This is a Scope of Work document issued by the Oregon Department of Fish and Wildlife (ODFW) for the procurement of fencing materials to support the Grande Ronde and John Day regions. The project aims to provide landowners with non-lethal mitigation tools to reduce crop, rangeland, and haystack damage caused by wintering big game species on private lands, thereby increasing landowner tolerance for wildlife. The contractor is responsible for providing and delivering all fencing materials listed in the Mandatory Bid Form and 2026 itemized Specifications document to two separate ODFW locations in northeastern Oregon. The contractor must notify ODFW of scheduled delivery times and confirm arrangements with site staff prior to delivery. All materials must be delivered no later than May 15th, 2026. ODFW will provide the final material list, site unloading instructions, and will handle unloading using its own equipment and personnel.
Payment for this procurement will be made on a fixed-price basis following confirmed receipt and acceptance of all materials. The final order quantities may be reduced or materials removed based on pricing and budgetary considerations at ODFW's discretion. Upon delivery, ODFW will inspect all materials to ensure conformity with specifications, correct quantities, and freedom from damages and defects, with non-conforming items subject to rejection. This is classified as an intermediate procurement under Oregon Administrative Rule 125-047-0270, and the agency will not accept protests on this solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sample Purchase Order with Standard Terms and Conditions~23.pdf | ||
| 2026 itemized Specifications by location.docx | DOCX document | |
| Mandatory Bid Proposal Form~2.docx | DOCX document | |
| Solicitation Bidding Instructions_S-63500-00016216.docx | DOCX document | |
| Federal terms for contracts under federal grants~24.pdf | ||
| OregonBuys Registration Guide~27.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Scope of Work, Delivery Schedule, and Budget
I. PROJECT TITLE: Grande Ronde and John Day Fencing Materials 2026
II. BACKGROUND or GENERAL INFORMATION and Purpose:
Big game can cause significant damage on private lands, as most of our wintering range is on private lands. This project is to provide landowners with tools to mitigate crop, rangeland and haystack damage with non-lethal means and increase tolerance for wintering big game species on private lands.
III. PROJECT DESCRIPTION, DESCRIPTION OF WORK and TASKS:
Project Description or Description of Work.
Contractor will provide and deliver all desired fencing materials to two separate locations in NE Oregon. The final order will depend on pricing due to budgetary considerations. ODFW may reduce quantities or remove materials.
TASKS:
Contractor will:
1. Provide fencing materials listed in the Mandatory Bid Form and 2026 itemized Specifications by Location document in the OregonBuys Attachments.
2. Deliver fencing materials to both ODFW Locations as per the Mandatory Bid Form.
3. Provide ODFW with a notice of scheduled delivery time and confirm with site staff.
ODFW will:
1. Provide list of fence materials needed and site unloading instructions.
2. Provide contractor with instructions on where exactly the fence material will be unloaded
3. Inspect fence materials.
4. Unload shipments using ODFW equipment and personnel.
IV. DELIVERABLES AND SCHEDULE:
Please see 2026 itemized Specifications by location attachment for additional information on items and delivery locations. Contractor will deliver fence materials to both ODFW locations no later than May 15th, 2026
V. PAYMENT METHODOLOGY
Fixed price. Payment is made after confirmed receipt and acceptance of all materials.
VI. DELIVERABLE REVIEW & ACCEPTANCE PROCESS
Upon ODFW Inspection of the materials to ensure materials conform to specifications, correct quantities, freedom from damages and defects. Non- conforming items will be rejected.