ESPECIFICACIONES dated 10 June 2020.pdf

PDF 4 MB Posted

Attached to
USMC PEB Federal contract opportunity
Solicitation number
FA557520B0005
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This is a solicitation for a construction project located at a U.S. Air Force base in Spain. The project scope includes civil works, concrete work, electrical work, and mechanical work to construct a concrete pad for security containers, perimeter fencing, and utility connections. The estimated value is between $250,000 and $500,000. A pre-proposal conference will be held on August 13, 2020, with questions due by August 19, 2020 and proposals due by August 31, 2020. In accordance with the defense cooperation agreement between the U.S. and Spain, Spanish labor, materials, and equipment must be used where feasible.

View the file

Other files for this federal contract opportunity

Other files attached to USMC PEB, newest first.
File Type Posted
Solicitation - FA557520B0005.pdf PDF
Solicitation Amendment FA557520B00050001 SF 30.pdf PDF
DRAWINGS dated 16 June 2020.pdf PDF
Construction Cost Estimate Breakdown Ktr.xls XLS spreadsheet
SPECIFICATIONS dated 10 June 2020.pdf PDF
SCHEDULE OF MAT.SUB. ENGISH.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CASTAÑO & ASOCIADOS

CERTIFIED PASSIVE HOUSE DESIGNER

Sevilla Budapest Tlfno.: +34.644.595.525 Tlfno.:+36 1 700 1200 Edificio Marie Curie, Avenida Leonardo da Vinci. 18 Fogaskerekü utca 4-6/ 5 epület Planta 2. Módulo 2. 1125 Budapest, Hungary 41092 Sevilla

Juan Manuel Castaño Salvador Móvil:+34.610.777.219 jm.castano@castanoyasociados.com www.castanoyasociados.com CASTAÑO & ASOCIADOS CONSTRUCCIÓN SOSTENIBLE S.L., C.I.F.: B90197807 Inscrita en el Registro Mercantil de Sevilla Hoja SE105118 Tomo 6013 Folio 41 Inscripción 1

100% DESIGN SUBMITTAL

ESPECIFICACIONES

USMC PEB (REVISION A)

A/E FIRM: CASTAÑO&ASOCIADOS

PROJECT NUMBER: QUUG 19-1011

CONTRACT NUMBER: FA557517D0001

DELIVERY ORDER: FA557519FA004

At MORON AIR BASE, SPAIN

USAFE_U.S. AIR FORCE IN EUROPE

Junio 2020

1/235 mailto:jm.castano@castanoyasociados.com http://www.castanoyasociados.com/

PREPARED FOR DEPARTMENT OF THE

AIR FORCE

BY

CASTAÑO & ASSOCIATES

(CASTAÑO Y ASOCIADOS CONSTRUCCIÓN SOSTENIBLE, S.L.)

TECHNICAL PROVISIONS & SPECIFICATIONS FOR:

PROYECTO QUUG 19-1011

USMC PEB (REVISION A)

Prepared by: __________________________________________________________________

Name: Juan Manuel Castaño Salvador, Architect (DOR) Date: 10 Jun 20

Name: Juan Manuel Castaño Reyes, Technical Architect Date: 10 Jun 20

Name: Juan de Dios Montero Naranjo, Building Engineer Date: 10 Jun 20

Name: María Vico García, Architect Date: 10 Jun 20

Name: Martín Benjumea Delgado, Architect Date: 10 Jun 20

Name: Rubén de la Rosa Morales, Technical Architect Date: 10 Jun 20

Name: Helena Cumbreras Torrente, Architect Date: 10 Jun 20

Name: Irene García Sáez, Architect Date: 10 Jun 20

2/235

LISTA DE ESPECIFICACIONES

DIVISION 01 – REQUISITOS GENERALES # of pages

01 11 00 Ámbito del trabajo y planos 5

01 11 01 Condiciones Generales 33

01 11 02 Condiciones Especiales 4

DIVISION 02 – CONDICIONES EXISTENTES

02 41 00 Demoliciones y Deconstrucciones 8

DIVISION 03 - HORMIGÓN

03 30 00 Hormigón ejecutado in situ 9

DIVISION 05 – METALES

05 05 23.16 Soldadura Estructural 4

DIVISION 22 - FONTANERÍA

22 00 00 Fontanería 12

DIVISION 26 – ELECTRICIDAD

26 00 00.00 20 Materiales y Métodos eléctricos básicos 8

26 20 00 Sistema de distribución eléctrica interior 15

26 56 00 Iluminación exterior 8

DIVISION 31 – MOVIMIENTO DE TIERRAS

31 00 00 Movimiento de tierras 11

DIVISION 32 – MEJORAS EXTERIORES

32 03 30 Terraplenes 9

32 04 22 Geotextiles como elementos de separación y filtro 3

32 05 10 Zahorras 6

32 05 12 Suelos estabilizados in situ 10

32 05 30 Riegos de imprimación 3

3/235

32 05 31 Riegos de adherencia 3

32 05 32 Riegos de curado 3

32 05 42 Pavimento bituminoso de mezcla en caliente 12

32 07 01 Señales y carteles verticales de circulación retrorreflectantes 3

32 16 19 Bordillos de hormigón, cunetas y aceras 9

32 17 23 Marcas en pavimentos 2

32 31 13 Valla de tela metálica y puerta 7

32 92 19 Siembra 9

DIVISION 33 - INSTALACIONES

33 30 00 Sistema de alcantarillado sanitario 10

33 40 00 Instalaciones de drenaje de aguas pluviales 4

33 71 02 Distribución eléctrica subterránea 19

33 82 00 Telecomunicaciones planta exterior 5

4/235

01 11 00 - 1

SECCIÓN 01 11 00

ÁMBITO DEL TRABAJO Y PLANOS

1. ÁMBITO DEL TRABAJO: El objeto del trabajo consiste en el suministro de toda la mano de obra, materiales, plantas, transportes, equipos y servicios para ejecutar todo el trabajo, en estricto acuerdo con los planos y especificaciones, finalizado y listo para su uso bajo un contrato de construcción de precio fijo firme. El trabajo incluye, pero no está limitado a las siguientes actividades, las cuales incluyen los ensayos a ser realizados por un laboratorio independiente para el control de calidad.

OFERTA BASE: LOSA DE HORMIGÓN PARA CONTENEDORES DE SEGURIDAD,

VALLADO PERIMETRAL E INSTALACIÓN ELÉCTRICA

Realizar los trabajos detallados abajo en el área indicada en los planos, con los movimientos de tierras y construcción de una losa de hormigón donde se instalarán dos contenedores de seguridad, incluyendo conexión eléctrica, y un vallado perimetral con 3 alambres de espino.

Los trabajos a realizar son los siguientes:

Trabajos de Civil

a. Limpiar y desbrozar las áreas afectadas por los trabajos

b. Trabajos de excavación, corte y relleno para la ejecución de la losa de hormigón

c. Nivelado y movimiento de tierras para el relleno de la losa de hormigón

d. Compactación del terreno subyacente

e. Relleno y compactación de los rellenos

f. Instalar señalética de información

g. Instalar vallado perimetral con 3 alambres de espino, brazo de extensión simple, y puerta de acceso batiente según se indica en los planos de proyecto

h. Transportar los contenedores de seguridad desde el punto de almacenamiento de la Base a la nueva losa de hormigón e instalar en el lugar asignado

Trabajos de Hormigón

a. Verter hormigón de limpieza para preparación de la superficie base de la losa

b. Instalar encofrados según sea necesario

c. Instalar acero y mallazos para la losa de hormigón según se requiera

d. Construir/Instalar las arquetas eléctricas y de telecomunicaciones

e. Instalar cualquier elemento requerido para la conexión del edificio según se requiera en planos de proyecto

f. Verter el hormigón en el elemento de cimentación de acuerdo con el diseño aprobado

5/235

01 11 00 - 2

Trabajos de electricidad

a. Proveer servicio eléctrico para el contenedor de seguridad desde panel eléctrico

b. Proveer sistema de puesta a tierra para el contenedor de seguridad y vallado

c. Modificar ruteado de la línea existente subterránea de alto voltaje, bordeando el perímetro de la nueva losa de hormigón.

Trabajos de Mecánica

a. Suministrar e Instalar nuevo conjunto de válcula de retención doble (DCVA) para la línea de alimentación del sistema de incendios del edificio.

b. Suministrar e instalar nuevo desconector-válvula de prevención de contraflujo de presión reducida (RPPD) para la línea de alimentación de agua sanitaria.

c. Suministrar e instalar nuevo contador de la red de agua sanitaria, a instalar en superficie junto al nuevo desconector-válvula de prevención de contraflujo de presión reducida (RPPD).

Otros

a. Pruebas y puesta en marcha

b. Limpieza final

c. Entrega de los planos As-built

d. Entrega de datos espaciales

OPCIÓN ADICIONAL 1: LOSA DE HORMIGÓN PARA NUEVO PEB

Trabajos de Civil

a. Limpiar y desbrozar las áreas afectadas por los trabajos

b. Trabajos de excavación, corte y relleno para la ejecución de la losa de hormigón

c. Nivelado y movimiento de tierras para el relleno de la losa de hormigón

d. Compactación del terreno subyacente

e. Relleno y compactación de los rellenos

f. Construir acerados según se indica en los planos del proyecto

g. Trabajos exteriores de las zonas indicadas

Trabajos de Hormigón

a. Verter hormigón de limpieza para preparación de la superficie base de la losa

b. Instalar encofrados según sea necesario

c. Instalar acero y mallazos para la losa de hormigón según se requiera

d. Construir/Instalar las arquetas eléctricas y de telecomunicaciones

e. Instalar cualquier elemento requerido para la conexión del edificio según se requiera en planos de proyecto

f. Verter el hormigón en el elemento de cimentación de acuerdo con el diseño aprobado

6/235

01 11 00 - 3

Trabajos de Telecomunicación

a. Demoler la línea existente que cruza bajo el área de la nueva losa de hormigón

b. Instalar nueva canalización enterrada de comunicaciones desde arqueta existente al oeste del edificio, rodeando el perímetro de la losa, conectando con la arqueta existente de la fachada principal. Estos trabajos deberán ser coordinados con el departamento de Comunicaciones de la

Base Aérea de Morón.

OPCIÓN ADICIONAL 2: NUEVO APARCAMIENTO DE ASFALTO

Trabajos de Civil

a. Limpiar y desbrozar las áreas afectadas por los trabajos

b. Trabajos de excavación, corte y relleno para la ejecución del pavimento de asfalto

* Se deberá prestar especial atención a los postes eléctricos de Alto Voltaje cercanos a las zonas de excavación, para evitar a toda costa daños en las instalaciones existentes, tomándose las medidas exigidas de arriostramientos y tablestacados.

c. Nivelado y movimiento de tierras para el relleno del pavimento de asfalto

d. Compactación del terreno subyacente

e. Aplicar capa principal para pavimento asfáltico

f. Aplicar capa intermedia para pavimento asfáltico

g. Aplicar capa de imprimación para pavimento asfáltico

h. Aplicar capa de rodadura

i. Construir zanjas, canales, rejillas, arquetas, colectores y separador de hidrocarburos para zona de aparcamiento y zona de almacenaje de acuerdo con SWPPP según se requiera.

j. Instalar canales de hormigón prefabricado en el perímetro del aparcamiento

k. Construir tuberías enterradas y pasacunetas de hormigón para la carretera de acceso

l. Instalar bordillos en el área del aparcamiento

m. Pintar señalética en el asfalto

n. Instalar señales de tráfico y señalética de información según se requiera

o. Instalar topes de goma para vehículos

Trabajos de Mecánica

a. Reemplazar hidrante existente según estándares americanos incluyendo un adaptador de conexión, y pintura de hidrante según estándar.

b. Demoler la línea de saneamiento existente bajo el área del parking nuevo

c. Proveer una nueva línea de saneamiento adyacente al área del parking nuevo

d. Demoler líneas de agua existentes bajo el área del parking nuevo.

e. Instalar nuevas líneas de agua de acometida del edificio para el agua sanitaria y para el hidrante contraincendios y conexiones de bomberos en el edificio, incluyendo las válvulas indicadas.

Protección Contraincendios

7/235

01 11 00 - 4

a. Pintura en suelo de texto “Fire Lane” en zona de almacenamiento existente

OPCIÓN ADICIONAL 3: ILUMINACIÓN EXTERIOR

Trabajos de Electricidad

a. Proveer sistema de iluminación con luminarias LED, consiguiendo al menos los niveles de iluminación requeridos para zonas de aparcamiento.

b. Construir canalizaciones de hormigón a los nuevos elementos de iluminación.

OPCIÓN ADICIONAL 4: NUEVA LÍNEA DE COMUNICACIONES

Trabajos de Telecomunicaciones

a. Proveer una canalización enterrada de comunicaciones que conecte con los Contenedores de

Seguridad directa desde el punto de telecomunicaciones existente según se define en los planos del proyecto. Estos trabajos deberán ser coordinados con el departamento de Comunicaciones de la

Base Aérea de Morón.

OPCIÓN 5: ADAPTACIÓN ELÉCTRICA DE CONTENEDORES DE SEGURIDAD

Trabajos de Electricidad

a. Reemplazar unidades de Calefacción, Ventilación y Aire Acondicionado, proveyendo unidades nuevas, en igual cantidad y características, conformes a los estándares americanos de electricidad

(NFPA 70, Unified Facilities Criteria y códigos locales aplicables).

b. Reemplazar deshumidifcadores existentes, proveyendo nuevas unidades, en misma cantidad y características, conformes a los estándares americanos de electricidad (NFPA 70, Unified Facilities

Criteria y códigos locales aplicables).

c. Reemplazar Panel de corte y desconexión existente, Panel Eléctrico, Interruptores de Circuito, Conductos y Tomas Eléctricas, proveyendo nuevos materiales de las mismas características conformes a los estándares americanos de electricidad (NFPA 70, Unified Facilities Criteria y códigos locales aplicables).

d. Reemplazar las luminarias existentes, proveyendo nuevas unidades conformes a los estándares americanos de electricidad, asegurando niveles de iluminación adecuados de acuerdo con la normativa aplicable (NFPA 70, Unified Facilities Criteria y códigos locales aplicables).

El contratista es responsable de inspeccionar las condiciones existentes de los contenedores de seguridad, y reemplazar los componentes eléctricos para asegurar el total cumplimiento con los estándares U.S.A. aplicables. Algunos componentes eléctricos pueden no aparecer en los documentos de proyecto. Es parte de la investigación del contratista la identificación de todos los elementos a reemplazar como parte del contrato, estén o no incluidos en la documentación de proyecto.

8/235

01 11 00 - 5

2. DRAWINGS:

No. De

Plano

Plano Fecha Título

R-770-01 01 de 37 G001 Junio 2020 Portada. Índice de Planos

R-770-02 02 de 37 G101 Junio 2020 Alcance del proyecto

R-770-03 03 de 37 GC101 Junio 2020 Rutas de Trabajo del Contratista

R-770-04 04 de 37 GR101 Junio 2020 Contenedores de Seguridad: Condiciones Existentes

R-770-05 05 de 37 CD101 Junio 2020 Instalaciones y Demoliciones de Civil

R-770-06 06 de 37 CD102 Junio 2020 Topografía Existente. Planta General

R-770-07 07 de 37 CD103 Junio 2020 Topografía Existente. Secciones I

R-770-08 08 de 37 CD104 Junio 2020 Topografía Existente. Secciones II

R-770-09 09 de 37 CD105 Junio 2020 Topografía Existente. Secciones III

R-770-10 10 de 37 C101 Junio 2020 Nueva Implantación

R-770-11 11 de 37 C102 Junio 2020 Nueva Topografía. Planta General

R-770-12 12 de 37 C103 Junio 2020 Nueva Topografía. Secciones I

R-770-13 13 de 37 C104 Junio 2020 Nueva Topografía. Secciones II

R-770-14 14 de 37 C105 Junio 2020 Nueva Topografía. Secciones III

R-770-15 15 de 37 C106 Junio 2020 Nueva Topografía. Secciones IV

R-770-16 16 de 37 C107 Junio 2020 Nueva Topografía. Secciones V

R-770-17 17 de 37 C108 Junio 2020 Nueva Topografía. Secciones VI

R-770-18 18 de 37 C109 Junio 2020 Plano de Juntas de Pavimentos de Hormigón

R-770-19 19 de 37 C110 Junio 2020 Nuevo Sistema de Drenaje

R-770-20 20 de 37 C501 Junio 2020 Detalles de Civil I

R-770-21 21 de 37 C502 Junio 2020 Detalles de Civil II

R-770-22 22 de 37 C503 Junio 2020 Detalles de Civil III

R-770-23 23 de 37 C504 Junio 2020 Detalles de Civil IV

R-770-24 24 de 37 S101 Junio 2020 Estructura. Ampliación de Losa Hormigón PEB

R-770-25 25 de 37 S102 Junio 2020 Estructura. Losa Hormigón Contenedores de Seguridad

R-770-26 26 de 37 PP101 Junio 2020 Fontanería

R-770-27 27 de 37 PS101 Junio 2020 Saneamiento

R-770-28 28 de 37 P501 Junio 2020 Detalles de Fontanería

R-770-29 29 de 37 P502 Junio 2020 Detalles de Saneamiento

R-770-30 30 de 37 EP101 Junio 2020 Electricidad. Fuerza Exterior

R-770-31 31 de 37 EL101 Junio 2020 Electricidad. Iluminación Exterior

R-770-32 32 de 37 EG101 Junio 2020 Sistema de Puesta a Tierra

R-770-33 33 de 37 E501 Junio 2020 Detalles de Electricidad I

R-770-34 34 de 37 E502 Junio 2020 Detalles de Electricidad II

R-770-35 35 de 37 E601 Junio 2020 Esquemas de Electricidad

R-770-36 36 de 37 T101 Junio 2020 Telecomunicaciones

R-770-37 37 de 37 T501 Junio 2020 Detalles de Telecomunicaciones

*** FIN DE LA SECCIÓN ***

9/235

01 11 01 -1

SECCIÓN 01 11 01

CONDICIONES GENERALES

1. GENERAL: El trabajo consiste en el suministro de toda la mano de obra, materiales, instalaciones, transporte, equipos y servicios para ejecutar el proyecto. De acuerdo con los planos y especificaciones, completamente finalizado y en disposición de uso. Las mediciones mostradas en los planos y especificaciones se dan únicamente como referencia. Es responsabilidad del

Contratista verificar todas y cada una de las medidas.

2. DESCRIPCIÓN GENERAL: El trabajo consiste en, pero sin estar limitado a, ejecutar las partidas indicadas en el ámbito de trabajo. Todas las partidas indicadas en el ámbito del trabajo no limitan ni reducen la responsabilidad del Contratista para realizar todo el trabajo que sea requerido por el proyecto para entregar una instalación completamente terminada y operativa.

3. UBICACIÓN: Los trabajos se encuentran el área de USMC PEB, entre las Avenidas A y B, con acceso desde la 7th Street, adyacente al área vallada de los edificios #939 y #923. In la Base

Aérea de Morón, España, como se muestra en los planos del contrato.

4. PLANOS QUE ACOMPAÑAN A LA ESPECIFICACIÓN: Los planos son propiedad del

Gobierno y no deberá ser usados para otro propósito distinto al contemplado por las especificaciones. Los planos indicados en las especificaciones están en formato A1.

5. GARANTÍA: Para este contrato, el Contratista deberá proporcionar una garantía comercial estándar de dos años para todas las partidas del alcance del trabajo, incluidos los materiales y la mano de obra. La garantía deberá cubrir cualquier defecto observado e informado al contratista en un plazo máximo de un año después de la aceptación de la obra. Correrá a cargo del

Contratista cualquier reparación o reemplazo de materiales defectuosos dentro de un plazo razonable y según lo apruebe el Oficial de Contrataciones. El Contratista debe cumplir con los períodos de garantía adicionales establecidos por los códigos y regulaciones españolas. El

Contratista deberá presentar la carta de garantía en un plazo de 15 días naturales posteriores a la aceptación del trabajo por parte del Oficial de Contrataciones.

6. NOTIFICACIÓN DE INICIO DE OBRAS:

6.1. Contratos Design-Build: Este documento es aplicable a contratos de Construcción y de

Diseño y Construcción. En las secciones indicadas abajo, se referencian la Notificación de Inicio de Diseño (DNTP) y la Notificación de Proceder de Construcción (CNTP). Estos son aplicables a contratos Design-Build. El contratista deberá solicitar el CNTP al Oficial de Contrataciones cuando empiece la movilización de la construcción, pudiéndose solicitar el CNTP antes de la finalización del diseño.

6.2. Contratos de Construcción: El contratista proporcionará una Notificación de Inicio de

Obras (NTP). En subsecuentes secciones, ambos DNTP y CNTP son aplicables para la fecha del

NTP.

10/235

01 11 01 -2

7. ACCESO A LA BASE:

7.1. Permisos o Autorizaciones: El Contratista obtendrá todos los permisos o autorizaciones requeridos para acceder a la Base Aérea de Morón. Una vez que las obras hayan finalizado, el Contratista devolverá los permisos o autorizaciones. El Contratista es responsable de proporcionar los escoltas requeridos para ejecutar las obras

7.2. Retrasos e Interrupciones: Se advierte al Contratista que es probable que haya retrasos, por razones de seguridad, durante el proceso de entrada y salida del personal y materiales de la

Base Aérea de Morón. Además, el Contratista interrumpirá inmediatamente el trabajo cuando sea requerido si se produjeran situaciones de alerta/peligro por seguridad. El Contratista deberá entregar por escrito, excesos de más de 90 minutos de retraso experimentados debidos al acceso a la base.

8. SOLICITUD DE PERMISO DE OBRAS:

8.1. En los 5 días naturales a partir de la fecha de notificación del inicio de las obras (CNTP), el Contratista solicitará el impreso "AF Form 103, Work Clearance Request" a Inspección de

Obras para obtener toda la información referente al estado actual de los servicios de la Base. Las solicitudes adicionales serán presentadas a Inspección de Obras con 15 días naturales de antelación, como mínimo. El Contratista no realizará ningún trabajo en ninguna circunstancia sin poseer el permiso de obras aprobado en el emplazamiento de la obra (copia en papel) y no sin antes haber marcado in-situ con estacas y/o piquetas la ubicación de las instalaciones. La solicitud del permiso de obras sólo se procesará cuando todos los materiales y la documentación necesarios para comenzar la obra hayan sido presentados y aprobados. El Contratista será responsable de cualquier daño causado a los servicios de la Base indicados en "AF Form 103" y planos del proyecto y será responsable de las reparaciones sin costo adicional para el Gobierno.

8.2. Se deberán devolverse el permiso completo a la oficina de Geobase tras la finalización de los trabajos de excavación. Si se encontraran instalaciones adicionales (o instalaciones marcadas no fueran encontradas en su ubicación esperada), el solicitados deberá proveer un plano as built a la oficina de Geobase detallando la ubicación exacta de todas las instalaciones que no han sido encontradas en el lugar esperado.

9. SERVICIOS DE LA BASE:

9.1. El contratista, a su cargo y en coordinación con el Oficial de Contrataciones, deberá instalar y mantener todas las conexiones temporales y líneas de distribución. Previo a la aceptación final de los trabajos por parte del Gobierno, el Contratista deberá eliminar todas las conexiones temporales, las líneas de distribución, y los accesorios asociados.

9.2. Uso de los Servicios de la Base: Los servicios de agua, saneamiento y electricidad de la

Base podrán estar a disposición del Contratista cuando sea posible y sus consumos sean razonables para el suministro a los siguientes edificios: oficinas, aseos, áreas de descanso y laboratorios. Si no hubiera disponibilidad y el Contratista las necesitara, el Contratista deberá proveerlas sin coste adicional para el Gobierno.

11/235

01 11 01 -3

Otros servicios, a parte de los enumerados a continuación, serán suministrados por el contratista sin costo para el Gobierno.

Los siguientes servicios estarán disponibles desde los servicios de la Base:

1. Electricidad: 120/208 Voltios, 60 Hz.

2. Agua no potable.

9.3. Conexión y desconexión de los servicios de la Base: En los 15 días naturales a partir de la fecha de notificación de inicio de las obras (NTP), el Contratista solicitará la desconexión y conexión e indicará:

1. Tipo de servicio afectado

2. Tipo de conexión y/o desconexión a realizar

3. Uso del servicio

4. Consumo requerido

5. Duración máxima

Todos los trabajos de conexión y desconexión de los servicios de la base deberán estar programados entre las 08:30 y las 16:00 (entre 08:30 y 15:00 durante el periodo desde el 15 de

Julio hasta el 15 de septiembre) de lunes a viernes, excepto en vacaciones. Las conexiones y desconexiones de las instalaciones pueden ser consideradas críticas para el Gobierno, en cuyo caso deberán ser realizadas en la fecha y hora más conveniente para el Gobierno, por ejemplo, fines de semana y/o durante horario nocturno, sin coste adicional para el Gobierno. El Contratista deberá ser responsable de realizar las conexiones y desconexiones, conversiones y transporte de la instalación de la Base al lugar de trabajo, incluyendo el suministro e instalación de mecanismos de que prevengan el reflujo de agua al servicio de la Base (Backflow Preventers) y el suministro e instalación de transformadores, si es requerido. El contratista no deberá activar o alterar ningún elemento de control, incluyendo agua, saneamiento y electricidad. EL gobierno será el encargado de la operación de estos sistemas. El contratista deberá entregar solicitudes adicionales al Manager de Construcción con un mínimo de 15 días naturales de antelación a la fecha estimada para las conexiones, desconexiones o maniobras requeridas de la instalación afectada. Conexiones temporales aéreas están prohibidas. Todos los servicios deberán ser restablecidos a su condición original previo a los pagos finales contractuales.

9.4. Corte de los servicios de la Base: cuando sea necesario un corte de servicios, el

Contratista lo solicitará al menos 15 días naturales antes del trabajo e indicará:

1. Tipo de servicio afectado

12/235

01 11 01 -4

2. Tipo de corte a realizar

3. Duración máxima

10. TRABAJOS DE SOLDADURA: El Contratista presentará para su aprobación una solicitud por escrito a Inspección de Obras con 15 días naturales de antelación para cualquier trabajo de soldadura, como la soldadura autógena o corte con chorro de plasma. Dicha solicitud indicará los procedimientos de soldadura y las medidas de prevención de incendios. Todos los trabajos de soldadura realizados durante la ejecución del proyecto sólo se llevarán a cabo por soldadores cualificados solamente. Las copias de los certificados de los soldadores, emitidos por una agencia aprobada, se mantendrán en los archivos del inspector de construcción.

11. TRÁFICO DE VEHÍCULOS, MAQUINARIA Y EQUIPOS

11.1. Plan de Control de tránsito: Todas las obras que requieren la interrupción del tráfico de vehículos o peatonal en la Base requerirá un plan de control de tránsito aprobado.

Dicho plan deberá ser aprobado al menos con 15 días naturales de antelación a dicha interrupción. Se incluirá:

1. Fecha de inicio de la interrupción del tráfico.

2. Duración de la interrupción del tráfico.

3. Rutas alternativas propuestas.

4. Señales, barreras, conos, banderas y/o persona que señaliza (señalero) a implementar.

El Contratista establecerá procedimientos alternativos si ocurrieran circunstancias imprevistas.

La responsabilidad de suministrar, erigir, mantener y retirar todas las señales, barreras, conos, banderas será exclusivamente del Contratista. Una vez finalizadas las obras, el Contratista retirará los elementos de señalización, como las señales, barreras, conos y/o banderas.

11.2. Plan de Rutas de Acceso: 10 días naturales a partir de la fecha de notificación de inicio de las obras (NTP), el Contratista presentará un plan de rutas de acceso a Inspección de

Obras para su aprobación por el Oficial de Contratación o representante autorizado.

11.3. Camiones: Los camiones cargados con materiales sueltos (polvo volátil, escombros u objetos que pudiesen caer de los mismos) irán debidamente cubiertos. Dichas cubiertas (lonas, etc.) estarán sujetas de forma segura y se colocarán sobre la carga antes de acceder a las calles de la Base.

12. ALMACENAJE:

13/235

01 11 01 -5

12.1. Áreas de almacenaje de material demolido/desmontado: El contratista deberá transportar el material demolido o excavado a un vertedero autorizado. En caso de que algún taller de la Base

Aérea de Morón necesitara todo o parte de material procedente de las operaciones de demolición

(hormigón, árido o suelo natural), el representante del Oficial de Contrataciones deberá coordinar con la Oficina de Construction Management sobre la ubicación exacta donde almacenar dicho material.

12.2. Área de almacenaje para el material del contratista y las oficinas del Contratista: El representante del Oficial de Contratación deberá coordinar con la oficina de Construction

Management la ubicación exacta para las oficinas del Contratista y el almacenaje de material.

13. PROGRAMA DE CONSTRUCCIÓN:

13.1. Deberá ser responsabilidad solo del Contratista asegurar que todas presentaciones requeridas son entregadas para aprobación en tiempo y forma, no debiéndose producir retrasos en el desarrollo del proyecto. Para materiales o equipos que requieran más tiempo de obtención y envío, ese tiempo deberá estar incluido en el periodo de ejecución de los trabajos. Retrasos en envío/obtención de materiales no justificarán una extensión en el periodo de ejecución.

13.2. El contratista deberá presentar un Programa de Construcción (Construction Schedule) no más tarde de 7 días naturales tras la fecha Notificación de Inicio (CNTP) y cuando sea requerido por el Oficial de Contrataciones o su representante autorizado. EN ningún caso se requerirá al contratista que presente una actualización con mayor frecuencia de 20 días de trabajo.

13.3. El Programa de Construcción deberá incluir un diagrama de Gantt mostrando cada tarea, incluyendo descripción de las tareas, número de identificación, duración en días de calendario, comienzo más temprano y fechas de finalización, tareas predecesoras y sucesoras y número de identificación, camino crítico y tiempos que una tarea puede retrasarse sin causar retrasos en la siguiente tarea o en la fecha de finalización del proyecto. El camino crítico deberá mostrarse con una línea roja, y el tiempo libre entre tareas con una línea negra tras la tarea predecesora.

13.4. El Programa de Construcción deberá mostrar la semana completa, de lunes a domingo. Los días laborales deberán ser de lunes a viernes. Sábados y domingos deberán ser días no laborales. Las vacaciones no deberán incluirse en el Programa de Construcción y, por tanto, deberán considerarse días laborales a efectos solo del Programa de Construcción.

13.5. El Programa de Construcción deberá desarrollarse asumiendo jornadas de trabajo de 8 horas por día de trabajo.

13.6. El Programa de Construcción deberá incluir las siguientes tareas si se requiere:

13.6.1. Tareas preconstructivas:

1. Preparación y presentación de las presentaciones de seguros y fianzas

14/235

01 11 01 -6

2. Preparación, presentación y aprobación de las presentaciones que se muestran en el documento Resumen Muestras de Material (Schedule of Materials Submittals) (Plan de Movilidad, Plan de Control de Calidad, Inspección Pre-Final / Final, Plan de

Seguridad y Salud, etc.).

3. Adquisición, fabricación y transporte al sitio de materiales y equipos que requieren largo período de fabricación/transporte/ensamblaje/adquisición.

4. Instalación de edificios modulares/temporales (aseos, vestidores, salas de comida, primeros auxilios, oficinas, si es requerido).

5. Instalación de conexiones temporales de los edificios modulares/temporales a los servicios de la base.

6. Instalación de vallado temporal y malla de plástico en el perímetro del área asignada para el Contratista (almacén de equipo y material, zona de aparcamiento de vehículos, casetas temporales, zona de vertido, si se requiere).

7. Instalación del cartel de proyecto.

8. Instalación del vallado Jersey temporal llenado de agua, vallado, malla de plástico, conos e iluminación en el perímetro de la zona de construcción.

9. Instalación de señalética ocupacional de seguridad y salud (prohibición, obligación, advertencia, socorro, prevención de incendios, peligro, cuadro de indicaciones) en el área asignado para el Contratista.

10. Instalación de señalética temporal de seguridad y salud en el área de construcción.

13.6.2. Tareas de Construcción:

1. Las tareas de construcción mostradas en el AF Form 3052, Estimación de

Costes, incluyendo tests, tiempo de curado y de presentación de recibos de vertido de los residuos de construcción, y aprobado de los tests de campo.

13.6.3. Tareas de terminación:

1. Tests requeridos.

2. Comisionado.

3. Inspección prefinal, incluyendo la solicitud.

4. Corrección de deficiencias.

5. Inspección final, incluyendo solicitud.

15/235

01 11 01 -7

6. Retirada de señalética ocupacional de seguridad y salud en el área de construcción.

7. Retirada de vallado Jersey temporal llenado de agua, vallado, malla de plástico, conos e iluminación en el perímetro de la zona de construcción.

8. Limpieza final.

9. Retirada de señalética temporal, barreras, conos y banderas en las rutas de tránsito.

10. Retirada del cartel de proyecto.

11. Retirada de señalética provisional de seguridad y salud en el área asignado al contratista.

12. Retirada de conexiones temporales a los servicios de la base, incluyendo emisión de solicitud de desconexiones y el aprobado del gobierno.

13. Retirada de casetas temporales de obra.

14. Retirada del vallado temporal y malla de plástico en el perímetro del área asignada al contratista.

15. Restitución del área asignada al contratista.

16. Preparación y emisión de la presentación de inventario de los materiales y equipos sobrantes importados duty-free para ser usados bajo el contrato.

17. Preparación y emisión de planos As-Built.

18. Preparación y emisión de presentación de documento spatial data.

19. Preparación y emisión de presentación de carta de garantía.

20. Preparación y emisión de de presentación de certificado de vertedero autorizado sobre vertidos estimados de residuos de construcción durante la ejecución del proyecto.

21. Aprobado de presentaciones.

22. Cierre del proyecto.

14. PROGRAMA DE AVANCE DE OBRA (formulario AF 3064): En los 10 días naturales a partir de la fecha de notificación de inicio de las obras u en otro período de tiempo determinado por el Oficial de Contratación, el Contratista desarrollará y presentará un

16/235

01 11 01 -8 programa viable de avance de obra a Inspección de Obras para su aprobación por el Oficial de Contratación o representante autorizado. El plan mostrará:

1. Secuencia de actividades que el Contratista propone para ejecutar el trabajo

2. Fechas propuestas por el Contratista para el inicio y finalización de los trabajos más significativos (incluyendo la adquisición de materiales, plantas y equipos)

El programa de avance de la obra será entregado en formato de gráfico de línea a una adecuada escala indicando el porcentaje del trabajo programado cada 15 días naturales para su ejecución durante el periodo de ejecución. Los trabajos programados corresponderán a las partidas del coste estimado del contrato. Si el Contratista no presentara el programa de avance de la obra en el período establecido, el Oficial de Contratación podrá retener la autorización del pago de las certificaciones hasta que el Contratista entregue el programa de avance requerido.

15. INFORME DE PROGRESO (AF Form 3065): Cada 15 días naturales se deberá enviar a la oficina de Construction Management de acuerdo con el anteriormente presentado Programa de Avance de Obra AF Form 3064. Si el Contratista fallara en la presentación del Informe de

Progreso en el periodo establecido, el Oficial de Contrataciones podrá retener la aprobación de los pagos hasta que el Contratista presente el requerido Informe de Progreso.

16. PLAN DE TRABAJO

16.1. El Contratista deberá presentar un Plan de Trabajo no después de 7 días de calendario tras la fecha de Notificación de Inicio (CNTP). El Plan de Trabajo deberá presentar las actividades de construcción que se planean llevar a cabo. El Plan de Trabajo deberá prepararse en coordinación con el Plan de Seguridad y Salud y el Plan de Control de Calidad, y deberá contener lo siguiente:

1. Resumen de metodología de trabajo propuesta para la ejecución de cada tarea requerida para la terminación de los trabajos

2. Recursos que se precisarán para la ejecución de cada tarea requerida para la terminación del proyecto, describiendo el equipo y personal a disponer.

3. Producción diaria para cada tarea requerida para la finalización del proyecto.

17. PLAN DE MOVILIDAD: El contratista deberá presentar un Plan de Movilidad a la oficina de

Dirección de Obras para su aprobar por el Oficial de Contrataciones o su representante autorizado.

Dicho plan deberá contener:

1. Ubicación y área de trabajo

2. Ubicación y área de oficinas

3. Ubicación y área de zona de aparcamiento

4. Ubicación y área de almacenaje de material

17/235

01 11 01 -9

El contratista deberá incluir en el Plan de Movilidad el sistema propuesto para alimentar las instalaciones requeridas en cada lugar.

17.1. Vallado del área de construcción: El área de construcción, oficinas, zona de aparcamiento, aseos y zonas de acopio de material deberá vallarse mediante un vallado perimetral de 2 metros de alto, con puertas y cerraduras, a menos que se apruebe lo contrario por el Gobierno. El Oficial de

Contrataciones o su representante aprobado, deberá especificar el tipo de vallado, altura y color. El vallado deberá estar tapado con una malla opaca verde para prevenir la vista del interior desde el exterior. El vallado y la malla deberán estar adecuadamente ancladas en el arranque y en la parte superior, para evitar que se caigan durante fuertes rachas de viento. El Contratista deberá incluir en el Plan de Movilidad:

1. Fotos, catálogo o muestras del vallado a usar

2. Fotos, catálogo o muestras de la malla a usar

El Contratista no deberá proceder con la instalación de valla y malla hasta que se aprueba por escrito el plan por el Oficial de Contrataciones o su representante autorizado. La responsabilidad de disponer, erigir, mantener y retirar todo el vallado y mallas será únicamente del Contratista. El

Contratista deberá reemplazar o reparar, en las 24 horas siguientes o según determine el Oficial de

Contrataciones o representante autorizado, todo vallado o secciones de malla que han sido dañadas o deterioradas. Una vez los trabajos hayan finalizado, el Contratista deberá retirar todo el vallado y mallas.

17.2. Oficinas: Las casetas temporales prefabricadas requeridas para cuestiones administrativas

(espacios de oficinas, salas de reuniones y salas de descanso) deberán estar en buenas condiciones.

Las casetas prefabricadas que requieran pintura, reparaciones o que estén en malas condiciones no serán permitidas. Dichas casetas temporales deberán mostrar una placa en el exterior de 0,5x0,5 metros de dimensiones máximas indicando nombre de la empresa y teléfono de contacto de la persona designada como punto de contacto para el Contratista. Una vez que los trabajos se hayan terminado, el Contratista deberá retirar todas las casetas temporales.

17.3. Aseos: Las casetas prefabricadas requeridas para el aseo del personal deberán estar en buenas condiciones. Las casetas prefabricadas que requieran pintura, reparaciones o que estén en malas condiciones no serán permitidas. Estas casetas deberán mantenerse en perfectas condiciones de uso y sanitarias, deberán ser tratadas para evitar insectos, y deberán vaciarse y limpiarse con útiles de limpieza por higiene al menos una vez a la semana. La frecuencia de vaciado y limpieza deberá ajustarse según las necesidades. La caseta temporal deberá ubicarse a no menos de 50 metros de algún edificio de la base si no pudieran ubicarse cerca de un pozo de saneamiento. Una vez los trabajos hayan finalizado, el Contratista deberá eliminar todas las instalaciones temporales y deberá dejar el área limpia e higienizada.

17.4. Aparcamiento: El Contratista y sus empleados y subcontratistas deberán aparcar sus vehículos, incluidos vehículos pesados, vehículos de obra y vehículos personales en áreas donde no supongan una obstrucción en el lugar de trabajo. Se deberá maximizar la ubicación de los vehículos en áreas donde no puedan ser vistos desde el exterior.

18/235

01 11 01 -10

17.5. Almacenaje de material: Los contenedores de almacenamiento deberán estar en buenas condiciones. El almacenamiento de material, en contenedores o no, en el lugar de trabajo, serán a cuenta y riesgo del Contratista. El uso de guardias de seguridad en el área de trabajo requerirá de previa aprobación por parte de la Fuerzas de Seguridad de la Fuerza Aérea Española. El Contratista no deberá usar el área de trabajo para almacenar material. Una vez los trabajos hayan finalizado, el

Contratista deberá retirar el exceso de materiales almacenados.

18. CARTEL DEL PROYECTO: Antes de 15 días tras la notificación de inicio (CNTP), el

Contratista deberá instalar un cartel de identificación del proyecto de acuerdo a la figura 1, no después de un día tras la finalización del vallado de obra. El cartel deberá montarse en postes de madera de 10x10cm como mínimo, anclados al terreno de manera adecuada. La ubicación de la señal deberá ser determinada por el Oficial Contratante o su representante. Durante la limpieza final de la zona de trabajo, el cartel, postes y sistema de anclaje deberán ser retirados. A menos que se indique lo contrario, el cartel deberá tener fondo negro, con letras en azul oscuro.

FIGURA 1: CARTEL DEL PROYECTO

19. PLAN DEL CONTROL DE CALIDAD: En los 15 días naturales a partir de la fecha de notificación de inicio de las obras y tras la aprobación del Programa de Obras, el Contratista presentará para su aprobación un completo Plan de Control de Calidad en inglés y español, que podrá ser consultado por los trabajadores en las oficinas del Contratista en la obra.

19.1. El plan contendrá como mínimo lo siguiente:

19/235

01 11 01 -11

1. Nombres y titulaciones del jefe de control de calidad e inspectores propuestos.

2. Organigrama. Incluir los socios colaboradores/subcontratistas principales, si fueran requeridos, para los trabajos requeridos. Los socios colaboradores/subcontratistas indicados serán aquellos que activamente participarán en el proyecto y serán los mismos que los presentados en la licitación del contrato. La falta de esta información o variación con los socios colaboradores/subcontratistas principales presentados con anterioridad será motivo para la desaprobación del Plan de Control de

Calidad (QC). En este caso, el Contratista ha de presentar uno nuevo antes de que los trabajos comiencen.

3. Responsabilidad de los Inspectores de Control de Calidad, Jefe de Control de Calidad y Jefe de Obra.

4. Tipo de inspecciones a realizar. El Contratista desarrollará completamente un Programa de Puntos de Inspecciones que cubra todos los tipos de trabajos involucrados en el proyecto. El desarrollo del Programa de

Puntos de Inspecciones estará basado en todos y cada uno de los documentos siguientes:

a. Planos del proyecto y especificaciones.

b. Regulaciones, códigos de industria y estándares aplicables.

c. Regulaciones específicas para ciertos productos, instalaciones o infraestructuras.

d. Recomendaciones del fabricante.

El tipo y número de Puntos de Inspecciones serán los requeridos para obtener un aceptable nivel de inspección para conseguir los mejores resultados de calidad. El

Oficial de Contratación o representante autorizado evaluará si el tipo y número

Puntos de Inspecciones son suficientes para obtener el nivel de calidad aceptable.

5. Procedimientos de inspección y medidas a tomar en caso de inspecciones fallidas o insatisfactorias.

6. Formulario de Informes de Inspección: Presentar todos los formularios de informes para cada tipo de inspección a realizar en este proyecto. Como mínimo, un formulario específico será desarrollado por cada sección de las especificaciones, cubriendo todos los puntos de inspección necesarios para dicho trabajo. La información mínima requerida para cada Punto de

Inspección será:

20/235

01 11 01 -12

a. La descripción del Punto de Inspección

b. Documentos aplicables

c. Tipo y frecuencia de la inspección

d. Lote aplicado para la inspección

e. Responsable de la inspección realizada

f. Resultado de la inspección

g. Fecha de la inspección

h. Referencia del documento/registro de incumplimiento, si no lo cumpliera

i. Información sobre el criterio de cumplimiento/incumplimiento para los Puntos de Inspecciones,

j. Otros

7. Lista de "Puntos de Inspecciones Pendientes" programados con las fechas estimadas del programa de construcción

8. El formulario "Resumen Muestras de Material" del proyecto con la columna titulada "Fecha de Entrega" cumplimentada por el Contratista con las fechas estimadas por el Contratista para la presentación del ítem correspondiente. Dichas fechas estimadas estarán basadas en los plazos para la entrega y revisión de las presentaciones y "re-presentaciones", los plazos para las compras, adquisiciones y recepciones en obra de los ítems , el Programa de Obras aprobado del Contratista y la fecha de finalización del contrato (ver cláusula 30, Presentaciones de Materiales, Equipos y

Planes). Si el Programa de Obras se modificara, el Contratista actualizará el formulario "Resumen Muestras de Material"

9. Solicitud de Información (RFI). Presentar el formulario de Solicitud de

Información y el formulario de registro de RFI (RFI Log Form) a utilizar.

Esto será utilizado para presentar y registrar cualquier "RFI" durante la

10. Ensayos de Materiales: Facilitar el nombre y cualificación del laboratorio o agencia de ensayos de materiales que se planee utilizar para los ensayos.

Todos los informes de los ensayos serán presentados a tiempo para su revisión y aprobación. La actividad de trabajo relacionado con estos

21/235

01 11 01 -13 ensayos sólo podrá continuarse cuando el informe de ensayos haya sido aprobado. Si algún ensayo fallase, no se ejecutarán las actividades de trabajo siguientes hasta que dicho fallo haya sido corregido. El Jefe de

Control de Calidad del Contratista será responsable de comprobar que todos los informes sean revisados por él y de adoptar las acciones necesarias para resolver cualquier ensayo fallido.

11. Realizar informes diarios de todas las actividades realizadas durante la vigencia del contrato. Estos informes diarios se mantendrán en el emplazamiento de la obra y estarán disponibles para su revisión en todo momento. Semanalmente se presentará una copia de los informes diarios realizados de lunes a viernes (o domingo si el Contratista trabaja durante el fin de semana) a Inspección de Obras. En el informe diario se incluirá, al menos, lo siguiente:

a. Fecha de la inspección

b. Condiciones climatológicas

c. Inspección de los equipos, materiales entregados en el emplazamiento de la obra y sus fechas de entrega

d. Nombre de las personas que hayan visitado el emplazamiento de la obra y fecha de la visita

e. Inspección de las deficiencias encontradas durante el día y acciones correctivas adoptadas

f. Inspección y aceptación de los materiales y mano de obra

g. Trabajo realizado durante el día, incluyendo el personal y equipo utilizado.

h. Cualquier cambio o modificación aprobado por el

Oficial de Contratación.

Nombre de los archivos electrónicos de los informes diarios. Cada Informe Diario deberá ser llamado como se indica en este párrafo, de no realizarse así, el informe diario será rechazado y el

Contratista ha de volver a presentarlo. Los nombres de los archivos de las Informes Diarios tendrán el formato siguiente: XX-X-XXXX, YY-YYYY, Daily Report, from ZZZZ WW VV to SSSS UU

TT, donde:

1. XX-X-XXXX representa los siete últimos dígitos del contrato, después de retirar los primeros dígitos “FA5575-".

22/235

01 11 01 -14

2. YY- YYYY representa el número del proyecto

3. ZZZZ representa el año en el que se hace la inspección del lunes

4. WW representa el mes en el que se hace la inspección del lunes

5. VV representa el día en el que se hace la inspección del lunes

6. SSSS representa el año en el que se hace la inspección del último día del período semanal (viernes o domingo)

7. UU representa el mes en el que se hace la inspección del último día del período

8. TT representa el día en el que se hace la inspección del último día del período

19.2. Aceptación del Plan de Control de Calidad de Construcción: Se requiere la aceptación del

Plan de Control de Calidad antes del comienzo de la obra. El Oficial de Contratación se reserva el derecho de requerir cambios en el plan de control de calidad, operaciones y personal clave, incluyendo la destitución del personal, para asegurar la calidad de trabajo especificada.

19.3. El Contratista será responsable de mantener los registros.

20. TEST DE LABORATORIO:

20.1. Laboratorio: Todos los muestreos y tests deberán realizarse por un laboratorio aprobado, independiente el Contratista, acreditado de acuerdo con la UNE-EN 9001:2000 y registrado por la Junta de Andalucía para los tests a realizar. El laboratorio deberá ser responsable de realizar el control de calidad completo del proyecto, como consultas, y deberá dar asistencia técnica que pueda requerirse.

20.2. Tests de Laboratorio: Los tests de laboratorio realizados más de 6 meses antes de la presentación no serán aceptados.

21. INSPECCIONES PRE FINAL Y FINAL: Las inspecciones pre-final y final serán llevadas a cabo conjuntamente por el Contratista, el inspector del Gobierno y un representante de la Oficina de Contratación. El Contratista solicitará una inspección pre-final una vez que se hayan finalizado todos los trabajos a juicio del inspector. Tras la resolución de las discrepancias halladas durante la inspección pre-final, si las hubiera, el Contratista solicitará una inspección final. Todos los ítems de la lista de discrepancias han de haber sido completamente arreglados antes de la recepción final de los trabajos del proyecto. El Contratista solicitará a Inspección de

Obras la inspección pre-final o final con al menos 15 días naturales de antelación a la fecha deseada.

23/235

01 11 01 -15

22. JORNADA LABORAL:

22.1. Horario de trabajo: El contratista llevará a cabo todo el trabajo durante las horas normales de trabajo a menos que el Oficial de Contrataciones o su representante autorizado emitan una autorización especial para desviarse del plan de trabajo. El horario de trabajo será de 8:00 a

17:00 de lunes a viernes, excepto festivos.

22.2. Horario especial: Si el Contratista desea trabajar fuera de las horas normales de trabajo, los sábados, los domingos o los festivos, deberá presentar una solicitud al Oficial de contrataciones con al menos 10 días de antelación.

23. CONSERVACIÓN Y MANTENIMIENTO DE LAS INSTALACIONES EXISTENTES:

Antes del inicio de cualquier actividad de trabajo, el Contratista realizará una inspección de las instalaciones existentes en el emplazamiento de la obra, o adjuntas al mismo, así como de los pavimentos propuestos por el Contratista en el Plan de Control de Tránsito y en el Plan de Rutas de Acceso. El Contratista presentará un informe por escrito, adjuntando fotografías, a Inspección de Obras de todos los defectos hallados durante dicha inspección. El Contratista reparará, sin cargo adicional para el Gobierno y antes de la recepción final de los trabajos del proyecto, todos los defectos de las instalaciones y/o pavimentos existentes que no se hayan incluido en el informe o se hayan deteriorado aún más por negligencia del Contratista o por el uso de las instalaciones y/o pavimentos por parte del Contratista. Estas reparaciones se completarán por parte del Contratista sin coste adicional para el Gobierno, y antes de la aceptación final del proyecto.

24. PLAN DE PROTECCIÓN MEDIOAMBIENTAL: En los 15 días naturales a partir de la fecha de notificación de inicio de las obras (NTP), el Contratista presentará a Inspección de

Obras para su aprobación por el Oficial de Contratación o representante autorizado un Plan de

Protección Medioambiental, en versiones inglesa y española, que podrá ser consultado por los trabajadores en las oficinas del Contratista en la obra. El programa cumplirá las siguientes normativas española e incluirá, sin estar limitado a, lo siguiente.

24.1. Integrated Natural Resources Management Plan for Morón Air Base (2015 - 2020)

24.2. Final Environmental Governing Standards for Spain, May 2014

24.3. Conservación y Mantenimiento de la Vegetación Existente: El Contratista conservará y protegerá la vegetación (árboles, arbustos, césped) existente en el emplazamiento o adyacente al mismo, que no tenga que ser retirada o no tenga que ser afectada por los trabajos requeridos por este contrato. El Contratista sólo retirará los árboles y/o arbustos específicamente identificados en las especificaciones y planos y evitará dañar la vegetación restante. Si se parte alguna rama de algún árbol durante la ejecución de los trabajos por el manejo de los equipos o por algún descuido de los obreros, el Contratista podará aquellas ramas afectadas con un corte limpio y aplicará a dicho corte una pasta de podar. El Contratista cortará el manto vegetal y/o césped del

24/235

01 11 01 -16 emplazamiento de forma que no exceda los 10 cm de altura. El Contratista restaurará, sin coste adicional para el Gobierno, a su estado original la zona afectada durante la ejecución de la obra antes de la recepción final de los trabajos del proyecto.

24.4. Limpieza del Emplazamiento: El Contratista retirará los escombros, materiales de desecho y…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .