- Solicitation number
- IFB1 GJFA 2026000120 2
- Issued by
- Pitkin County, Lakewood City, Colorado
About this file
This is a Unit Pricing Form issued by the State of Colorado Office of the State Architect State Buildings Program for the project LCC 26-9 Replace Natural Gas Line-Bowman & Trustees Buildings. The form is designed to establish unit prices for potential change orders during the execution of the contract. The document provides nine numbered line items (U1 through U9) for unit pricing entries, with columns designated for description, unit of measure, and unit price. Bidders are required to complete the form with detailed descriptions based on specifications provided in Division 01 of the project specifications before submission with their bids. The unit prices established through this form will remain valid until the date of contract completion as established on the Notice to Proceed.
All unit prices submitted must include the pro-rata share of materials, equipment, and disposal costs required to complete each work item. Overhead, profit, and bond will be calculated separately on a Change Order Proposal form (SC-6.312) rather than being incorporated into the unit prices. The form requires the bidder's company name, authorized signature, and date of submission. This pricing mechanism allows the state to adjust contract sums for authorized changes to the work scope while maintaining consistency in pricing methodology throughout the project duration.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
UNIT PRICING FORM
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
The unit prices below shall be used to determine adjustment to the contract sum when changes in the work involving said items are deemed necessary.
Unit Prices shall apply until the date of contract completion established on the Notice to Proceed.
All unit prices shall include the pro-rata share of all costs of materials, equipment and disposal required to complete the work item. Overhead, profit and bond will be calculated on a Change Order Proposal (SC-6.312).
(Architect/Engineer should complete a brief description below based on their complete description provided in Division 01 of their specification before inserting into the solicitation)
UNIT PRICING
| Number |
| Description |
Unit of Measure
Unit Price
U1
U2
U3
U4
U5
U6
U7
U8
U9
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
SBP-6.131
Rev 7/2025 image1.jpeg