SCO ID#23-26532-01A-ADD #3.pdf

PDF 59 KB Posted

Attached to
NC Department of Natural and Cultural Resources
Solicitation number
SCO-23-26532-01A
Issued by
Person County, North Carolina

About this file

This document is Addendum Number 3 for the North Carolina Department of Natural and Cultural Resources' Museum of the Albemarle Fire Alarm Replacement project, issued by Sud Associates, P.A. Consulting Engineers on April 15, 2025. The addendum clarifies key technical specifications for the fire alarm system replacement, specifically allowing any fire alarm panel manufacturer that meets the revised requirements from Addendum 2. The project requires 5 SLC loops (1 per floor and 1 for the pump building), with each loop limited to no more than 20 addressable devices between isolators, as detailed on Sheet 1/E205. Contractors are instructed to incorporate this addendum and all previous addenda into their proposals and acknowledge receipt on their bid proposal forms.

The addendum supersedes any conflicting previous specifications and mandates a fully operational, turnkey fire alarm system. The project is identified by the State Construction Office (SCO) number 23-26532-01A and is distributed to key stakeholders including Shannon Riley from the NC Department of Natural and Cultural Resources and several representatives from Sud Associates, P.A. The document provides technical clarification to ensure potential contractors understand the precise requirements for the fire alarm system replacement, emphasizing the need for a comprehensive and compliant installation that meets all project specifications.

View the file

Other files

File Type Posted
SCO ID#23-26532-01A-ADD #1.pdf PDF
SCO-23-26532-01A.pdf PDF
SCO ID#23-26532-01A-ADD #2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Satellite Office:

90 Southside Avenue, Suite 300

Asheville, NC 28801 O: (828) 255-4691

NORTH CAROLINA DEPARTMENT OF NATURAL AND CULTURAL RESOURCES

MUSEUM OF THE ALBEMARLE

FIRE ALARM REPLACEMENT

SCO # 23-26532-01A

ADDENDUM NUMBER 3 CLARIFICATIONS

April 15, 2025

1. The owner will allow any fire alarm panel manufacturer that meets the requirements of the Revised Addendum 2 and all other project requirements. 5 SLC loops are required, 1 per floor and 1 for the pump building. Each loop has no more than 20 addressable devices between isolators. See Sheet 1/E205. This overrides the less stringent specification

283111,1.3, F. A fully operational, turnkey system is required.

2. All contractors submitting proposals shall incorporate the items in this Addendum and all other addenda into their proposals and acknowledge receipt of the Addenda on their bid proposal forms. This Addendum shall be incorporated in the Drawings and Specifications which are a part of the Contract Documents and shall supersede anything contained therein with which it may conflict.

DISTRIBUTION:

Shannon Riley NC Dept. of Natural and Cultural Resources

Ish Sud Sud Associates, PA

Patrick Haramija Sud Associates, PA

Steven Boyet Sud Associates, PA

File details come from the government source that posted it. Updated .