Sch B3 Welcome Center Snow Removal specs Ironwood 7-17-26.docx

DOCX document 43 KB Posted

Attached to
Ironwood Welcome Center Janitorial and Snow
Solicitation number
RFP 591 260000002386 1
Issued by
Genesee County, Huntington Woods City, Michigan

About this file

This is a Snow Removal Specifications document issued by the State of Michigan for RFP No. 260000002386, covering janitorial, partial grounds, and snow services for the Ironwood Welcome Center. The contractor must complete snow removal on driving surfaces—including entrance ramps, parking areas for both cars and trucks, and exit ramps—by 7:00 a.m. following any accumulation of 2 inches or more of snow on any day, including weekends and holidays. Multiple service trips may be required during heavy snowfall events. The contractor must also apply granular or approved liquid deicer when hard-packed snow or ice remains on pavement after snow removal operations are completed, and must respond to additional emergency requests from the Program Manager within one hour of notification. The contractor is responsible for furnishing, operating, and maintaining all necessary equipment, which cannot be stored on state property. Equipment must comply with all local, state, and federal codes and is subject to inspection by the Program Manager; equipment failure does not constitute an acceptable reason for service delays.

The specifications emphasize that "time is of the essence" for all snow and ice removal activities, and the contractor must exercise due diligence to complete work within the shortest reasonable timeframe. Snow cannot be piled to obstruct vision or create hazards to the public, nor can it be placed on sidewalks or adjacent roads and shoulders in accordance with state law. All snow storage areas must be designated by the Program Manager or shown on a provided map. The contractor must notify the Program Manager no later than the next day following any completed work and must consult the Program Manager for work inspection and approval to allow time for corrections if necessary. The state assumes no responsibility for theft, vandalism, or damage to contractor equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement

SCHEDULE B.3 – SNOW REMOVAL SPECIFICATIONS

Michigan.gov/MiProcurement

SCHEDULE B.3 – SNOW REMOVAL SPECIFICATIONS

Request for Proposal (RFP) No. 260000002386 Janitorial/Partial Grounds/Snow Services for the Ironwood Welcome Center

SNOW AND ICE REMOVAL SPECIFICATIONS

A. General Requirements:

“TIME IS OF THE ESSENCE” in respect to snow and/or ice removal Contract Activities. The Contractor must perform Contract Activities in conformance with the provisions set forth herein and use due diligence to complete the work within the shortest reasonable period of time.

B. Snow Removal on Driving Surfaces

1. Snow removal shall be completed by 7:00 a.m. after each accumulation of 2” or more of snow on any given day including weekends and holidays. In cases of heavy snowfall, multiple service occurrences may be required during the day. Typical service is plowing 2” to 6” of snow accumulation. The Program Manager may request additional service trips to remove snow which has accumulated.

2. Areas for snow removal shall include entrance ramps, car parking areas, truck parking areas, and exit ramps.

3. Snow shall not be piled to cause a vision obstruction or hazard to the public; nor shall it be piled on sidewalks, or sidewalk “cuts”. All snow shall be pushed away from sidewalks and stored in the areas shown on the map (if provided) or in areas designed by the Program Manager.

4. BY STATE LAW no snow shall be pushed across or on to adjacent roads and shoulders.

5. Any accidents or damages on the premises must be reported immediately to the Program Manager.

C. Ice Removal

1. Granular or approved liquid deicer shall be applied anytime hard packed snow or ice remains on pavement after snow removal operation has been completed.

2. Deicer shall be applied during any period(s) of freezing precipitation as directed by the Program Manager.

D. Calls for Additional Services

1. The Program Manager may request additional or emergency snow/ice removal services as needed (drifting snow or other circumstances) and as determined by the Program Manager or designee.

2. The Contractor must respond and be in route to the call out location(s) within one hour of notification from the Program Manager or designee.

E. Work Approval

1. The Contractor must notify the Program Manager or designee no later than the next day after any work is performed.

2. The Contractor shall consult the Program Manager for inspection and tentative approval of work being accomplished, so that in the event of unsatisfactory work, sufficient time will be available for the Contractor to make corrections in a satisfactory manner within the time specified.

F. Equipment

1. The Contractor shall furnish, operate and maintain suitable and adequate equipment necessary to maintain entrance/exit ramps and all parking areas free from ice and snow.

2. The Contractor's snow removal equipment WILL NOT be stored on State property for any reason.

3. Under no circumstances shall the State be responsible for any theft, vandalism, or damage to the Contractor’s equipment.

4. The Program Manager shall have the right to inspect all equipment which is to be used in carrying out the terms of the Contract. Any equipment which does not comply with local, state, and federal codes, or with the Contract, may be rejected.

5. Equipment failure WILL NOT constitute an acceptable reason for failure to provide scheduled service.

image1.png