Scope of work Gulfport FRONT GATE OVERHAUL.1.docx

DOCX document 254 KB Posted

Attached to
Overhaul Repair and upgrade main slide gate system
Solicitation number
3033526Q0000008
Issued by

About this file

This is a Scope of Work document for the overhaul, repair, and upgrade of the main entrance slide gate operating system at USCG Station Gulfport, Mississippi.

The U.S. Coast Guard is seeking qualified contractors to repair and upgrade the main slide gate system through Request for Quotation (RFQ) Solicitation Number 3033526Q0000008. This is a small business set-aside contract with NAICS code 238290 and a small business size standard of 16.5-19.0 million dollars. The contract will be awarded on a firm-fixed price basis using lowest price, technically acceptable evaluation criteria, with assessment based on price, technical acceptability, and past performance. The required delivery/performance timeline is 30-120 days after receipt of order (ARO) with FOB Destination to the U.S. Coast Guard facility in Gulfport, Mississippi. All prospective quoters must be actively registered in the System for Award Management (SAM.gov). The work involves comprehensive repair and upgrade services to ensure proper functioning of the critical access control infrastructure at the Coast Guard station. Federal Acquisition Regulation clauses and Department of Labor wage rates for construction apply to this solicitation.

View the file

Other files

File Type Posted
Images3.pdf PDF
Vendor Questions and Answer1.docx DOCX document
Images2.pdf PDF
Images4.pdf PDF
Constructions.Solicitation.docx DOCX document
SF1442-14b.solicitation.offer.and.award.docx DOCX document
ms2.txt TXT text file
Scope of work Gulfport FRONT GATE OVERHAUL.1.docx DOCX document
SF1442-14b.solicitation.offer.and.award.docx DOCX document
Construction Clauses.docx DOCX document
Constructions.Solicitation.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT SPECIFICATIONS

FRONT GATE OVERHAUL

AT

UNITED STATES COAST GUARD

STATION GULFPORT, GULFPORT MS

PROJECT NUMBER

April 2026

SECTION 01 11 00

Article I. SUMMARY OF WORK Article II. 1.0 Project Overview & Administration This scope of work outlines the requirements for the contractor to provide all labor, materials, and equipment necessary to overhaul, repair, and upgrade the main entrance slide gate operating system at USCG Station Gulfport, MS. This project includes replacing the primary operator, upgrading safety sensors, reworking electrical enclosures for harsh environments, and performing comprehensive mechanical adjustments.

1.1 Location

The work is located at:

U.S. Coast Guard Station Gulfport 991 23rd Ave.

Gulfport, MS 39501 Arrangements for visiting the site may be made by contacting:

· Contact: MKC Shelton Franklin

· Email: Shelton.K.Franklin@uscg.mil

· Telephone: (206) 815-7012

1.2 Project Performance Period

The total contract performance period is 120 calendar days. This period includes the time needed for material submittals, on-site work, and the completion of all project closeout documents. After work begins, the contractor shall perform the work continuously during normal working hours and show daily progress until completion.

1.3 Work Hours

· Normal Hours: Work shall be performed Monday through Friday, from 8:00 AM to 5:00 PM.

· Special Scheduling: The schedule must be coordinated to minimize disruptions to building operations.

· After-Hours Work: Performing work outside of normal hours requires prior approval from the Coast Guard unit.

1.4 Drawings Accompanying Specification

There are no drawings accompanying this specification.

Article III. 2.0 Site Conditions & Contractor Requirements

2.1 Contractor Use of Premises

The work will be performed on an operational military installation. The Contractor shall:

· Become familiar with and obey all station fire, traffic, and security regulations.

· Not stray from the immediate work area or designated routes of ingress/egress unless authorized by the Contracting Officer’s Representative (COR).

· Isolate each construction area with temporary partitions and dust controls.

· Provide high-visibility safety fencing around all outdoor work areas and equipment laydown areas.

· Provide temporary covers on any excavations that remain open overnight.

2.2 Security

· Personnel Roster: Prior to the pre-construction conference, the Contractor shall submit a list of all personnel working on-site for approval. The roster must include the first name, last name, job description, and company of employment for each individual.

· Roster Updates: A new list must be submitted immediately upon any change in project personnel.

· Identification: All approved personnel must carry valid, Government-issued identification conforming to the Real ID Act of 2005. Non-compliant personnel will be escorted off the property.

2.3 Temporary Facilities or Utilities

· Temporary Facilities: The contractor shall provide temporary toilet facilities for their personnel.

· Utility Availability: Reasonable amounts of electricity and potable water will be made available without charge.

· Connections: The Contractor is responsible for all costs and labor associated with connecting to and disconnecting from utilities, including providing necessary transformers and backflow preventers.

2.4 Underground and Concealed Utilities

The Contractor shall physically verify the location and elevation of all existing underground and concealed utilities prior to commencing work, using methods such as electromagnetic and sonic scanning. All discovered utility locations shall be marked on the surface.

2.5 Utility Outages

Utility interruptions are not permitted until authorized by the COR. The Contractor must submit a request identifying the utility, reason for the outage, proposed time, and estimated duration.

2.6 Safety Program

The Contractor is wholly responsible for work site safety. A safety program must be implemented to protect all personnel, prevent property damage, and comply with all applicable federal, state, and local safety regulations. This includes providing barricades, signs, and other necessary safety measures.

2.7 Cleanup

The Contractor shall keep the work area, laydown, and storage areas free from waste accumulations daily. The Contractor shall not use any Coast Guard waste disposal facilities (e.g., garbage cans, dumpsters) and must comply with all regulations for waste storage, transport, and disposal.

2.8 Storm Protection

The Contractor shall take all practicable precautions to minimize danger from storms, including closing openings, securing loose materials and equipment, and securing scaffolding.

2.9 Receipt, Delivery, and Storage

The Contractor is solely responsible for receiving, transporting, and securely storing all equipment, materials, and supplies required for the project.

Article IV. 3.0 Environmental Requirements

3.1 Protection of the Environment

The Contractor must comply with all applicable federal, state, and local environmental laws and regulations, including but not limited to the Endangered Species Act (ESA), Resource Conservation and Recovery Act (RCRA), and others as applicable.

3.2 Generated Waste

· All project-generated waste shall be recycled or disposed of in accordance with RCRA requirements.

· Any hazardous waste shall be manifested off-site with the Coast Guard unit listed as the Generator. The Contractor shall manage the analysis, characterization, storage, and disposal in accordance with all regulations.

· The Contractor shall submit the proposed disposal facility, transporter qualifications, and draft manifest to the COR for approval.

3.3 Disposition of Materials

All materials, including construction debris and old equipment, shall be removed from Government property. The Contractor shall submit a disposal receipt from the landfill to the COR within 10 working days of disposal.

Article V. 4.0 Code Compliance All work must conform to the latest editions of the following codes and standards:

· National Electrical Code (NEC)

Article VI. 5.0 Detailed Work Requirements

5.1 Task Overview: The contractor shall complete the following tasks to ensure the proper operation and environmental resilience of all gate components.

5.2 Operating System Replacement: Remove the existing gate operator and photocell. Install and configure the new HySecurity operator and EMX retroreflective photoeye.

5.3 Junction Box & Wiring Overhaul: Restore or rework the existing electrical junction box. Correct any existing wiring issues. Rework and reseal all incoming and outgoing wires into the junction box, ensuring it is completely watertight and sealed to withstand a harsh coastal environment.

5.4 Mechanical Adjustments & Repairs: Make necessary repairs and adjustments to the existing slide gate and roller system. Rework the slide gate rollers and apply all required marine-grade lubrication to the system to ensure smooth, proper operation.

5.5 Keypad Servicing: Replace the keypad and integrate it with the new operating system.

Article VII. 6.0 Contractor Furnished Materials (Parts List) The following items are the responsibility of the Contractor to procure and install as part of this scope of work:

Item Category
Description
Quantity
Gate Operator
HySecurity S-SD2-1-7B SlideDriver II SD40 (1hp, 208-230v, 1ph)
1
Safety Sensor
EMX IRB-RET2 UNIVERSAL UL325 RETROREFLECTIVE PHOTOEYE
1
Access Control
Replacement Keypad (Model to ensure system compatibility)
1 (If replacement is required)
Electrical Enclosure
Watertight Junction Box (If the existing box cannot be properly restored)
1 (If required)
Miscellaneous Materials
Wiring, watertight sealants, weather-resistant connectors, and industrial lubricants
As needed

Article VIII. 7.0 Testing, Training, and Final Acceptance

7.1 Environmental Protection: All electrical terminations, splices, and enclosures must be explicitly sealed and rated for harsh outdoor environments to prevent water ingress and corrosion.

7.2 Operational Validation: Following installation, the contractor must conduct a full operational test of the gate system, ensuring all mechanical components move freely without binding, and that all safety sensors and access controls function according to manufacturer specifications.

7.3 Training: The contractor will provide training to unit personnel on the operation of the new equipment.

7.4 Final Acceptance: Final acceptance is contingent upon successful inspection and turnover of all required documentation and warranties.

7.04 Final acceptance is contingent upon successful inspection and turnover of all required documentation and warranties.

-- End of Section --