Construction Cost Estimate Breakdown Ktr.xls

XLS spreadsheet 259 KB Posted

Attached to
USMC PEB Federal contract opportunity
Solicitation number
FA557520B0005
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This is a solicitation for construction services at the USMC PEB facility in Moron Air Base, Spain. The solicitation includes a base bid for a new concrete pad and security containers, and five options including additional pads, parking areas, lighting, telecommunications lines, and retrofitting security containers. The project value is between $250,000 and $500,000 USD. A pre-proposal conference will be held on August 13, with questions due by August 19 and proposals due August 31. The work will be governed by specifications and drawings. In accordance with the defense cooperation agreement between the US and Spain, Spanish materials, labor and equipment must be used where feasible and consistent with requirements.

View the file

Other files for this federal contract opportunity

Other files attached to USMC PEB, newest first.
File Type Posted
Solicitation - FA557520B0005.pdf PDF
Solicitation Amendment FA557520B00050001 SF 30.pdf PDF
DRAWINGS dated 16 June 2020.pdf PDF
ESPECIFICACIONES dated 10 June 2020.pdf PDF
SCHEDULE OF MAT.SUB. ENGISH.xlsx XLSX spreadsheet
SPECIFICATIONS dated 10 June 2020.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE BID

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
INDEPENDENT GOVERNMENT ESTIMATEMORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
USMC PEB (REVISION A) - BASE BID
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1011MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
NEW CONCRETE PAD FOR NEW SECURITY CONTAINERS, USMC PEB
NUEVA LOSA DE HORMIGÓN PARA NUEVOS CONTENEDOREs DE SEGURIDAD EN USMC PEB
ARCHITECTURAL WORKS
TRABAJOS DE ARQUITECTURA
Earthworks New Concrete Pad for New Security Containers, USMC PEB
Movimiento de Tierras en Nueva Losa de Hormigón para Nuevos Contenedores de Seguridad en USMC PEB
1Clearing and Grubbing
Limpieza y desbroce del terrenoSM
2Excavation Works
Trabajos de DesmonteCM
3Artificial Crush-Graded Aggregated Compacted at 98% MP
Zahorra Artificial Compactada al 98% MPCM
4Geotextile GEOTEXAN NT 35
Geotextil GEOTEXAN NT 35SM
5Stone Backfill (Macadam) diameter 40/70 mm, compacted
Enchado de grava (macadam) diameter 40/70 mm CompactadoCM
Total Earthworks Work
Total Trabajos de Movimiento de Tierras
Foundation Works. New Pad for New Security Containers, USMC PEB
Trabajos de Cimentación en Nueva Losa de Hormigón para Nuevos Contenedores de Seguridad en USMC PEB
6Leam concrete
Hormigón de limpiezaSM
7Reinforced Concrete Slab. HA30-B-20-IIa concrete and B500s steel (75kg/m3)
losa de Hormigón Armado compuesta por hormigón HA30-B-20-IIa armado con acero B500sc (75kg/m3)CM
8Polyethylene Sheet
Lamina separadora de PolietilenoSM
9Sawcut Concrete Slab and Sealant Contraction Joint
Corte y sellado de Juntas de Contracción en Losa de HormigónLM
Total Foundation Works
Total Trabajos de Cimentación
Security Containers Isnstall. New Concrete Pad for New Security Containers, USMC PEB
Installaciones de Contenedores de Seguridad. Nueva Losa de Hormigón para Nuevos Contenedores de Seguridad en USMC PEB
10Transport Security Constiners from the Base Storage to New Concrete Pad
Tranpsote de Container desde el Lugar de Almacenamiento en la Base a la Nueva Losa de HormigónEA
11Security Containers Install in the Asigned Places
Instalación de los Contenedores de Seguridad en el Lugar AsignadoEA
Total Security Containers Install Works
Total Trabajos de Instalación de Contenedores de Seg.
Chain Link Fence and Gate. New Concrete Pad for New Security Containers, USMC PEB
Vallado y Puerta de Tela Metálica en Nueva Losa de Hormigón para Nuevos Contenedores de Seguridad en USMC PEB
11Fence Doors 3,71x2,00 m and Barbed Wire 0,30m
Puertas metálicas de malla de simple torsión 3,71x2,00 m mas 0,30 de alambre de espinoEA
12Steel fence and barbed wire h=2,30 m
Cerramiento de malla de simple torsión con alambre de espino h=2,30 mLM
13Anchor steel Plate 200.200.10mm
Placas de Anclaje de Acero 200.200.10mmCM
Total Chain Link Fence and Gate Works
Total Trabajos de Vallado y Puerta
ARCHITECTURAL WORKS SUMMARY
RESUMEN TRABAJOS DE ARQUITECTURA
Total Earthworks Works
Total Trabajos de Movimiento de Tierras
Total Foundation works
Total Trabajos de Cimentación
Total Security Constainers Install works
Total Trabajos de Instalaión de Container de seguridad
Total Chain Link Fence
Total Trabajos de Vallado
TOTAL ARCHITECTURAL WORK
TOTAL TRABAJOS DE ARQUITECTURA
CIVIL WORKS
TRABAJOS DE CIVIL
Previous and Demolitions Works
Trabajos Previos y de demoliciones
14Remove Enderground Electrical Line (high voltage)
Demolición de Line Electrica Enterrada (alto voltage)LM
Total Previous and Demolitions Works
Total Trabajos Previos y Demoliciones
Earthworks
Trabajos de Movimiento de tierras
15Utilities Trench excavation
Excavación de Zanja de para instalacionesCM
16Utilities Trench Backfill
Relleno de Zanja de para instalacionesCM
Total Earthworks
Total Trabajos de Movimiento de Tierra
Civil works
Trabajos de Civil
17Precast concrete electrical manhole type A1 (ncluded excavations works)
Arqueta prefabricada de hormigón electrica tipo A1EA
18Cover and frame of ductil cast iron
Tapa y marco de acero de fundiciónEA
19In slab Precast PVC manhole 35cmx35cms
arqueta de PVC de 35x35 cms empotrada en losaEA
20Precast concrete electrical manhole type A2 (ncluded excavations works)
Arqueta prefabricada de hormigón electrica tipo A2EA
21Cover and frame of ductil cast iron
Tapa y marco de acero de fundiciónEA
Total Civil Works
Total Trabajos de Civil
CIVIL WORK SUMMARY
RESUMEN TRABAJOS DE CIVIL
Previous and Demolitions Works
Trabajos Previos y Movimeintos de Tierras
Earthworks
Trabajos de Movimiento de tierras
Civil Works
Trabajos de Civil
TOTAL CIVIL WORK
TOTAL TRABAJOS DE CIVIL
ELECTRICAL WORKS
TRABAJOS DE ELECTRICDAD
Electrical Supply Works for New Security Containers, USMC PEB
Trabajos Instalación suminsitro Electrico para Nuevos Contenedores de Seguridad en USMC PEB
224 way ductbank ext. Diam. 110 mm. polyethylene. Exterior Ligthing electrical line
Prisma de 4 tubos de polyetileno dia. Ext. 110 mm. Linea eléctrica de alumbrado exteriorLM
232 Way Ductbank Ext. Diam 160 mm
Prisma de 2 tubos de Polietileno Diam Ext. 160mmLM
24Disconnection Works of High Voltage electrical Line In Electrical Post and Transformer
Trabajos de desconexión de Linea Electrica de Alta Tensión en Poste Eléctrico y TransformadorEA
25New Routing of Electrical line to transformer Connection
Conexión de la Nueva Line de Alimentaciónn del TransformadorEA
26Works in Existing Main Panel in PEB
Trabajos de Ampliación en Cuadros de Mando y Protección existentes del PEBEA
27New Routing of Electrical connection to transformer, Three Phase Line RHZ 1-K 12/20 KV 1x35mm2 CU
Nuevo Trazado de Circuito de Acometida hasta transformardo, Linea Trifásica Cable de Cobre RHZ 1-K 12/20 KV 1x35mm2 CuLM
28Service Power Supply line Size 16mm2 / (1-1) 16 mm2 GND Copper 3-1/C 0,6 /* 1kv
Circuito de Acometida 16 mm2 / (1-1) 16 mm2 GND Copper 3-1/C 0,6 /* 1kvLM
29Copper clad grounding rod 3/4" diameter 3 meter long in plastic box
Pica de conexión a tierra chapada en cobre diámetro 3/4" y longitud 3 m en arqueta prefabricada de plásticoEA
30Exothermic weld Connection
Soldaualiminotermica de red de tierraEA
31Grounding Electrode Conductor Bare Cooper 25 mm2
Conductor de Puesta a Tierra de Cobre desnudo 25 mm2LM
Total Electrical Works
Total Trabajos de Electricidad
ELECTRICAL WORKS SUMMARY
RESUMEN TRABAJOS DE ELECTRICIDAD
Electrical Supply Works
Trabajos Instalación suminsitro Eléctrico
TOTAL ELECTRICAL WORK
TOTAL TRABAJOS DE ELECTRICDAD
SUMMARY - BASE BID
RESUMEN TRABAJOS - OFERTA BASE
TOTAL ARCHITECTURAL WORKS
TOTAL TRABAJOS ARQUITECTURA
TOTAL CIVIL WORKS
TOTAL OBRA CIVL
TOTAL ELECTRICAL WORKS
TOTAL TRABAJOS DE ELECTRICDAD
GRAND TOTAL
GRAN TOTAL
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
$1euros
TOTAL PROJECT US$
DATE:FIRM NAME:
TITLE:BY:

&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N

OP 1 NEW CONCRETE PAD FOR PEB

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
INDEPENDENT GOVERNMENT ESTIMATEMORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
USMC PEB (REVISION A) - OPTION 1: NEW CONCRETE PAD FOR NEW PEB ADDITION
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1011MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
OPTION #1 NEW CONCRETE PAD FOR NEW PEB ADDITION, USMC PEB
OPCIÓN #1 NUEVA LOSA DE HORMIGÓN PARA NUEVO PEB EN USMC PEB
ARCHITECTURAL WORKS
TRABAJOS DE ARQUITECTURA
Demolitions and Previous Works for New Concrete Pad For New PEB Addition
Demoliciones y trabajos Previos en Nueva Losa de Hormigón para Nuevo PEB
1Sawcut Existing Concrete Sidewalk
Corte de Acerado de HormigónLM
2Remove Existing Concrete sidewalk
Demolición de Acerado de Hormigón ExistenteSM
3Remove Existing Underground Telecommunication Line
Demolición Linea de Telecomunicaciones Existente EnterradaLM
Total Demolitions and Previous Works
Total Demoliciones y Trabajos Previos
Earthworks. New Concrete Pad for New PEB Addition
Movimiento de Tierras en Nueva Losa de Hormigón para Nueva ampliación del PEB
4Clearing and Grubbing
Limpieza y desbroce del terrenoSM
5Excavation Works
Trabajos de DesmonteCM
6Artificial Crush-Graded Aggregated Compacted at 98% MP
Zahorra Artificial Compactada al 98% MPCM
7Geotextile GEOTEXAN NT 35
Geotextil GEOTEXAN NT 35SM
8Stone Backfill (Macadam) diameter 40/70 mm, compacted
Enchado de grava (macadam) diameter 40/70 mm CompactadoCM
º
Total Trabajos de Movimiento de Tierras
Foundation Works.New Concrete Pad for New PEB Addition
Trabajos de Cimentación en Nueva Losa de Hormigón para Nueva ampliación del PEB
9Leam concrete
Hormigón de limpiezaSM
10Reinforced Concrete Slab. HA30-B-25-IIa concrete and B500s steel (81kg/m3)
losa de Hormigón Armado compuesta por hormigón HA30-B-25-IIa armado con acero B500s (81kg/m3)CM
11Polyethylene Sheet
Lamina separadora de PolietilenoSM
Total Foundation Works
Total Trabajos de Cimentación
ARCHITECTURAL WORKS SUMMARY
RESUMEN TRABAJOS DE ARQUITECTURA
Total Demolitions and Previous Works
Total Trabajos de Vallado
Total Earthworks Works
Total Trabajos de Movimiento de Tierras
Total Foundation works
Total Trabajos de Cimentación
TOTAL ARCHITECTURAL WORK
TOTAL TRABAJOS DE ARQUITECTURA
CIVIL WORKS
TRABAJOS DE CIVIL
Earthworks
Trabajos de Movimiento de tierras
12Excavation Works
Trabajos de DesmonteCM
Total Earthworks
Total Trabajos de Movimiento de Tierra
Civil works
Trabajos de Civil
13New Concrete Sidewalk Thickness 18 cms
Nuevo acerado de Hormigón de 18 cms de EspesorLM
14Aggregate subbase 98% Compacted
Subbase de Zahorra Artificial compactada 98% ProctorCM
15Stone Backfill (Macadam) diameter 40/70 mm, compacted
Enchado de grava (macadam) diameter 40/70 mm CompactadoCM
16Contraction Joints
Junta de contracciónLM
17Expansión Joints
Junta de ExpansiónLM
18Precast concrete electrical manhole type A1 (included excavations works)
Arqueta prefabricada de hormigón electrica tipo A1(incluye excavación)EA
194 Way Ductbank Ext. Diam 110 mm
Prisma de 4 tubos de Polietileno Diam Ext. 110mmLM
Total Civil Works
Total Trabajos de Civil
CIVIL WORK SUMMARY
RESUMEN TRABAJOS DE CIVIL
Earthworks
Trabajos de Movimiento de tierras
Civil Works
Trabajos de Civil
TOTAL CIVIL WORK
TOTAL TRABAJOS DE CIVIL
ELECTRICAL WORKS
TRABAJOS DE ELECTRICDAD
Grounding System Works
Trabajos Instalación de Red de Tierra
2035 mm2 Naked Copper Wire Buried Ring
Anillo enterrado de Cobre Desnudo de 35 mm2LM
21Aluminothermic Welding Point
Prisma de 2 tubos de Polietileno Diam Ext. 160mmEA
Total Grounding System Works
Total Trabajos de Red de Tierras
ELECTRICAL WORKS SUMMARY
RESUMEN TRABAJOS DE ELECTRICIDAD
Grounding System Works
Trabajos Instalación de Red de Tierras
TOTAL ELECTRICAL WORK
TOTAL TRABAJOS DE ELECTRICDAD
SUMMARY - OPTION 1 NEW CONCRETE PAD FOR NEW PEB ADDITION
RESUMEN TRABAJOS - OPCIÓN 1. NUEVA LOSA DE HORMIGÓN PARA NUEVA AMPLIACIÓN DEL PEB
TOTAL ARCHITECTURAL WORKS
TOTAL TRABAJOS ARQUITECTURA
TOTAL CIVIL WORKS
TOTAL OBRA CIVL
TOTAL ELECTRICAL WORKS
TOTAL TRABAJOS DE ELECTRICDAD
GRAND TOTAL
GRAN TOTAL
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
$1euros
TOTAL PROJECT US$
DATE:FIRM NAME:
TITLE:BY:

&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N

OP 2 NEW ASPHALT PARKING AREA

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
INDEPENDENT GOVERNMENT ESTIMATEMORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
USMC PEB (REVISION A) - OPTION 2: NEW ASPHALT PARKING LOT
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1011MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEM 3OFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
OPTION #2 NEW ASPHALT PARKING AREA
OPCIÓN #2 NUEVA ÁREA DE APARCAMIENTO DE PAVIMETO ASFÁLTICO
CIVIL WORK NEW PARKING AREA
TRABAJOS DE CIVIL EN NUEVO APARACAMIENTO
Previous and Demolition Civil Work
Trabajos Previos y de Demolición de Civil
1Sawcut asphalt pavement
Corte con sierra en pavimento asfalticoLM
2Remove Exisitng Hydrant
Demoler Hidrant ExistenteEA
3Remove Asphalt Pavement (exisitng access)
Demolicion de Pavimento Asfáltico (acceso existente)SM
4Remove Underground Water Pipe
Demolicion de Tubería de Agua EnterradaLM
5Remove Underground Sewage Pipe
Demolicion de Tubería de Saneamiento EnterradaLM
6Remove Sewage Manhole
Demolicion de Pozo de SaneamientoEA
Total Previous and Demoliton Work
Total Trabajos Previos y de Demolición
Civil Earth Works
Trabajos de Movimiento de Tierras de Civil
7Clearing and Grubbing
Limpieza y desbroce del terrenoSM
8Excavation Works
Trabajos de DesmonteCM
9Sewer Manhole Excavation Works
Exacavación para Pozos de SaneamientoEA
10Utilities Trench excavation
Excavación de Zanja de para instalacionesCM
11Utilities Trench Backfill
Relleno de Zanja de para instalacionesCM
12Aggregate subbase 100% Compacted
Subbase de Zahorra Artificial compactada 100% ProctorCM
13Stabilized soil S-EST3 98% compacted
Suelo estabilizado S-EST3 Compactado 98%CM
14Selected soil type 2 95% Comacted
Suelo seleccionado tipo 2 compactado 95%CM
15backfill and Compacted Natural subgrade 98%
Relleno y Compactado con Terreno de la Porpia Excavación 2 compactado 98%CM
16Geotextile GEOTEXAN NT 35
Geotextil GEOTEXAN NT 35SM
17Metallic Sheet Piling
Pantalla autoportante de tablestacas metálicas machihembradasSM
Total Civil Earth Works
Total Trabajos de Movimientos de Tierras de Civil
Civil Works
Trabajos de Civil
17Primer irrigation C60BF4 IMP
Riego de imprimación tipo C60BF4SM
18Bituminous mixture AC 16 SURF 35/50 thickness 10 cms
Mezcla bituminosa AC 16 SURF 35/50 espesor 10 cmsSM
19New Concrete Sidewalk Thickness 18 cms
Nuevo acerado de Hormigón de 18 cms de EspesorSM
20Aggregate subbase 98% Compacted
Subbase de Zahorra Artificial compactada 98% ProctorCM
21Contraction Joints
Junta de contracciónLM
22Expansión Joints
Junta de ExpansiónLM
23Precast Concrete dual layer Curbing
Bordillo Prefabricado de Hormigón BicapaLM
24Precast Concrete dual layer Header
Encitado Acanalado de Hormigón Prefabricado BicapaLM
25Pavement traffic paint (Stop lettering and stop lines with reflexive paint)
Marca y símbolo de tráfico (letrero de stop y simbolos de stop con pintura reflexiva)SM
26Traffic, lettering and sign
Marca de calzada con pintura reflexivaLM
27Vertical traffic stop sign
Señal vertical de tráfico de stopEA
28Vertical parking sign
Señal vertical de aparcamientosEA
29Seeding Cynodon Dactylon Tifway 4169
Semabrado de Cynodon Dactylon Tifway 4169EA
Total Civil Works
Total Trabajos de Civil
Grading and Drainage Works
Trabajos Drenaje y Evacuación de Pluviales
29Buried Pipe PVC diameter 200 mm
Colector enterrado Tubería Pres. PVC ø200mmLM
30Concrete Headwalls
Marcos de Hormigón ArmadoEA
31Steel frames 600x250 Embedded in Concrete HM-25 at Road Access
Prisma de Hormigón HM-25 con marco de acero de 600x250mm en Calle de AccesoEA
32Precast Concrete curb chanel
Rigola Prefaricada de HormigónLM
33Riprap Stone to be Installed on Existing Ditch, 100mm Thickness
Refuerzo con Roca en Cuneta Existente de 100 mm de EspesorSM
34New PVC Sewer Manhole
Nuevo Pozo de Sanemiento Prefabricado de PVCEA
35Buried Pipe PVC diameter Ø6"
Colector enterrado Tubería de PVC corrugado doble pared de ø6"LM
36Buried Pipe PVC diameter Ø8"
Colector enterrado Tubería de PVC ø8"LM
37Directional Boring A AvenUE
Paso subterraneo de Conducto en Avenida AEA
Total Grading and drainage Works
Total Trabajos de Drenaje y Evacuación de Pluviales
CIVIL WORK SUMMARY
RESUMEN TRABAJOS DE CIVIL
Total Previous and Demolition Works
Total Trabajos de Demolición
Total Earthworks
Total Trabajos de Movimientos de Tierras
Total Civil Works
Total Trabajos Civil
Total Grading and Drainage Works
Total de drenaje y Eavcuación de Pluviales Civil
TOTAL CIVIL WORK
TOTAL TRABAJOS DE CIVIL
MECHANICAL WORKS
TRABAJOS DE MECÁNICA
Fire Suppresions System Works
Trabajos de Sistemas de extinción de Incendios
38New Fire Hydrant Mod. Super Centurion Installations, including disconnection and connections main pipe
Instalación de Nuevo Hidrante de estinción de Incendios Mod. Super Centurion, inluye desconexión y conexión de la red generalEA
39Steel Handhole for general Red valves
Arqueta de Acero para Valvulas de Red GeneralEA
40General valve for Polyethylene Pipe Ø6"
Valvula Generald para Tuberíad de PolietilenoØ6"EA
41General Supply Buried HDPE Pipe Ø6"
Tubería de Polietileno de Acometida EnterradaØ6"LM
Total Fire Suppressions System Works
Total Trabajos de Sistema de Extinción de Incendios
Plumbing Water Supply Modified Works
Trabajos de Fontanería Modificacion del suministro de agua
42Water Suply Point Connection Work
Trabajos en Punto de Conexión de Suminsitro de aguaEA
43Steel Handhole for general Red valves
Arqueta de Acero para Valvulas de Red GeneralEA
44General valve for Polyethylene Pipe Ø 1 1/2"
Valvula Generald para Tuberíad de PolietilenoØ 1 1/2"EA
45New Backflow Preventer Ø 1 1/2"
Nuevo dispositivo de Protección contra Reflujos y Sobrepresiones de Ø 1 1/2"EA
46New Water Flow Meter Ø 1 1/2"
Nuevo Contador equipado Ø 1 1/2"EA
47General supply Buried HDPE Pipe Ø1 1/2"
Tubería de HDPE de Acomtida enterrada Ø 1 1/2"LM
48Directional Boring A AvenUE
Paso subterraneo de Conducto en Avenida AEA
49General Supply Buried HDPE Pipe for Bldg. 1426
Tubería General de alimentación de HDPE para Suministro de agua al Edif. 1426LM
50General Valve Bldg 1426
Válvula de Corte General Edif 1426EA
Total Plumbing Water Supply Modified Works
Total Trabajos de Fontanería Modificación del Suminstro de agua
MECHANICAL WORK SUMMARY
RESUMEN TRABAJOS DE MECÁNICA
Total Fire Supression System Works
Total Trabajos Sistema de Extinción de Incendios
Total Water Supply Modified Works
Total Trabajos de Modificación del Suminsitro de Agua
TOTAL MECHANICAL WORK
TOTAL TRABAJOS DE MECÁNICA
SUMMARY ADDITIONAL OPTION 2: NEW ASPHALT PARKING LOT
RESUMEN OPCIÓN ADICIONAL #2 NUEVO APARCAMIENTO DE PAVIMETO ASFÁLTICO
TOTAL CIVIL WORK
TOTAL TRABAJOS DE CIVIL
TOTAL MECHANICAL WORK
TOTAL TRABAJOS DE MECÁNICA
GRAND TOTAL
GRAN TOTAL
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
$1euros
TOTAL PROJECT US$
DATE:FIRM NAME:
TITLE:BY:

&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N

OP 3 EXTERIOR LIGHTING

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
INDEPENDENT GOVERNMENT ESTIMATEMORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
USMC PEB (REVISION A) - OPTION 3: EXTERIOR LIGHTING
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1011MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEM 4OFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
OPTION #3 NEW EXTERIOR LIGHTING
OPCIÓN #3 NUEVO ALUMBRADO EXTERIOR
CIVIL WORKS
TRABAJOS DE CIVIL
Demolitions and Previous Works
Demiliciones y Trabajos Previos
1Sawcut Concrete Sidewalks
Precorte en Acera de HormigónLM
2Remove Concrete Sidewalk
Demolición de Acerado de HormigónSM
Total Demolitions and Previous Works
Total Demoliciones y Trabajos Previos
Earthworks
Trabajos de Movimiento de tierras
3Utilities Trench excavation
Excavación de Zanja de para instalacionesCM
4Utilities Trench Backfill
Relleno de Zanja de para instalacionesCM
Total Earthworks
Total Trabajos de Movimiento de Tierra
Civil works
Trabajos de Civil
5Precast concrete electrical manhole type A1
Arqueta prefabricada de hormigón electrica tipo A1EA
6Cover and frame of ductil cast iron
Tapa y marco de acero de fundiciónEA
7Reinforced polipropylene manhole (out 450x450mm int 350x350mm)
Arqueta de polipropileno reforzado (ext 450x450mm int 350x350mm)EA
Total Civil Works
Total Trabajos de Civil
CIVIL WORK SUMMARY
RESUMEN TRABAJOS DE CIVIL
Demolitions and Previous Works
Demoliciones y Trabajos Previos
Earthworks
Trabajos de Movimiento de tierras
Civil Works
Trabajos de Civil
TOTAL CIVIL WORK
TOTAL TRABAJOS DE CIVIL
ELECTRICAL WORKS
TRABAJOS DE ELECTRICIDAD
Electrical System
Instalación Electrica
8Works in Existing Main Panel in PEB
Trabajos de Ampliación en Cuadros de Mando y Protección existentes del PEBEA
8Breaker lighting Circuit 25 A
Interruptor Magnetotérmico de circuito Alumbrado 25 AEA
9Lighting contactors 2x2P 30A 208V electrically operated
Contactores operados electricamnete 2P 30A 208VEA
102 way ductbank ext. Diam. 110 mm. polyethylene. Exterior Ligthing electrical line
Prisma de 2 tubos de polyetileno dia. Ext. 110 mm. Linea eléctrica de alumbrado exteriorLM
11Circuit 10 mm 3 P+10mm2 N
Circuito monofásico 10mm2 3 Fase+10mm2 NeutroLM
12Circuit 6 mm 2 Phase
Circuito monofásico 6mm2 2 FaseLM
13Circuit 2,5 mm 2 Phase
Circuito monofásico 2,5mm2 2 FaseLM
13Copper clad grounding rod 3/4" diameter 3 meter long in plastic box
Pica de conexión a tierra chapada en cobre diámetro 3/4" y longitud 3 m en arqueta prefabricada de plásticoEA
14Weatherproof daylight sensor for exterior lighting including conduits & wiring
Sensor de luminosidad estanco para iluminación exterior incluso p.p. de conductos y cablesEA
15Timer Electrical Control Switch
Interruptor de Control HorarioEA
16Outdoor led spotlight including conduits & wiring
Luminaria estanca exterior incluso p.p. de conductos y cableadoEA
17Outdoor led Post - top
Farola Led exterior sobre BáculoEA
Total Electrical Works
Total Instalación Eléctrica
ELECTRICAL WORK SUMMARY
RESUMEN TRABAJOS DE ELECTRICIDAD
Electrical Works
Trabajos de electricidad
TOTAL ELECTRICAL WORK
TOTAL TRABAJOS DE ELECTRICIDAD
SUMMARY ADDITIONAL OPTION 3: EXTERIOR LIGHTING
RESUMEN OPCIÓN ADICIONAL #3 NUEVO ALUMBRADO EXTERIOR
TOTAL CIVIL WORK
TOTAL OBRA CIVL
TOTAL ELECTRICAL WORK
TOTAL TRABAJOS DE ELECTRICIDAD
GRAND TOTAL
GRAN TOTAL
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
$1euros
TOTAL PROJECT US$
DATE:FIRM NAME:
TITLE:BY:

&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N

OP 4 ADD. COMM LINE

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
INDEPENDENT GOVERNMENT ESTIMATEMORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
USMC PEB (REVISION A) - OPTION 4: TELECOMMUNICATION LINE FROM EXISTING COMMUNICATION CONNECTION POINT TO SECURITY CONTAINERS
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1011MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
OPTION # 4 TELECOMMUNICATION LINE FROM EXISTING COMMUNICATIONN CONNECTION POINT TO SECURITY CONTAINERS
OPCIÓN # 4 LINEA DE TELECOMUNICACIONES HASTA CONTENEDORES DE SEGURIDAD DESDE PUNTO EXISTENTE DE TELECOMUNICACIONES
CIVIL WORKS
TRABAJOS DE CIVIL
Earthworks
Trabajos de Movimiento de tierras
1Utilities Trench excavation
Excavación de Zanja de para instalacionesCM
2Utilities Trench Backfill
Relleno de Zanja de para instalacionesCM
Total Earthworks
Total Trabajos de Movimiento de Tierra
Civil works
Trabajos de Civil
3Precast concrete manhole type A1 (Included excavations works)
Arqueta prefabricada de hormigón tipo A1 (incliye excavacion)EA
4In slab Precast PVC manhole 35cmx35cms
arqueta de PVC de 35x35 cms empotrada en losaEA
5Cover and frame of ductil cast iron
Tapa y marco de acero de fundiciónEA
Total Civil Works
Total Trabajos de Civil
CIVIL WORK SUMMARY
RESUMEN TRABAJOS DE CIVIL
Earthworks
Trabajos de Movimiento de tierras
Civil Works
Trabajos de Civil
TOTAL CIVIL WORK
TOTAL TRABAJOS DE CIVIL
TELECOMMUNICACTIONS WORKS
TRABAJOS DE TELECOMUNICACIONES
Telecommunications Works for New Armory Containers, USMC PEB
Trabajos de Telecomunicaciones para Nuevos Polvorines en USMC PEB
62 Way Ductbank Ext. Diam 110 mm
Prisma de 2 tubos de Polietileno Diam Ext. 110mmLM
7Works in PEB Existing Main telecommunications Panel
Trabajos de Ampliación en Panel Principal de Telecomunicaciones del PEBEA
Total Telecommunications Works
Total Trabajos de Telecomunicaciones
TELECOMMUNICATIONS WORKS SUMMARY
RESUMEN TRABAJOS DE TELECOMUNICACIONES
Telecommunctions Works
Trabajos Instalación de Telecomunicaciones
TOTAL TELECOMMUNICATIONS WORK
TOTAL TRABAJOS DE TELECOMUNICACIONES
SUMMARY - OPTION 4 - TELECOMMUNICTION LINE FROM EXISTING COMMUNICATION CONNECTION POINT TO SECURITY CONTAINERS
RESUMEN TRABAJOS - LINEA DE TELECOMUNICACIONES HASTA CONTENEDORES DE SEGURIDAD DESDE PUNTOS EXITENTES DE TELECOMUNICACIONES
TOTAL CIVIL WORKS
TOTAL OBRA CIVL
TOTAL TELECOMMUNICATIONS WORKS
TOTAL TRABAJOS DE TELECOMUNICACIONES
GRAND TOTAL
GRAN TOTAL
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
$1euros
TOTAL PROJECT US$
DATE:FIRM NAME:
TITLE:BY:

&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N

OP 5 CONTAINERS RETROF.

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
INDEPENDENT GOVERNMENT ESTIMATEMORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
USMC PEB (REVISION A) - OPTION 5: RETROFITTING ELECTRICAL SYSTEM OF THE SECURITY CONTAINER TO U.S.A. ELECTRICAL STANDARDS
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1011MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
OPTION # 5: RETROFITTING ELECTRICAL SYSTEM OF THE SECURITY CONTAINER TO U.S.A. ELECTRICAL STANDARDS
OPCIÓN # 5: ADAPTACIÓN DEL SISTEMA ELÉCTRICO DE LOS CONTENEDORES DE SEGURIDAD A ESTÁNDARES DE ESTADOS UNIDOS
ELECTRICAL WORK
TRABAJOS DE ELECTRICIDAD
Interior Security Container 1 Electrical Work
Trabajos de Electricidad en el Interior de los Contenedor de Seguridad 1
1Replacement Existing European Shunt Trip Disconnected Panel for New American Standards Shunt Trip Disconnected Panel
Reemplazar el Existente Interruptor de Desconexión Europeo por un Nuevo Interruptor de Desconexión para Suministro de Corriente AmericanaEA
2Works in Existing Main Panel in Security Constainer
Trabajos de Adaptación en Cuadros de Mando y Protección existente en Contenedor de SeguridadEA
3Replacement European Existing Main Breaker for New American Standars Main Breaker
Reemplazar el Interrutor de Corte Principal Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente AmericanaEA
4Replacement European Existing Receptacles Circuit Breaker for New American Standars Main Breaker
Reemplazar el Interrutor de Corte de Circuito de Tomas de Corriente Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente AmericanaEA
5Replacement European Existing Light circuit Breaker for New American Standars Main Breaker
Reemplazar el Interrutor de Corte de Circuito de Alumbrado Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente AmericanaEA
6Replacement European Existing IDS Circuit Breaker for New American Standars Main Breaker
Reemplazar el interrutor de corte de circuito de IDS europeo por un nuevo interruptor de corte para suministro de corriente americanaEA
7Replacement Existing European Receptacles interior circuit, conduit included for Standars American Receptacles Circuit, conduit included
Reemplazar el Circuito de Tomas de Corriente Existente por uno Nuevo Según Estandares Americanos Incluido los ConductosLM
8Replacement Existing European Light Interior Circuit, Conduit Included for Standars American Light Circuit, Conduit Included
Reemplazar el circuito de Alumbrado Existente por uno Nuevo Según Estandares Americanos Incluido los ConductosLM
9Replacement Existing European IDS Circuit, Conduit Included for Standars American IDS Circuit, Conduit Included
Reemplazar el circuito de Alumbrado Existente por uno Nuevo Según Estandares Americanos Incluido los ConductosLM
10Replacement Existing European Receptacles for Standars American Receptacles (NEMA)
Reemplazar Tomas de Corriente Existentes por Nuevas Según Estandares Americanos (NEMA)EA
11Replacement Existing Interior European Lighting for Standars American Lighting
Reemplazar Luminarias Europeas Existentes por Nuevas Según Estandares AmericanosEA
12Replacement Existing Exterior European Lighting for Standars American exterior Lighting
Reemplazar Luminarias exteriores Europeas Existentes por Nuevas Según Estandares AmericanosEA
Total SecurityContainer 1 Electrical Works
Total Trabajos de Electricidad en Cont. de seg. 1
Interior Security Container 2 Electrical Work
Trabajos de Electricidad en el Interior de los Contenedor de Seguridad 2
13Replacement Existing European Shunt Trip Disconnected Panel for New American Standards Shunt Trip Disconnected Panel
Reemplazar el Existente Interruptor de Desconexión Europeo por un Nuevo Interruptor de Desconexión para Suministro de Corriente AmericanaEA
14Works in Existing Main Panel in Security Constainer
Trabajos de Adaptación en Cuadros de Mando y Protección existente en Contenedor de SeguridadEA
15Replacement European Existing Main Breaker for New American Standars Main Breaker
Reemplazar el Interrutor de Corte Principal Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente AmericanaEA
16Replacement European Existing Receptacles Circuit Breaker for New American Standars Main Breaker
Reemplazar el Interrutor de Corte de Circuito de Tomas de Corriente Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente AmericanaEA
17Replacement European Existing Light circuit Breaker for New American Standars Main Breaker
Reemplazar el Interrutor de Corte de Circuito de Alumbrado Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente AmericanaEA
18Replacement European Existing IDS Circuit Breaker for New American Standars Main Breaker
Reemplazar el interrutor de corte de circuito de IDS europeo por un nuevo interruptor de corte para suministro de corriente americanaEA
19Replacement Existing European Receptacles interior circuit, conduit included for Standars American Receptacles Circuit, conduit included
Reemplazar el Circuito de Tomas de Corriente Existente por uno Nuevo Según Estandares Americanos Incluido los ConductosLM
20Replacement Existing European Light Interior Circuit, Conduit Included for Standars American Light Circuit, Conduit Included
Reemplazar el circuito de Alumbrado Existente por uno Nuevo Según Estandares Americanos Incluido los ConductosLM
21Replacement Existing European IDS Circuit, Conduit Included for Standars American IDS Circuit, Conduit Included
Reemplazar el circuito de Alumbrado Existente por uno Nuevo Según Estandares Americanos Incluido los ConductosLM
22Replacement Existing European Receptacles for Standars American Receptacles (NEMA)
Reemplazar Tomas de Corriente Existentes por Nuevas Según Estandares Americanos (NEMA)EA
23Replacement Existing Interior European Lighting for Standars American Lighting
Reemplazar Luminarias Europeas Existentes por Nuevas Según Estandares AmericanosEA
24Replacement Existing Exterior European Lighting for Standars American exterior Lighting
Reemplazar Luminarias exteriores Europeas Existentes por Nuevas Según Estandares AmericanosEA
Total Security Container 2 Electrical Works
Total Trabajos de Electricidad en Contenedor de seg. 2
ELECTRICAL WORK SUMMARY
RESUMEN TRABAJOS DE ELECTRICIDAD
Interior Security Container 1 Electrical Work
Trabajos de Electricidad en el Interior del Contenedor de Seguridad 1
Interior Security Container 2 Electrical Work
Trabajos de Electricdad en el Interior del Contenedor de Seguridad 2
TOTAL ELECTRICAL WORK
TOTAL TRABAJOS DE ELECTRICIDAD
TELECOMMUNICACTION WORKS
TRABAJOS DE TELECOMUNICACIONES
Security Container 2 Telecommunication Work
Trabajos de Telecomunicaiones del Contenedor de Seguridad 2
25Replacement Existing Phone Box with 24"x24"x8" NEMA 4xSS BOX
Reemplazar Caja de Telecomunicaciones por Caja de 24"x24"x8" NEMA 4xSS BOXEA
Total Telecommunications Works
Total Trabajos de Telecomunicaciones
TELECOMMUNICATIONS WORKS SUMMARY
RESUMEN TRABAJOS DE TELECOMUNICACIONES
Security Container 2 Telecommunication Works
Trabajos de Telecomunicaciones Contenedor de seg. 2
TOTAL TELECOMMUNICATIONS WORK
TOTAL TRABAJOS DE TELECOMUNICACIONES
MECHANICAL WORKS
TRABAJOS DE MECÁNICA
Security Containers HVAC Works
Trabajos de Climatización y Ventilación en Contenedores de Seguridad
26Replacement Existing European HVAC Equipments with Standars American HVAC Equiments
Reemplazar los Equipos Europeos de Climatización Extentes con otros de Estandares AmericanosEA
27Replacement Existing European Deshumidifier Equipments with Standars American Humidifier Equiments
Reemplazar los Equipos Europeos de Climatización Extentes con otros de Estandares AmericanosEA
Total Mechanical Works
Toral Trabajos de Mecánica
MECHANICAL WORKS SUMMARY
RESUMEN TRABAJOS DE MECÁNICA
Security Containers HVAC WORKS
Trabajs de clilatizacion, ventilación en Contenedores de Seguridad
TOTAL MECHANICAL WORK
TOTAL TRABAJO DE MECÁNICA
SUMMARY - OPTION 5 - RETROFFITING ELECTRICAL SYSTEM OF THE SECURITY CONTAINER TO U.S.A. ELECTRICAL STANDARDS
RESUMEN TRABAJOS - OPCIÓN 5 - ADAPTACIÓN DEL SISTEMA ELÉCTRICO DE LOS CONTENEDORES DE SEGURIDAD A ESTANDARES DE ESTADOS UNIDOS
TOTAL ELECTRICAL WORKS
TOTAL TRABAJOS DE ELECTRICIDAD
TOTAL TELECOMMUNICATION WORKS
TOTAL TRABAJOS DE TELECOMUNICACIONES
TOTAL MECHANICAL WORKS
TOTAL TRABAJOS DE MECÁNICA
GRAND TOTAL
GRAN TOTAL
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
$1euros
TOTAL PROJECT US$
DATE:FIRM NAME:
TITLE:BY:

&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N

SUMARY

CONSTRUCTION COST ESTIMATE SUMMARY
CONTRACTORADDRESS
INDEPENDENT GOVERNMENT ESTIMATEMORON AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
USMC PEB (REVISION A)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1011MORÓN AIR BASE, SPAIN
GRAND TOTAL15% OVERHEAD10% PROFITTOTAL PROJECT EUROSTOTAL PROJECT US $ (0,8587€/$)
A- BASE BID: NEW CONCRETE PAD FOR NEW SEGURITY CONTAINERS, USMC PEB
B- OPTION 1.- NEW CONCRETE PAD FOR NEW PEB ADDITION, USMC PEB
C- OPTION 2.- NEW ASPHALT PARKING AREA
D- OPTION 3.- EXTERIOR LIGHTING
E- OPTION 4.- TELECOMMUNICATION LINE FROM EXISTING COMMUNICATION CONNECTION POINT TO SECURITY CONTAINERS
F- OPTION 5.- RETOFITTING ELECTRICAL SYSTEM OF THE SECURITY CONTINERS STANDARDS
DATE:FIRM NAME:
TITLE:BY:

&LINDEPENDENT GOVERMENT ESTIMATE&CFOR OFFICIAL USE ONLY&RPage &P of &N

SUMARY 2

CONSTRUCTION COST ESTIMATE SUMMARY
CONTRACTORADDRESS
INDEPENDENT GOVERNMENT ESTIMATEMORON AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
USMC PEB (REVISION A)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1011MORÓN AIR BASE, SPAIN
MATERIAL COSTLABOR COSTOTHER DIRECT COSTLINE TOTAL COST
A.- BASE BID.- NEW CONCRETE PAD FOR NEW SECURITY CONTAINERS, USMC PEB
B.- OPTION 1.- NEW CONCRETE PAD FOR PEB ADDITION
C- OPTION 2.- NEW ASPHALT PARKING AREA
D- OPTION 3.- EXTERIOR LIGHTING
E- OPTION 4.- TELECOMMUNICATIONS LINE
F- OPTION 5.- RETROFITTING ELECTRICAL SYSTEM
CONSTRUCTION COST ESTIMATE SUMMARY
CONTRACTORADDRESS
INDEPENDENT GOVERNMENT ESTIMATEMORON AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
USMC PEB (REVISION A)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1011MORÓN AIR BASE, SPAIN
GRAND TOTAL15%OVERHEAD+10%PROFITTOTAL PROJECT EUROSTOTAL PROJECT US$ (0,8587€/$)
A+B
A+B+C
A+B+C+D
A+B+C+D+E
A+B+C+D+E+F
DATE:FIRM NAME:
º
TITLE:BY:

&LINDEPENDENT GOVERMENT ESTIMATE&CFOR OFFICIAL USE ONLY&RPage &P of &N