BASE YEAR
| Asbestos Abatement Services Contract |
| Schedule B |
| 1/6/22 |
| PART 1 - SECTION B |
| SUPPLIES OR SERVICES AND PRICES / COST |
| | Estimated | | | |
| Item | Description | Annual | UNIT | UNIT | TOTAL |
| | Quantity | | PRICE | AMOUNT |
BASE YEAR March 15, 2022 to March 14, 2023
FIRM-FIXED-PRICE
| 0001 | Perform Cutting, Drilling or Abrading | | | |
| 1a | Less than 1 SF cutout | 5 | EA |
| 1b | Each additional cutout, per 1 SF | 5 | EA |
| 1c | Holes, 1 inch or less, first hole | 5 | EA |
| 1d | Each additional hole, 1 inch or less | 5 | EA |
| 0002 | Temporary Facilities, Asbestos Abatement and Mobilization Cost | | | |
| 2a | Small Scale, Short Duration Projects | 30 | EA |
| | (Routine) | | |
| 2b | Small Scale, Short Duration Projects | 10 | EA |
| | (Emergency Response, within 24 hours) | | |
| 2c | Abatement Projects | 20 | EA |
| 0003 | Temporary Pressure Differential and Air Circulation Equipment, | 30 | EA |
| at 1500 CFM or greater | | |
| 0004 | Temporary Enclosures | | | |
| 4a | Temporary Enclosures, per 1000 CF | 30 | EA |
| 4b | Exterior Enclosures, per 1000 CF | 5 | EA |
| 4c | Exterior Wind Break / Visual Barrier per 200 SF | 5 | EA |
| 0005 | Making Entry into Controlled Area, such as above a ceiling, | 5 | EA |
| each Project | | |
| 0006 | Small Scale Short Duration (O&M) Work | | | |
| 6a | Glovebag up to 20 LF of pipe insulation and | 30 | EA |
| | fittings (less than 6 inches in diameter), or | | |
| | 10 LF of pipe insulation and fittings | | |
| | (6 inches to 12 inches in diameter), or | | |
| | up to 8 individual fittings (10 inches or less in diameter) | | |
| 6b | Up to 10 SF of surfacing material or Thermal System | 10 | EA |
| | Insulation (TSI). | | |
| 6c | Asbestos-containing duct tape | 50 | LF |
| 6d | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, 0 to 500 SF | | |
| 6e | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, 0 to 500 SF | | |
| 6f | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, areas or adjacent areas 501 to 2000 SF | | |
| 6g | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, areas or adjacent areas 501 to 2000 SF | | |
| 6h | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, areas or adjacent areas over | | |
| | 2000 SF | | |
| 6i | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, areas or adjacent areas over | | |
| | 2000 SF | | |
| 6j | Removal of carpet tiles to expose vinyl-asbestos | 10000 | SF |
| | floor tile | | |
| 6k | Non-friable cementitious materials; such as siding, | 3000 | SF |
| | shingles and wall board | | |
| 6l | Non-friable cementitious pipe, | 10 | EA |
| | less than 6 inches in diameter, per 20 LF | | |
| 6m | Non-friable cementitious pipe, | 10 | EA |
| | 6 inches or more in diameter, per 20 LF | | |
| 6n | Wrap and cut piping with insulation, | 10 | EA |
| | less than 6 inches in diameter, per 20 LF | | |
| 6o | Wrap and cut piping with insulation, | 10 | EA |
| | 6 inches or more in diameter, per 20 LF | | |
| 6p | RACM vinyl-asbestos floor tile and adhesive | 3000 | SF |
| 6q | RACM vinyl-asbestos floor tile only | 3000 | SF |
| 0007 | Installation, Operation and Removal of a Complete Decontamination Unit | | |
| in Support of Abatement Operations | 25 | EA |
0008 Project Decontamination, per 1000 CF of Containment 25 EA
| 0009 | Cleaning and Decontamination | | | |
| 9a | Removal of visible debris, per 100 SF area | 10 | EA |
| 9b | Room decontamination, per 1000 CF | 10 | EA |
| 9c | Decontaminating objects, per 100 SF | 10 | EA |
| 0010 | Demolition / Renovation - Asbestos Abatement | | | |
| 10a | Ceiling tiles | 1000 | SF |
| 10b | Surfacing material such as architectural finishes, | 2000 | SF |
| | fireproofing and fire blankets | | |
| 10c | Linoleum Flooring | 500 | SF |
| 10d | Pipe insulation, less than 6" in diameter | 1000 | LF |
| 10e | Pipe insulation, 6 inches or more in diameter | 500 | LF |
| 10f | Asbestos-containing siding, shingles or wall board | 3000 | SF |
| 10g | Non-friable cementitious pipe, less than 6" in diameter | 10 | EA |
| | per 20 LF | | |
| 10h | Non-friable cementitious pipe, 6 inches or more in | 10 | EA |
| | diameter per 20 LF | | |
| 0011 | Demolition of Asbesto-Contaminated Materials | | | |
| 11a | Ceiling Tiles | 1000 | SF |
| 11b | Ceiling Support Systems | 500 | SF |
| 11c | Carpeting | 2000 | SF |
| 0012 | Removal of Asbesto-Containing Material | | | |
| 12a | Duct/Pipe insulation, less than 6 inches in diameter | 100 | LF |
| 12b | Duct/Pipe insulation, 6 inches or more in diameter | 100 | LF |
| 12c | Thermal system insulation, all surfaces except round | 300 | SF |
| | round duct and pipe covered in 12a & 12b | | |
| 12d | Surfacing material such as architectural finishes, | 300 | SF |
| | fireproofing and fire blankets | | |
| 12e | Wrap and cut pipe insulation, less than 6 inches in diameter, | 50 | EA |
| | per 20 LF | | |
| 12f | Wrap and cut pipe insulation, 6" or more in diameter, | 50 | EA |
| | per 20 LF | | |
| 0013 | Removal of Asbestos-Containing Soil | | | |
| 13a | Wet Soil | 10 | SF |
| 13b | Dry Soil | 10 | SF |
| 0014 | Disposal of Asbestos-Containing Material is to be included in other | NOT SEPERATELY PRICED |
| proposal items | |
0015 Gypsum Drywall Asbestos Enclosures per 100 SF 30 EA
| 0016 | Encapsulation of Asbestos-Containing Material | | | |
| 16a | Pipe insulation, less than 6 inches in diameter | 10 | LF |
| 16b | Pipe insulation, 6 inches or more in diameter | 10 | LF |
| 16c | All other surfaces, per 100 SF | 5 | EA |
| 0017 | Repair of Insulation and Lagging Using Reinforced Bridging Encapsulant | | | |
| 17a | Pipe insulation, less than 6 inches in diameter | 20 | LF |
| 17b | Pipe insulation, 6 inches or more in diameter | 20 | LF |
| 17c | All other surfaces, per 100 SF | 10 | EA |
| 0018 | Repair of Insulation and Lagging Using Plastic Jacket | | | |
| 18a | Pipe insulation, less than 6 inches in diameter | 20 | LF |
| 18b | Pipe insulation, 6 inches or more in diameter | 20 | LF |
| 0019 | Labor for Projects to remove mold, Lead Based Paint and other | | | |
| similar contaminants from contaminated articles and building materials | | | |
| (rate to be used for required activities not included in line items above, | | | |
| for instance; building temporary enclosures includes the labor in that | | | |
| line item and includes necessary personal protective equipment). | | | |
| 19a | Project Manager, per hour | 100 | HR |
| 19b | Technician, per hour | 400 | HR |
| | | | NOT TO EXCEED |
| 0020 | Miscellaneous Prep Work in support of abatement projects | 1 | EA | |
| (such as demolition of walls, built-in cabinets, moving equipment, | | | |
| rental of lifts, etc.), shall be paid at the contractor's standard | | | |
| rate or the contractor's documented cost. | | | |
| | | | NOT TO EXCEED |
| 0021 | Labor, Supplies, or Services not included elsewhere in this | 1 | EA | |
| schedule, shall be paid at the contractor's standard | | | |
| rate or the contractor's documented cost. | | | |
| 0022 | State of Oklahoma Department of Labor Contractor Work | 10 | EA | |
| Fee(s) IAW Oklahoma Asbestos Control Act 40 O.S. | | | |
| Subsection 450.OAC 380:50-25-1. "Contractor Fee". Fee(s) | | | |
| shall be paid at the contractor's documented cost. | | | |
| Contractor will invoice with supporting documentation. | | | NOT TO EXCEED |
TOTAL ESTIMATED BASE YEAR
1ST OPTION YEAR
| Asbestos Abatement Services Contract |
| Schedule B |
| 6/21/21 |
| PART 1 - SECTION B |
| SUPPLIES OR SERVICES AND PRICES / COST |
| | Estimated | | | |
| CLIN | Description | Annual | UNIT | UNIT | TOTAL |
| | Quantity | | PRICE | AMOUNT |
1ST OPTION YEAR March 15, 2023 to March 14, 2024
FIRM-FIXED-PRICE
| 1001 | Perform Cutting, Drilling or Abrading | | | |
| 1a | Less than 1 SF cutout | 5 | EA |
| 1b | Each additional cutout, per 1 SF | 5 | EA |
| 1c | Holes, 1 inch or less, first hole | 5 | EA |
| 1d | Each additional hole, 1 inch or less | 5 | EA |
| 1002 | Temporary Facilities, Asbestos Abatement and Mobilization Cost | | | |
| 2a | Small Scale, Short Duration Projects | 30 | EA |
| | (Routine) | | |
| 2b | Small Scale, Short Duration Projects | 10 | EA |
| | (Emergency Response, within 24 hours) | | |
| 2c | Abatement Projects | 20 | EA |
| 1003 | Temporary Pressure Differential and Air Circulation Equipment, | 30 | EA |
| at 1500 CFM or greater | | |
| 1004 | Temporary Enclosures | | | |
| 4a | Temporary Enclosures, per 1000 CF | 30 | EA |
| 4b | Exterior Enclosures, per 1000 CF | 5 | EA |
| 4c | Exterior Wind Break / Visual Barrier per 200 SF | 5 | EA |
| 1005 | Making Entry into Controlled Area, such as above a ceiling, | 5 | EA |
| each Project | | |
| 1006 | Small Scale Short Duration (O&M) Work | | | |
| 6a | Glovebag up to 20 LF of pipe insulation and | 30 | EA |
| | fittings (less than 6 inches in diameter), or | | |
| | 10 LF of pipe insulation and fittings | | |
| | (6 inches to 12 inches in diameter), or | | |
| | up to 8 individual fittings (10 inches or less in diameter) | | |
| 6b | Up to 10 SF of surfacing material or Thermal System | 10 | EA |
| | Insulation (TSI). | | |
| 6c | Asbestos-containing duct tape | 50 | LF |
| 6d | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, 0 to 500 SF | | |
| 6e | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, 0 to 500 SF | | |
| 6f | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, areas or adjacent areas 501 to 2000 SF | | |
| 6g | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, areas or adjacent areas 501 to 2000 SF | | |
| 6h | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, areas or adjacent areas over | | |
| | 2000 SF | | |
| 6i | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, areas or adjacent areas over | | |
| | 2000 SF | | |
| 6j | Removal of carpet tiles to expose vinyl-asbestos | 10000 | SF |
| | floor tile | | |
| 6k | Non-friable cementitious materials; such as siding, | 3000 | SF |
| | shingles and wall board | | |
| 6l | Non-friable cementitious pipe, | 10 | EA |
| | less than 6 inches in diameter, per 20 LF | | |
| 6m | Non-friable cementitious pipe, | 10 | EA |
| | 6 inches or more in diameter, per 20 LF | | |
| 6n | Wrap and cut piping with insulation, | 10 | EA |
| | less than 6 inches in diameter, per 20 LF | | |
| 6o | Wrap and cut piping with insulation, | 10 | EA |
| | 6 inches or more in diameter, per 20 LF | | |
| 6p | RACM vinyl-asbestos floor tile and adhesive | 3000 | SF |
| 6q | RACM vinyl-asbestos floor tile only | 3000 | SF |
| 1007 | Installation, Operation and Removal of a Complete Decontamination Unit | | |
| in Support of Abatement Operations | 25 | EA |
1008 Project Decontamination, per 1000 CF of Containment 25 EA
| 1009 | Cleaning and Decontamination | | | |
| 9a | Removal of visible debris, per 100 SF area | 10 | EA |
| 9b | Room decontamination, per 1000 CF | 10 | EA |
| 9c | Decontaminating objects, per 100 SF | 10 | EA |
| 1010 | Demolition / Renovation - Asbestos Abatement | | | |
| 10a | Ceiling tiles | 1000 | SF |
| 10b | Surfacing material such as architectural finishes, | 2000 | SF |
| | fireproofing and fire blankets | | |
| 10c | Linoleum Flooring | 500 | SF |
| 10d | Pipe insulation, less than 6" in diameter | 1000 | LF |
| 10e | Pipe insulation, 6 inches or more in diameter | 500 | LF |
| 10f | Asbestos-containing siding, shingles or wall board | 3000 | SF |
| 10g | Non-friable cementitious pipe, less than 6" in diameter | 10 | EA |
| | per 20 LF | | |
| 10h | Non-friable cementitious pipe, 6 inches or more in | 10 | EA |
| | diameter per 20 LF | | |
| 1011 | Demolition of Asbesto-Contaminated Materials | | | |
| 11a | Ceiling Tiles | 1000 | SF |
| 11b | Ceiling Support Systems | 500 | SF |
| 11c | Carpeting | 2000 | SF |
| 1012 | Removal of Asbesto-Containing Material | | | |
| 12a | Duct/Pipe insulation, less than 6 inches in diameter | 100 | LF |
| 12b | Duct/Pipe insulation, 6 inches or more in diameter | 100 | LF |
| 12c | Thermal system insulation, all surfaces except round | 300 | SF |
| | round duct and pipe covered in 12a & 12b | | |
| 12d | Surfacing material such as architectural finishes, | 300 | SF |
| | fireproofing and fire blankets | | |
| 12e | Wrap and cut pipe insulation, less than 6 inches in diameter, | 50 | EA |
| | per 20 LF | | |
| 12f | Wrap and cut pipe insulation, 6" or more in diameter, | 50 | EA |
| | per 20 LF | | |
| 1013 | Removal of Asbestos-Containing Soil | | | |
| 13a | Wet Soil | 10 | SF |
| 13b | Dry Soil | 10 | SF |
| 1014 | Disposal of Asbestos-Containing Material is to be included in other | NOT SEPERATELY PRICED |
| proposal items | |
1015 Gypsum Drywall Asbestos Enclosures per 100 SF 30 EA
| 1016 | Encapsulation of Asbestos-Containing Material | | | |
| 16a | Pipe insulation, less than 6 inches in diameter | 10 | LF |
| 16b | Pipe insulation, 6 inches or more in diameter | 10 | LF |
| 16c | All other surfaces, per 100 SF | 5 | EA |
| 1017 | Repair of Insulation and Lagging Using Reinforced Bridging Encapsulant | | | |
| 17a | Pipe insulation, less than 6 inches in diameter | 20 | LF |
| 17b | Pipe insulation, 6 inches or more in diameter | 20 | LF |
| 17c | All other surfaces, per 100 SF | 10 | EA |
| 1018 | Repair of Insulation and Lagging Using Plastic Jacket | | | |
| 18a | Pipe insulation, less than 6 inches in diameter | 20 | LF |
| 18b | Pipe insulation, 6 inches or more in diameter | 20 | LF |
| 1019 | Labor for Projects to remove mold, Lead Based Paint and other | | | |
| similar contaminants from contaminated articles and building materials | | | |
| (rate to be used for required activities not included in line items above, | | | |
| for instance; building temporary enclosures includes the labor in that | | | |
| line item and includes necessary personal protective equipment). | | | |
| 19a | Project Manager, per hour | 100 | HR |
| 19b | Technician, per hour | 400 | HR |
| | | | NOT TO EXCEED |
| 1020 | Miscellaneous Prep Work in support of abatement projects | 1 | EA | |
| (such as demolition of walls, built-in cabinets, moving equipment, | | | |
| rental of lifts, etc.), shall be paid at the contractor's standard | | | |
| rate or the contractor's documented cost. | | | |
| | | | NOT TO EXCEED |
| 1021 | Labor, Supplies, or Services not included elsewhere in this | 1 | EA | |
| schedule, shall be paid at the contractor's standard | | | |
| rate or the contractor's documented cost. | | | |
| 1022 | State of Oklahoma Department of Labor Contractor Work | 10 | EA | |
| Fee(s) IAW Oklahoma Asbestos Control Act 40 O.S. | | | |
| Subsection 450.OAC 380:50-25-1. "Contractor Fee". Fee(s) | | | |
| shall be paid at the contractor's documented cost. | | | |
| Contractor will invoice with supporting documentation. | | | NOT TO EXCEED |
TOTAL ESTIMATED 1ST OPTION YEAR
2ND OPTION YEAR
| Asbestos Abatement Services Contract |
| Schedule B |
| 6/21/21 |
| PART 1 - SECTION B |
| SUPPLIES OR SERVICES AND PRICES / COST |
| | Estimated | | | |
| CLIN | Description | Annual | UNIT | UNIT | TOTAL |
| | Quantity | | PRICE | AMOUNT |
2ND OPTION YEAR March 15, 2024 to March 14, 2025
FIRM-FIXED-PRICE
| 2001 | Perform Cutting, Drilling or Abrading | | | |
| 1a | Less than 1 SF cutout | 5 | EA |
| 1b | Each additional cutout, per 1 SF | 5 | EA |
| 1c | Holes, 1 inch or less, first hole | 5 | EA |
| 1d | Each additional hole, 1 inch or less | 5 | EA |
| 2002 | Temporary Facilities, Asbestos Abatement and Mobilization Cost | | | |
| 2a | Small Scale, Short Duration Projects | 30 | EA |
| | (Routine) | | |
| 2b | Small Scale, Short Duration Projects | 10 | EA |
| | (Emergency Response, within 24 hours) | | |
| 2c | Abatement Projects | 20 | EA |
| 2003 | Temporary Pressure Differential and Air Circulation Equipment, | 30 | EA |
| at 1500 CFM or greater | | |
| 2004 | Temporary Enclosures | | | |
| 4a | Temporary Enclosures, per 1000 CF | 30 | EA |
| 4b | Exterior Enclosures, per 1000 CF | 5 | EA |
| 4c | Exterior Wind Break / Visual Barrier per 200 SF | 5 | EA |
| 2005 | Making Entry into Controlled Area, such as above a ceiling, | 5 | EA |
| each Project | | |
| 2006 | Small Scale Short Duration (O&M) Work | | | |
| 6a | Glovebag up to 20 LF of pipe insulation and | 30 | EA |
| | fittings (less than 6 inches in diameter), or | | |
| | 10 LF of pipe insulation and fittings | | |
| | (6 inches to 12 inches in diameter), or | | |
| | up to 8 individual fittings (10 inches or less in diameter) | | |
| 6b | Up to 10 SF of surfacing material or Thermal System | 10 | EA |
| | Insulation (TSI). | | |
| 6c | Asbestos-containing duct tape | 50 | LF |
| 6d | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, 0 to 500 SF | | |
| 6e | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, 0 to 500 SF | | |
| 6f | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, areas or adjacent areas 501 to 2000 SF | | |
| 6g | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, areas or adjacent areas 501 to 2000 SF | | |
| 6h | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, areas or adjacent areas over | | |
| | 2000 SF | | |
| 6i | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, areas or adjacent areas over | | |
| | 2000 SF | | |
| 6j | Removal of carpet tiles to expose vinyl-asbestos | 10000 | SF |
| | floor tile | | |
| 6k | Non-friable cementitious materials; such as siding, | 3000 | SF |
| | shingles and wall board | | |
| 6l | Non-friable cementitious pipe, | 10 | EA |
| | less than 6 inches in diameter, per 20 LF | | |
| 6m | Non-friable cementitious pipe, | 10 | EA |
| | 6 inches or more in diameter, per 20 LF | | |
| 6n | Wrap and cut piping with insulation, | 10 | EA |
| | less than 6 inches in diameter, per 20 LF | | |
| 6o | Wrap and cut piping with insulation, | 10 | EA |
| | 6 inches or more in diameter, per 20 LF | | |
| 6p | RACM vinyl-asbestos floor tile and adhesive | 3000 | SF |
| 6q | RACM vinyl-asbestos floor tile only | 3000 | SF |
| 2007 | Installation, Operation and Removal of a Complete Decontamination Unit | | |
| in Support of Abatement Operations | 25 | EA |
2008 Project Decontamination, per 1000 CF of Containment 25 EA
| 2009 | Cleaning and Decontamination | | | |
| 9a | Removal of visible debris, per 100 SF area | 10 | EA |
| 9b | Room decontamination, per 1000 CF | 10 | EA |
| 9c | Decontaminating objects, per 100 SF | 10 | EA |
| 2020 | Demolition / Renovation - Asbestos Abatement | | | |
| 10a | Ceiling tiles | 1000 | SF |
| 10b | Surfacing material such as architectural finishes, | 2000 | SF |
| | fireproofing and fire blankets | | |
| 10c | Linoleum Flooring | 500 | SF |
| 10d | Pipe insulation, less than 6" in diameter | 1000 | LF |
| 10e | Pipe insulation, 6 inches or more in diameter | 500 | LF |
| 10f | Asbestos-containing siding, shingles or wall board | 3000 | SF |
| 10g | Non-friable cementitious pipe, less than 6" in diameter | 10 | EA |
| | per 20 LF | | |
| 10h | Non-friable cementitious pipe, 6 inches or more in | 10 | EA |
| | diameter per 20 LF | | |
| 2011 | Demolition of Asbesto-Contaminated Materials | | | |
| 11a | Ceiling Tiles | 1000 | SF |
| 11b | Ceiling Support Systems | 500 | SF |
| 11c | Carpeting | 2000 | SF |
| 2012 | Removal of Asbesto-Containing Material | | | |
| 12a | Duct/Pipe insulation, less than 6 inches in diameter | 100 | LF |
| 12b | Duct/Pipe insulation, 6 inches or more in diameter | 100 | LF |
| 12c | Thermal system insulation, all surfaces except round | 300 | SF |
| | round duct and pipe covered in 12a & 12b | | |
| 12d | Surfacing material such as architectural finishes, | 300 | SF |
| | fireproofing and fire blankets | | |
| 12e | Wrap and cut pipe insulation, less than 6 inches in diameter, | 50 | EA |
| | per 20 LF | | |
| 12f | Wrap and cut pipe insulation, 6" or more in diameter, | 50 | EA |
| | per 20 LF | | |
| 2013 | Removal of Asbestos-Containing Soil | | | |
| 13a | Wet Soil | 10 | SF |
| 13b | Dry Soil | 10 | SF |
| 2014 | Disposal of Asbestos-Containing Material is to be included in other | NOT SEPERATELY PRICED |
| proposal items | |
2015 Gypsum Drywall Asbestos Enclosures per 100 SF 30 EA
| 2016 | Encapsulation of Asbestos-Containing Material | | | |
| 16a | Pipe insulation, less than 6 inches in diameter | 10 | LF |
| 16b | Pipe insulation, 6 inches or more in diameter | 10 | LF |
| 16c | All other surfaces, per 100 SF | 5 | EA |
| 2017 | Repair of Insulation and Lagging Using Reinforced Bridging Encapsulant | | | |
| 17a | Pipe insulation, less than 6 inches in diameter | 20 | LF |
| 17b | Pipe insulation, 6 inches or more in diameter | 20 | LF |
| 17c | All other surfaces, per 100 SF | 10 | EA |
| 2018 | Repair of Insulation and Lagging Using Plastic Jacket | | | |
| 18a | Pipe insulation, less than 6 inches in diameter | 20 | LF |
| 18b | Pipe insulation, 6 inches or more in diameter | 20 | LF |
| 2019 | Labor for Projects to remove mold, Lead Based Paint and other | | | |
| similar contaminants from contaminated articles and building materials | | | |
| (rate to be used for required activities not included in line items above, | | | |
| for instance; building temporary enclosures includes the labor in that | | | |
| line item and includes necessary personal protective equipment). | | | |
| 19a | Project Manager, per hour | 100 | HR |
| 19b | Technician, per hour | 400 | HR |
| | | | NOT TO EXCEED |
| 2020 | Miscellaneous Prep Work in support of abatement projects | 1 | EA | |
| (such as demolition of walls, built-in cabinets, moving equipment, | | | |
| rental of lifts, etc.), shall be paid at the contractor's standard | | | |
| rate or the contractor's documented cost. | | | |
| | | | NOT TO EXCEED |
| 2021 | Labor, Supplies, or Services not included elsewhere in this | 1 | EA | |
| schedule, shall be paid at the contractor's standard | | | |
| rate or the contractor's documented cost. | | | |
| 2022 | State of Oklahoma Department of Labor Contractor Work | 10 | EA | |
| Fee(s) IAW Oklahoma Asbestos Control Act 40 O.S. | | | |
| Subsection 450.OAC 380:50-25-1. "Contractor Fee". Fee(s) | | | |
| shall be paid at the contractor's documented cost. | | | |
| Contractor will invoice with supporting documentation. | | | NOT TO EXCEED |
TOTAL ESTIMATED 2ND OPTION YEAR
3RD OPTION YEAR
| Asbestos Abatement Services Contract |
| Schedule B |
| 6/21/21 |
| PART 1 - SECTION B |
| SUPPLIES OR SERVICES AND PRICES / COST |
| | Estimated | | | |
| CLIN | Description | Annual | UNIT | UNIT | TOTAL |
| | Quantity | | PRICE | AMOUNT |
3RD OPTION YEAR March 15, 2025 to March 14, 2026
FIRM-FIXED-PRICE
| 3001 | Perform Cutting, Drilling or Abrading | | | |
| 1a | Less than 1 SF cutout | 5 | EA |
| 1b | Each additional cutout, per 1 SF | 5 | EA |
| 1c | Holes, 1 inch or less, first hole | 5 | EA |
| 1d | Each additional hole, 1 inch or less | 5 | EA |
| 3002 | Temporary Facilities, Asbestos Abatement and Mobilization Cost | | | |
| 2a | Small Scale, Short Duration Projects | 30 | EA |
| | (Routine) | | |
| 2b | Small Scale, Short Duration Projects | 10 | EA |
| | (Emergency Response, within 24 hours) | | |
| 2c | Abatement Projects | 20 | EA |
| 3003 | Temporary Pressure Differential and Air Circulation Equipment, | 30 | EA |
| at 1500 CFM or greater | | |
| 3004 | Temporary Enclosures | | | |
| 4a | Temporary Enclosures, per 1000 CF | 30 | EA |
| 4b | Exterior Enclosures, per 1000 CF | 5 | EA |
| 4c | Exterior Wind Break / Visual Barrier per 200 SF | 5 | EA |
| 3005 | Making Entry into Controlled Area, such as above a ceiling, | 5 | EA |
| each Project | | |
| 3006 | Small Scale Short Duration (O&M) Work | | | |
| 6a | Glovebag up to 20 LF of pipe insulation and | 30 | EA |
| | fittings (less than 6 inches in diameter), or | | |
| | 10 LF of pipe insulation and fittings | | |
| | (6 inches to 12 inches in diameter), or | | |
| | up to 8 individual fittings (10 inches or less in diameter) | | |
| 6b | Up to 10 SF of surfacing material or Thermal System | 10 | EA |
| | Insulation (TSI). | | |
| 6c | Asbestos-containing duct tape | 50 | LF |
| 6d | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, 0 to 500 SF | | |
| 6e | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, 0 to 500 SF | | |
| 6f | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, areas or adjacent areas 501 to 2000 SF | | |
| 6g | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, areas or adjacent areas 501 to 2000 SF | | |
| 6h | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, areas or adjacent areas over | | |
| | 2000 SF | | |
| 6i | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, areas or adjacent areas over | | |
| | 2000 SF | | |
| 6j | Removal of carpet tiles to expose vinyl-asbestos | 10000 | SF |
| | floor tile | | |
| 6k | Non-friable cementitious materials; such as siding, | 3000 | SF |
| | shingles and wall board | | |
| 6l | Non-friable cementitious pipe, | 10 | EA |
| | less than 6 inches in diameter, per 20 LF | | |
| 6m | Non-friable cementitious pipe, | 10 | EA |
| | 6 inches or more in diameter, per 20 LF | | |
| 6n | Wrap and cut piping with insulation, | 10 | EA |
| | less than 6 inches in diameter, per 20 LF | | |
| 6o | Wrap and cut piping with insulation, | 10 | EA |
| | 6 inches or more in diameter, per 20 LF | | |
| 6p | RACM vinyl-asbestos floor tile and adhesive | 3000 | SF |
| 6q | RACM vinyl-asbestos floor tile only | 3000 | SF |
| 3007 | Installation, Operation and Removal of a Complete Decontamination Unit | | |
| in Support of Abatement Operations | 25 | EA |
3008 Project Decontamination, per 1000 CF of Containment 25 EA
| 3009 | Cleaning and Decontamination | | | |
| 9a | Removal of visible debris, per 100 SF area | 10 | EA |
| 9b | Room decontamination, per 1000 CF | 10 | EA |
| 9c | Decontaminating objects, per 100 SF | 10 | EA |
| 3030 | Demolition / Renovation - Asbestos Abatement | | | |
| 10a | Ceiling tiles | 1000 | SF |
| 10b | Surfacing material such as architectural finishes, | 2000 | SF |
| | fireproofing and fire blankets | | |
| 10c | Linoleum Flooring | 500 | SF |
| 10d | Pipe insulation, less than 6" in diameter | 1000 | LF |
| 10e | Pipe insulation, 6 inches or more in diameter | 500 | LF |
| 10f | Asbestos-containing siding, shingles or wall board | 3000 | SF |
| 10g | Non-friable cementitious pipe, less than 6" in diameter | 10 | EA |
| | per 20 LF | | |
| 10h | Non-friable cementitious pipe, 6 inches or more in | 10 | EA |
| | diameter per 20 LF | | |
| 3011 | Demolition of Asbesto-Contaminated Materials | | | |
| 11a | Ceiling Tiles | 1000 | SF |
| 11b | Ceiling Support Systems | 500 | SF |
| 11c | Carpeting | 2000 | SF |
| 3012 | Removal of Asbesto-Containing Material | | | |
| 12a | Duct/Pipe insulation, less than 6 inches in diameter | 100 | LF |
| 12b | Duct/Pipe insulation, 6 inches or more in diameter | 100 | LF |
| 12c | Thermal system insulation, all surfaces except round | 300 | SF |
| | round duct and pipe covered in 12a & 12b | | |
| 12d | Surfacing material such as architectural finishes, | 300 | SF |
| | fireproofing and fire blankets | | |
| 12e | Wrap and cut pipe insulation, less than 6 inches in diameter, | 50 | EA |
| | per 20 LF | | |
| 12f | Wrap and cut pipe insulation, 6" or more in diameter, | 50 | EA |
| | per 20 LF | | |
| 3013 | Removal of Asbestos-Containing Soil | | | |
| 13a | Wet Soil | 10 | SF |
| 13b | Dry Soil | 10 | SF |
| 3014 | Disposal of Asbestos-Containing Material is to be included in other | NOT SEPERATELY PRICED |
| proposal items | |
3015 Gypsum Drywall Asbestos Enclosures per 100 SF 30 EA
| 3016 | Encapsulation of Asbestos-Containing Material | | | |
| 16a | Pipe insulation, less than 6 inches in diameter | 10 | LF |
| 16b | Pipe insulation, 6 inches or more in diameter | 10 | LF |
| 16c | All other surfaces, per 100 SF | 5 | EA |
| 3017 | Repair of Insulation and Lagging Using Reinforced Bridging Encapsulant | | | |
| 17a | Pipe insulation, less than 6 inches in diameter | 20 | LF |
| 17b | Pipe insulation, 6 inches or more in diameter | 20 | LF |
| 17c | All other surfaces, per 100 SF | 10 | EA |
| 3018 | Repair of Insulation and Lagging Using Plastic Jacket | | | |
| 18a | Pipe insulation, less than 6 inches in diameter | 20 | LF |
| 18b | Pipe insulation, 6 inches or more in diameter | 20 | LF |
| 3019 | Labor for Projects to remove mold, Lead Based Paint and other | | | |
| similar contaminants from contaminated articles and building materials | | | |
| (rate to be used for required activities not included in line items above, | | | |
| for instance; building temporary enclosures includes the labor in that | | | |
| line item and includes necessary personal protective equipment). | | | |
| 19a | Project Manager, per hour | 100 | HR |
| 19b | Technician, per hour | 400 | HR |
| | | | NOT TO EXCEED |
| 3030 | Miscellaneous Prep Work in support of abatement projects | 1 | EA | |
| (such as demolition of walls, built-in cabinets, moving equipment, | | | |
| rental of lifts, etc.), shall be paid at the contractor's standard | | | |
| rate or the contractor's documented cost. | | | |
| | | | NOT TO EXCEED |
| 3021 | Labor, Supplies, or Services not included elsewhere in this | 1 | EA | |
| schedule, shall be paid at the contractor's standard | | | |
| rate or the contractor's documented cost. | | | |
| 3022 | State of Oklahoma Department of Labor Contractor Work | 10 | EA | |
| Fee(s) IAW Oklahoma Asbestos Control Act 40 O.S. | | | |
| Subsection 450.OAC 380:50-25-1. "Contractor Fee". Fee(s) | | | |
| shall be paid at the contractor's documented cost. | | | |
| Contractor will invoice with supporting documentation. | | | NOT TO EXCEED |
TOTAL ESTIMATED 3RD OPTION YEAR
4TH OPTION YEAR
| Asbestos Abatement Services Contract |
| Schedule B |
| 6/21/21 |
| PART 1 - SECTION B |
| SUPPLIES OR SERVICES AND PRICES / COST |
| | Estimated | | | |
| CLIN | Description | Annual | UNIT | UNIT | TOTAL |
| | Quantity | | PRICE | AMOUNT |
4TH OPTION YEAR March 15, 2026 to March 14, 2027
FIRM-FIXED-PRICE
| 4001 | Perform Cutting, Drilling or Abrading | | | |
| 1a | Less than 1 SF cutout | 5 | EA |
| 1b | Each additional cutout, per 1 SF | 5 | EA |
| 1c | Holes, 1 inch or less, first hole | 5 | EA |
| 1d | Each additional hole, 1 inch or less | 5 | EA |
| 4002 | Temporary Facilities, Asbestos Abatement and Mobilization Cost | | | |
| 2a | Small Scale, Short Duration Projects | 30 | EA |
| | (Routine) | | |
| 2b | Small Scale, Short Duration Projects | 10 | EA |
| | (Emergency Response, within 24 hours) | | |
| 2c | Abatement Projects | 20 | EA |
| 4003 | Temporary Pressure Differential and Air Circulation Equipment, | 30 | EA |
| at 1500 CFM or greater | | |
| 4004 | Temporary Enclosures | | | |
| 4a | Temporary Enclosures, per 1000 CF | 30 | EA |
| 4b | Exterior Enclosures, per 1000 CF | 5 | EA |
| 4c | Exterior Wind Break / Visual Barrier per 200 SF | 5 | EA |
| 4005 | Making Entry into Controlled Area, such as above a ceiling, | 5 | EA |
| each Project | | |
| 4006 | Small Scale Short Duration (O&M) Work | | | |
| 6a | Glovebag up to 20 LF of pipe insulation and | 30 | EA |
| | fittings (less than 6 inches in diameter), or | | |
| | 10 LF of pipe insulation and fittings | | |
| | (6 inches to 12 inches in diameter), or | | |
| | up to 8 individual fittings (10 inches or less in diameter) | | |
| 6b | Up to 10 SF of surfacing material or Thermal System | 10 | EA |
| | Insulation (TSI). | | |
| 6c | Asbestos-containing duct tape | 50 | LF |
| 6d | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, 0 to 500 SF | | |
| 6e | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, 0 to 500 SF | | |
| 6f | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, areas or adjacent areas 501 to 2000 SF | | |
| 6g | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, areas or adjacent areas 501 to 2000 SF | | |
| 6h | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile and adhesive, areas or adjacent areas over | | |
| | 2000 SF | | |
| 6i | Non-friable (non-RACM) vinyl-asbestos floor | 5000 | SF |
| | tile only, areas or adjacent areas over | | |
| | 2000 SF | | |
| 6j | Removal of carpet tiles to expose vinyl-asbestos | 10000 | SF |
| | floor tile | | |
| 6k | Non-friable cementitious materials; such as siding, | 3000 | SF |
| | shingles and wall board | | |
| 6l | Non-friable cementitious pipe, | 10 | EA |
| | less than 6 inches in diameter, per 20 LF | | |
| 6m | Non-friable cementitious pipe, | 10 | EA |
| | 6 inches or more in diameter, per 20 LF | | |
| 6n | Wrap and cut piping with insulation, | 10 | EA |
| | less than 6 inches in diameter, per 20 LF | | |
| 6o | Wrap and cut piping with insulation, | 10 | EA |
| | 6 inches or more in diameter, per 20 LF | | |
| 6p | RACM vinyl-asbestos floor tile and adhesive | 3000 | SF |
| 6q | RACM vinyl-asbestos floor tile only | 3000 | SF |
| 4007 | Installation, Operation and Removal of a Complete Decontamination Unit | | |
| in Support of Abatement Operations | 25 | EA |
4008 Project Decontamination, per 1000 CF of Containment 25 EA
| 4009 | Cleaning and Decontamination | | | |
| 9a | Removal of visible debris, per 100 SF area | 10 | EA |
| 9b | Room decontamination, per 1000 CF | 10 | EA |
| 9c | Decontaminating objects, per 100 SF | 10 | EA |
| 4040 | Demolition / Renovation - Asbestos Abatement | | | |
| 10a | Ceiling tiles | 1000 | SF |
| 10b | Surfacing material such as architectural finishes, | 2000 | SF |
| | fireproofing and fire blankets | | |
| 10c | Linoleum Flooring | 500 | SF |
| 10d | Pipe insulation, less than 6" in diameter | 1000 | LF |
| 10e | Pipe insulation, 6 inches or more in diameter | 500 | LF |
| 10f | Asbestos-containing siding, shingles or wall board | 3000 | SF |
| 10g | Non-friable cementitious pipe, less than 6" in diameter | 10 | EA |
| | per 20 LF | | |
| 10h | Non-friable cementitious pipe, 6 inches or more in | 10 | EA |
| | diameter per 20 LF | | |
| 4011 | Demolition of Asbesto-Contaminated Materials | | | |
| 11a | Ceiling Tiles | 1000 | SF |
| 11b | Ceiling Support Systems | 500 | SF |
| 11c | Carpeting | 2000 | SF |
| 4012 | Removal of Asbesto-Containing Material | | | |
| 12a | Duct/Pipe insulation, less than 6 inches in diameter | 100 | LF |
| 12b | Duct/Pipe insulation, 6 inches or more in diameter | 100 | LF |
| 12c | Thermal system insulation, all surfaces except round | 300 | SF |
| | round duct and pipe covered in 12a & 12b | | |
| 12d | Surfacing material such as architectural finishes, | 300 | SF |
| | fireproofing and fire blankets | | |
| 12e | Wrap and cut pipe insulation, less than 6 inches in diameter, | 50 | EA |
| | per 20 LF | | |
| 12f | Wrap and cut pipe insulation, 6" or more in diameter, | 50 | EA |
| | per 20 LF | | |
| 4013 | Removal of Asbestos-Containing Soil | | | |
| 13a | Wet Soil | 10 | SF |
| 13b | Dry Soil | 10 | SF |
| 4014 | Disposal of Asbestos-Containing Material is to be included in other | NOT SEPERATELY PRICED |
| proposal items | |
4015 Gypsum Drywall Asbestos Enclosures per 100 SF 30 EA
| 4016 | Encapsulation of Asbestos-Containing Material | | | |
| 16a | Pipe insulation, less than 6 inches in diameter | 10 | LF |
| 16b | Pipe insulation, 6 inches or more in diameter | 10 | LF |
| 16c | All other surfaces, per 100 SF | 5 | EA |
| 4017 | Repair of Insulation and Lagging Using Reinforced Bridging Encapsulant | | | |
| 17a | Pipe insulation, less than 6 inches in diameter | 20 | LF |
| 17b | Pipe insulation, 6 inches or more in diameter | 20 | LF |
| 17c | All other surfaces, per 100 SF | 10 | EA |
| 4018 | Repair of Insulation and Lagging Using Plastic Jacket | | | |
| 18a | Pipe insulation, less than 6 inches in diameter | 20 | LF |
| 18b | Pipe insulation, 6 inches or more in diameter | 20 | LF |
| 4019 | Labor for Projects to remove mold, Lead Based Paint and other | | | |
| similar contaminants from contaminated articles and building materials | | | |
| (rate to be used for required activities not included in line items above, | | | |
| for instance; building temporary enclosures includes the labor in that | | | |
| line item and includes necessary personal protective equipment). | | | |
| 19a | Project Manager, per hour | 100 | HR |
| 19b | Technician, per hour | 400 | HR |
| | | | NOT TO EXCEED |
| 4040 | Miscellaneous Prep Work in support of abatement projects | 1 | EA | |
| (such as demolition of walls, built-in cabinets, moving equipment, | | | |
| rental of lifts, etc.), shall be paid at the contractor's standard | | | |
| rate or the contractor's documented cost. | | | |
| | | | NOT TO EXCEED |
| 4021 | Labor, Supplies, or Services not included elsewhere in this | 1 | EA | |
| schedule, shall be paid at the contractor's standard | | | |
| rate or the contractor's documented cost. | | | |
| 4022 | State of Oklahoma Department of Labor Contractor Work | 10 | EA | |
| Fee(s) IAW Oklahoma Asbestos Control Act 40 O.S. | | | |
| Subsection 450.OAC 380:50-25-1. "Contractor Fee". Fee(s) | | | |
| shall be paid at the contractor's documented cost. | | | |
| Contractor will invoice with supporting documentation. | | | NOT TO EXCEED |
TOTAL ESTIMATED 4TH OPTION YEAR
TOTAL ESTIMATED POTENTIAL VALUE: BASE YEAR PLUS ALL OPTION YEARS