Schedule C Specification.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- Road Spray Patcher, Trailer Mounted
- Solicitation number
- RFP 171 180000002508 1
- Issued by
- Michigan
About this file
This file is a Schedule C Specification document issued by the Missouri Department of Transportation (MDOT) for three separate roadway equipment trailer requests under RFP Department 171, Number 180000002508. The specifications detail requirements for three distinct pieces of equipment: (1) a Spray Injection Patch Trailer (Specification C36-0501.18), referenced to a Dura Patcher P2 model; (2) a Roadway Spray Crack Sealer Trailer (Specification C36-0026.18), referenced to a Crafco 47600SC100 E-Z Series II 1000 SC Melter Applicator; and (3) a Roadway Asphalt Recycler Trailer (Specification C36-0401.18), referenced to a KM International KM T-2 Asphalt Recycler. All equipment shall be new, latest model, in current production with all standard features included. Contractors are required to respond to each specification section with "YES" or provide detailed explanations and alternative options if unable to meet specifications.
Each specification contains comprehensive technical requirements organized by functional system. The Spray Injection Patch Trailer requires a 250-gallon ASME-certified pressure tank with electric blanket heating, diesel engine rated at no more than 74 horsepower, and a spray delivery system with three-section boom. The Spray Crack Sealer Trailer specifies a 265-gallon double-boiler jacketed tank, 48-horsepower Tier IV Final diesel engine, 100 CFM air compressor, and hydraulic-driven bi-directional variable speed pumping unit with heated enclosed chamber. The Asphalt Recycler Trailer requires a unit capable of recycling up to 4 tons per hour with hydraulically controlled heating drum, 700,000 BTU burner capacity, and minimum 21.6 BHP diesel engine. All three trailers require electric brakes with breakaway protection, dual axle suspension systems, 7-way Berg type connectors with MDOT-compliant wiring, LED lighting, and Dupont paint specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Proposal Instructions and Vendor Questions Worksheet.docx | DOCX document | |
| Schedule F - SIGMA Catalog Template.xlsx | XLSX spreadsheet | |
| Schedule E Trailer Wiring Diagram.pdf | ||
| Schedule D Prosperity Regional Map.pdf | ||
| Standard Contract Terms.docx | DOCX document | |
| Schedule A - Statement of Work.docx | DOCX document | |
| Schedule B Pricing.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
#1 - Spray Inj. Patch Trailer
| RFP Dept. 171, No. 180000002508 | |
| #1 - Specification # C36-0501.18 Roadway Spray Injection Patch Trailer |
All items specified and furnished by the Contractor shall be new of the latest model in current production and shall include all standard features normally offered with these models CONTRACTOR must respond to each section with YES. (or additional information as requested)
If NO is indicated provide explanation and available option.
Referenced Make and Model: Dura Patcher, P2 Contract to to identify proposed make and model
| Brands or trade names are for identification purposes only and do not limit the Contractor to such brands | Make and Model | |
| 1.0 | Basic Requirements: | |
| 1.1 | Spray Injection design with aggregate supplied from tow vehicle by gravity feed tube. | |
| 1.2 | Trailer mounted and rated for highway use. | |
| 1.3 | Diesel powered with engine enclosure. | |
| 1.4 | Electric blanket heated emulsion tank. | |
| 1.5 | Emulsion working capacity of 250 gallons. | |
| 1.6 | Overnight electric heating for maintaining emulsion temp. | |
| 2.0 | Emulsion heating and storage: | |
| 2.1 | The tank must be a pressure vessel and be ASME certified | |
| 2.2 | The tank shall have 250 gallon capacity, 200PSI working pressure at 500 degrees | |
| 2.3 | Insulation shall be minimum R15 rated fiberglass insulation | |
| 2.4 | Loading hatch shall have a minimum filler opening of 12” and be equipped with t-bolt closures. | |
| 2.5 | Clean out valve shall be minimum of 3” and will be installed at the bottom of the tank. | |
| 2.6 | Tank will be wrapped with 2 electric blankets for overnight heating. Min. 1500W x (2) 120VAC. A thermostat and overnight heating extension cord will be included. Heating probes will not be considered for alternate as they do not allow tank pre heating and 100% use of emulsion tank volume. | |
| 2.7 | System must be capable of maintaining heat so as to allow operation of patcher in ambient temperatures as low as 5 degrees Fahrenheit. | |
| 3.0 | Delivery System: | |
| 3.1 | Trailer mounted hopper with integral screen with opening for slide gate | |
| 3.2 | Slide gate shall be air operated with min 4” stroke air ram. | |
| 3.3 | Venturi shall be designed to draw aggregate into air stream. Must have access panel. | |
| 3.4 | Aggregate delivery tube shall be a minimum 3.5” ID schedule 40 pipe 10 ft. in length. Designed to be rotatable for maximum life | |
| 3.5 | Aggregate delivery hose will be min. 3.5” ID. Non-kinking, plastic wire reinforced rubber neoprene-lined hose with a min. length of 164”. | |
| 3.6 | The delivery boom shall be a three section device that allows the operator to move throughout its full radius using only very light force from one hand, and shall be adjustable for height. | |
| 3.7 | The boom design must keep the boom and the operator well out of the adjoining lane and the operator must be capable of placing the nozzle tip on the center stripe of a multi-lane roadway without any portion of the boom, or the operator, intruding over the center stripe. | |
| 3.8 | A 12 volt pump shall circulate heat transfer oil through a pipe inside the emulsion tank and min. 3/8" diameter lines the full length of the hose to the emulsion nozzle, then back. All parts including: emulsion valves, hose, and nozzle will be heated by this hot fluid heating system | |
| 3.9 | The nozzle shall be designed so it diffuses/slows down the air stream at the tip to minimize overspray. The emulsion nozzle will be slotted to create a single fan of emulsion to properly coat the aggregate. The nozzle will be low voltage DC heated to prevent material build up during cold weather operation. | |
| 4.0 | Engine: | |
| 4.1 | The unit will be equipped with a water cooled direct injected, diesel engine. The engine will have spin-on type oil and fuel filters. Rubber isolation engine mounts are required | |
| 4.2 | The engine will be protected with an engine enclosure that is certified by the manufacturer. |
It will be lockable for security and provide noise reduction for operator safety The Contractor will provide a set of (3) keys
| 4.3 | Auto shutdown protection will be provided for alternator, oil pressure coolant temperature. An hour meter and RPM gauge will be included. | |
| 4.4 | The engine will be rated at no more than 74HP and be able to operate the delivery system to fill a patch with 1/4” stone @ 1100 RPM and 1 ½ “ stone at no more than 1800 RPM | |
| 4.5 | Engine cover will enclose engine, battery and air compressor. | |
| 4.6 | Engine controller must be accessible without having to open engine cover and contain the Hour Meter, RPM Gauge and shutdown for Oil, Water and Battery | |
| 4.7 | The unit will include a minimum 18 gallon diesel fuel tank | |
| 5.0 | Emulsion Flush System: | |
| 5.1 | A minimum 13 gallon pressurized vessel will be included for flushing of emulsion lines and nozzle after use. It shall be equipped with a pressure relief valve set at 110 PSI. | |
| 5.2 | A clean out container will be mounted to the frame of the machine. At end of shift, operator will place wand in container to flush emulsion lines and nozzle. No disassembly and soaking of any part of the emulsion system will be necessary. The entire nozzle clean out procedure may not get emulsion or diesel on the operator. No system using a pump will be accepted. | |
| 6.0 | Blower and Air Compressor: | |
| 6.1 | Blower will be rated at min. 450 CFM @ 7psi @ 1500 RPM | |
| 6.2 | Lobe style blower direct driven off patcher engine. | |
| 6.3 | Pop off valve set to 12 psi for protection. | |
| 6.4 | Dual stage heavy duty filter element on blower intake. | |
| 6.5 | Air muffler to reduce airflow noise required. | |
| 6.6 | Compressor to be 15CFM minimum pressure relief to be set to 95psi | |
| 6.7 | No conveyors, augers or pumps will be used in the aggregate or emulsion delivery systems. | |
| 7.0 | Paint and safety decals: | |
| 7.1 | The unit shall be painted Omaha Orange Dupont Acrylic paint. | |
| It will be equipped with required safety decals and signage | Identify safety decals and sinage equiped with |
proposed unit:
| 8.0 | Trailer: |
| 8.1 | The frame is to be constructed of minimum ¼” gusseted steel tube for safety and strength |
| 8.2 | A 3” towing ring that is adjustable in height from 15” to 30” high will be provided for lateral adjustability |
| 8.3 | Trailer will have radial tires, sized to accommodate the weight of the trailer, with a spare tire and wheel mounted to the trailer |
| 8.4 | Electric trailer brakes/ with brake away protection |
| 8.5 | The trailer shall have a dual axle leaf spring system and be rated at a GAWR (Gross Axle Weight Rating) of 12,000 lbs. |
| 8.6 | A directional arrow board will be mounted at the back of the machine and be selectable for left/right or both traffic control. |
| 8.7 | Fenders shall be a minimum of 12 gauge horizontal steel. |
| 8.8 | Tongue jack, rated to handle the capacity of the trailer/with caster wheel. |
| 8.9 | Provide a remote mounted camera assembly, to be shipped loose. |
Reference Make: ECCO Reference Model: # EC5605-WK, or equivalent
| Brands or trade names are for identification purposes only and do not limit the Contractor to such brands | Make & Model: | |
| 8.10 | Trailer Lights |
Will meet Federal guidelines for approved tail, stop and turn LED type AND, wired for turn signals independent of stop lights.
| 8.11 | Trailer Wiring Diagram, trailer connector shall be 7-way round pin Berg type , wired for turn signals independent of stop, compatible with trailers that have amber or side turn lamps, per MDOT standard trailer conector wiring diagram (Refer to Schedule E - Trailer Wiring Diagram). |
| 8.12 | All wires passing through holes in metal or non-metal wearing surfaces, which could cause wear of the insulation, shall be adequately protected by rubber or plastic grommets, and/or non-metal conduit. Ends of all wires shall be adequately anchored to prevent loosening. All wiring shall be properly secured to the trailer or engine by proper wiring hangers. |
MDOT to provide Contractor with wiring diagram
| 8.13 | All electrical connections shall be soldered and enclosed in heat shrink or in water tight junction blocks |
| 8.14 | Scotch locks and wire nuts are NOT acceptable |
END OF SPECIFICATION
#2 - Spray Crack Sealer Trailer
| RFP Dept. 171, No. 180000002508 | |
| #2 - Specification # C36-0026.18 Roadway Spray Crack Sealer Trailer |
All items specified and furnished by the Contractor shall be new of the latest model in current production and shall include all standard features normally offered with these models CONTRACTOR must respond to each section with YES. (or additional information as requested)
If NO is indicated provide explanation and available option.
Referenced Make and Model: Crafco 47600SC100: E-Z Series II 1000 SC Melter Applicator with Diesel fueled engine and 100 CFM Air Compressor Contract to identify proposed make and model
| Brands or trade names are for identification purposes only and do not limit the Contractor to such brands | Make and Model | |
| 1.0 | Basic Requirements: | |
| 1.1 | Melter applicator capable of heating and applying all grades of asphalt rubber sealant, asphalt fiber blends and specification hot pour crack and joint sealants. | |
| 1.2 | Trailer mounted and rated for highway use. | |
| 1.3 | Diesel powered with engine enclosure. | |
| 1.4 | Air Compressor shall provide 100 CFM @125psi | |
| 1.5 | Unit will be equipped with safety shut-off on loading doors that automatically stops the agitator when the lid is opened | |
| 1.6 | The heat transfer oil shall bring the sealant material to application temperature with out a heat transfer pump | |
| 2.0 | Material Heating Tank: | |
| 2.1 | The material tank shall be round with a capacity of 265 gallons | |
| 2.2 | Tank shall have rear discharge to the pump and rear outlet | |
| 2.3 | Tank shall be of a double boiler type jacket with an internal reservoir that hold 33 gallons of heat transfer oil | |
| 2.4 | The jacketed shall wrap around 100% of the outside of the material tank | |
| 2.5 | Tank and jacket shall be constructed with 3/16 inch rolled sheet steel | |
| 2.6 | Heating tank shall be insulated by a minimum of 1 1/2 - inch thick high temperature ceramic insulation and covered by 22 gauge steel outer wrapper. | |
| 2.7 | Tank shall be equipped with two low profile angled openings for material loading | |
| 2.8 | One opening shall be on the curb side for operator safety | |
| 2.9 | One opening shall be on the street side to allow the retrofit of a power loading system | |
| 2.10 | Material loading heights shall not be less than 56 inches | |
| 2.11 | Both openings will be 14 inches by 18 inches | |
| 2.12 | Both openings will be hinged at the bottom to allow the material to be placed on them and closure of the lids will be the method of loading the material | |
| 2.13 | All melter fluid tanks shall be located no lower than deck level | |
| 3.0 | Heating Oil System: | |
| 3.1 | Heating oil tank design shall provide a center tower with a minimum 18 inches in height to provide efficient and uniform product heating | |
| 3.2 | The tank shall be built to allow no more than 12 inch's from a heated surface | |
| 3.2 | A plug shall be provided to allow the entire heating oil system to be drained | |
| 3.4 | Heat transfer oils shall be ISO grade 68 | |
| 3.5 | A vented expansion tank shall be provided for the heat transfer oil | |
| 4.0 | Heating System: | |
| 4.1 | Provide a 290,000 BTU high efficiency forced air diesel fired burner at the bottom of the heat transfer tank | |
| 4.2 | Easily removable burner combustion box shall be provided | |
| 4.3 | The burner and combustion box will be insulated by high temperature flexible insulation that is resistant to damage from vibration and over the road travel | |
| 4.4 | Burner and combustion box shall be located toward the passenger side frame rail | |
| 4.5 | Ignition for the burner to be provided by a constant duty high voltage transformer, powering an electric spark ignitor | |
| 4.6 | Burner fuel system shall be self priming | |
| 4.7 | Burner fuel system shall be equipped with a shut off valve | |
| 4.8 | Burner fuel system shall have a removable in line filter with feed and return lines to the main tank | |
| 4.9 | Burner will be controlled by a thermostat control located on the rear curb side of the machine | |
| 5.0 | Control System: | |
| 5.1 | Integrated control system shall be provided to control engine, heating system, agitation system and application system | |
| 5.2 | Melter applicator shall have a thermostatic control that automatically regulates hot oil, material and hose temperature | |
| 5.3 | Control system shall have a digital readout and separate dial control for heat transfer oil, material and applicator temperatures | |
| 5.4 | Thermostatic burner control shall be provided to maintain a temperature range of 200 degrees F to 425 degrees F | |
| 5.5 | Single weather proof box shall be provided for temperature controls | |
| 5.6 | Controls will automatically start the agitation system when the material reaches 275 degrees F | |
| 5.7 | Controls will automatically start the hose heating system when the material temperature reaches 275 degrees F | |
| 5.8 | Controls will automatically start the application system when the hose temperature reaches 325 degrees F | |
| 5.9 | Controls will include an automated lock out of agitation system, hose heating system and application system when material temperature is below minimum operation temperature | |
| 5.10 | Burner will have an audible 105db alarm that will operate in the event the burner goes into a lock out mode | |
| 5.11 | A reset switch will be provided to reset the burner if it goes into a lock out mode | |
| 5.12 | Controller will run the engine at warm up RPM for 30 to 45 seconds, then will adjust to the standard engine idle RPM | |
| 5.13 | Controller will raise the engine to operation RPM once the sealant temperature reaches 275 degrees F | |
| 5.14 | Controller will automatically increase engine RPM if air compressor is activated before material reaches 275 degrees F | |
| 6.0 | Hydraulic System: | |
| 6.1 | A hydraulic pump shall be provided to power the agitation, pumping and compressor systems | |
| 6.2 | Hydraulic valves shall be solenoid operated by a toggle switch and wand handle switch | |
| 6.3 | Hydraulic controls will allow for bi-directional operation of sealant pump and agitator | |
| 6.4 | Flow control valve shall be located at rear of the unit to allow operator to adjust pump operational speed | |
| 6.5 | All controls will be mounted at the curb side rear of the trailer for operator operation | |
| 6.6 | Hydraulic tank shall have a minimum capacity of 30 gallons | |
| 6.7 | Hydraulic tank shall be equipped with an internal 10 micron full flow filter | |
| 6.8 | A filter restriction indicator will be provided | |
| 6.9 | Tank will incorporate a sight level gauge and an oil temperature gauge mounted so it can be viewed by the operator | |
| 6.10 | A self contained air to oil hydraulic cooler with an electric fan shall be provided to maintain proper hydraulic oil temperature | |
| 7.0 | Agitation System: | |
| 7.1 | Agitator shall be powered by a direct drive hydraulic motor | |
| 7.2 | Hydraulic drive shall run augur at 250 ft./min tip speed | |
| 7.3 | Agitator hydraulic motor shall be mounted to the top of the material tank | |
| 7.4 | Agitator drive shaft shall be mounted vertically | |
| 7.5 | Agitator shall be capable of rotating in either direction | |
| 7.6 | Agitator shall have two opposing horizontal paddle with vertical risers | |
| 7.7 | Agitator paddles shall have a minimum of 513 square inches of surface area | |
| 7.8 | Both loading hatches shall be equipped with automatic auger shut off safety switches | |
| 8.0 | Drive and Drive Controls: | |
| 8.1 | Agitator and material pump shall be hydraulically driven | |
| 8.2 | Rotation speed of the material pump shall be controlled by adjustable hydraulic valves | |
| 8.3 | Material pump shall have an infinite speed control and is activated by toggle switch on the control panel and the hand wand | |
| 9.0 | Bi-Directional Variable Speed Pumping Unit: | |
| 9.1 | Material pump shall be a 2 inch positive displacement helical gear pump | |
| 9.2 | Sealant pump shall be an on demand system, which shall stop pump rotation when the sealant wand trigger in not activated | |
| 9.3 | Unit will be equipped with a heated enclosed insulated chamber which contains the recirculation and tank valves | |
| 9.4 | This chamber shall be heated by a slide gate that separates this chamber from the tank air jacket | |
| 9.5 | The heat chamber shall have insulated doors which are hinged and notched for the applicator hose access | |
| 9.6 | Heating chamber shall be large enough to provide storage for the sealant hoses | |
| 9.7 | A removable rear access panel shall be provided for access to the pump for maintenance and repair | |
| 10.0 | Sealant Hose and Applicator Wand: | |
| 10.1 | Unit shall be equipped with a non-heated hose and applicator wand | |
| 10.2 | Hose shall be capable of handling liquid asphalt products at temperature up to 400 degrees F at 350psi working pressure | |
| 10.3 | Hose shall be made of 1 inch inside diameter, insulated, rubber coated, steel braid reinforced with neoprene lining | |
| 10.4 | Hose and wand shall be a minimum of 23 feet in length with a working radius of 16 feet 6 inches from the center of the unit | |
| 10.5 | Hose shall be connected to the wand by a 360 degree swivel, which shall be rated for the working temperatures and pressers of the hose | |
| 10.6 | Hand wand shall be constructed of steel which can withstand the normal day to day operation of the unit | |
| 10.7 | A digital read out shall be provided to show the temperature of the material being pump through the hose | |
| 10.8 | Material flow shall be activated by a toggle switch in the control box and shall be controlled by a ball valve on the wand and a recirculation valve | |
| 11.0 | Hose Support Boom: | |
| 11.1 | A 7 foot 2 inch boom shall be supplied to hold the applicator hose | |
| 11.2 | Boom will swivel side to side on dual pillow block bearings | |
| 11.3 | A hose carriage that pivots with 7 foot of horizontal linear movements on roller bearings wheels shall be provided | |
| 11.4 | Boom shall have a minimum of 6 foot 6 inches of ground clearance | |
| 12.0 | Engine: | |
| 12.1 | The unit will be equipped with a liquid cooled, direct injected, Tier IV emission compliant diesel engine. Rubber isolation engine mounts are required | |
| 12.2 | The engine will have spin-on type oil and fuel filters | |
| 12.3 | The engine will be protected with an engine enclosure that is certified by the manufacturer. |
It will be lockable for security and provide noise reduction for operator safety The Contractor will provide a set of (3) keys
| 12.4 | Auto shutdown protection will be provided for, low oil pressure, high coolant temperature. |
| 12.5 | The engine will be rated at 48HP @ 2350 RPM, and must be Tier IV Final emission compliant |
| 12.6 | Engine will be 2.2L displacement |
| 12.7 | Engine cover will enclose engine, battery |
| 12.8 | Engine shall be equipped with the following gauges, hour meter, RPM gauge, oil pressure, water temperature, volt meter and a torque percentage |
| 12.9 | Engine shall be equipped with an auto start function which preheats and starts the engine |
| 13.0 | Air Compressor: |
| 13.1 | Air compressor shall be rated 100 CFM @125 psi and be a rotary vane type compressor |
| 13.2 | Air compressor shall be hydraulically powered |
| 13.3 | Air pressure shall be controlled by a continual intake modulation, which adjusts air flow depending on user demand |
| 13.4 | Air compressor maximum relief pressure shall be set to 85 psi |
| 13.5 | A toroidal oil cooler shall be provided |
| 13.6 | Air compressor shall be equipped with a high temperature shut down |
| 13.7 | Unit shall be supplied with 50 foot of 3/4 air hose with Chicago style quick couplers on each end |
| 13.8 | A shelf shall be provided for hose storage |
| 13.9 | A cold air lance shall be provided |
| 13.10 | A 360 degree swivel shall be provided between the air hose and the cold air lance |
| 13.11 | A safety shut off valve shall be provided in the air system which will restrict the air flow in the event of air hose breakage |
| 14.0 | Paint and safety decals: |
| 14.1 | The unit shall be painted manufactures standard color, paint shall be a Dupont two part epoxy. |
| 14.2 | Unit will be equipped with all required safety decals and signage |
| 15.0 | Trailer: |
| 15.1 | The frame will be constructed out hot rolled steel channel with minimum dimensions of 5 inches depth, .325 inch web thickness with 1.885 inch flange width |
| 15.2 | The channels shall be cold formed with the flanges on the outside so there is a one piece frame member |
| 15.3 | A 3” towing ring that is adjustable in height from 14” to 32” high will be provided for lateral adjustability |
| 15.4 | Trailer will have radial tires, sized to accommodate the weight of the trailer, with a spare tire and wheel mounted to the trailer |
| 15.5 | Electric trailer brakes/ with brake away protection shall be provided |
| 15.6 | Trailer will have dual independent rubber torsional suspension with a minimum capacity of 5200 pounds each |
| 15.7 | A swing away tongue jack, rated to handle the capacity of the trailer will be provided. |
| 15.8 | Trailer Lights, will meet Federal guidelines for approved tail, stop and turn LED type AND, wired for turn signals independent of stop lights. |
| 15.9 | Trailer Wiring Diagram, trailer connector shall be 7-way round pin Berg type , wired for turn signals independent of stop, compatible with trailers that have amber or side turn lamps, per MDOT standard trailer connector wiring diagram (Refer to Schedule E - Trailer Wiring Diagram). |
| 15.10 | Unit shall be equipped with a Class 1 mast mounted strobe light |
| 15.11 | All wires passing through holes in metal or non-metal wearing surfaces, which could cause wear of the insulation, shall be adequately protected by rubber or plastic grommets, and/or non-metal conduit. Ends of all wires shall be adequately anchored to prevent loosening. All wiring shall be properly secured to the trailer or engine by proper wiring hangers |
| 15.12 | All electrical connections shall be soldered and enclosed in heat shrink or in water tight junction blocks |
| 15.13 | Scotch locks and wire nuts are NOT acceptable |
END OF SPECIFICATION
#3 - Recycler Trailer
| RFP Dept. 171, No. 180000002508 | |
| #3 - Specification # C36-0401.18 Roadway Asphalt Recycler Trailer |
All items specified and furnished by the Contractor shall be new of the latest model in current production and shall include all standard features normally offered with these models CONTRACTOR must respond to each section with YES. (or additional information as requested)
If NO is indicated provide explanation and available option.
Referenced Make and Model: KM International KM T-2 Asphalt Recycler Contract to identify proposed make and model
| Brands or trade names are for identification purposes only and do not limit the Contractor to such brands | Make and Model | |
| 1.0 | Basic Requirements: | |
| 1.1 | Recycler unit shall be designed to recycle up to 4 tons an hour. | |
| 1.2 | The asphalt recycler shall be able to recycle either saw cut material or asphalt millings. | |
| 1.3 | The unit is designed to produce "plant quality" hot mix asphalt from recycled asphalt product (RAP). | |
| 1.4 | The recycling asphalt temperature is controlled by the operator | |
| 1.5 | Operating temperature ranges from 280 to 360 degrees Fahrenheit | |
| 2.0 | Loading Hopper: | |
| 2.1 | The unit will be equipped with a top opening loading hopper with an minimum opening size of 26" x 94" | |
| 2.2 | Loading hopper will be constructed of 3/16" steel, 235 Brinell hardened | |
| 2.3 | The loading hopper will be raised and lowered by 2 - 2" x 16" hydraulic cylinders with a minimum rating of 3,250 psi | |
| 2.4 | The loading hopper will be equipped with two vibrators to assist material load feed into the asphalt drum. Vibrators will be operated by a manual push button | |
| 2.5 | Loading hopper must be located at the rear of the unit | |
| 3.0 | Asphalt Heating Drum: | |
| 3.1 | The asphalt heating drum will be constructed of 3/16" steel. ASTM A36 steel alloy with the outside diameter insulated | |
| 3.2 | The asphalt heating drum shall be equipped with eight (8) 3/16 inch Brinell hardened steel agitators inside of drum | |
| 3.3 | The agitators will have a sawtooth design at staggered heights in order to break down material | |
| 3.4 | The asphalt heating drum will be hydraulically controlled to rotate clockwise and counter clockwise, with a rotation speed of approximately 10 rpm | |
| 3.5 | The asphalt heating drum will sit and rotate on four (4) 3" x 8" steel foraged casters. Each caster will be rated for 14,000 lbs. and be equipped with 1-1/4" precision tapered roller bearings. | |
| 3.6 | The asphalt heating drum will sit on a single 3' x 6' thrust caster rated at 12,000lbs. And be equipped with 1-1/4 precision tapered roller bearings | |
| 4.0 | Engine: | |
| 4.1 | The unit will be equipped with a liquid cooled, direct injected, Tier IV emission compliant diesel engine | |
| 4.2 | The engine will be a minimum of 21.6 BHP @ 3200 rpm | |
| The engine will have spin-on type oil and fuel filters. | ||
| 4.3 | An engine control panel shall be provided with the following components, auto shutdown protection will be provided for alternator, oil pressure, and coolant temperature. An hour meter and RPM gauge key switch, and a speed selector switch (idle/run) will be included. | |
| 4.4 | Engine cover will enclose engine, and battery | |
| 4.5 | The engine will have a 12 volt starter, 60 amp alternator | |
| 4.6 | The battery will be a 12 volt marine type deep cycle gel battery | |
| 4.7 | The unit will include a minimum 80 gallon fuel tank with replaceable filter, with a manual shut off valve, This will be a shared tank with the burner | |
| 5.0 | Hydraulics: | |
| 5.1 | The hydraulic fluid reservoir will hold a capacity of 30 gallons | |
| 5.2 | The unit will be equipped with a hydraulic cooler with a hydraulic fan which is adjustable to accommodate hot or cold weather conditions | |
| 5.3 | The hydraulic pump output will be 12 gallons per minute with a drive shaft | |
| 5.4 | The hydraulic motor will be a 38 cubic inch unit with a 3 piece self-centering keyless shaft-hub locking assembly | |
| 5.5 | Hydraulic cylinders: Lift (1) - 5" x 15" Load (2) - 2" x 16" | |
| 5.6 | Hydraulics will be manually adjustable and equipped with a variable speed hydraulic heat exchanger, control valve, pressure gages, filters, piping and hoses | |
| 6.0 | Heating System: | |
| 6.1 | The heating source will be a Beckett model SDC burner or equivalent | |
| 6.2 | The burner will be capable of being run on Number 1 or 2 diesel or B-5 bio-diesel | |
| 6.3 | The burner will have a maximum capacity of 700,000 BTU | |
| 6.4 | Burner shall be mounted on an adjustable swivel arm that rotates horizontally | |
| 6.5 | Other components to be included are piping, hoses pressure gauge, hour meter, and swivel arm | |
| 7.0 | Paint and safety decals: | |
| 7.1 | The unit shall be painted manufactures standard color, paint shall be a Dupont two part epoxy. |
| 7.2 | Unit will be equipped with all required safety decals and signage |
| 8.0 | Trailer: |
| 8.1 | The frame is to be constructed of 8" channel steel with 2 1/2" x 1/4 square tube support members |
| 8.3 | Trailer will be equipped with a 3” pintle hitch that is adjustable in height from 18” to 30” |
| 8.4 | Trailer will to be equipped with four (4) ST 235/80R 16 trailer service tires, with the same size spare tire and wheel mounted to the trailer |
| 8.5 | Electric trailer brakes on all wheels / with brake away protection |
| 8.6 | The trailer shall have a dual axle leaf spring system with 7000 lb. axles |
| 8.7 | The GVWR will be a minimum of 8,850 lbs. |
| 8.8 | Fenders shall be a minimum of 11 gage diamond plate steel welded to the frame |
| 8.9 | Tongue jack, rated at 7000lbs. with a swivel mount manual jack stand |
| 8.10 | Trailer to be equipped with 3/8" zinc coated grade 70 safety chains |
| 8.11 | Trailer Lights: DOT approved tail, stop and turn LED type, wired for turn signals independent of stop lights |
| 8.12 | Per MDOT supplied - Trailer Wiring Diagram, trailer connector shall be 7-way round pin Berg type , wired for turn signals independent of stop, compatible with trailers that have amber or side turn lamps |
| 8.13 | Trailer plug to also be wired to allow charging of the battery off of the tow vehicle |
| 8.14 | All wires passing through holes in metal or non-metal wearing surfaces, which could cause wear of the insulation, shall be adequately protected by rubber or plastic grommets, and/or non-metal conduit. |
| 8.15 | Ends of all wires shall be adequately anchored to prevent loosening |
| 8.16 | All electrical connections shall be soldered and enclosed in heat shrink or in water tight junction blocks |
| 8.17 | Scotch locks and wire nuts are not acceptable |
END OF SPECIFICATION