This document contains a schedule of material submittals for a federal construction contract opportunity with the U.S. Marine Corps in Spain. The contract is for a construction project numbered QUUG 19-1011 titled "USMC PEB" with an estimated value between $250,000-$500,000. The schedule lists over 150 required material submittals organized by construction section, including plans, samples, test reports, warranties, and other documentation. Submittals are due from the contractor beginning at notice to proceed with the last due at final inspection, and must be reviewed and approved by the Civil Engineering office by the stated return dates. The agreement of defense cooperation between the U.S. and Spain stipulates that Spanish labor, material and equipment shall be used whenever feasible for this opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA557520B0005.pdf | ||
| Solicitation Amendment FA557520B00050001 SF 30.pdf | ||
| SPECIFICATIONS dated 10 June 2020.pdf | ||
| DRAWINGS dated 16 June 2020.pdf | ||
| Construction Cost Estimate Breakdown Ktr.xls | XLS spreadsheet | |
| ESPECIFICACIONES dated 10 June 2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Sch. (ENG)
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 19-1011 | PROJECT TITLE: | |||
| USMC PEB | SOLICITATION / CONTRACT NO. |
FA557519FA004
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 01 | ||||||||||||
| 01 | Warranty letter | 1 | Acceptance+15 | |||||||||
| 02 | Construction Schedule | 1 | CNTP+7 | |||||||||
| 03 | Progress Schedule | 1 | CNTP+10 | |||||||||
| 04 | Work Plan | 1 | CNTP+7 | |||||||||
| 05 | Mobility Plan | 1 | CNTP+15 | |||||||||
| 06 | Project Sign | 1 | CNTP+15 | |||||||||
| 07 | Quality Control Plan | 1 | CNTP+15 | |||||||||
| 08 | Environmental Protection Plan | 1 | CNTP+15 | |||||||||
| 09 | DD Form 1354 | 1 | FI+15 | |||||||||
| 10 | Waste & construction debris management | 1 | Final Inspection | |||||||||
| 11 | As-Built drawings | 1 | FI+15 | |||||||||
| 12 | Spatial Data | 1 | As Built+10 | |||||||||
| 13 | Key Staff | 1 | CNTP+15 | |||||||||
| 14 | Health and safety Plan | 1 | CNTP +15 | |||||||||
| SECTION 01 11 02 | ||||||||||||
| 15 | Work Phasing Plan | 1 | Commencement of work - 15 | |||||||||
| 16 | Utilities shuto off Plan | 1 | Commencement of work - 15 | |||||||||
| 17 | Salvage plan | 1 | CNTP + 15 | |||||||||
| 18 | Operation & Maintenance (O&M) Manuals | 1 | FI + 15 | |||||||||
| SECTION 02 41 00 | ||||||||||||
| 19 | Existing Conditions | 1 | ||||||||||
| 20 | Demolition and Deconstruction Plan | 1 | ||||||||||
| 21 | Receipts | 1 | ||||||||||
| 22 | Waste Management Plan | 1 | ||||||||||
| 23 | Waste Manager for Demo and Construction | 1 | ||||||||||
| 24 | Authorized dump or treatment & recovery plant | 1 | ||||||||||
| 25 | Delivery & disposal certificate of waste from cons & demo | 1 | ||||||||||
| SECTION 03 30 00 | ||||||||||||
| 26 | Quality Control Plan | 1 | ||||||||||
| 27 | Forms and Materials | 1 | ||||||||||
| 28 | Reinforcement | 1 | ||||||||||
| 29 | Concrete Datasheet | 1 | ||||||||||
| SECTION 05 05 23.16 | ||||||||||||
| 30 | Welding Procedure Qualifications | 1 | ||||||||||
| 31 | Welder, Welding Operator, and Tacker Qualification | 1 | ||||||||||
| 32 | Welding Electrodes and Rods | 1 | ||||||||||
| 33 | Certified Welder Performance | 1 | ||||||||||
| SECTION 22 00 00 | ||||||||||||
| 34 | High Density Polyethylene Piping | 1 | ||||||||||
| 35 | Accesories for Polyethylene Pipe Connections | 1 | ||||||||||
| 36 | Galvanized Steel Pipe | 1 | ||||||||||
| 37 | Steel pipe accessories | 1 | ||||||||||
| 38 | Fire Hydrant | 1 | ||||||||||
| 39 | Gate Valve | 1 | ||||||||||
| 40 | Valve Box | 1 | ||||||||||
| 41 | Universal Flange adapter | 1 | ||||||||||
| 42 | Backflow Preventer | 1 | ||||||||||
| 43 | Water Meter | 1 | ||||||||||
| 44 | Test Reports: Tests, Flushing and Disinfection | 1 | ||||||||||
| 45 | Tightness Test Reports | 1 | ||||||||||
| SECTION 26 20 00 | ||||||||||||
| 46 | Rigid Metal Conduit and Fittings | 1 | ||||||||||
| 47 | Junction and pull boxes | 1 | ||||||||||
| 48 | Outlet Boxes and Covers | 1 | ||||||||||
| 49 | Wires and Cables | 1 | ||||||||||
| 50 | Splices and Termiantion Components | 1 | ||||||||||
| 51 | Circuit Breakers | 1 | ||||||||||
| 52 | Device Plates | 1 | ||||||||||
| 53 | Panelboards | 1 | ||||||||||
| 54 | Labels | 1 | ||||||||||
| 55 | Metering | 1 | ||||||||||
| 56 | Panelboards | 1 | ||||||||||
| 57 | Field Test: Devices Subject to Manual Operation | 1 | ||||||||||
| 58 | Field Test: 1000-Volt Wiring Test | 1 | ||||||||||
| 59 | Field Test: Grounding System Test | 1 | ||||||||||
| SECTION 26 56 00 | ||||||||||||
| 60 | Luminaire Warranty | 1 | ||||||||||
| 61 | LED Luminaires | 1 | ||||||||||
| 62 | Luminaire Light Sources | 1 | ||||||||||
| 63 | Lighting Contactor | 1 | ||||||||||
| 64 | Photocell | 1 | ||||||||||
| 65 | Luminaires Useful Life Certificate | 1 | ||||||||||
| 66 | Lighting Fixtures Field Test Report | 1 | ||||||||||
| SECTION 31 00 00 | ||||||||||||
| 67 | Sheeting Shop Drawings | 1 | ||||||||||
| 68 | Electricl Posts Bracing System | 1 | ||||||||||
| SECTION 32 03 30 | ||||||||||||
| 69 | Tolerable Soil Identification | 1 | ||||||||||
| 70 | Selected Soil Origin Control | 1 | ||||||||||
| 71 | Tolerable Soil Test Section | 1 | 1 | |||||||||
| 72 | Selected Soil Test Section | 1 | 1 | |||||||||
| 73 | Finished Surface of Tolerable Soil and Pavement | 1 | ||||||||||
| 74 | Tolerable Soil Acceptance Control | 1 | 1 | |||||||||
| 75 | Selected Soil Acceptance Control | 1 | 1 | |||||||||
| SECTION 32 04 22 | ||||||||||||
| 76 | Geotextile | 1 | 1 | 1 | 1 | |||||||
| 77 | Execution Control | 1 | 1 | |||||||||
| SECTION 32 05 10 | ||||||||||||
| 78 | Aggregates Origin Control | 1 | 1 | 1 | ||||||||
| 79 | Job Mix Formula | 1 | ||||||||||
| 80 | Test Section | 1 | 1 | |||||||||
| 81 | Acceptance Control | 1 | ||||||||||
| SECTION 32 05 12 | ||||||||||||
| 82 | Underlaying Surface | 1 | ||||||||||
| 83 | Water | 1 | ||||||||||
| 84 | Cement Origin Control | 1 | 1 | 1 | ||||||||
| 85 | Soil Origin Control | 1 | 1 | |||||||||
| 86 | Job Mix Formula | 1 | ||||||||||
| 87 | Test Section | 1 | 1 | |||||||||
| 88 | Execution Control | 1 | 1 | |||||||||
| 89 | Acceptance Control | 1 | ||||||||||
| SECTION 32 05 30 | ||||||||||||
| 90 | Existing Surface | 1 | ||||||||||
| 91 | Prime Coat Origin Control | 1 | 1 | 1 | 1 | 1 | ||||||
| 92 | Coverage Aggregate Origin Control | 1 | 1 | 1 | 1 | |||||||
| 93 | Prime Coat Application Rate to be Applied | 1 | ||||||||||
| 94 | Coverage Aggregate Application rate to be placed | 1 | ||||||||||
| 95 | Execution Control | 1 | 1 | |||||||||
| SECTION 32 05 31 | ||||||||||||
| 96 | Tack Coat Origin Control | 1 | 1 | 1 | 1 | 1 | ||||||
| 97 | Tack Coat application rate | 1 | ||||||||||
| 98 | Execution Control | 1 | 1 | |||||||||
| 99 | Acceptance Control | 1 | 1 | |||||||||
| SECTION 32 05 32 | ||||||||||||
| 100 | Curing Coat Origin Control | 1 | 1 | 1 | 1 | 1 | ||||||
| 101 | Coverage Aggregate Origin Control | 1 | 1 | 1 | 1 | |||||||
| 102 | Curing Coat Application Rate to be applied | 1 | ||||||||||
| 103 | Coverage Aggregate Application rate to be placed | 1 | ||||||||||
| 104 | Execution Control | 1 | ||||||||||
| SECTION 32 07 01 | ||||||||||||
| 105 | CE Certification of the Sign | 1 | ||||||||||
| 106 | Signing System for Traffic Protection | 1 | ||||||||||
| SECTION 32 12 17 | ||||||||||||
| 107 | Control of Origin of the Bitumen | 1 | 1 | |||||||||
| 108 | Control of Origin of the Agreggates | 1 | 1 | |||||||||
| 109 | Control of Origin of the Filler | 1 | 1 | |||||||||
| 110 | Production Plant | 1 | ||||||||||
| 111 | Job mix formula | 1 | ||||||||||
| 112 | Test Selection | 1 | 1 | |||||||||
| 113 | Paving Plan | 1 | ||||||||||
| 114 | Production Control | 1 | 1 | |||||||||
| 115 | Placement and Compaction Control | 1 | ||||||||||
| 116 | Acceptance Control | 1 | ||||||||||
| SECTION 32 16 19 | ||||||||||||
| 117 | Concrete | 1 | ||||||||||
| 118 | Field Quality Control | 1 | ||||||||||
| SECTION 32 17 23 | ||||||||||||
| 119 | Painting CE Certification | 1 | ||||||||||
| 120 | CE Certification of glass microsphere | 1 | ||||||||||
| 121 | Signing System | 1 | 1 | |||||||||
| 122 | Tests of Verification | 1 | ||||||||||
| SECTION 32 31 13 | ||||||||||||
| 123 | Manufacturers Installation/Erection Drawings | 1 | ||||||||||
| 124 | Posts anchors calculations | |||||||||||
| 125 | Fence Assembly | 1 | 1 | |||||||||
| 126 | Door Assembly | 1 | 1 | |||||||||
| 127 | Door Hardware and Accessories | 1 | 1 | |||||||||
| 128 | Concrete | 1 | ||||||||||
| 129 | Resina de anclaje de postes | 1 | ||||||||||
| SECTION 32 92 19 | ||||||||||||
| 130 | Topsoil Composition | 1 | ||||||||||
| 131 | Wood Cellulose Fiber Mulch | 1 | ||||||||||
| 132 | Fertilizer | 1 | ||||||||||
| 133 | Topsoil Composition test | 1 | ||||||||||
| SECTION 33 30 00 | ||||||||||||
| 134 | PVC pipe and fittings | 1 | ||||||||||
| 135 | Round Manhole (Less than 1,2m depth) | 1 | ||||||||||
| 136 | Round Manhole (More than 1,2m depth) | 1 | ||||||||||
| 137 | Round Manhole frame and cover | 1 | ||||||||||
| 138 | Sewer pipe protection film and sealant | 1 | ||||||||||
| 139 | Plan and Topographic profile for new pipe | 1 | ||||||||||
| SECTION 33 40 00 | ||||||||||||
| 140 | Post-Installation Inspection Report | 1 | ||||||||||
| 141 | Precast Concrete Curb Line | 1 | ||||||||||
| 142 | Lineal Drain Channel | 1 | ||||||||||
| 143 | Steel frame culvert | 1 | ||||||||||
| 144 | Steel frame treatment certificate | 1 | ||||||||||
| 145 | Concrete | 1 | ||||||||||
| 146 | Sealant | 1 | ||||||||||
| SECTION 33 71 02 | ||||||||||||
| 147 | Precast Underground Structures | 1 | ||||||||||
| 148 | Precast Concrete Structures | 1 | ||||||||||
| 149 | Manhole Frames and Covers | 1 | ||||||||||
| 150 | Conduits and Spacers | 1 | ||||||||||
| 151 | Cables and conductors | 1 | ||||||||||
| 152 | Warning and identification tape | 1 | ||||||||||
| 153 | Field Acceptance Check and Tests | 1 | ||||||||||
| 154 | Manhole Certificates | 1 | ||||||||||
| SECTION 33 82 00 | ||||||||||||
| 155 | Conduits | 1 | ||||||||||
| 156 | Handholes | 1 |
&"Arial,Negrita"&8QUUG 19-1011. 100% DESIGN SUBMITTAL Schedule of Material Submittals, June 2020 Page &P of &N
Resumen Muestras de Mat. (ESP)
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | ||
| QUUG 19-1011 | TÍTULO DE PROYECTO: |
USMC PEB
SOLICITACIÓN / CONTRATO NO.
FA557519FA004
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 01 | ||||||||||||
| 1 | Carta de garantía | 1 | Antes de Inspección final (IF) | |||||||||
| 2 | Plan de obra | 1 | CNTP+7 | |||||||||
| 3 | Programa de avance de obras | 1 | CNTP+10 | |||||||||
| 4 | Plan de obra | 1 | CNTP+7 | |||||||||
| 5 | Plan de movilización | 1 | CNTP+15 | |||||||||
| 6 | Cartel de proyecto | 1 | CNTP+15 | |||||||||
| 7 | Plan de control de calidad | 1 | CNTP+15 | |||||||||
| 8 | Plan de protección medioambiental | 1 | CNTP+15 | |||||||||
| 9 | Formularino DD 1354 | 1 | Inspección Final + 15 | |||||||||
| 10 | Certificado de gestión de residuos y escombros | 1 | Antes de Inspección final (IF) | |||||||||
| 11 | Planos As-Builts | 1 | Inspección Final + 15 | |||||||||
| 12 | Datos espaciales | 1 | Antes de Inspección final (IF), tras la aprobación de as-builts + 10 | |||||||||
| 13 | Personal Clave | 1 | CNTP+15 | |||||||||
| 14 | Plan de salud y seguridad | 1 | CNTP+15 | |||||||||
| SECCIÓN 01 11 02 | ||||||||||||
| 15 | Plan de Fases del Trabajo | 1 | Comienzo de los Trabajos - 15 | |||||||||
| 16 | Plan de cortes de suministros | 1 | Comienzo de los Trabajos - 15 | |||||||||
| 17 | Plan de recuperación | 1 | CNTP + 15 | |||||||||
| 18 | Manuales de Operación y Mantenimiento | 1 | Antes de Inspección final (IF) + 15 | |||||||||
| SECTION 02 41 00 | ||||||||||||
| 19 | Condiciones Existentes | 1 | ||||||||||
| 20 | Plan de Demoliciones y Desmontaje | 1 | ||||||||||
| 21 | Comprobantes de Recepción | 1 | ||||||||||
| 22 | Plan de Gestión de Residuos | 1 | ||||||||||
| 23 | Gestor de Residuos de Demolición y Construcción | 1 | ||||||||||
| 24 | Vertedero Autorizado o Planta de Tratamiento y Recuperación | 1 | ||||||||||
| 25 | Certificado de Entregas y Eliminación de Residuos de Construcción y Demolición | 1 | ||||||||||
| SECTION 03 30 00 | ||||||||||||
| 26 | Plan de Control de Calidad | 1 | ||||||||||
| 27 | Encofrado y Materiales | 1 | ||||||||||
| 28 | Armaduras | 1 | ||||||||||
| 29 | Ficha de Hormigón | 1 | ||||||||||
| SECTION 05 05 23.16 | ||||||||||||
| 30 | Calificaciones del Procedimiento de Soldadura | 1 | ||||||||||
| 31 | Soldador, Operador de Soldadura. Cualificación | 1 | ||||||||||
| 32 | Electrodos y Varilla de Soldadura | 1 | ||||||||||
| 33 | Cualificación de Soldador Certificado | 1 | ||||||||||
| SECTION 22 00 00 | ||||||||||||
| 34 | Tubería de Polietileno de Alta Densidad | 1 | ||||||||||
| 35 | Accesorios de conexión para tuberías de polietileno | 1 | ||||||||||
| 36 | Tubería de Acero Galvanizado | 1 | ||||||||||
| 37 | Accesorios para tubería de acero | 1 | ||||||||||
| 38 | Hidrante Contraincendios | 1 | ||||||||||
| 39 | Válvula de Compuerta | 1 | ||||||||||
| 40 | Arqueta de Válvula | 1 | ||||||||||
| 41 | Adaptador de brida universal y acoplamiento | 1 | ||||||||||
| 42 | Válvula de prevención de contraflujo | 1 | ||||||||||
| 43 | Contador de Agua | 1 | ||||||||||
| 44 | Informes de prueba: Purga y Desinfección | 1 | ||||||||||
| 45 | Reporte Test de estanqueidad | 1 | ||||||||||
| SECTION 26 20 00 | ||||||||||||
| 46 | Conducto Metálico Rígido y accesorios | 1 | ||||||||||
| 47 | Juntas y cajas de Conexión | 1 | ||||||||||
| 48 | Cajas de Tomas y Cubiertas | 1 | ||||||||||
| 49 | Hilos y Cables | 1 | ||||||||||
| 50 | Empalmes y Componentes de Terminación | 1 | ||||||||||
| 51 | Disyuntores | 1 | ||||||||||
| 52 | Placas de Dispositivos | 1 | ||||||||||
| 53 | Cuadros Eléctricos | 1 | ||||||||||
| 54 | Etiquetas | 1 | ||||||||||
| 55 | Medidor | 1 | ||||||||||
| 56 | Cuadros Eléctricos | 1 | ||||||||||
| 57 | Ensayo: Dispositivos sujetos a operación manual | 1 | ||||||||||
| 58 | Ensayo: Prueba de Cableado de 1000 voltios | 1 | ||||||||||
| 59 | Ensayo: Prueba de Puesta a Tierra | 1 | ||||||||||
| SECTION 26 56 00 | ||||||||||||
| 60 | Garantía de Luminaria | 1 | ||||||||||
| 61 | Luminarias LED | 1 | ||||||||||
| 62 | Fuentes de Luz de Luminarias | 1 | ||||||||||
| 63 | Contactor de Iluminación | 1 | ||||||||||
| 64 | Fotocélula | 1 | ||||||||||
| 65 | Certificado de Vida Útil de la Luminaria | 1 | ||||||||||
| 66 | Lighting Fixtures Test Report | 1 | ||||||||||
| SECTION 31 00 00 | ||||||||||||
| 67 | Tablestacado Planos de Taller | 1 | ||||||||||
| 68 | Arriostramiento de Postes Eléctricos | 1 | ||||||||||
| SECTION 32 03 30 | ||||||||||||
| 69 | Identificación de Suelo Tolerable | 1 | ||||||||||
| 70 | Control de Procedencia del Suelo seleccionado | 1 | ||||||||||
| 71 | Tramo de prueba del suelo Tolerable | 1 | 1 | |||||||||
| 72 | Tramo de Prueba del Suelo Seleccionado | 1 | 1 | |||||||||
| 73 | Planta de la superficie de acabado del suelo tolerable y del pavimento | 1 | ||||||||||
| 74 | Control de Recepción de Suelo Tolerable | 1 | 1 | |||||||||
| 75 | Control de Recepción de Suelo Seleccionado | 1 | 1 | |||||||||
| SECTION 32 04 22 | ||||||||||||
| 76 | Geotextil | 1 | 1 | 1 | 1 | |||||||
| 77 | Control de Ejecución | 1 | 1 | |||||||||
| SECTION 32 05 10 | ||||||||||||
| 78 | Control de Procedencia de los Áridos | 1 | 1 | 1 | ||||||||
| 79 | Fórmula de trabajo | 1 | ||||||||||
| 80 | Tramo de Prueba | 1 | 1 | |||||||||
| 81 | Control de Recepción | 1 | ||||||||||
| SECTION 32 05 12 | ||||||||||||
| 82 | Superficie Subyacente | 1 | ||||||||||
| 83 | Agua | 1 | ||||||||||
| 84 | Control de Procedencia del Cemento | 1 | 1 | 1 | ||||||||
| 85 | Control de Procedencia del Suelo seleccionado | 1 | 1 | |||||||||
| 86 | Fórmula de Trabajo | 1 | ||||||||||
| 87 | Tramo de Prueba | 1 | 1 | |||||||||
| 88 | Control de Ejecución | 1 | 1 | |||||||||
| 89 | Control de Recepción | 1 | ||||||||||
| SECTION 32 05 30 | ||||||||||||
| 90 | Superficie Existente | 1 | ||||||||||
| 91 | Control de Procedencia del Riego de Imprimación | 1 | 1 | 1 | 1 | 1 | ||||||
| 92 | Control de Procedencia del Árido de Cobertura | 1 | 1 | 1 | 1 | |||||||
| 93 | Dotación del Riego de Imprimación a aplicar | 1 | ||||||||||
| 94 | Dotación de Árido de Cobertura a Extender | 1 | ||||||||||
| 95 | Control de Ejecución | 1 | 1 | |||||||||
| SECTION 32 05 31 | ||||||||||||
| 96 | Control de Procedencia del Riego de Adherencia | 1 | 1 | 1 | 1 | 1 | ||||||
| 97 | Dotación de riego de adherencia a aplicar | 1 | ||||||||||
| 98 | Control de Ejecución | 1 | 1 | |||||||||
| 99 | Control de Recepción | 1 | 1 | |||||||||
| SECTION 32 05 32 | ||||||||||||
| 100 | Control de Procedencia del Riego de Curado | 1 | 1 | 1 | 1 | 1 | ||||||
| 101 | Control de Procedencia del Árido de Cobertura | 1 | 1 | 1 | 1 | |||||||
| 102 | Dotación del Riego de Curado a aplicar | 1 | ||||||||||
| 103 | Dotación del Árido de Cobertura a Extender | 1 | ||||||||||
| 104 | Control de Ejecución | 1 | ||||||||||
| SECTION 32 07 01 | ||||||||||||
| 105 | Marcado CE de la señal | 1 | ||||||||||
| 106 | Sistema de Señalización para Protección del Tráfico | 1 | ||||||||||
| SECTION 32 12 17 | ||||||||||||
| 107 | Control de Procedencia del Betún | 1 | 1 | |||||||||
| 108 | Control de Procedencia de los Áridos | 1 | 1 | |||||||||
| 109 | Control de Procedencia del Polvo Mineral | 1 | 1 | |||||||||
| 110 | Central de Fabricación | 1 | ||||||||||
| 111 | Fórmula de Trabajo | 1 | ||||||||||
| 112 | Tramo de Prueba | 1 | 1 | |||||||||
| 113 | Plan de Pavimentación | 1 | ||||||||||
| 114 | Control de Fabricación | 1 | 1 | |||||||||
| 115 | Control de Extensión y Compactación | 1 | ||||||||||
| 116 | Control de Recepción | 1 | ||||||||||
| SECTION 32 16 19 | ||||||||||||
| 117 | Hormigón | 1 | ||||||||||
| 118 | Control de Calidad de la Obra | 1 | ||||||||||
| SECTION 32 17 23 | ||||||||||||
| 119 | Marcado CE de la pintura | 1 | ||||||||||
| 120 | Marcado CE de las microesferas de Vidrio | 1 | ||||||||||
| 121 | Sistema de Señalización | 1 | 1 | |||||||||
| 122 | Ensayos de Comprobación | 1 | ||||||||||
| SECTION 32 31 13 | ||||||||||||
| 123 | Planos de Instalación/Montaje del Fabricante | 1 | ||||||||||
| 124 | Cálculos de anclajes de postes | |||||||||||
| 125 | Montaje de la Valla | 1 | 1 | |||||||||
| 126 | Montaje de la Puerta | 1 | 1 | |||||||||
| 127 | Hardware y Accesorios de la Puerta | 1 | 1 | |||||||||
| 128 | Hormigón | 1 | ||||||||||
| 129 | Post anchor resins | 1 | ||||||||||
| SECTION 32 92 19 | ||||||||||||
| 130 | Composición de la capa vegetal | 1 | ||||||||||
| 131 | Lecho orgánico de fibra de celulosa | 1 | ||||||||||
| 132 | Fertilizante | 1 | ||||||||||
| 133 | Ensayo de la composición de la capa vegetal | 1 | ||||||||||
| SECTION 33 30 00 | ||||||||||||
| 134 | Tubería y Accesorios | 1 | ||||||||||
| 135 | Arquetas de registro circulares menores de 1.2 m de profundidad | 1 | ||||||||||
| 136 | Pozos de registro circulares mayores de 1.2 m de profundidad | 1 | ||||||||||
| 137 | Marcos y tapas de pozos de registro circulares | 1 | ||||||||||
| 138 | Lámina de protección y sellante para tubería de saneamiento | 1 | ||||||||||
| 139 | Planta y perfil topográfico para instalación de nueva tubería | 1 | ||||||||||
| SECTION 33 40 00 | ||||||||||||
| 140 | Informe de Inspección Posterior a la Instalación | 1 | ||||||||||
| 141 | Línea de Bordillo de Hormigón Prefabricado | 1 | ||||||||||
| 142 | Canalizaciones de Drenaje Lineal | 1 | ||||||||||
| 143 | Marco metálico pasacunetas | 1 | ||||||||||
| 144 | Tratamiento superficial de marco metálico | 1 | ||||||||||
| 145 | Hormigón | 1 | ||||||||||
| 146 | Sellante | 1 | ||||||||||
| SECTION 33 71 02 | ||||||||||||
| 147 | Estructuras Subterráneas Prefabricadas | 1 | ||||||||||
| 148 | Estructuras de Hormigón Prefabricado | 1 | ||||||||||
| 149 | Marcos y Tapas de Arquetas | 1 | ||||||||||
| 150 | Conductos y Espaciadores | 1 | ||||||||||
| 151 | Cables y Conductores | 1 | ||||||||||
| 152 | Cinta de advertencia e identificación | 1 | ||||||||||
| 153 | Comprobaciones y pruebas de aceptación de la obra | 1 | ||||||||||
| 154 | Certificado de Arquetas | 1 | ||||||||||
| SECTION 33 82 00 | ||||||||||||
| 155 | Conductos | 1 | ||||||||||
| 156 | Arquetas | 1 |