Scope of work Gulfport FRONT GATE OVERHAUL.1.docx
DOCX document 254 KB Posted
- Solicitation number
- 3033526Q0000008
About this file
This is a Scope of Work document for a construction contract to overhaul, repair, and upgrade the main entrance slide gate operating system at U.S. Coast Guard Station Gulfport, located at 991 23rd Ave. in Gulfport, MS 39501. The contractor must provide all labor, materials, and equipment necessary to complete the project within a 120-calendar-day performance period, working Monday through Friday from 8:00 AM to 5:00 PM with prior approval required for after-hours work.
The detailed work requirements include: removal and replacement of the existing gate operator with a HySecurity S-SD2-1-7B SlideDriver II SD40 (1hp, 208-230v, 1ph) unit; installation of an EMX IRB-RET2 Universal UL325 retroreflective photoeye safety sensor; replacement of the access control keypad with a model ensuring system compatibility; restoration or rework of the electrical junction box with complete waterproofing and sealing for the harsh coastal environment; mechanical repairs and adjustments to the slide gate and roller system including application of marine-grade lubrication; and comprehensive testing and training. The contractor is responsible for procuring all specified materials, managing waste disposal in accordance with RCRA requirements, maintaining site safety and security, providing temporary facilities and utilities connections, and submitting personnel rosters for government approval. All work must comply with the National Electrical Code and applicable federal, state, and local environmental regulations. Final acceptance is contingent upon successful inspection, operational validation, and submission of required documentation and warranties. The related solicitation (3033526Q0000008) is issued as a Request for Quotation (RFQ) for a small business set-aside under NAICS code 238290, with evaluation based on price, technical acceptability, and past performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Images3.pdf | ||
| Vendor Questions and Answer1.docx | DOCX document | |
| Images2.pdf | ||
| Images4.pdf | ||
| Constructions.Solicitation.docx | DOCX document | |
| Scope of work Gulfport FRONT GATE OVERHAUL.1.docx | DOCX document | |
| SF1442-14b.solicitation.offer.and.award.docx | DOCX document | |
| ms2.txt | TXT text file | |
| SF1442-14b.solicitation.offer.and.award.docx | DOCX document | |
| Construction Clauses.docx | DOCX document | |
| Constructions.Solicitation.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT SPECIFICATIONS
FRONT GATE OVERHAUL
AT
UNITED STATES COAST GUARD
STATION GULFPORT, GULFPORT MS
PROJECT NUMBER
April 2026
SECTION 01 11 00
Article I. SUMMARY OF WORK Article II. 1.0 Project Overview & Administration This scope of work outlines the requirements for the contractor to provide all labor, materials, and equipment necessary to overhaul, repair, and upgrade the main entrance slide gate operating system at USCG Station Gulfport, MS. This project includes replacing the primary operator, upgrading safety sensors, reworking electrical enclosures for harsh environments, and performing comprehensive mechanical adjustments.
1.1 Location
The work is located at:
U.S. Coast Guard Station Gulfport 991 23rd Ave.
Gulfport, MS 39501 Arrangements for visiting the site may be made by contacting:
· Contact: MKC Shelton Franklin
· Email: Shelton.K.Franklin@uscg.mil
· Telephone: (206) 815-7012
1.2 Project Performance Period
The total contract performance period is 120 calendar days. This period includes the time needed for material submittals, on-site work, and the completion of all project closeout documents. After work begins, the contractor shall perform the work continuously during normal working hours and show daily progress until completion.
1.3 Work Hours
· Normal Hours: Work shall be performed Monday through Friday, from 8:00 AM to 5:00 PM.
· Special Scheduling: The schedule must be coordinated to minimize disruptions to building operations.
· After-Hours Work: Performing work outside of normal hours requires prior approval from the Coast Guard unit.
1.4 Drawings Accompanying Specification
There are no drawings accompanying this specification.
Article III. 2.0 Site Conditions & Contractor Requirements
2.1 Contractor Use of Premises
The work will be performed on an operational military installation. The Contractor shall:
· Become familiar with and obey all station fire, traffic, and security regulations.
· Not stray from the immediate work area or designated routes of ingress/egress unless authorized by the Contracting Officer’s Representative (COR).
· Isolate each construction area with temporary partitions and dust controls.
· Provide high-visibility safety fencing around all outdoor work areas and equipment laydown areas.
· Provide temporary covers on any excavations that remain open overnight.
2.2 Security
· Personnel Roster: Prior to the pre-construction conference, the Contractor shall submit a list of all personnel working on-site for approval. The roster must include the first name, last name, job description, and company of employment for each individual.
· Roster Updates: A new list must be submitted immediately upon any change in project personnel.
· Identification: All approved personnel must carry valid, Government-issued identification conforming to the Real ID Act of 2005. Non-compliant personnel will be escorted off the property.
2.3 Temporary Facilities or Utilities
· Temporary Facilities: The contractor shall provide temporary toilet facilities for their personnel.
· Utility Availability: Reasonable amounts of electricity and potable water will be made available without charge.
· Connections: The Contractor is responsible for all costs and labor associated with connecting to and disconnecting from utilities, including providing necessary transformers and backflow preventers.
2.4 Underground and Concealed Utilities
The Contractor shall physically verify the location and elevation of all existing underground and concealed utilities prior to commencing work, using methods such as electromagnetic and sonic scanning. All discovered utility locations shall be marked on the surface.
2.5 Utility Outages
Utility interruptions are not permitted until authorized by the COR. The Contractor must submit a request identifying the utility, reason for the outage, proposed time, and estimated duration.
2.6 Safety Program
The Contractor is wholly responsible for work site safety. A safety program must be implemented to protect all personnel, prevent property damage, and comply with all applicable federal, state, and local safety regulations. This includes providing barricades, signs, and other necessary safety measures.
2.7 Cleanup
The Contractor shall keep the work area, laydown, and storage areas free from waste accumulations daily. The Contractor shall not use any Coast Guard waste disposal facilities (e.g., garbage cans, dumpsters) and must comply with all regulations for waste storage, transport, and disposal.
2.8 Storm Protection
The Contractor shall take all practicable precautions to minimize danger from storms, including closing openings, securing loose materials and equipment, and securing scaffolding.
2.9 Receipt, Delivery, and Storage
The Contractor is solely responsible for receiving, transporting, and securely storing all equipment, materials, and supplies required for the project.
Article IV. 3.0 Environmental Requirements
3.1 Protection of the Environment
The Contractor must comply with all applicable federal, state, and local environmental laws and regulations, including but not limited to the Endangered Species Act (ESA), Resource Conservation and Recovery Act (RCRA), and others as applicable.
3.2 Generated Waste
· All project-generated waste shall be recycled or disposed of in accordance with RCRA requirements.
· Any hazardous waste shall be manifested off-site with the Coast Guard unit listed as the Generator. The Contractor shall manage the analysis, characterization, storage, and disposal in accordance with all regulations.
· The Contractor shall submit the proposed disposal facility, transporter qualifications, and draft manifest to the COR for approval.
3.3 Disposition of Materials
All materials, including construction debris and old equipment, shall be removed from Government property. The Contractor shall submit a disposal receipt from the landfill to the COR within 10 working days of disposal.
Article V. 4.0 Code Compliance All work must conform to the latest editions of the following codes and standards:
· National Electrical Code (NEC)
Article VI. 5.0 Detailed Work Requirements
5.1 Task Overview: The contractor shall complete the following tasks to ensure the proper operation and environmental resilience of all gate components.
5.2 Operating System Replacement: Remove the existing gate operator and photocell. Install and configure the new HySecurity operator and EMX retroreflective photoeye.
5.3 Junction Box & Wiring Overhaul: Restore or rework the existing electrical junction box. Correct any existing wiring issues. Rework and reseal all incoming and outgoing wires into the junction box, ensuring it is completely watertight and sealed to withstand a harsh coastal environment.
5.4 Mechanical Adjustments & Repairs: Make necessary repairs and adjustments to the existing slide gate and roller system. Rework the slide gate rollers and apply all required marine-grade lubrication to the system to ensure smooth, proper operation.
5.5 Keypad Servicing: Replace the keypad and integrate it with the new operating system.
Article VII. 6.0 Contractor Furnished Materials (Parts List) The following items are the responsibility of the Contractor to procure and install as part of this scope of work:
| Item Category |
| Description |
| Quantity |
| Gate Operator |
| HySecurity S-SD2-1-7B SlideDriver II SD40 (1hp, 208-230v, 1ph) |
| 1 |
| Safety Sensor |
| EMX IRB-RET2 UNIVERSAL UL325 RETROREFLECTIVE PHOTOEYE |
| 1 |
| Access Control |
| Replacement Keypad (Model to ensure system compatibility) |
| 1 (If replacement is required) |
| Electrical Enclosure |
| Watertight Junction Box (If the existing box cannot be properly restored) |
| 1 (If required) |
| Miscellaneous Materials |
| Wiring, watertight sealants, weather-resistant connectors, and industrial lubricants |
| As needed |
Article VIII. 7.0 Testing, Training, and Final Acceptance
7.1 Environmental Protection: All electrical terminations, splices, and enclosures must be explicitly sealed and rated for harsh outdoor environments to prevent water ingress and corrosion.
7.2 Operational Validation: Following installation, the contractor must conduct a full operational test of the gate system, ensuring all mechanical components move freely without binding, and that all safety sensors and access controls function according to manufacturer specifications.
7.3 Training: The contractor will provide training to unit personnel on the operation of the new equipment.
7.4 Final Acceptance: Final acceptance is contingent upon successful inspection and turnover of all required documentation and warranties.
7.04 Final acceptance is contingent upon successful inspection and turnover of all required documentation and warranties.
-- End of Section --