SCCS Pagaing RFP BP1 r1 pics.pdf

PDF 1 MB Posted

Attached to
Paging System - addendum added
Solicitation number
RFP-SWTZ-190000002216-4
Issued by
Genesee County, Michigan

About this file

The provided document contains floor plans for three elementary schools (Elms, Gaines, and Moorish) with detailed room layouts and annotated images of typical building hall speakers and new system locations. The floor plans include room numbers, building sections marked with letters (A and B), and photographs of audio/communication equipment mounted on walls or in technical areas. Each school's floor plan is drawn to no scale and oriented with a north arrow. The images appear to be part of a technical documentation set related to a communication or audio system installation project across multiple school sites.

The floor plans show consistent layout patterns across the three schools, with room numbering schemes and similar architectural configurations. Photographs include close-up views of speakers mounted on brick walls, technical equipment like control panels and boxes, and a wall-mounted device with a heart-shaped graphic. The "New System Location" is marked on each floor plan, indicating potential upgrade or installation points for audio/communication infrastructure. The consistent presentation suggests this is part of a standardized technical documentation package for a school district or educational facilities communication system upgrade project.

View the file

Other files

File Type Posted
SCCS-PA-BP1-Addendum#1.pdf PDF
SCCS Pagaing RFP BP1 r1 1-44 (1).pdf PDF
SCCS Pagaing RFP BP1 r1 1-44.pdf PDF
SCCS Pagaing RFP BP1 r1 pics (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Typical Building

Hall Speaker

New System Location

Typical Building

Hall Speaker

New System Location

File details come from the government source that posted it. Updated .