This document contains a schedule of material submittals for a federal construction contract opportunity with the U.S. Marine Corps in Spain. The contract is for a construction project numbered QUUG 19-1011 titled "USMC PEB" with an estimated value between $250,000-$500,000. The schedule lists over 150 required material submittals organized by construction section, including plans, samples, test reports, warranties, and other documentation. Submittals are due from the contractor beginning at notice to proceed with the last due at final inspection, and must be reviewed and approved by the Civil Engineering office by the stated return dates. The agreement of defense cooperation between the U.S. and Spain stipulates that Spanish labor, material and equipment shall be used whenever feasible for this opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to USMC PEB, newest first.
File Type Posted
Solicitation - FA557520B0005.pdf PDF
Solicitation Amendment FA557520B00050001 SF 30.pdf PDF
SPECIFICATIONS dated 10 June 2020.pdf PDF
DRAWINGS dated 16 June 2020.pdf PDF
Construction Cost Estimate Breakdown Ktr.xls XLS spreadsheet
ESPECIFICACIONES dated 10 June 2020.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Sch. (ENG)

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 19-1011PROJECT TITLE:
USMC PEBSOLICITATION / CONTRACT NO.

FA557519FA004

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 01
01Warranty letter1Acceptance+15
02Construction Schedule1CNTP+7
03Progress Schedule1CNTP+10
04Work Plan1CNTP+7
05Mobility Plan1CNTP+15
06Project Sign1CNTP+15
07Quality Control Plan1CNTP+15
08Environmental Protection Plan1CNTP+15
09DD Form 13541FI+15
10Waste & construction debris management1Final Inspection
11As-Built drawings1FI+15
12Spatial Data1As Built+10
13Key Staff1CNTP+15
14Health and safety Plan1CNTP +15
SECTION 01 11 02
15Work Phasing Plan1Commencement of work - 15
16Utilities shuto off Plan1Commencement of work - 15
17Salvage plan1CNTP + 15
18Operation & Maintenance (O&M) Manuals1FI + 15
SECTION 02 41 00
19Existing Conditions1
20Demolition and Deconstruction Plan1
21Receipts1
22Waste Management Plan1
23Waste Manager for Demo and Construction1
24Authorized dump or treatment & recovery plant1
25Delivery & disposal certificate of waste from cons & demo1
SECTION 03 30 00
26Quality Control Plan1
27Forms and Materials1
28Reinforcement1
29Concrete Datasheet1
SECTION 05 05 23.16
30Welding Procedure Qualifications1
31Welder, Welding Operator, and Tacker Qualification1
32Welding Electrodes and Rods1
33Certified Welder Performance1
SECTION 22 00 00
34High Density Polyethylene Piping1
35Accesories for Polyethylene Pipe Connections1
36Galvanized Steel Pipe1
37Steel pipe accessories1
38Fire Hydrant1
39Gate Valve1
40Valve Box1
41Universal Flange adapter1
42Backflow Preventer1
43Water Meter1
44Test Reports: Tests, Flushing and Disinfection1
45Tightness Test Reports1
SECTION 26 20 00
46Rigid Metal Conduit and Fittings1
47Junction and pull boxes1
48Outlet Boxes and Covers1
49Wires and Cables1
50Splices and Termiantion Components1
51Circuit Breakers1
52Device Plates1
53Panelboards1
54Labels1
55Metering1
56Panelboards1
57Field Test: Devices Subject to Manual Operation1
58Field Test: 1000-Volt Wiring Test1
59Field Test: Grounding System Test1
SECTION 26 56 00
60Luminaire Warranty1
61LED Luminaires1
62Luminaire Light Sources1
63Lighting Contactor1
64Photocell1
65Luminaires Useful Life Certificate1
66Lighting Fixtures Field Test Report1
SECTION 31 00 00
67Sheeting Shop Drawings1
68Electricl Posts Bracing System1
SECTION 32 03 30
69Tolerable Soil Identification1
70Selected Soil Origin Control1
71Tolerable Soil Test Section11
72Selected Soil Test Section11
73Finished Surface of Tolerable Soil and Pavement1
74Tolerable Soil Acceptance Control11
75Selected Soil Acceptance Control11
SECTION 32 04 22
76Geotextile1111
77Execution Control11
SECTION 32 05 10
78Aggregates Origin Control111
79Job Mix Formula1
80Test Section11
81Acceptance Control1
SECTION 32 05 12
82Underlaying Surface1
83Water1
84Cement Origin Control111
85Soil Origin Control11
86Job Mix Formula1
87Test Section11
88Execution Control11
89Acceptance Control1
SECTION 32 05 30
90Existing Surface1
91Prime Coat Origin Control11111
92Coverage Aggregate Origin Control1111
93Prime Coat Application Rate to be Applied1
94Coverage Aggregate Application rate to be placed1
95Execution Control11
SECTION 32 05 31
96Tack Coat Origin Control11111
97Tack Coat application rate1
98Execution Control11
99Acceptance Control11
SECTION 32 05 32
100Curing Coat Origin Control11111
101Coverage Aggregate Origin Control1111
102Curing Coat Application Rate to be applied1
103Coverage Aggregate Application rate to be placed1
104Execution Control1
SECTION 32 07 01
105CE Certification of the Sign1
106Signing System for Traffic Protection1
SECTION 32 12 17
107Control of Origin of the Bitumen11
108Control of Origin of the Agreggates11
109Control of Origin of the Filler11
110Production Plant1
111Job mix formula1
112Test Selection11
113Paving Plan1
114Production Control11
115Placement and Compaction Control1
116Acceptance Control1
SECTION 32 16 19
117Concrete1
118Field Quality Control1
SECTION 32 17 23
119Painting CE Certification1
120CE Certification of glass microsphere1
121Signing System11
122Tests of Verification1
SECTION 32 31 13
123Manufacturers Installation/Erection Drawings1
124Posts anchors calculations
125Fence Assembly11
126Door Assembly11
127Door Hardware and Accessories11
128Concrete1
129Resina de anclaje de postes1
SECTION 32 92 19
130Topsoil Composition1
131Wood Cellulose Fiber Mulch1
132Fertilizer1
133Topsoil Composition test1
SECTION 33 30 00
134PVC pipe and fittings1
135Round Manhole (Less than 1,2m depth)1
136Round Manhole (More than 1,2m depth)1
137Round Manhole frame and cover1
138Sewer pipe protection film and sealant1
139Plan and Topographic profile for new pipe1
SECTION 33 40 00
140Post-Installation Inspection Report1
141Precast Concrete Curb Line1
142Lineal Drain Channel1
143Steel frame culvert1
144Steel frame treatment certificate1
145Concrete1
146Sealant1
SECTION 33 71 02
147Precast Underground Structures1
148Precast Concrete Structures1
149Manhole Frames and Covers1
150Conduits and Spacers1
151Cables and conductors1
152Warning and identification tape1
153Field Acceptance Check and Tests1
154Manhole Certificates1
SECTION 33 82 00
155Conduits1
156Handholes1

&"Arial,Negrita"&8QUUG 19-1011. 100% DESIGN SUBMITTAL Schedule of Material Submittals, June 2020 Page &P of &N

Resumen Muestras de Mat. (ESP)

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 19-1011TÍTULO DE PROYECTO:

USMC PEB

SOLICITACIÓN / CONTRATO NO.

FA557519FA004

(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 01
1Carta de garantía1Antes de Inspección final (IF)
2Plan de obra1CNTP+7
3Programa de avance de obras1CNTP+10
4Plan de obra1CNTP+7
5Plan de movilización1CNTP+15
6Cartel de proyecto1CNTP+15
7Plan de control de calidad1CNTP+15
8Plan de protección medioambiental1CNTP+15
9Formularino DD 13541Inspección Final + 15
10Certificado de gestión de residuos y escombros1Antes de Inspección final (IF)
11Planos As-Builts1Inspección Final + 15
12Datos espaciales1Antes de Inspección final (IF), tras la aprobación de as-builts + 10
13Personal Clave1CNTP+15
14Plan de salud y seguridad1CNTP+15
SECCIÓN 01 11 02
15Plan de Fases del Trabajo1Comienzo de los Trabajos - 15
16Plan de cortes de suministros1Comienzo de los Trabajos - 15
17Plan de recuperación1CNTP + 15
18Manuales de Operación y Mantenimiento1Antes de Inspección final (IF) + 15
SECTION 02 41 00
19Condiciones Existentes1
20Plan de Demoliciones y Desmontaje1
21Comprobantes de Recepción1
22Plan de Gestión de Residuos1
23Gestor de Residuos de Demolición y Construcción1
24Vertedero Autorizado o Planta de Tratamiento y Recuperación1
25Certificado de Entregas y Eliminación de Residuos de Construcción y Demolición1
SECTION 03 30 00
26Plan de Control de Calidad1
27Encofrado y Materiales1
28Armaduras1
29Ficha de Hormigón1
SECTION 05 05 23.16
30Calificaciones del Procedimiento de Soldadura1
31Soldador, Operador de Soldadura. Cualificación1
32Electrodos y Varilla de Soldadura1
33Cualificación de Soldador Certificado1
SECTION 22 00 00
34Tubería de Polietileno de Alta Densidad1
35Accesorios de conexión para tuberías de polietileno1
36Tubería de Acero Galvanizado1
37Accesorios para tubería de acero1
38Hidrante Contraincendios1
39Válvula de Compuerta1
40Arqueta de Válvula1
41Adaptador de brida universal y acoplamiento1
42Válvula de prevención de contraflujo1
43Contador de Agua1
44Informes de prueba: Purga y Desinfección1
45Reporte Test de estanqueidad1
SECTION 26 20 00
46Conducto Metálico Rígido y accesorios1
47Juntas y cajas de Conexión1
48Cajas de Tomas y Cubiertas1
49Hilos y Cables1
50Empalmes y Componentes de Terminación1
51Disyuntores1
52Placas de Dispositivos1
53Cuadros Eléctricos1
54Etiquetas1
55Medidor1
56Cuadros Eléctricos1
57Ensayo: Dispositivos sujetos a operación manual1
58Ensayo: Prueba de Cableado de 1000 voltios1
59Ensayo: Prueba de Puesta a Tierra1
SECTION 26 56 00
60Garantía de Luminaria1
61Luminarias LED1
62Fuentes de Luz de Luminarias1
63Contactor de Iluminación1
64Fotocélula1
65Certificado de Vida Útil de la Luminaria1
66Lighting Fixtures Test Report1
SECTION 31 00 00
67Tablestacado Planos de Taller1
68Arriostramiento de Postes Eléctricos1
SECTION 32 03 30
69Identificación de Suelo Tolerable1
70Control de Procedencia del Suelo seleccionado1
71Tramo de prueba del suelo Tolerable11
72Tramo de Prueba del Suelo Seleccionado11
73Planta de la superficie de acabado del suelo tolerable y del pavimento1
74Control de Recepción de Suelo Tolerable11
75Control de Recepción de Suelo Seleccionado11
SECTION 32 04 22
76Geotextil1111
77Control de Ejecución11
SECTION 32 05 10
78Control de Procedencia de los Áridos111
79Fórmula de trabajo1
80Tramo de Prueba11
81Control de Recepción1
SECTION 32 05 12
82Superficie Subyacente1
83Agua1
84Control de Procedencia del Cemento111
85Control de Procedencia del Suelo seleccionado11
86Fórmula de Trabajo1
87Tramo de Prueba11
88Control de Ejecución11
89Control de Recepción1
SECTION 32 05 30
90Superficie Existente1
91Control de Procedencia del Riego de Imprimación11111
92Control de Procedencia del Árido de Cobertura1111
93Dotación del Riego de Imprimación a aplicar1
94Dotación de Árido de Cobertura a Extender1
95Control de Ejecución11
SECTION 32 05 31
96Control de Procedencia del Riego de Adherencia11111
97Dotación de riego de adherencia a aplicar1
98Control de Ejecución11
99Control de Recepción11
SECTION 32 05 32
100Control de Procedencia del Riego de Curado11111
101Control de Procedencia del Árido de Cobertura1111
102Dotación del Riego de Curado a aplicar1
103Dotación del Árido de Cobertura a Extender1
104Control de Ejecución1
SECTION 32 07 01
105Marcado CE de la señal1
106Sistema de Señalización para Protección del Tráfico1
SECTION 32 12 17
107Control de Procedencia del Betún11
108Control de Procedencia de los Áridos11
109Control de Procedencia del Polvo Mineral11
110Central de Fabricación1
111Fórmula de Trabajo1
112Tramo de Prueba11
113Plan de Pavimentación1
114Control de Fabricación11
115Control de Extensión y Compactación1
116Control de Recepción1
SECTION 32 16 19
117Hormigón1
118Control de Calidad de la Obra1
SECTION 32 17 23
119Marcado CE de la pintura1
120Marcado CE de las microesferas de Vidrio1
121Sistema de Señalización11
122Ensayos de Comprobación1
SECTION 32 31 13
123Planos de Instalación/Montaje del Fabricante1
124Cálculos de anclajes de postes
125Montaje de la Valla11
126Montaje de la Puerta11
127Hardware y Accesorios de la Puerta11
128Hormigón1
129Post anchor resins1
SECTION 32 92 19
130Composición de la capa vegetal1
131Lecho orgánico de fibra de celulosa1
132Fertilizante1
133Ensayo de la composición de la capa vegetal1
SECTION 33 30 00
134Tubería y Accesorios1
135Arquetas de registro circulares menores de 1.2 m de profundidad1
136Pozos de registro circulares mayores de 1.2 m de profundidad1
137Marcos y tapas de pozos de registro circulares1
138Lámina de protección y sellante para tubería de saneamiento1
139Planta y perfil topográfico para instalación de nueva tubería1
SECTION 33 40 00
140Informe de Inspección Posterior a la Instalación1
141Línea de Bordillo de Hormigón Prefabricado1
142Canalizaciones de Drenaje Lineal1
143Marco metálico pasacunetas1
144Tratamiento superficial de marco metálico1
145Hormigón1
146Sellante1
SECTION 33 71 02
147Estructuras Subterráneas Prefabricadas1
148Estructuras de Hormigón Prefabricado1
149Marcos y Tapas de Arquetas1
150Conductos y Espaciadores1
151Cables y Conductores1
152Cinta de advertencia e identificación1
153Comprobaciones y pruebas de aceptación de la obra1
154Certificado de Arquetas1
SECTION 33 82 00
155Conductos1
156Arquetas1

&"Arial,Negrita"&8QUUG 19-1011. 100%DESIGN SUBMITTAL Resumen de muestras de material, Junio 2020 Página &P de &N