Scope of Service Appliance Maintenance and Repair.docx
DOCX document 16 KB Posted
- Solicitation number
- 22-444DHS-DEVDI-B-22120
- Issued by
- Illinois
About this file
This document is a Scope of Work for an Annual Service Contract for Appliance Maintenance and Repair for the W.G. Murray Developmental Center. The vendor shall provide all labor, supervision, equipment, tools, materials, parts, and incidentals to repair and maintain all Walk-In Coolers/Freezers, Refrigerators, Freezers, Water fountains, Washing Machines, and Clothes Dryers. The vendor must respond to all service calls within four (4) hours unless otherwise agreed upon, and comply with all applicable state and federal laws, standards, rules, and regulations. The contract calls for the construction of a "public work" subject to the Illinois Prevailing Wage Act, and the contractor/subcontractor must comply with all requirements of the Act and the Illinois Procurement Code.
The contract does not specify any pricing terms, set-asides, incumbents, funding requirements or sources, or other salient financial information. The document focuses primarily on the scope of work, service level requirements, and legal compliance aspects of the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FormsBSectionV201~61.docx | DOCX document | |
| StandardCertifications-A-V181.docx | DOCX document | |
| Mandatory Onsite Visit Guidance for Vendors Murray~13.docx | DOCX document | |
| RMU50~66.docx | DOCX document | |
| StandardTermsConditions201~54.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Annual service contract for Appliance Maintenance and Repair.
Vendor shall provide all labor, supervision, equipment, tools, materials, parts and all incidentals to repair and maintain all Walk-In Coolers/Freezers, Refrigerators, Freezers, Water fountains, Washing Machines and Clothes Dryers.
Vendor shall be responsible for maintaining all types of appliances whether being an authorized factory representative or an competing manufacturer and shall be responsible for replacing all worn parts or complete devices identical parts with approval by the Facility Chief Engineer.
Only genuine parts supplied by the manufacturer or an acceptable substitute are to be used when approved by the Facility Chief Engineer.
Vendor shall respond to all service calls within four (4) hours unless agreed upon by the Facility Chief Engineer to extend service time for repair/maintenance.
Vendor must comply with all applicable State and Federal Laws, standards, rules and regulations which includes Illinois Dept. of Labor/OSHA codes.
W.G. Murray Developmental Center will not be held liable for any stolen, lost and or broken tools, materials and equipment.
Hours of operations will be 07:00AM - 4.30PM, Monday thru Friday excluding weekends and Holidays unless approved by Facility Chief Engineer.
Vendor must give report to Facility Chief Engineer of work progress.
Vendor must supply all applicable paperwork of warranted materials, equipment and parts to facility Chief Engineer.
Vendor must sign-in and out during each and every service call at the Boiler House. Failure to do so will result of facility right of approval to service fee rendered.
This contract calls for the construction of a “public work”, within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”) or is a service contract subject to the prevailing wage requirements of the Illinois Procurement Code, 30 ILCS 500/25-60 (“the Code”). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the current “prevailing rate of wages” (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Code requires vendors awarded certain service contracts to pay service workers no less than the general prevailing wages rate of hourly wages (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Illinois Department of Labor publishes the prevailing wage rates on its website at http://labor.illinois.gov. The Illinois Department of Labor revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the Illinois Department of Labor’s website for revisions to prevailing wage rates. All contractors and subcontractor’s rendering services under this contract must comply with all requirements of the Act and Code, including but not limited to, all wage requirements and notice and record keeping duties.
File details come from the government source that posted it. Updated .