Scoreboards270132_BF.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 27-0132
- Issued by
- Sarasota County, Florida
About this file
This is a bid form scorecard for the School Board of Sarasota County, Florida's procurement of scoreboards and installation services under Bid #27-0132. The solicitation seeks a contractor to provide five specific scoreboard configurations: an outdoor baseball/softball scoreboard (20 ft. x 6 ft., 350 lbs.), a larger outdoor baseball/softball scoreboard (26 ft. x 9 ft., 800 lbs.), an outdoor football scoreboard (26 ft. x 10 ft., 750 lbs.), an outdoor soccer/lacrosse scoreboard (16 ft. x 5 ft., 265 lbs.), and an indoor basketball/volleyball/wrestling scoreboard (9 ft. x 5 ft., 133 lbs.). All scoreboards must be aluminum cabinet construction with cast vinyl accent materials, amber or red digit colors, and 120 VAC electrical systems. The contract intends to establish firm, fixed pricing for purchase, delivery FOB destination to Sarasota County locations, comprehensive training, and installation labor including supervision, materials, equipment, tools, and all associated costs.
Pricing submissions must include the scoreboard cost, installation labor costs, and manufacturer specification sheets with each bid item; failure to submit specifications will render a bidder non-responsive. Bidders must provide hourly rates for removal and disposal of existing scoreboards, engineering drawings fees, service and maintenance labor at standard and non-standard hours, and indicate their use of company staff versus subcontractors for installation. The bid form requires statements of delivery timeframes post-purchase order and establishes maximum markup allowances of 10 percent for subcontracted services, parts and materials, and rental equipment for non-warranty repairs. Bidders must also provide balance-of-line percentage discounts for scoreboards and accessories beyond the five specified items, with space for multiple manufacturer discount submissions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scoreboards_ITEM.pdf | ||
| Scoreboards_REC.pdf | ||
| A._Certification_Page.pdf | ||
| Scoreboards270132_BID_RESPONSE_2.pdf | ||
| Scoreboards270132_BID_RESPONSE.pdf | ||
| Scoreboards270132_ITB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Tab
| Scoreboard pricing shall include the cost of the scoreboard, delivery FOB: Destination delivered to the SBSC location within Sarasota County, training, and related items necessary in accordance with the Technical/Detailed Specifications to provide a completely functional scoreboard. Manufacturer's specification sheets shall be included with the bid submittal on items bid. Failure to submit the manufacturer's specifications will deem the bidder non-responsive to this solicitation. | |||||||
| Item | Decription | Brand/Manufacturer's Name | Model Number | Warranty | Scoreboard Price | Cost for Installation | |
| 1 | Outdoor - Baseball/Softball Scoreboard: (1) Overall Dimensions - 20 ft. x 6 ft. (2) Weight - 350 lbs. (3) Cabinet Material - Aluminum (4) Caption Height - 8 in., 6 in., 4 1/2 in. (5) Accent Material - 2.4 mil cast vinyl (6) Digit Height - 15 in., 11 in. (7) Indicator Size - 15 in. (8) Digit Colors - Amber or Red (9) Electrical - 3.5 Amps, 120 VAC -Including all but not limited to the equipment and features listed in the Technical/Detailed Specifications starting on Page 13. | $ | |||||
| 2 | Outdoor - Baseball/Softball Scoreboard: (1) Overall Dimensions - 26 ft. x 9 ft. (2) Weight - 800 lbs. (3) Cabinet Material - Aluminum (4) Caption Height - 12 in., 10 in., 6 in. (5) Accent Material - 2.4 mil cast vinyl (6) Digit Height - 18 in., 15 in. (7) Indicator Size - 15 in. (8) Digit Colors - Amber or Red (9) Electrical - 5.3 Amps, 120 VAC Including all but not limited to the equipment and features listed in the Technical/Detailed Specifications starting on Page 13. | $ | |||||
| 3 | Outdoor - Football Scoreboard: (1) Overall Dimensions - 26 ft. x 10 ft. (2) Weight - 750 lbs. (3) Cabinet Material - Aluminum (4) Caption Height - 12 in., 13 in., 9 in. (5) Accent Material - 2.4 mil cast vinyl (6) Digit Height - 30 in., 24 in., 18 in. (7) Indicator Size - 10 in. (8) Digit Colors - Amber or Red (9) Electrical - 2.9 Amps, 120 VAC Including all but not limited to the equipment and features listed in the Technical/Detailed Specifications starting on Page 13. | $ | |||||
| 4 | Outdoor - Soccer/Lacrosse Scoreboard: (1) Overall Dimensions - 16 ft. x 5 ft. (2) Weight - 265 lbs. (3) Cabinet Material - Aluminum (4) Caption Height - 8 in., 6 1/2 in. (5) Accent Material - 2.4 mil cast vinyl (6) Digit Height - 18 in., 15 in. (7) Indicator Size - n/a (8) Digit Colors - Amber or Red (9) Electrical - 2.2 Amps, 120 VAC Including all but not limited to the equipment and features listed in the Technical/Detailed Specifications starting on Page 13. | $ | |||||
| 5 | Indoor - Basketball/Volleyball/Wrestling Scoreboard: (1) Overall Dimensions - 9 ft. x 5 ft. (2) Weight - 133 lbs. (3) Cabinet Material - Aluminum (4) Caption Height - 5 in., 4 in., 3 in. (5) Accent Material - 2.4 mil cast vinyl (6) Digit Height - 12 in., 9 | ||||||
| in. (7) Indicator Size - 3 in. (8) Digit Colors - Amber, Red, and Green (9) Electrical - 1.5 Amps, 120 VAC Including all but not limited to the equipment and features listed in the Technical/Detailed Specifications starting on Page 13. | $ | ||||||
| Provide a Balance of Line discount off MSRP for scoreboards and accessories not specified in items #1-5 of the bid form. | |||||||
| 6 | Brand/Manufacturer's Name: | ||||||
| Percentage Discount: | ______________ % | ||||||
| 7 | Brand/Manufacturer's Name: | ||||||
| Percentage Discount: | ______________ % | ||||||
| 8 | Brand/Manufacturer's Name: | ||||||
| Percentage Discount: | ______________ % | ||||||
| 9 | Brand/Manufacturer's Name: | ||||||
| Percentage Discount: | ______________ % | ||||||
| 10 | Balance of Line Percentage Discount: | ______________ % | |||||
| 11 | Hourly Rate for removal and disposal of existing scoreboard (shall include labor, supervision, materials, equipment, tools, fuel costs, trip charges, mileage, vehicle charges, and travel times). |
hourly
| 12 | Fee for engineering drawings, where needed for permitting. | $ | |
| 13 | Do you use current company staff for installation of scoreboards? | Yes or No | |
| 14 | Does your company use subcontractors for installation of scoreboards or for other | ||
| reasons? | Yes or No | ||
| 14a | If you answered yes on item #14, please clarify. | ||
| 15 | Number of days for delivery or completion after receipt of purchase order. | ||
| LABOR FOR SERVICE & MAINTENANCE (for non-warranty repairs above and beyond initial scoreboard installation or for replacement of structure that supports the scoreboard when required to meet code) Enter the hourly rate per worker. | |||
| 16 | Hourly rate for standard working hours for service and maintenance, exclusive of warranty. (Monday through Friday from 7:00 A.M. to 5:00 P.M.). | $ _________________ |
hourly rate 17 Hourly rate for non-standard working hours for service and maintenance, exclusive of warranty. (Monday through Friday prior to 7:00 A.M. and after 5:00 P.M., and Saturday and Sunday). $ _________________ hourly rate
| SUBCONTRACTED SERVICES | ||
| 18 | Subcontracted services are to be billed at net cost plus A MAXIMUM OF 10% MARKUP. Indicate this percentage in the space to the right. A mark-up on sales tax will not be allowed. The Contractor's invoices will clearly show the description of the subcontracted service, cost, and percent mark-up cost. A copy of the Subcontractor's invoice will be included with the Contractor's invoice | __________________ |
Maximum 10% markup
| PARTS AND MATERIALS (for non-warranty repairs above and beyond initial scoreboard installation or for replacement of structure that supports the scoreboard when required to meet code). | ||
| 19 | The cost of parts and materials shall be based on the Contractor's wholesale price from the supply house plus A MAXIMUM OF 10% MARKUP. Indicate this percentage in the space to the right. A mark-up on sales tax will not be allowed. | |
| The Contractor's invoices shall clearly show the manufacturers' part number, description, supply house cost and percent mark-up cost. A copy of the supply house invoice shall be submitted with the Contractor's invoice. | __________________ |
Maximum 10% markup
| RENTAL EQUIPMENT (for non-warranty repairs above and beyond initial scoreboard installation or for replacement of structure that supports the scoreboard when required to meet code). | ||
| 20 | The cost of special rental equipment will be allowed based on the Contractor's cost from the rental facility plus A MAXIMUM OF 10% MARKUP. Indicate this percentage in the space to the right. A mark-up on sales tax will not be allowed. The Contractor's invoices shall clearly show the description of rental equipment used, number of hours or days of active use, cost, and percent mark-up cost. A copy of the rental equipment invoice shall be submitted with the Contractor's invoice. | __________________ |
Maximum 10% markup
&"Arial,Regular"&10THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA
SCOREBOARDS AND INSTALLATION SERVICES - BID #27-0132
BID FORM
File details come from the government source that posted it. Updated .