Construction Cost Estimate Breakdown Ktr.xls
XLS spreadsheet 259 KB Posted
- Attached to
- USMC PEB Federal contract opportunity
- Solicitation number
- FA557520B0005
About this file
This is a solicitation for construction services at the USMC PEB facility in Moron Air Base, Spain. The solicitation includes a base bid for a new concrete pad and security containers, and five options including additional pads, parking areas, lighting, telecommunications lines, and retrofitting security containers. The project value is between $250,000 and $500,000 USD. A pre-proposal conference will be held on August 13, with questions due by August 19 and proposals due August 31. The work will be governed by specifications and drawings. In accordance with the defense cooperation agreement between the US and Spain, Spanish materials, labor and equipment must be used where feasible and consistent with requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA557520B0005.pdf | ||
| Solicitation Amendment FA557520B00050001 SF 30.pdf | ||
| DRAWINGS dated 16 June 2020.pdf | ||
| ESPECIFICACIONES dated 10 June 2020.pdf | ||
| SCHEDULE OF MAT.SUB. ENGISH.xlsx | XLSX spreadsheet | |
| SPECIFICATIONS dated 10 June 2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE BID
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| USMC PEB (REVISION A) - BASE BID | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1011 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| NEW CONCRETE PAD FOR NEW SECURITY CONTAINERS, USMC PEB | ||||||||||
| NUEVA LOSA DE HORMIGÓN PARA NUEVOS CONTENEDOREs DE SEGURIDAD EN USMC PEB | ||||||||||
| ARCHITECTURAL WORKS | ||||||||||
| TRABAJOS DE ARQUITECTURA | ||||||||||
| Earthworks New Concrete Pad for New Security Containers, USMC PEB | ||||||||||
| Movimiento de Tierras en Nueva Losa de Hormigón para Nuevos Contenedores de Seguridad en USMC PEB | ||||||||||
| 1 | Clearing and Grubbing | |||||||||
| Limpieza y desbroce del terreno | SM | |||||||||
| 2 | Excavation Works | |||||||||
| Trabajos de Desmonte | CM | |||||||||
| 3 | Artificial Crush-Graded Aggregated Compacted at 98% MP | |||||||||
| Zahorra Artificial Compactada al 98% MP | CM | |||||||||
| 4 | Geotextile GEOTEXAN NT 35 | |||||||||
| Geotextil GEOTEXAN NT 35 | SM | |||||||||
| 5 | Stone Backfill (Macadam) diameter 40/70 mm, compacted | |||||||||
| Enchado de grava (macadam) diameter 40/70 mm Compactado | CM | |||||||||
| Total Earthworks Work | ||||||||||
| Total Trabajos de Movimiento de Tierras | ||||||||||
| Foundation Works. New Pad for New Security Containers, USMC PEB | ||||||||||
| Trabajos de Cimentación en Nueva Losa de Hormigón para Nuevos Contenedores de Seguridad en USMC PEB | ||||||||||
| 6 | Leam concrete | |||||||||
| Hormigón de limpieza | SM | |||||||||
| 7 | Reinforced Concrete Slab. HA30-B-20-IIa concrete and B500s steel (75kg/m3) | |||||||||
| losa de Hormigón Armado compuesta por hormigón HA30-B-20-IIa armado con acero B500sc (75kg/m3) | CM | |||||||||
| 8 | Polyethylene Sheet | |||||||||
| Lamina separadora de Polietileno | SM | |||||||||
| 9 | Sawcut Concrete Slab and Sealant Contraction Joint | |||||||||
| Corte y sellado de Juntas de Contracción en Losa de Hormigón | LM | |||||||||
| Total Foundation Works | ||||||||||
| Total Trabajos de Cimentación | ||||||||||
| Security Containers Isnstall. New Concrete Pad for New Security Containers, USMC PEB | ||||||||||
| Installaciones de Contenedores de Seguridad. Nueva Losa de Hormigón para Nuevos Contenedores de Seguridad en USMC PEB | ||||||||||
| 10 | Transport Security Constiners from the Base Storage to New Concrete Pad | |||||||||
| Tranpsote de Container desde el Lugar de Almacenamiento en la Base a la Nueva Losa de Hormigón | EA | |||||||||
| 11 | Security Containers Install in the Asigned Places | |||||||||
| Instalación de los Contenedores de Seguridad en el Lugar Asignado | EA | |||||||||
| Total Security Containers Install Works | ||||||||||
| Total Trabajos de Instalación de Contenedores de Seg. | ||||||||||
| Chain Link Fence and Gate. New Concrete Pad for New Security Containers, USMC PEB | ||||||||||
| Vallado y Puerta de Tela Metálica en Nueva Losa de Hormigón para Nuevos Contenedores de Seguridad en USMC PEB | ||||||||||
| 11 | Fence Doors 3,71x2,00 m and Barbed Wire 0,30m | |||||||||
| Puertas metálicas de malla de simple torsión 3,71x2,00 m mas 0,30 de alambre de espino | EA | |||||||||
| 12 | Steel fence and barbed wire h=2,30 m | |||||||||
| Cerramiento de malla de simple torsión con alambre de espino h=2,30 m | LM | |||||||||
| 13 | Anchor steel Plate 200.200.10mm | |||||||||
| Placas de Anclaje de Acero 200.200.10mm | CM | |||||||||
| Total Chain Link Fence and Gate Works | ||||||||||
| Total Trabajos de Vallado y Puerta | ||||||||||
| ARCHITECTURAL WORKS SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ARQUITECTURA | ||||||||||
| Total Earthworks Works | ||||||||||
| Total Trabajos de Movimiento de Tierras | ||||||||||
| Total Foundation works | ||||||||||
| Total Trabajos de Cimentación | ||||||||||
| Total Security Constainers Install works | ||||||||||
| Total Trabajos de Instalaión de Container de seguridad | ||||||||||
| Total Chain Link Fence | ||||||||||
| Total Trabajos de Vallado | ||||||||||
| TOTAL ARCHITECTURAL WORK | ||||||||||
| TOTAL TRABAJOS DE ARQUITECTURA | ||||||||||
| CIVIL WORKS | ||||||||||
| TRABAJOS DE CIVIL | ||||||||||
| Previous and Demolitions Works | ||||||||||
| Trabajos Previos y de demoliciones | ||||||||||
| 14 | Remove Enderground Electrical Line (high voltage) | |||||||||
| Demolición de Line Electrica Enterrada (alto voltage) | LM | |||||||||
| Total Previous and Demolitions Works | ||||||||||
| Total Trabajos Previos y Demoliciones | ||||||||||
| Earthworks | ||||||||||
| Trabajos de Movimiento de tierras | ||||||||||
| 15 | Utilities Trench excavation | |||||||||
| Excavación de Zanja de para instalaciones | CM | |||||||||
| 16 | Utilities Trench Backfill | |||||||||
| Relleno de Zanja de para instalaciones | CM | |||||||||
| Total Earthworks | ||||||||||
| Total Trabajos de Movimiento de Tierra | ||||||||||
| Civil works | ||||||||||
| Trabajos de Civil | ||||||||||
| 17 | Precast concrete electrical manhole type A1 (ncluded excavations works) | |||||||||
| Arqueta prefabricada de hormigón electrica tipo A1 | EA | |||||||||
| 18 | Cover and frame of ductil cast iron | |||||||||
| Tapa y marco de acero de fundición | EA | |||||||||
| 19 | In slab Precast PVC manhole 35cmx35cms | |||||||||
| arqueta de PVC de 35x35 cms empotrada en losa | EA | |||||||||
| 20 | Precast concrete electrical manhole type A2 (ncluded excavations works) | |||||||||
| Arqueta prefabricada de hormigón electrica tipo A2 | EA | |||||||||
| 21 | Cover and frame of ductil cast iron | |||||||||
| Tapa y marco de acero de fundición | EA | |||||||||
| Total Civil Works | ||||||||||
| Total Trabajos de Civil | ||||||||||
| CIVIL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE CIVIL | ||||||||||
| Previous and Demolitions Works | ||||||||||
| Trabajos Previos y Movimeintos de Tierras | ||||||||||
| Earthworks | ||||||||||
| Trabajos de Movimiento de tierras | ||||||||||
| Civil Works | ||||||||||
| Trabajos de Civil | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL TRABAJOS DE CIVIL | ||||||||||
| ELECTRICAL WORKS | ||||||||||
| TRABAJOS DE ELECTRICDAD | ||||||||||
| Electrical Supply Works for New Security Containers, USMC PEB | ||||||||||
| Trabajos Instalación suminsitro Electrico para Nuevos Contenedores de Seguridad en USMC PEB | ||||||||||
| 22 | 4 way ductbank ext. Diam. 110 mm. polyethylene. Exterior Ligthing electrical line | |||||||||
| Prisma de 4 tubos de polyetileno dia. Ext. 110 mm. Linea eléctrica de alumbrado exterior | LM | |||||||||
| 23 | 2 Way Ductbank Ext. Diam 160 mm | |||||||||
| Prisma de 2 tubos de Polietileno Diam Ext. 160mm | LM | |||||||||
| 24 | Disconnection Works of High Voltage electrical Line In Electrical Post and Transformer | |||||||||
| Trabajos de desconexión de Linea Electrica de Alta Tensión en Poste Eléctrico y Transformador | EA | |||||||||
| 25 | New Routing of Electrical line to transformer Connection | |||||||||
| Conexión de la Nueva Line de Alimentaciónn del Transformador | EA | |||||||||
| 26 | Works in Existing Main Panel in PEB | |||||||||
| Trabajos de Ampliación en Cuadros de Mando y Protección existentes del PEB | EA | |||||||||
| 27 | New Routing of Electrical connection to transformer, Three Phase Line RHZ 1-K 12/20 KV 1x35mm2 CU | |||||||||
| Nuevo Trazado de Circuito de Acometida hasta transformardo, Linea Trifásica Cable de Cobre RHZ 1-K 12/20 KV 1x35mm2 Cu | LM | |||||||||
| 28 | Service Power Supply line Size 16mm2 / (1-1) 16 mm2 GND Copper 3-1/C 0,6 /* 1kv | |||||||||
| Circuito de Acometida 16 mm2 / (1-1) 16 mm2 GND Copper 3-1/C 0,6 /* 1kv | LM | |||||||||
| 29 | Copper clad grounding rod 3/4" diameter 3 meter long in plastic box | |||||||||
| Pica de conexión a tierra chapada en cobre diámetro 3/4" y longitud 3 m en arqueta prefabricada de plástico | EA | |||||||||
| 30 | Exothermic weld Connection | |||||||||
| Soldaualiminotermica de red de tierra | EA | |||||||||
| 31 | Grounding Electrode Conductor Bare Cooper 25 mm2 | |||||||||
| Conductor de Puesta a Tierra de Cobre desnudo 25 mm2 | LM | |||||||||
| Total Electrical Works | ||||||||||
| Total Trabajos de Electricidad | ||||||||||
| ELECTRICAL WORKS SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ELECTRICIDAD | ||||||||||
| Electrical Supply Works | ||||||||||
| Trabajos Instalación suminsitro Eléctrico | ||||||||||
| TOTAL ELECTRICAL WORK | ||||||||||
| TOTAL TRABAJOS DE ELECTRICDAD | ||||||||||
| SUMMARY - BASE BID | ||||||||||
| RESUMEN TRABAJOS - OFERTA BASE | ||||||||||
| TOTAL ARCHITECTURAL WORKS | ||||||||||
| TOTAL TRABAJOS ARQUITECTURA | ||||||||||
| TOTAL CIVIL WORKS | ||||||||||
| TOTAL OBRA CIVL | ||||||||||
| TOTAL ELECTRICAL WORKS | ||||||||||
| TOTAL TRABAJOS DE ELECTRICDAD | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| $1 | euros | |||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N
OP 1 NEW CONCRETE PAD FOR PEB
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| USMC PEB (REVISION A) - OPTION 1: NEW CONCRETE PAD FOR NEW PEB ADDITION | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1011 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| OPTION #1 NEW CONCRETE PAD FOR NEW PEB ADDITION, USMC PEB | ||||||||||
| OPCIÓN #1 NUEVA LOSA DE HORMIGÓN PARA NUEVO PEB EN USMC PEB | ||||||||||
| ARCHITECTURAL WORKS | ||||||||||
| TRABAJOS DE ARQUITECTURA | ||||||||||
| Demolitions and Previous Works for New Concrete Pad For New PEB Addition | ||||||||||
| Demoliciones y trabajos Previos en Nueva Losa de Hormigón para Nuevo PEB | ||||||||||
| 1 | Sawcut Existing Concrete Sidewalk | |||||||||
| Corte de Acerado de Hormigón | LM | |||||||||
| 2 | Remove Existing Concrete sidewalk | |||||||||
| Demolición de Acerado de Hormigón Existente | SM | |||||||||
| 3 | Remove Existing Underground Telecommunication Line | |||||||||
| Demolición Linea de Telecomunicaciones Existente Enterrada | LM | |||||||||
| Total Demolitions and Previous Works | ||||||||||
| Total Demoliciones y Trabajos Previos | ||||||||||
| Earthworks. New Concrete Pad for New PEB Addition | ||||||||||
| Movimiento de Tierras en Nueva Losa de Hormigón para Nueva ampliación del PEB | ||||||||||
| 4 | Clearing and Grubbing | |||||||||
| Limpieza y desbroce del terreno | SM | |||||||||
| 5 | Excavation Works | |||||||||
| Trabajos de Desmonte | CM | |||||||||
| 6 | Artificial Crush-Graded Aggregated Compacted at 98% MP | |||||||||
| Zahorra Artificial Compactada al 98% MP | CM | |||||||||
| 7 | Geotextile GEOTEXAN NT 35 | |||||||||
| Geotextil GEOTEXAN NT 35 | SM | |||||||||
| 8 | Stone Backfill (Macadam) diameter 40/70 mm, compacted | |||||||||
| Enchado de grava (macadam) diameter 40/70 mm Compactado | CM | |||||||||
| º | ||||||||||
| Total Trabajos de Movimiento de Tierras | ||||||||||
| Foundation Works.New Concrete Pad for New PEB Addition | ||||||||||
| Trabajos de Cimentación en Nueva Losa de Hormigón para Nueva ampliación del PEB | ||||||||||
| 9 | Leam concrete | |||||||||
| Hormigón de limpieza | SM | |||||||||
| 10 | Reinforced Concrete Slab. HA30-B-25-IIa concrete and B500s steel (81kg/m3) | |||||||||
| losa de Hormigón Armado compuesta por hormigón HA30-B-25-IIa armado con acero B500s (81kg/m3) | CM | |||||||||
| 11 | Polyethylene Sheet | |||||||||
| Lamina separadora de Polietileno | SM | |||||||||
| Total Foundation Works | ||||||||||
| Total Trabajos de Cimentación | ||||||||||
| ARCHITECTURAL WORKS SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ARQUITECTURA | ||||||||||
| Total Demolitions and Previous Works | ||||||||||
| Total Trabajos de Vallado | ||||||||||
| Total Earthworks Works | ||||||||||
| Total Trabajos de Movimiento de Tierras | ||||||||||
| Total Foundation works | ||||||||||
| Total Trabajos de Cimentación | ||||||||||
| TOTAL ARCHITECTURAL WORK | ||||||||||
| TOTAL TRABAJOS DE ARQUITECTURA | ||||||||||
| CIVIL WORKS | ||||||||||
| TRABAJOS DE CIVIL | ||||||||||
| Earthworks | ||||||||||
| Trabajos de Movimiento de tierras | ||||||||||
| 12 | Excavation Works | |||||||||
| Trabajos de Desmonte | CM | |||||||||
| Total Earthworks | ||||||||||
| Total Trabajos de Movimiento de Tierra | ||||||||||
| Civil works | ||||||||||
| Trabajos de Civil | ||||||||||
| 13 | New Concrete Sidewalk Thickness 18 cms | |||||||||
| Nuevo acerado de Hormigón de 18 cms de Espesor | LM | |||||||||
| 14 | Aggregate subbase 98% Compacted | |||||||||
| Subbase de Zahorra Artificial compactada 98% Proctor | CM | |||||||||
| 15 | Stone Backfill (Macadam) diameter 40/70 mm, compacted | |||||||||
| Enchado de grava (macadam) diameter 40/70 mm Compactado | CM | |||||||||
| 16 | Contraction Joints | |||||||||
| Junta de contracción | LM | |||||||||
| 17 | Expansión Joints | |||||||||
| Junta de Expansión | LM | |||||||||
| 18 | Precast concrete electrical manhole type A1 (included excavations works) | |||||||||
| Arqueta prefabricada de hormigón electrica tipo A1(incluye excavación) | EA | |||||||||
| 19 | 4 Way Ductbank Ext. Diam 110 mm | |||||||||
| Prisma de 4 tubos de Polietileno Diam Ext. 110mm | LM | |||||||||
| Total Civil Works | ||||||||||
| Total Trabajos de Civil | ||||||||||
| CIVIL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE CIVIL | ||||||||||
| Earthworks | ||||||||||
| Trabajos de Movimiento de tierras | ||||||||||
| Civil Works | ||||||||||
| Trabajos de Civil | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL TRABAJOS DE CIVIL | ||||||||||
| ELECTRICAL WORKS | ||||||||||
| TRABAJOS DE ELECTRICDAD | ||||||||||
| Grounding System Works | ||||||||||
| Trabajos Instalación de Red de Tierra | ||||||||||
| 20 | 35 mm2 Naked Copper Wire Buried Ring | |||||||||
| Anillo enterrado de Cobre Desnudo de 35 mm2 | LM | |||||||||
| 21 | Aluminothermic Welding Point | |||||||||
| Prisma de 2 tubos de Polietileno Diam Ext. 160mm | EA | |||||||||
| Total Grounding System Works | ||||||||||
| Total Trabajos de Red de Tierras | ||||||||||
| ELECTRICAL WORKS SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ELECTRICIDAD | ||||||||||
| Grounding System Works | ||||||||||
| Trabajos Instalación de Red de Tierras | ||||||||||
| TOTAL ELECTRICAL WORK | ||||||||||
| TOTAL TRABAJOS DE ELECTRICDAD | ||||||||||
| SUMMARY - OPTION 1 NEW CONCRETE PAD FOR NEW PEB ADDITION | ||||||||||
| RESUMEN TRABAJOS - OPCIÓN 1. NUEVA LOSA DE HORMIGÓN PARA NUEVA AMPLIACIÓN DEL PEB | ||||||||||
| TOTAL ARCHITECTURAL WORKS | ||||||||||
| TOTAL TRABAJOS ARQUITECTURA | ||||||||||
| TOTAL CIVIL WORKS | ||||||||||
| TOTAL OBRA CIVL | ||||||||||
| TOTAL ELECTRICAL WORKS | ||||||||||
| TOTAL TRABAJOS DE ELECTRICDAD | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| $1 | euros | |||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N
OP 2 NEW ASPHALT PARKING AREA
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| USMC PEB (REVISION A) - OPTION 2: NEW ASPHALT PARKING LOT | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1011 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM 3 | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| OPTION #2 NEW ASPHALT PARKING AREA | ||||||||||
| OPCIÓN #2 NUEVA ÁREA DE APARCAMIENTO DE PAVIMETO ASFÁLTICO | ||||||||||
| CIVIL WORK NEW PARKING AREA | ||||||||||
| TRABAJOS DE CIVIL EN NUEVO APARACAMIENTO | ||||||||||
| Previous and Demolition Civil Work | ||||||||||
| Trabajos Previos y de Demolición de Civil | ||||||||||
| 1 | Sawcut asphalt pavement | |||||||||
| Corte con sierra en pavimento asfaltico | LM | |||||||||
| 2 | Remove Exisitng Hydrant | |||||||||
| Demoler Hidrant Existente | EA | |||||||||
| 3 | Remove Asphalt Pavement (exisitng access) | |||||||||
| Demolicion de Pavimento Asfáltico (acceso existente) | SM | |||||||||
| 4 | Remove Underground Water Pipe | |||||||||
| Demolicion de Tubería de Agua Enterrada | LM | |||||||||
| 5 | Remove Underground Sewage Pipe | |||||||||
| Demolicion de Tubería de Saneamiento Enterrada | LM | |||||||||
| 6 | Remove Sewage Manhole | |||||||||
| Demolicion de Pozo de Saneamiento | EA | |||||||||
| Total Previous and Demoliton Work | ||||||||||
| Total Trabajos Previos y de Demolición | ||||||||||
| Civil Earth Works | ||||||||||
| Trabajos de Movimiento de Tierras de Civil | ||||||||||
| 7 | Clearing and Grubbing | |||||||||
| Limpieza y desbroce del terreno | SM | |||||||||
| 8 | Excavation Works | |||||||||
| Trabajos de Desmonte | CM | |||||||||
| 9 | Sewer Manhole Excavation Works | |||||||||
| Exacavación para Pozos de Saneamiento | EA | |||||||||
| 10 | Utilities Trench excavation | |||||||||
| Excavación de Zanja de para instalaciones | CM | |||||||||
| 11 | Utilities Trench Backfill | |||||||||
| Relleno de Zanja de para instalaciones | CM | |||||||||
| 12 | Aggregate subbase 100% Compacted | |||||||||
| Subbase de Zahorra Artificial compactada 100% Proctor | CM | |||||||||
| 13 | Stabilized soil S-EST3 98% compacted | |||||||||
| Suelo estabilizado S-EST3 Compactado 98% | CM | |||||||||
| 14 | Selected soil type 2 95% Comacted | |||||||||
| Suelo seleccionado tipo 2 compactado 95% | CM | |||||||||
| 15 | backfill and Compacted Natural subgrade 98% | |||||||||
| Relleno y Compactado con Terreno de la Porpia Excavación 2 compactado 98% | CM | |||||||||
| 16 | Geotextile GEOTEXAN NT 35 | |||||||||
| Geotextil GEOTEXAN NT 35 | SM | |||||||||
| 17 | Metallic Sheet Piling | |||||||||
| Pantalla autoportante de tablestacas metálicas machihembradas | SM | |||||||||
| Total Civil Earth Works | ||||||||||
| Total Trabajos de Movimientos de Tierras de Civil | ||||||||||
| Civil Works | ||||||||||
| Trabajos de Civil | ||||||||||
| 17 | Primer irrigation C60BF4 IMP | |||||||||
| Riego de imprimación tipo C60BF4 | SM | |||||||||
| 18 | Bituminous mixture AC 16 SURF 35/50 thickness 10 cms | |||||||||
| Mezcla bituminosa AC 16 SURF 35/50 espesor 10 cms | SM | |||||||||
| 19 | New Concrete Sidewalk Thickness 18 cms | |||||||||
| Nuevo acerado de Hormigón de 18 cms de Espesor | SM | |||||||||
| 20 | Aggregate subbase 98% Compacted | |||||||||
| Subbase de Zahorra Artificial compactada 98% Proctor | CM | |||||||||
| 21 | Contraction Joints | |||||||||
| Junta de contracción | LM | |||||||||
| 22 | Expansión Joints | |||||||||
| Junta de Expansión | LM | |||||||||
| 23 | Precast Concrete dual layer Curbing | |||||||||
| Bordillo Prefabricado de Hormigón Bicapa | LM | |||||||||
| 24 | Precast Concrete dual layer Header | |||||||||
| Encitado Acanalado de Hormigón Prefabricado Bicapa | LM | |||||||||
| 25 | Pavement traffic paint (Stop lettering and stop lines with reflexive paint) | |||||||||
| Marca y símbolo de tráfico (letrero de stop y simbolos de stop con pintura reflexiva) | SM | |||||||||
| 26 | Traffic, lettering and sign | |||||||||
| Marca de calzada con pintura reflexiva | LM | |||||||||
| 27 | Vertical traffic stop sign | |||||||||
| Señal vertical de tráfico de stop | EA | |||||||||
| 28 | Vertical parking sign | |||||||||
| Señal vertical de aparcamientos | EA | |||||||||
| 29 | Seeding Cynodon Dactylon Tifway 4169 | |||||||||
| Semabrado de Cynodon Dactylon Tifway 4169 | EA | |||||||||
| Total Civil Works | ||||||||||
| Total Trabajos de Civil | ||||||||||
| Grading and Drainage Works | ||||||||||
| Trabajos Drenaje y Evacuación de Pluviales | ||||||||||
| 29 | Buried Pipe PVC diameter 200 mm | |||||||||
| Colector enterrado Tubería Pres. PVC ø200mm | LM | |||||||||
| 30 | Concrete Headwalls | |||||||||
| Marcos de Hormigón Armado | EA | |||||||||
| 31 | Steel frames 600x250 Embedded in Concrete HM-25 at Road Access | |||||||||
| Prisma de Hormigón HM-25 con marco de acero de 600x250mm en Calle de Acceso | EA | |||||||||
| 32 | Precast Concrete curb chanel | |||||||||
| Rigola Prefaricada de Hormigón | LM | |||||||||
| 33 | Riprap Stone to be Installed on Existing Ditch, 100mm Thickness | |||||||||
| Refuerzo con Roca en Cuneta Existente de 100 mm de Espesor | SM | |||||||||
| 34 | New PVC Sewer Manhole | |||||||||
| Nuevo Pozo de Sanemiento Prefabricado de PVC | EA | |||||||||
| 35 | Buried Pipe PVC diameter Ø6" | |||||||||
| Colector enterrado Tubería de PVC corrugado doble pared de ø6" | LM | |||||||||
| 36 | Buried Pipe PVC diameter Ø8" | |||||||||
| Colector enterrado Tubería de PVC ø8" | LM | |||||||||
| 37 | Directional Boring A AvenUE | |||||||||
| Paso subterraneo de Conducto en Avenida A | EA | |||||||||
| Total Grading and drainage Works | ||||||||||
| Total Trabajos de Drenaje y Evacuación de Pluviales | ||||||||||
| CIVIL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE CIVIL | ||||||||||
| Total Previous and Demolition Works | ||||||||||
| Total Trabajos de Demolición | ||||||||||
| Total Earthworks | ||||||||||
| Total Trabajos de Movimientos de Tierras | ||||||||||
| Total Civil Works | ||||||||||
| Total Trabajos Civil | ||||||||||
| Total Grading and Drainage Works | ||||||||||
| Total de drenaje y Eavcuación de Pluviales Civil | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL TRABAJOS DE CIVIL | ||||||||||
| MECHANICAL WORKS | ||||||||||
| TRABAJOS DE MECÁNICA | ||||||||||
| Fire Suppresions System Works | ||||||||||
| Trabajos de Sistemas de extinción de Incendios | ||||||||||
| 38 | New Fire Hydrant Mod. Super Centurion Installations, including disconnection and connections main pipe | |||||||||
| Instalación de Nuevo Hidrante de estinción de Incendios Mod. Super Centurion, inluye desconexión y conexión de la red general | EA | |||||||||
| 39 | Steel Handhole for general Red valves | |||||||||
| Arqueta de Acero para Valvulas de Red General | EA | |||||||||
| 40 | General valve for Polyethylene Pipe Ø6" | |||||||||
| Valvula Generald para Tuberíad de PolietilenoØ6" | EA | |||||||||
| 41 | General Supply Buried HDPE Pipe Ø6" | |||||||||
| Tubería de Polietileno de Acometida EnterradaØ6" | LM | |||||||||
| Total Fire Suppressions System Works | ||||||||||
| Total Trabajos de Sistema de Extinción de Incendios | ||||||||||
| Plumbing Water Supply Modified Works | ||||||||||
| Trabajos de Fontanería Modificacion del suministro de agua | ||||||||||
| 42 | Water Suply Point Connection Work | |||||||||
| Trabajos en Punto de Conexión de Suminsitro de agua | EA | |||||||||
| 43 | Steel Handhole for general Red valves | |||||||||
| Arqueta de Acero para Valvulas de Red General | EA | |||||||||
| 44 | General valve for Polyethylene Pipe Ø 1 1/2" | |||||||||
| Valvula Generald para Tuberíad de PolietilenoØ 1 1/2" | EA | |||||||||
| 45 | New Backflow Preventer Ø 1 1/2" | |||||||||
| Nuevo dispositivo de Protección contra Reflujos y Sobrepresiones de Ø 1 1/2" | EA | |||||||||
| 46 | New Water Flow Meter Ø 1 1/2" | |||||||||
| Nuevo Contador equipado Ø 1 1/2" | EA | |||||||||
| 47 | General supply Buried HDPE Pipe Ø1 1/2" | |||||||||
| Tubería de HDPE de Acomtida enterrada Ø 1 1/2" | LM | |||||||||
| 48 | Directional Boring A AvenUE | |||||||||
| Paso subterraneo de Conducto en Avenida A | EA | |||||||||
| 49 | General Supply Buried HDPE Pipe for Bldg. 1426 | |||||||||
| Tubería General de alimentación de HDPE para Suministro de agua al Edif. 1426 | LM | |||||||||
| 50 | General Valve Bldg 1426 | |||||||||
| Válvula de Corte General Edif 1426 | EA | |||||||||
| Total Plumbing Water Supply Modified Works | ||||||||||
| Total Trabajos de Fontanería Modificación del Suminstro de agua | ||||||||||
| MECHANICAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE MECÁNICA | ||||||||||
| Total Fire Supression System Works | ||||||||||
| Total Trabajos Sistema de Extinción de Incendios | ||||||||||
| Total Water Supply Modified Works | ||||||||||
| Total Trabajos de Modificación del Suminsitro de Agua | ||||||||||
| TOTAL MECHANICAL WORK | ||||||||||
| TOTAL TRABAJOS DE MECÁNICA | ||||||||||
| SUMMARY ADDITIONAL OPTION 2: NEW ASPHALT PARKING LOT | ||||||||||
| RESUMEN OPCIÓN ADICIONAL #2 NUEVO APARCAMIENTO DE PAVIMETO ASFÁLTICO | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL TRABAJOS DE CIVIL | ||||||||||
| TOTAL MECHANICAL WORK | ||||||||||
| TOTAL TRABAJOS DE MECÁNICA | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| $1 | euros | |||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N
OP 3 EXTERIOR LIGHTING
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| USMC PEB (REVISION A) - OPTION 3: EXTERIOR LIGHTING | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1011 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM 4 | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| OPTION #3 NEW EXTERIOR LIGHTING | ||||||||||
| OPCIÓN #3 NUEVO ALUMBRADO EXTERIOR | ||||||||||
| CIVIL WORKS | ||||||||||
| TRABAJOS DE CIVIL | ||||||||||
| Demolitions and Previous Works | ||||||||||
| Demiliciones y Trabajos Previos | ||||||||||
| 1 | Sawcut Concrete Sidewalks | |||||||||
| Precorte en Acera de Hormigón | LM | |||||||||
| 2 | Remove Concrete Sidewalk | |||||||||
| Demolición de Acerado de Hormigón | SM | |||||||||
| Total Demolitions and Previous Works | ||||||||||
| Total Demoliciones y Trabajos Previos | ||||||||||
| Earthworks | ||||||||||
| Trabajos de Movimiento de tierras | ||||||||||
| 3 | Utilities Trench excavation | |||||||||
| Excavación de Zanja de para instalaciones | CM | |||||||||
| 4 | Utilities Trench Backfill | |||||||||
| Relleno de Zanja de para instalaciones | CM | |||||||||
| Total Earthworks | ||||||||||
| Total Trabajos de Movimiento de Tierra | ||||||||||
| Civil works | ||||||||||
| Trabajos de Civil | ||||||||||
| 5 | Precast concrete electrical manhole type A1 | |||||||||
| Arqueta prefabricada de hormigón electrica tipo A1 | EA | |||||||||
| 6 | Cover and frame of ductil cast iron | |||||||||
| Tapa y marco de acero de fundición | EA | |||||||||
| 7 | Reinforced polipropylene manhole (out 450x450mm int 350x350mm) | |||||||||
| Arqueta de polipropileno reforzado (ext 450x450mm int 350x350mm) | EA | |||||||||
| Total Civil Works | ||||||||||
| Total Trabajos de Civil | ||||||||||
| CIVIL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE CIVIL | ||||||||||
| Demolitions and Previous Works | ||||||||||
| Demoliciones y Trabajos Previos | ||||||||||
| Earthworks | ||||||||||
| Trabajos de Movimiento de tierras | ||||||||||
| Civil Works | ||||||||||
| Trabajos de Civil | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL TRABAJOS DE CIVIL | ||||||||||
| ELECTRICAL WORKS | ||||||||||
| TRABAJOS DE ELECTRICIDAD | ||||||||||
| Electrical System | ||||||||||
| Instalación Electrica | ||||||||||
| 8 | Works in Existing Main Panel in PEB | |||||||||
| Trabajos de Ampliación en Cuadros de Mando y Protección existentes del PEB | EA | |||||||||
| 8 | Breaker lighting Circuit 25 A | |||||||||
| Interruptor Magnetotérmico de circuito Alumbrado 25 A | EA | |||||||||
| 9 | Lighting contactors 2x2P 30A 208V electrically operated | |||||||||
| Contactores operados electricamnete 2P 30A 208V | EA | |||||||||
| 10 | 2 way ductbank ext. Diam. 110 mm. polyethylene. Exterior Ligthing electrical line | |||||||||
| Prisma de 2 tubos de polyetileno dia. Ext. 110 mm. Linea eléctrica de alumbrado exterior | LM | |||||||||
| 11 | Circuit 10 mm 3 P+10mm2 N | |||||||||
| Circuito monofásico 10mm2 3 Fase+10mm2 Neutro | LM | |||||||||
| 12 | Circuit 6 mm 2 Phase | |||||||||
| Circuito monofásico 6mm2 2 Fase | LM | |||||||||
| 13 | Circuit 2,5 mm 2 Phase | |||||||||
| Circuito monofásico 2,5mm2 2 Fase | LM | |||||||||
| 13 | Copper clad grounding rod 3/4" diameter 3 meter long in plastic box | |||||||||
| Pica de conexión a tierra chapada en cobre diámetro 3/4" y longitud 3 m en arqueta prefabricada de plástico | EA | |||||||||
| 14 | Weatherproof daylight sensor for exterior lighting including conduits & wiring | |||||||||
| Sensor de luminosidad estanco para iluminación exterior incluso p.p. de conductos y cables | EA | |||||||||
| 15 | Timer Electrical Control Switch | |||||||||
| Interruptor de Control Horario | EA | |||||||||
| 16 | Outdoor led spotlight including conduits & wiring | |||||||||
| Luminaria estanca exterior incluso p.p. de conductos y cableado | EA | |||||||||
| 17 | Outdoor led Post - top | |||||||||
| Farola Led exterior sobre Báculo | EA | |||||||||
| Total Electrical Works | ||||||||||
| Total Instalación Eléctrica | ||||||||||
| ELECTRICAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ELECTRICIDAD | ||||||||||
| Electrical Works | ||||||||||
| Trabajos de electricidad | ||||||||||
| TOTAL ELECTRICAL WORK | ||||||||||
| TOTAL TRABAJOS DE ELECTRICIDAD | ||||||||||
| SUMMARY ADDITIONAL OPTION 3: EXTERIOR LIGHTING | ||||||||||
| RESUMEN OPCIÓN ADICIONAL #3 NUEVO ALUMBRADO EXTERIOR | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL OBRA CIVL | ||||||||||
| TOTAL ELECTRICAL WORK | ||||||||||
| TOTAL TRABAJOS DE ELECTRICIDAD | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| $1 | euros | |||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N
OP 4 ADD. COMM LINE
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| USMC PEB (REVISION A) - OPTION 4: TELECOMMUNICATION LINE FROM EXISTING COMMUNICATION CONNECTION POINT TO SECURITY CONTAINERS | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1011 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| OPTION # 4 TELECOMMUNICATION LINE FROM EXISTING COMMUNICATIONN CONNECTION POINT TO SECURITY CONTAINERS | ||||||||||
| OPCIÓN # 4 LINEA DE TELECOMUNICACIONES HASTA CONTENEDORES DE SEGURIDAD DESDE PUNTO EXISTENTE DE TELECOMUNICACIONES | ||||||||||
| CIVIL WORKS | ||||||||||
| TRABAJOS DE CIVIL | ||||||||||
| Earthworks | ||||||||||
| Trabajos de Movimiento de tierras | ||||||||||
| 1 | Utilities Trench excavation | |||||||||
| Excavación de Zanja de para instalaciones | CM | |||||||||
| 2 | Utilities Trench Backfill | |||||||||
| Relleno de Zanja de para instalaciones | CM | |||||||||
| Total Earthworks | ||||||||||
| Total Trabajos de Movimiento de Tierra | ||||||||||
| Civil works | ||||||||||
| Trabajos de Civil | ||||||||||
| 3 | Precast concrete manhole type A1 (Included excavations works) | |||||||||
| Arqueta prefabricada de hormigón tipo A1 (incliye excavacion) | EA | |||||||||
| 4 | In slab Precast PVC manhole 35cmx35cms | |||||||||
| arqueta de PVC de 35x35 cms empotrada en losa | EA | |||||||||
| 5 | Cover and frame of ductil cast iron | |||||||||
| Tapa y marco de acero de fundición | EA | |||||||||
| Total Civil Works | ||||||||||
| Total Trabajos de Civil | ||||||||||
| CIVIL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE CIVIL | ||||||||||
| Earthworks | ||||||||||
| Trabajos de Movimiento de tierras | ||||||||||
| Civil Works | ||||||||||
| Trabajos de Civil | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL TRABAJOS DE CIVIL | ||||||||||
| TELECOMMUNICACTIONS WORKS | ||||||||||
| TRABAJOS DE TELECOMUNICACIONES | ||||||||||
| Telecommunications Works for New Armory Containers, USMC PEB | ||||||||||
| Trabajos de Telecomunicaciones para Nuevos Polvorines en USMC PEB | ||||||||||
| 6 | 2 Way Ductbank Ext. Diam 110 mm | |||||||||
| Prisma de 2 tubos de Polietileno Diam Ext. 110mm | LM | |||||||||
| 7 | Works in PEB Existing Main telecommunications Panel | |||||||||
| Trabajos de Ampliación en Panel Principal de Telecomunicaciones del PEB | EA | |||||||||
| Total Telecommunications Works | ||||||||||
| Total Trabajos de Telecomunicaciones | ||||||||||
| TELECOMMUNICATIONS WORKS SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE TELECOMUNICACIONES | ||||||||||
| Telecommunctions Works | ||||||||||
| Trabajos Instalación de Telecomunicaciones | ||||||||||
| TOTAL TELECOMMUNICATIONS WORK | ||||||||||
| TOTAL TRABAJOS DE TELECOMUNICACIONES | ||||||||||
| SUMMARY - OPTION 4 - TELECOMMUNICTION LINE FROM EXISTING COMMUNICATION CONNECTION POINT TO SECURITY CONTAINERS | ||||||||||
| RESUMEN TRABAJOS - LINEA DE TELECOMUNICACIONES HASTA CONTENEDORES DE SEGURIDAD DESDE PUNTOS EXITENTES DE TELECOMUNICACIONES | ||||||||||
| TOTAL CIVIL WORKS | ||||||||||
| TOTAL OBRA CIVL | ||||||||||
| TOTAL TELECOMMUNICATIONS WORKS | ||||||||||
| TOTAL TRABAJOS DE TELECOMUNICACIONES | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| $1 | euros | |||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N
OP 5 CONTAINERS RETROF.
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| USMC PEB (REVISION A) - OPTION 5: RETROFITTING ELECTRICAL SYSTEM OF THE SECURITY CONTAINER TO U.S.A. ELECTRICAL STANDARDS | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1011 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| OPTION # 5: RETROFITTING ELECTRICAL SYSTEM OF THE SECURITY CONTAINER TO U.S.A. ELECTRICAL STANDARDS | ||||||||||
| OPCIÓN # 5: ADAPTACIÓN DEL SISTEMA ELÉCTRICO DE LOS CONTENEDORES DE SEGURIDAD A ESTÁNDARES DE ESTADOS UNIDOS | ||||||||||
| ELECTRICAL WORK | ||||||||||
| TRABAJOS DE ELECTRICIDAD | ||||||||||
| Interior Security Container 1 Electrical Work | ||||||||||
| Trabajos de Electricidad en el Interior de los Contenedor de Seguridad 1 | ||||||||||
| 1 | Replacement Existing European Shunt Trip Disconnected Panel for New American Standards Shunt Trip Disconnected Panel | |||||||||
| Reemplazar el Existente Interruptor de Desconexión Europeo por un Nuevo Interruptor de Desconexión para Suministro de Corriente Americana | EA | |||||||||
| 2 | Works in Existing Main Panel in Security Constainer | |||||||||
| Trabajos de Adaptación en Cuadros de Mando y Protección existente en Contenedor de Seguridad | EA | |||||||||
| 3 | Replacement European Existing Main Breaker for New American Standars Main Breaker | |||||||||
| Reemplazar el Interrutor de Corte Principal Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente Americana | EA | |||||||||
| 4 | Replacement European Existing Receptacles Circuit Breaker for New American Standars Main Breaker | |||||||||
| Reemplazar el Interrutor de Corte de Circuito de Tomas de Corriente Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente Americana | EA | |||||||||
| 5 | Replacement European Existing Light circuit Breaker for New American Standars Main Breaker | |||||||||
| Reemplazar el Interrutor de Corte de Circuito de Alumbrado Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente Americana | EA | |||||||||
| 6 | Replacement European Existing IDS Circuit Breaker for New American Standars Main Breaker | |||||||||
| Reemplazar el interrutor de corte de circuito de IDS europeo por un nuevo interruptor de corte para suministro de corriente americana | EA | |||||||||
| 7 | Replacement Existing European Receptacles interior circuit, conduit included for Standars American Receptacles Circuit, conduit included | |||||||||
| Reemplazar el Circuito de Tomas de Corriente Existente por uno Nuevo Según Estandares Americanos Incluido los Conductos | LM | |||||||||
| 8 | Replacement Existing European Light Interior Circuit, Conduit Included for Standars American Light Circuit, Conduit Included | |||||||||
| Reemplazar el circuito de Alumbrado Existente por uno Nuevo Según Estandares Americanos Incluido los Conductos | LM | |||||||||
| 9 | Replacement Existing European IDS Circuit, Conduit Included for Standars American IDS Circuit, Conduit Included | |||||||||
| Reemplazar el circuito de Alumbrado Existente por uno Nuevo Según Estandares Americanos Incluido los Conductos | LM | |||||||||
| 10 | Replacement Existing European Receptacles for Standars American Receptacles (NEMA) | |||||||||
| Reemplazar Tomas de Corriente Existentes por Nuevas Según Estandares Americanos (NEMA) | EA | |||||||||
| 11 | Replacement Existing Interior European Lighting for Standars American Lighting | |||||||||
| Reemplazar Luminarias Europeas Existentes por Nuevas Según Estandares Americanos | EA | |||||||||
| 12 | Replacement Existing Exterior European Lighting for Standars American exterior Lighting | |||||||||
| Reemplazar Luminarias exteriores Europeas Existentes por Nuevas Según Estandares Americanos | EA | |||||||||
| Total SecurityContainer 1 Electrical Works | ||||||||||
| Total Trabajos de Electricidad en Cont. de seg. 1 | ||||||||||
| Interior Security Container 2 Electrical Work | ||||||||||
| Trabajos de Electricidad en el Interior de los Contenedor de Seguridad 2 | ||||||||||
| 13 | Replacement Existing European Shunt Trip Disconnected Panel for New American Standards Shunt Trip Disconnected Panel | |||||||||
| Reemplazar el Existente Interruptor de Desconexión Europeo por un Nuevo Interruptor de Desconexión para Suministro de Corriente Americana | EA | |||||||||
| 14 | Works in Existing Main Panel in Security Constainer | |||||||||
| Trabajos de Adaptación en Cuadros de Mando y Protección existente en Contenedor de Seguridad | EA | |||||||||
| 15 | Replacement European Existing Main Breaker for New American Standars Main Breaker | |||||||||
| Reemplazar el Interrutor de Corte Principal Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente Americana | EA | |||||||||
| 16 | Replacement European Existing Receptacles Circuit Breaker for New American Standars Main Breaker | |||||||||
| Reemplazar el Interrutor de Corte de Circuito de Tomas de Corriente Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente Americana | EA | |||||||||
| 17 | Replacement European Existing Light circuit Breaker for New American Standars Main Breaker | |||||||||
| Reemplazar el Interrutor de Corte de Circuito de Alumbrado Europeo por un Nuevo Interruptor de Corte para Suministro de Corriente Americana | EA | |||||||||
| 18 | Replacement European Existing IDS Circuit Breaker for New American Standars Main Breaker | |||||||||
| Reemplazar el interrutor de corte de circuito de IDS europeo por un nuevo interruptor de corte para suministro de corriente americana | EA | |||||||||
| 19 | Replacement Existing European Receptacles interior circuit, conduit included for Standars American Receptacles Circuit, conduit included | |||||||||
| Reemplazar el Circuito de Tomas de Corriente Existente por uno Nuevo Según Estandares Americanos Incluido los Conductos | LM | |||||||||
| 20 | Replacement Existing European Light Interior Circuit, Conduit Included for Standars American Light Circuit, Conduit Included | |||||||||
| Reemplazar el circuito de Alumbrado Existente por uno Nuevo Según Estandares Americanos Incluido los Conductos | LM | |||||||||
| 21 | Replacement Existing European IDS Circuit, Conduit Included for Standars American IDS Circuit, Conduit Included | |||||||||
| Reemplazar el circuito de Alumbrado Existente por uno Nuevo Según Estandares Americanos Incluido los Conductos | LM | |||||||||
| 22 | Replacement Existing European Receptacles for Standars American Receptacles (NEMA) | |||||||||
| Reemplazar Tomas de Corriente Existentes por Nuevas Según Estandares Americanos (NEMA) | EA | |||||||||
| 23 | Replacement Existing Interior European Lighting for Standars American Lighting | |||||||||
| Reemplazar Luminarias Europeas Existentes por Nuevas Según Estandares Americanos | EA | |||||||||
| 24 | Replacement Existing Exterior European Lighting for Standars American exterior Lighting | |||||||||
| Reemplazar Luminarias exteriores Europeas Existentes por Nuevas Según Estandares Americanos | EA | |||||||||
| Total Security Container 2 Electrical Works | ||||||||||
| Total Trabajos de Electricidad en Contenedor de seg. 2 | ||||||||||
| ELECTRICAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ELECTRICIDAD | ||||||||||
| Interior Security Container 1 Electrical Work | ||||||||||
| Trabajos de Electricidad en el Interior del Contenedor de Seguridad 1 | ||||||||||
| Interior Security Container 2 Electrical Work | ||||||||||
| Trabajos de Electricdad en el Interior del Contenedor de Seguridad 2 | ||||||||||
| TOTAL ELECTRICAL WORK | ||||||||||
| TOTAL TRABAJOS DE ELECTRICIDAD | ||||||||||
| TELECOMMUNICACTION WORKS | ||||||||||
| TRABAJOS DE TELECOMUNICACIONES | ||||||||||
| Security Container 2 Telecommunication Work | ||||||||||
| Trabajos de Telecomunicaiones del Contenedor de Seguridad 2 | ||||||||||
| 25 | Replacement Existing Phone Box with 24"x24"x8" NEMA 4xSS BOX | |||||||||
| Reemplazar Caja de Telecomunicaciones por Caja de 24"x24"x8" NEMA 4xSS BOX | EA | |||||||||
| Total Telecommunications Works | ||||||||||
| Total Trabajos de Telecomunicaciones | ||||||||||
| TELECOMMUNICATIONS WORKS SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE TELECOMUNICACIONES | ||||||||||
| Security Container 2 Telecommunication Works | ||||||||||
| Trabajos de Telecomunicaciones Contenedor de seg. 2 | ||||||||||
| TOTAL TELECOMMUNICATIONS WORK | ||||||||||
| TOTAL TRABAJOS DE TELECOMUNICACIONES | ||||||||||
| MECHANICAL WORKS | ||||||||||
| TRABAJOS DE MECÁNICA | ||||||||||
| Security Containers HVAC Works | ||||||||||
| Trabajos de Climatización y Ventilación en Contenedores de Seguridad | ||||||||||
| 26 | Replacement Existing European HVAC Equipments with Standars American HVAC Equiments | |||||||||
| Reemplazar los Equipos Europeos de Climatización Extentes con otros de Estandares Americanos | EA | |||||||||
| 27 | Replacement Existing European Deshumidifier Equipments with Standars American Humidifier Equiments | |||||||||
| Reemplazar los Equipos Europeos de Climatización Extentes con otros de Estandares Americanos | EA | |||||||||
| Total Mechanical Works | ||||||||||
| Toral Trabajos de Mecánica | ||||||||||
| MECHANICAL WORKS SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE MECÁNICA | ||||||||||
| Security Containers HVAC WORKS | ||||||||||
| Trabajs de clilatizacion, ventilación en Contenedores de Seguridad | ||||||||||
| TOTAL MECHANICAL WORK | ||||||||||
| TOTAL TRABAJO DE MECÁNICA | ||||||||||
| SUMMARY - OPTION 5 - RETROFFITING ELECTRICAL SYSTEM OF THE SECURITY CONTAINER TO U.S.A. ELECTRICAL STANDARDS | ||||||||||
| RESUMEN TRABAJOS - OPCIÓN 5 - ADAPTACIÓN DEL SISTEMA ELÉCTRICO DE LOS CONTENEDORES DE SEGURIDAD A ESTANDARES DE ESTADOS UNIDOS | ||||||||||
| TOTAL ELECTRICAL WORKS | ||||||||||
| TOTAL TRABAJOS DE ELECTRICIDAD | ||||||||||
| TOTAL TELECOMMUNICATION WORKS | ||||||||||
| TOTAL TRABAJOS DE TELECOMUNICACIONES | ||||||||||
| TOTAL MECHANICAL WORKS | ||||||||||
| TOTAL TRABAJOS DE MECÁNICA | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| $1 | euros | |||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N
SUMARY
| CONSTRUCTION COST ESTIMATE SUMMARY | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORON AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| USMC PEB (REVISION A) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1011 | MORÓN AIR BASE, SPAIN | |||||||||
| GRAND TOTAL | 15% OVERHEAD | 10% PROFIT | TOTAL PROJECT EUROS | TOTAL PROJECT US $ (0,8587€/$) | ||||||
| A- BASE BID: NEW CONCRETE PAD FOR NEW SEGURITY CONTAINERS, USMC PEB | ||||||||||
| B- OPTION 1.- NEW CONCRETE PAD FOR NEW PEB ADDITION, USMC PEB | ||||||||||
| C- OPTION 2.- NEW ASPHALT PARKING AREA | ||||||||||
| D- OPTION 3.- EXTERIOR LIGHTING | ||||||||||
| E- OPTION 4.- TELECOMMUNICATION LINE FROM EXISTING COMMUNICATION CONNECTION POINT TO SECURITY CONTAINERS | ||||||||||
| F- OPTION 5.- RETOFITTING ELECTRICAL SYSTEM OF THE SECURITY CONTINERS STANDARDS | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&LINDEPENDENT GOVERMENT ESTIMATE&CFOR OFFICIAL USE ONLY&RPage &P of &N
SUMARY 2
| CONSTRUCTION COST ESTIMATE SUMMARY | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORON AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| USMC PEB (REVISION A) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1011 | MORÓN AIR BASE, SPAIN | |||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COST | LINE TOTAL COST | |||||||
| A.- BASE BID.- NEW CONCRETE PAD FOR NEW SECURITY CONTAINERS, USMC PEB | ||||||||||
| B.- OPTION 1.- NEW CONCRETE PAD FOR PEB ADDITION | ||||||||||
| C- OPTION 2.- NEW ASPHALT PARKING AREA | ||||||||||
| D- OPTION 3.- EXTERIOR LIGHTING | ||||||||||
| E- OPTION 4.- TELECOMMUNICATIONS LINE | ||||||||||
| F- OPTION 5.- RETROFITTING ELECTRICAL SYSTEM | ||||||||||
| CONSTRUCTION COST ESTIMATE SUMMARY | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORON AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| USMC PEB (REVISION A) | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1011 | MORÓN AIR BASE, SPAIN | |||||||||
| GRAND TOTAL | 15%OVERHEAD+10%PROFIT | TOTAL PROJECT EUROS | TOTAL PROJECT US$ (0,8587€/$) | |||||||
| A+B | ||||||||||
| A+B+C | ||||||||||
| A+B+C+D | ||||||||||
| A+B+C+D+E | ||||||||||
| A+B+C+D+E+F | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| º | ||||||||||
| TITLE: | BY: |
&LINDEPENDENT GOVERMENT ESTIMATE&CFOR OFFICIAL USE ONLY&RPage &P of &N
File details come from the government source that posted it. Updated .