SCCS Pagaing RFP BP1 r1 pics (1).pdf

PDF 1 MB Posted

Attached to
Paging System - addendum added
Solicitation number
RFP-SWTZ-190000002216-4
Issued by
Genesee County, Michigan

About this file

The document contains floor plans for three different elementary schools (Elms, Gaines, and Moorish), which appear to be part of a facilities infrastructure or communication system upgrade project. The floor plans illustrate proposed locations for new audio/communication system equipment, including typical building hall speakers mounted on walls and new system installation points within various rooms and hallways. Each school's floor plan is detailed with room numbers and includes photographic evidence of existing audio/communication hardware and installation environments.

The images suggest a systematic approach to upgrading communication infrastructure across multiple school sites, with consistent placement strategies for speakers and system components. The floor plans show careful consideration of room layouts, potential speaker locations, and integration points for new communication technology. Accompanying photographs depict existing hardware such as wall-mounted speakers, control panels, and equipment boxes, indicating the current state of audio/communication systems prior to the proposed upgrades.

View the file

Other files

File Type Posted
SCCS Pagaing RFP BP1 r1 pics.pdf PDF
SCCS Pagaing RFP BP1 r1 1-44 (1).pdf PDF
SCCS Pagaing RFP BP1 r1 1-44.pdf PDF
SCCS-PA-BP1-Addendum#1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Typical Building

Hall Speaker

New System Location

Typical Building

Hall Speaker

New System Location

File details come from the government source that posted it. Updated .