staff the program with qualified personnel, identify and manage critical vendors and subcontractors, and control costs within a firm fixed price environment. The Offeror shall document planned communications with the Government, detailing the purpose, entrance criteria, key accomplishments anticipated, exit criteria, and documentation methodologies for each meeting, review, or key management milestone within the program.
The Offeror shall plan the program using the program reviews identified in Section 2.1 of Attachment 1 – Statement of Work and Technical Requirements Document and in accordance with other dates specified throughout Attachment 1. If the Offeror believes that an alternate review structure (e.g., combining certain reviews) is more appropriate and meets the needs of the
Government for insight into the design and understanding of challenges and risks at appropriate stages of the development, the Offeror is free to propose it and their supporting rationale. For each review combined, omitted, or added, the Offeror shall clearly delineate during what remaining review(s) the information traditionally provided shall be discussed. Table 4 identifies mandatory milestone payment events. If the Offeror omits these reviews, then they shall clearly identify an equivalent event that will be used in lieu of the mandatory review for milestone payments as specified.
The Government acknowledges that determining the solution that balances performance, schedule, and cost for this mission is challenging. The need for,justification for, and mission impact of any issues where the Offeror does not meet the IR Mission Payload System Requirements shall be discussed in the performance analysis appendices to Volume II – Technical in the context of a best-value solution for the mission.
The Offeror shall clearly and explicitly state the need for, justification for, and mission impact of any anticipated waivers to requirements, Government standards, and compliance documents specified in Attachment 1 – Statement of Work and Technical Requirements
Document and its classified appendix.
3.1.1.2.1 Subcontractor and Supply Chain Management
The Offeror shall address their subcontractor and supply chain management methodologies. The
Offeror should describe how they will minimize the effect on the program from fluctuations in supply chain availability and subcontractor deliveries.
3.1.1.2.2 Nontraditional Defense Contractors (NDC) / Nonprofit Research Institution
If applicable, the Offeror shall identify which subcontractors constitute an NDC or a nonprofit research institution in accordance with 10 U.S.C. § 3014. The Offeror shall identify the extent of participation of NDC(s) and/or nonprofit research institution(s) to the Offeror’s T1 Tracking Layer program.
3.1.1.3 Systems and Mission Engineering
The Offeror shall detail the Systems and Mission Engineering processes and methods that will be used to execute the T1 Tracking Layer program. The Offeror shall clearly identify their approach to systems and mission engineering and detail the use of any processes and tools that will be used on the program. The Government expects that the Offeror will utilize Engineering best practices.
3.1.1.4 Mission Assurance
The Offeror shall describe the mission assurance approach and Offeror’s quality systems. The
Offeror should include a discussion of relevant standards and certifications. In particular, the Government is interested in how the Offeror plans to tailor – if applicable – existing mission assurance processes and tools to meet the requirements of a proliferated LEO constellation designed for a relatively short on-orbit lifetime.
3.1.1.5 Organizational Conflict of Interest
The Offeror shall clearly identify any real or perceived organizational conflicts of interest (OCI) for themselves or any of their teammates that would arise from their participation in the T1 Tracking Layer program. If the Offeror believes that they and their teammates have no organizational conflicts of interest, then they should explicitly state this position.
If the Offeror believes that an OCI exists or may exist upon award, then the Offeror shall include an OCI mitigation plan as an Appendix to this volume. The OCI mitigation plan will not be included in the Volume I page limit.
3.1.1.6 Personnel Résumés
Personnel résumés shall not exceed two (2) pages each. The personnel résumés shall be included as attachments to this volume and will not be included in the Volume I page limit.
The Offeror shall identify the key personnel planned to be assigned to this program from the Offeror and major teammates as appropriate. Résumés should be in bullet format and include:
Summary statement highlighting experience and expertise
Current role with the Offeror or teammate to include current assignments and programs
Planned role within the T1 Tracking Layer program
Evidence of applicable mission experience or understanding
Education (academic and military, if applicable)
Military, Government, or Commercial space-related experience (if any)
Anticipated percentage of time to be assigned to this program
Signed statement agreeing to support the SDA T1 Tracking Layer program if awarded
Proposed staff members not currently employed by the Offeror may be included as appropriate. In those cases, the Offeror shall include signed contingent offer letters. These letters should be signed by both the Offeror and the proposed staff member and should state the willingness of the proposed staff member to join the Offeror in support of the SDA T1 Tracking Layer program if awarded.
At a minimum, key personnel shall include:
From Offeror:
Program Manager
Chief Engineer
Assembly, Integration, and Test (AI&T) Lead
If Offeror is developing any of the major subsystems, the subsystem lead(s)
From each major teammate:
Program Manager
Chief Engineer
If Major Teammate is developing any of the major subsystems, the subsystem lead(s)
3.1.1.7 Personnel Matrix
The personnel matrix shall be submitted as an attachment to this volume and will not be included in the Volume I page limit.
The Offeror shall compare and contrast their submitted personnel résumés against the SDA T1 Tracking Layer requirements to validate corporate and individual experience and expertise thereby giving the Government confidence in the Offeror’s probability of success. Format for this comparison is entirely up to the Offeror but this section of the proposal should stand alone for evaluation.
3.1.1.8 Technical Data and Computer Software Rights Assertions
The Offeror shall clearly delineate all limitations on data, hardware, and computer software rights for technical data, hardware, or computer software provided by the Offeror and all of its teammates, using the format shown in Table 2. The Government prefers that no technical data or computer software be provided with less than Government Purpose Rights. The Offeror shall clearly identify those elements to be provided with less than Government Purpose Rights and identify the rationale for their assertion(s) using the format shown in Table 2. Any item related to the performance of this effort and not contained in Table 2, shall be delivered upon request to the
Government, with no less than Government Purpose Rights. See terms defined in Volume VI Draft Other Transaction (OT) Agreement.
Table 2. Technical and Data Rights Assertions Template
Company
Asserting
Data Rights
Hardware/Technical
Data/Computer Software to be Furnished with
Restrictions
Summary of
Intended Use in the Conduct of the
Effort
Basis for
Assertion
Asserted
Rights
Category
Name of
Person
Asserting
Restrictions
(NAME) (LIST) (NARRATIVE) (LIST) (LIST) (LIST)
Table 2 shall be included as an attachment to Volume I and will not be included in the page count.
3.1.2 Volume II - Technical
Volume II shall not exceed forty (40) pages. Any pages in excess of this limit, other than those noted below as specifically excluded from the overall page limit, will be removed from the
Offeror’s proposal and not evaluated.
3.1.2.1 Executive Summary
The Offeror shall present their proposed solution concept for two (2) planes of the T1 Tracking
Layer. The Executive Summary shall include an Operational Viewpoint (OV)-1 or equivalent high-level overview of the proposed solution. The graphics shall depict the space vehicles, their payloads, the means by which they communicate with each other and the ground (to include anticipated data rates by spectral band), and the means by which they provide data to the warfighter. Integrated into this graphical representation shall be the Offeror’s milestone-driven integrated master schedule for capability delivery, culminating in an in-orbit delivery and performance per SDA’s schedule requirements.
3.1.2.2 Space Vehicle (SV) Overview
The Offeror shall present an overview of the SV, including but not limited to:
SV block diagram
Delta-V budget
High-level mass budget
Power budget with power modes
Thermal management strategy
Vehicle configuration showing all major components
Backup TT&C system design
This section should also include an overview of the SV Concept of Operations (CONOPS).
A detailed Master Equipment List (MEL) with mass, power, Manufacturing Readiness Level
(MRL), and Technology Readiness Level (TRL) or other flight heritage shall be included as an appendix and will not count against the Volume II page limit. The level of detail required in the MEL is not specified but is expected to decompose to assemblies below the subsystem level. The power budget should include the duty cycle and current best estimate for each component by power mode, as well as the orbit average power generated in each power mode and enough information to determine the battery depth of discharge.
3.1.2.2.1 Tranche 1 Tracking Layer Payload Architecture and Design
The Offeror shall present their overall payload architecture and design. For each payload element below, the Offeror shall include, but not be limited to a discussion of payload hardware, software, control, data transfer capability and/or limitations, and power requirements. Proposals shall demonstrate a clear understanding of each payload’s mission application and the technical solution’s ability to accomplish it’s the overall tracking mission. Proposals should also address any needed test and certification requirements and plans, and must include schedule and risk assessments for subject completion.
3.1.2.2.1.1 Infrared Mission Payload
The Offeror shall provide a detailed description of the infrared mission payload, including its projected size, weight, and power (SWAP) requirements, placement on the SV, maturity by component (TRL/MRL), technical capability, operational application, and image processing methods. The Offeror shall describe the ground AI&T approach, including details of sensor calibration and environmental testing approach, and any radiation testing required. The Offeror shall provide a description of how on-orbit calibration, solar avoidance, continuous imaging operations, and pointing modes will be implemented. The Offeror shall propose how calibration will be completed on-orbit for initial operations and how it will be updated through the life cycle.
The Offeror shall propose one or multiple IR spectral bands based on SDA’s stated mission objectives of detecting and tracking infrared targets (both bright and dim, and both static and moving), including hypersonic vehicles and other advanced missiles. The Contractor shall propose a detection and processing architecture for use on-board each Tracking SV and on the ground that:
a) performs sensor-level processing to calibrate data and update calibration solutions as needed,
b) suppresses backgrounds and detects candidate events (i.e., exceedances), to transmit to ground or Transport SV BMC3 units, and
c) generates 2D tracks to transmit to ground or Transport SV BMC3 units.
The Contractor shall also propose a fusion processing architecture that performs fusion of exceedance data (from multiple Tracking SVs from any vendor) into 3D tracks; the fusion architecture will be implemented for deployment on BMC3 units that may reside on Transport SVs or on the ground at the Ground Mission Data Processing Center. The Offeror shall describe their on-board data storage, lossless compression approach, and management of both raw and processed data for prioritization and routing based on the requirements of the ground IR missile warning and tracking mission.
The Offeror shall provide analysis supporting their design approach including, but not be limited to, the following:
Trades analysis conducted to achieve optimal design performance
IR mission data processing architecture
IR Sensor configuration
Spectral band choice
Radiometry budget and accuracy
IR sensor on-board data processing throughput and data management/storage approach
Line-of-Sight budget and state vector accuracy
Stray light management approach
Target tracking performance (MDT, NET, coverage)
A detailed radiometry analysis shall be provided as an Appendix, which does not count against the Volume II page limit, but shall not exceed five (5) pages. The Offeror shall demonstrate the
Minimum Detectable Target and Noise Equivalent Target performance of the system, as well as probability of detection, tracking, and warning, as specified in the classified TRD SOW appendix.
The Offeror shall detail the signal, noise, and clutter parameters and performance expectations in a radiometry budget or equivalent to allow the Government to evaluate the risk associated with the sensor and processing chain performance.
Similarly, a detailed metric analysis shall be provided as a separate Appendix, which does not count against the Volume II page limit, but shall not exceed five (5) pages. The Offeror shall demonstrate coverage and state vector accuracy performance expectations of the system and provide a line-of-sight knowledge budget, including random and bias terms and contributing parameters and assumptions, to allow the Government to assess the state vector accuracy performance.
The Offeror shall describe inherent resiliency capabilities of their design and any opportunities to incorporate features that protect critical components from damage due to external threats. This discussion may be provided as a classified Appendix, but shall not exceed two (2) pages, which do not count against the Volume II page limit.
3.1.2.2.1.2 Optical Communication Terminals (OCTs)
The Offeror shall provide a detailed description of the optical communication terminals, including placement on the SV, individual and total field of regard, and ability to create and maintain space-to-terrestrial and space-to-space links. The Offeror should identify the anticipated power requirements, data rate, bit error rate, and any other parameters considered key by the Offeror. The
Offeror should provide a link budget demonstrating the closure of the optical links and clearly state any assumptions used in the creation of the link budget. The Government expects that the link budgets will be developed using industry standards for margin (e.g., 3 dB). The Offeror shall identify the compliance of their current system with the SDA OCT Standard v3.0, detail any non-compliant components of their design, and describe the path to full compliance for those components.
3.1.2.2.1.3 Ka Mission Payload System
The Offeror shall provide a detailed description of Ka-band subsystems used for the mission payload communications. The Offeror should identify the number of terminals, frequency of operation, bandwidth, anticipated power requirements, anticipated data rate, bit error rate, and any other parameters key to mission performance. The Offeror should identify the antenna configurations, field of regard, and deployment mechanisms for each of the antenna systems. The Offeror should provide link budgets demonstrating the closure of required RF links and clearly state all assumptions used in the creation of the link budget. The Government expects that the link budgets will be developed using industry standards for margin (e.g., 3 dB). The Offeror shall include a description of the space-to-ground communications solution to accomplish checkout and early operations.
3.1.2.2.1.4 Telemetry, Tracking, and Control (TT&C)
The Offeror shall provide a detailed description of the RF communications subsystems used for telemetry, tracking, and control (TT&C). The Offeror should identify the number of terminals, frequency of operation, bandwidth, anticipated power requirements, anticipated data rate, bit error rate, and any other parameters key to mission performance. The Offeror should identify the antenna configurations, field of regard, and deployment mechanisms for each of the antenna systems. The Offeror should provide link budgets demonstrating the closure of required RF links and clearly state all assumptions used in the creation of the link budget. The Government expects that the link budgets will be developed using industry standards for margin (e.g., 3 dB). The Offeror shall include a description of the space-to-ground communications solution to accomplish checkout and early operations.
3.1.2.2.1.5 Networking and Data Routing
The Offeror should describe the networking capabilities enabled by their technical solution. The Offeror should detail the compliance of their system with the SDA NEBULA Standard v3.0, identify any non-compliant components of their design, and identify the path to full compliance for those components. The Offeror should indicate how their design supports networking and data routing both with and without the use of the BMC3 module to provide onboard network control and management. The Offeror should discuss their plans for on-orbit network initialization and provide estimates of system performance.
3.1.2.2.1.6 Navigation
The Offeror should describe the proposed implementation of navigation capabilities including a description of:
How an assured position, velocity, and timing (PVT) solution is provided on board the satellite utilizing Global Positioning System (GPS), OCTs, clock(s) and system components as required
The orbit propagator
The trust engine/integrity audit and how the PVT solution will be utilized to ensure the validity of the received GPS signals and PVT sensor data in order to meet DoDI 4650.08
The selected Global Navigation Satellite System (GNSS) receiver(s) and clocks, and how these will be integrated to provide an assured PVT solution for all satellite systems
3.1.2.2.2 Space Vehicle (SV) Bus Design
The Offeror shall present their SV design based on the manufacture or purchase of commoditized SV buses per the definition included in Attachment 1 – Statement of Work and Technical
Requirements Document. Should the Offeror elect a non-commoditized bus alternative, they shall present their process for commoditizing the alternative bus.
3.1.2.2.2.1 Bus Design and Heritage
The Offeror shall provide a detailed description of the SV bus including the size, weight and power available. The Offeror shall present a discussion of the bus heritage to include:
At what orbit altitude/inclination, and how many have flown
Design life and experienced flight life
Types and frequency of experienced anomalies and their solution(s)
Any major modifications required to meet the T1 Tracking Layer objectives
If the proposed bus has not flown, the Offeror shall provide the heritage from an existing bus (if applicable) and the changes made to reach the proposed bus design along with the rationale for each proposed change.
3.1.2.2.2.2 Space Vehicle (SV) Subsystems
For each of the major subsystems (e.g., electrical and power; attitude control; telemetry, tracking and control; thermal management; etc.) the Offeror shall provide a detailed description of the subsystem as well as system heritage (similar to that for Bus Design and Heritage above). The Offeror shall discuss specialty engineering (e.g., radiation, electromagnetic interference, contamination control, etc.) issues and approaches as appropriate. The Offeror should discuss the overall fault management approach, including the safe mode implementation.
3.1.2.2.2.3 Cybersecurity
The Risk Management Framework (RMF), per DoD Instruction 8510.01, will be used by the Offeror to obtain separate authorities to operate (ATO) from the Government for the ground segment and for the space segment. For the T1 Tracking Layer, the ground segment refers to any ground stations, networks, or ground-based antennas supporting the T1 Tracking Layer SVs during launch and early operations, transition to operations, and operations. The Government has already performed Step 2 of the RMF process by selecting security controls that the Contractor must implement for the ground segment and for the space segment to achieve the desired system categorization. These security controls are included in the RMF Process and Security Controls for T1 Tracking Layer Ground and Space Segments.xlsx document in the Bidder’s Library. In their proposal, the Offeror may provide arguments to add or remove any security control while still achieving the security objectives of both the T1 Tracking Layer space segment and ground segment.
The Government Authorizing Official will make the final determination on the security controls that shall be implemented.
The Offeror should discuss their cyber resilience strategy, including any resiliency plans, trusted boot systems, security guarantees, and measurements and measurement frequencies. The Offeror should discuss any novel solutions and trade-offs required to produce a highly resilient space vehicle and a highly resilient constellation network in order to minimize cyber risk. The Offeror should describe how the compromise of a single SV will not impact the entire network and highlight key aspects of cyber resilience that will be a part of their solution.
If desired, the Offeror may submit classified discussions related to the cyber resiliency of their system. Each page of these submissions will count as a full page of Volume II, regardless of the amount of text on the page. The allowable page count for the Unclassified Volume II will be reduced by the number of pages in the classified submission. Offerors wishing to submit a classified submission shall follow the instructions in Section 3.2.
3.1.2.2.2.4 Encryption
The Offeror should describe the proposed implementation of security concerns, such as red-black isolation, encryption, and command authentication. The Offeror should describe the encryption systems and technologies used on the space vehicle and how these systems will obtain certification and interoperate with the systems of other T1 Tracking Layer vendors and the ground.
3.1.2.2.3 Interoperability
The Offeror should discuss how interoperability between vendor-agnostic SVs is enhanced and enabled by their technical solution. This section should detail other programs for which the vendor has enabled interoperability, how they tested – or would test – this requirement, and the additional capability for the customer shown by this process. The Offeror should discuss situations in which they have led or at least participated in the development and acceptance of industry standards.
Simply stating that the Offeror will work with SDA to ensure interoperability will not be sufficient for this section; the Offeror shall detail instances in which they instantiated interoperability in theirs’ and other vendor’s systems, subsystems or components. The Offeror should define the verification, interoperability, and compatibility tests or analysis that they plan to perform and the benefit that those efforts will bring to SDA.
3.1.2.3 Manufacturability
The Offeror shall present their manufacturing and assembly-line processes, captured in digital format, to demonstrate their ability to produce high-quality repeatable fabrication of the SVs including (1) assembly of key parts, (2) testing of individual parts and assemblies to ensure they meet the reliability and availability standards associated with the SV, (3) sparing approach at each level of assembly, (4) assembly and test of SV subsystems, (5) integration and test of subsystem hardware, and (6) integration and test of software with the hardware subsystems. A key focus of this demonstration is the IR mission payload for assembly, integration, and test. The digital media shall be submitted in MP4 (.mp4) format and the duration of the video shall be less than ten (10) minutes. Any video content that exceeds the ten-minute time requirement will not be evaluated. The
Government is primarily interested in videos that show actual hardware, assembly lines and personnel that will be employed by the Offeror in the design, development, assembly, integration, test and delivery of T1 Tracking Layer SVs. Videos that are created using 3-D computer-aided visualization programs are not preferred but will be accepted if they clearly demonstrate critical manufacturing and assembly assets that will be employed during T1 Tracking Layer program execution. Any such videos depicting manufacturing and assembly assets that do not yet exist must explicitly indicate development schedules substantiating the availability of those assets during T1
Tracking Layer program execution. Video narration will be accepted but must be accompanied by a transcript, which shall be submitted as a separate .pdf file and will not count against the Volume
II page limit.
Videos shall be submitted via DoD Secure Access File Exchange (SAFE): https://safe.apps.mil/ as part of the proposal submission. Videos shall be a single file which shall not exceed the size limits of a single DoD SAFE submission.
While Offerors are free to include content they consider important to demonstrating their capabilities, video inspection shall, at a minimum, present the system-level assembly, integration, and test (AI&T) process and shall capture the assembly-line process and assembly of at least the following SV components:
SV Bus
IR Mission Payload
OCT
In addition to the video, Offerors should explain their ability to procure or manufacture commoditized buses 1 at low cost and high reliability while achieving economies of scale as demonstrated in the commercial sector. Offerors shall identify risks in their manufacturing processes or the manufacturing processes of their major teammates and shall identify their planned responses to those risks, including strategies for overcoming the inability of the Offeror or a major teammate to produce the required number of components. The Offeror shall provide estimates of the manufacturing capacity of themselves (if applicable) and any major teammate, as identified in
Section 3, inclusive of current contracts and any potential contracts within the Tranche 1 timeframe.
3.1.2.3.1 Supply Chain
The Offeror shall address production capacity, supply chain capacity, supply chain security, and production scalability issues for the T1 Tracking Layer SV buses and key payloads including, but not limited to, Infrared Mission Payload, OCTs, processors, and cryptographic equipment.
3.1.2.4 Test, Demonstration, and Verification
The Offeror shall present their hardware and software, ground and orbit-based test and demonstration approach(es). This section should address all aspects of test and demonstration to include modeling, simulation, analysis, emulation, ground and space-based testing. The Offeror
1 A commodity space vehicle utilizes an existing bus design that can be easily manufactured and reused across multiple space vehicles and for multiple missions. A commoditized bus has been designed for manufacture and is suitable for, or currently being produced by, an assembly line like process at economies of scale.
https://safe.apps.mil/ should address requirements verification at the component, subsystem, system, vehicle and constellation levels up to and through environmental tests. The Offeror shall specifically address requirements verification of the IR mission payload and image processing. The Offeror should describe test approaches, methodologies, performance, verification, documentation, and staffing.
This section should include sample test artifacts from previous programs, and identification of test platforms and hardware maintained by the Offeror, as well as use of engineering development units and special test equipment (aka ground-support equipment). The Offeror shall address facility and hardware cleanliness requirements and contamination monitoring approach throughout AI&T and launch integration. The Offeror shall specifically address test approach for the IR mission payload to include calibration, image processing, and space environment survivability. The Offeror shall provide test approach for SV interface to ground segment. For cases where test activities are expected to be accomplished outside of the Offeror’s direct control, the Offeror should identify their approach to manage test conduct and the experience level of the organization the Offeror plans to use to conduct the test. Of particular interest to SDA is the Offeror’s approach to conducting tests and demonstrations in concert with the SDA Operations Center (OC) prior to launch and during early orbit operations and checkout, as well as use of the SVs in conjunction with warfighter exercises once in orbit. Throughout discussion of their test activities, Offerors should clearly identify live, virtual, and constructive tests and demonstrations, if applicable, and any elements expected to be provided by the Government to facilitate completion of their verification program.
3.1.2.5 Launch Services Overview
SDA will procure launch services through the use of the National Security Space Launch contract.
The Offeror shall describe how seven (7) of their SVs will integrate onto a single EELV- M (Evolved Expendable Launch Vehicle-Medium) class launch vehicle, including any custom adapters or separation systems required to attach to the launch vehicle. The Offeror should include graphics depicting seven (7) vehicles integrated onto a representative launch vehicle. The Offeror shall clearly identify any limitations that their design imparts on the launch vehicle, any adapter systems, and assume a total mass of 7,200 kg (SVs, ESPA rings, dispenser systems, separation systems, adaptor places, etc.). The Offeror should provide analysis of mass considerations and constraints to support launch planning and possible addition of other payloads. The Offeror shall identify any particular launch services (such as a T-0 dry nitrogen purge) or additional accesses required to support launch vehicle integration. If the proposed bus has flown on an NSSL class launch vehicle, the Offeror shall provide the bus heritage. For pricing purposes, the Offeror shall assume that all launches will be conducted from Vandenberg Space Force Base.
3.1.2.6 Ground Segment and Operations
The Offeror shall present their approaches to operating their constellation through their NEBULA Operations – Vendor Architecture (NOVA) software and integrating with the SDA Unified
Planning Environment and Resources for NEBULA Operations – Vendor Agnostic (SUPERNOVA) provided by the SDA Operations and Integration (O&I) contractor. The Offeror shall define which functions their NOVA will provide, which functions are assumed to be provided by SUPERNOVA, and how the two systems will interact during operations and maintenance activities. The Offeror shall describe their use of COTS software and tools and the resultant benefits to integrated operations. The Offeror shall describe how their ground system will provide SV system health and status data to the integrated ground operations management systems for continuous situational awareness and performance monitoring. The Offeror shall describe their approach to shift the control of their SV planes to the operations center as part of the development of the integrated ground system. The Offeror shall describe its mission data processing architecture, software, maturity, heritage, and performance.
The Offeror shall describe their concept, level of automation, and staffing requirements for nominal operations. The Offeror shall describe their approach for anomaly resolution, discrepancy reporting, and planned and unplanned system maintenance. The Offeror should list the documentation and training anticipated to be provided to SDA operations personnel. The Offeror should describe the systems and approach for maintaining inventory accountability and control.
The Offeror should describe the suggested approach for verification that the proposed SVs are fully compatible with the integrated ground segment and the SDA Operations Center (OC).
3.1.2.7 Mission Operations, Sustainment, and Disposal
The Offeror shall define the facilities and systems that will be used to support launch and early operations (LEOps) from the vendor facility and how they will transition to constellation operations at the SDA OC. The Offeror shall clearly identify the anticipated locations of SV communications systems, ground antennas, and processing facilities that will be utilized during LEOps. The Offeror shall clearly identify the ability of their facilities to support operations at SECRET classification and what network connections are currently available. The Offeror shall provide an overview of the LEOps plan for orbit raising and SV and constellation level initialization and checkout. The Offeror shall describe their on-orbit check-out plan and test flow to demonstrate full operational capability of their SVs, mission payloads, and networked orbital planes prior to delivery to the Government and transition to operations. The Offeror shall identify the support that they will provide to the SDA OC during nominal constellation operations, surge support, and anomaly operations.