This is a demolition plan document prepared by the State of Alaska Department of Transportation and Public Facilities (DOT&PF) South Coast Region for the removal of structures at Kodiak Airport. The project scope includes the full demolition of two one-story wood frame buildings and two 500-gallon aboveground storage tanks (ASTs) located on Lots 3, 4A, and 5A at Kodiak Airport. The contractor must remove all above-ground portions of existing structures while leaving all below-ground foundations and slab surfaces in place; foundation walls and curbs above ground level shall be cut to ground surface level. The contractor is responsible for all utility locates in accordance with Alaska Dig Line and applicable Alaska Administrative Code, maintaining perimeter fencing at Lots 3 and 4A, and removing 48 linear feet of interior fencing as noted on the plans. All demolition materials must be removed from the project site and disposed of unless otherwise noted, with the owner retaining first right to salvage marked items. The contractor must provide the owner seventy-two hours' notice prior to site mobilization to allow for salvage activities.

The demolition plan specifies that all floor drains and wastewater piping at floor slabs shall be plugged and capped, and any AST piping between tanks and building footprints must be removed and capped. Ground-disturbing activity must be limited to only what is necessary for demolition work, with all non-scheduled features protected in place. The corresponding invitation for quotes (Contract No. SPC-25263009A) indicates that bids were to be received until 4:00 p.m. on February 24, 2026, at the office of the Contracts Officer in Juneau, Alaska, with submissions also accepted via email. The contractor must furnish all labor, equipment, materials, supervision, and incidentals necessary to complete the work. Questions regarding the project should be directed to Jenny Huntley, Chief of Contracts, at (907) 465-4420.

View the file

Other files

File Type Posted
Addendum- 1.pdf PDF
Addendum- 2.pdf PDF
SPC-25263009A- IFQ Advertise Packet.pdf PDF
Kodiak Airport Buildings HMA_20211215.pdf PDF
thumbnail_IMG_0120.zip ZIP file
SC Structure Demo Technical SPECS.pdf PDF
Ph1ESA_ADQ_L3-L5A_BLK1400_2021-1217.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Brad Doggett Line

Brad Doggett Line

Brad Doggett Text Box Not in Contract

DEMOLITION PLAN NOTES:

1. ALL ITEMS SCHEDULED FOR DEMOLITION SHALL BE REMOVED FROM THE PROJECT SITE

(LOT 3, 4a, AND 5A) AND SHALL BE DISPOSED OF BY THE CONTRACTOR UNLESS NOTED

OTHERWISE. OWNER HAS FIRST RIGHT TO SALVAGE ANY ITEMS MARKED FOR

DEMOLITION.

2. OWNER RESERVES THE RIGHT TO SALVAGE ITEMS FROM THE SITE PRIOR TO THE

CONTRACTOR MOBILIZATION OF THE SITE AND DURING DEMOLITION. CONTRACTOR TO

NOTIFY OWNER SEVENTY-TWO HOURS PRIOR TO SITE MOBILIZATION TO ALLOW OWNER

TO SALVAGE ANY ITEM SHOWN ON THE PLANS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATES IN ACCORDANCE WITH

ALASKA DIG LINE AND APPLICABLE ALASKA ADMINISTRATIVE CODE (AAC).

4. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL

EXISTING ITEMS NECESSARY FOR COMPLETION OF THE WORK.

5. LIMIT GROUND DISTURBING ACTIVITY TO ONLY WHAT IS NECESSARY FOR DEMOLITION

WORK. PROTECT IN PLACE EXISTING FEATURES THAT ARE NOT SCHEDULED FOR

DEMOLITION.

6. CONTRACTOR SHALL MAINTAIN FENCING AT PERIMETER OF LOT 3 AND 4A. DEMOLISH

INTERIOR FENCING AS NOTED ON PLAN.

7. SEE LEGEND AND ABBREVIATIONS ON SHEET H1.1

CIVIL WORK ITEMS:

8. REMOVE ALL ABOVE GROUND PORTIONS OF EXISTING STRUCTURES. ALL

BELOWGROUND FOUNDATIONS AND SLAB SURFACES TO REMAIN IN PLACE.

FOUNDATION WALLS AND CURBS ABOVE THE SURROUNDING GROUND SURFACE SHALL

BE CUT DOWN AND REMOVED TO GROUND SURFACE LEVEL.

9. PLUG AND CAP ALL FLOOR DRAINS AND WASTEWATER PIPING AT FLOOR SLAB.

10. ANY AST PIPING BETWEEN THE TANK AND THE BUILDING FOOTPRINT SHALL BE

REMOVED AND CAPPED. DO NOT REMOVE PIPING IN THE INTERIOR OF THE BUILDING.

EXISTING SITE & DEMOLITION PLAN

LOT 3

LOT 5A

D at e R ev is ed

La yo ut N am e:

Fi le

P at h

N am e:

D es ig ne d By

D ra w n By

C he ck ed B y:

STATE OF ALASKA

DEPARTMENT OF TRANSPORTATION

AND PUBLIC FACILITIES

SOUTH COAST REGION

SOUTH COAST REGION

STRUCTURE REMOVAL

KODIAK AIRPORT BUILDING REMOVALS

LOT 5A & LOT 3, BLOCK 1400, KODIAK AIRPORT

PROJECT No. TBD

DATE:

SHEET:

REVISIONDATEBYR

&M

P R

O

JE

C T

N U

M

BE

R : 2

8.

03/14/2022

65% DESIGN REVIEW

PLANS DEVELOPED BY:

R&M CONSULTANTS, INC.

CERT. OF AUTH.: AECC111

ONE STORY WOOD

FRAME BUILDING

TO BE DEMOLISHED.

SEE NOTE 8.

500-GAL AST

TO BE DEMOLISHED

ONE STORY WOOD FRAME

BUILDING TO BE DEMOLISHED.

SEE NOTE 8.

500-GAL AST

TO BE DEMOLISHED

ONE STORY WOOD

FRAME BUILDING

TO BE DEMOLISHED.

SEE NOTE 8.

H2.1

500-GAL AST

TO BE DEMOLISHED

PERIMETER FENCE

& GATES TO

REMAIN IN PLACE.

DEVIL'S CREEK SERVICE ROAD

AIRPORT W

AY

DEMO 48 LF OF

INTERIOR FENCE

DEMO 48 LF OF

INTERIOR FENCE

LONG TERM PARKING

(NOT INCLUDED IN PROJECT SCOPE)

SHORT TERM

PARKING

LOT 4A

LOT 6A

LOT 1 & 2

LOT 46

LOT 7B & 8A

SITE PHOTO 1: REPRESENTATIVE CONDITIONS

SITE PHOTO 2: REPRESENTATIVE CONDITIONS

Brad Doggett Text Box Note: some items such as the RV, boat, and trailers have been removed. See January 2026 photos for current conditions

G1.0.pdf
Sheets and Views
2658.13-G1.0 Cover Sheet Cold Bay-G1
H2.1.pdf
Sheets and Views
H2.1
H1.8.pdf
Sheets and Views
2658.13-H1.6 Details-H1.6

File details come from the government source that posted it. Updated .