This is an Information for Bidders document prepared by the Colorado state and local government for contract opportunity LCC 26-9, which involves replacing a natural gas line serving the Bowman and Trustees Buildings. The project requires bidders to submit proposals for the complete removal of the existing natural gas line and installation of a new line to serve both buildings. The document establishes the submission deadline, required documentation, and procedural requirements for all interested contractors. Bidders are required to attend a mandatory pre-bid meeting to review project specifications and site conditions, with attendance documented through a sign-in sheet. The contract award will be made to the lowest responsive and responsible bidder meeting all specified requirements and qualifications.
The bidding process requires submission of sealed bids by the specified deadline, with bids evaluated based on price and compliance with technical specifications outlined in the scope of work. Bidders must demonstrate financial capability, insurance requirements, and relevant experience with natural gas utility projects. The document specifies that all bids must include detailed pricing for labor, materials, and equipment, along with a timeline for project completion. Contractors must comply with prevailing wage requirements and provide evidence of bonding capacity. The project is funded through state capital appropriations, and the selected contractor must maintain performance and payment bonds for the duration of the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SBP-6.13 Bid Form_2025.pdf | ||
| SC6.21 DBB A_2025_1.docx | DOCX document | |
| SC6.23 DBB GC_2025.pdf | ||
| PreBid Walkthru 022326.pdf | ||
| 2026-032M25 LCC Replace natural Gas Line Bowman Trustees Addendum #1 022026.pdf | ||
| SBP6.18 Labor Burden Calc R8-2023 (9).docx | DOCX document | |
| 2509-0376 Lamar CC Gas Improvement Plans - Stamped.pdf | ||
| 2026-032M25 Project Manual LCC Replace Gas Line Bowman Trustees.pdf | ||
| SBP-6.14 Bid Bond_2025 (6).docx | DOCX document | |
| SBP-6.133 Unit Pricing_2025 (2).docx | DOCX document | |
| AFB-2025 (7).pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.12
Rev 7/2025
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
INFORMATION FOR BIDDERS
Institution or Agency:
Project No./Project Name:
1. BID FORM: Bidders are required to use the Bid form attached to the solicitation.
Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days. In addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, in calendar days.
Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner. Bids and applicable bid security shall be submitted according to the following instructions:
2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of addendum.
3. APPLICABLE LAWS AND REGULATIONS: All work under this Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances and regulations which might in any manner affect the work to be done or those to be employed in or about the work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in Articles 27 and 52 of the General Conditions. This includes the requirements for apprenticeship and prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions of eligible materials shall be governed by the provisions of Colorado State Law. This includes the requirements for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential (GWP) limits as established by the Office of the State Architect.
4. BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form
SBP-6.12
Rev 7/2025 satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.
5. TAXES: The Bid submitted shall exclude all applicable federal excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the GENERAL CONDITIONS.
6. OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or equipment specified. Any material or equipment that will fully perform the duties specified, will be considered “equal”, provided the bid submits proof that such material or equipment is of equivalent substance and function and is approved, in writing. Requests for the approval of “or equal” shall be made in writing at least five (5) business days prior to bid opening. During the bidding period, all approvals shall be issued by the Architect/Engineer in the form of addenda at least two (2) business days prior to the bid opening date.
7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two
(2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form.
8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents for this project require alternate prices, additive and/or deductible alternates shall be listed on the alternates bid form provided by the Principal Representative.
Bidders should note the Method of Award is applicable to this Bid as stated below.
A. DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by, and the contract will be awarded on the base bid combined with deductible alternates, accepted in numerical order as listed in the Bid Alternates Form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
B. ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid combined with additive alternates in numerical order in as listed in the Bid Alternates Form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
9. NOTICE OF CONTRACTOR’S SETTLEMENT – Agencies/institutions must indicate in the initial Solicitation where settlement will be advertised in electronic media.
| INFORMATION FOR BIDDERS |
| DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by, and the contract will be awarded on the base bid combined with deductible alternates, accepted in numerical order as listed in the Bid Alternates Form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder. |
| ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid combined with additive alternates in numerical order in as listed in the Bid Alternates Form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder. |
| DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used. |
| TextInput.136: Lamar Community College |
| TextInput.182: 2026-032M25/Replace Natural Gas Line, Bowman & Trustees Buildings |
| Submission Instructions: Please Mail or Hand Deliver Bids to: Ava Bair - Lamar Community College |
2401 S Man St.
Lamar, CO 81052
Bids sent by other methods will not be accepted. The Bid Package must be titled with the Invitation for Bid (IFB) Number, IFB Title, and the Offeror’s name as noted below:
Insert IFB number here_ Insert IFB Title here_ Company Name