SBE_Program_Provisions.pdf

PDF 228 KB Posted

Attached to
ON CALL STRUCTURAL ENGINEERING DESIGN SERVICES
Solicitation number
230099
Issued by
Pima County, Tucson City, Arizona

About this file

This document comprises Small Business Enterprise (SBE) Program Provisions and supporting forms issued by the City of Tucson Department of Procurement for professional design services contracts. The SBE Program Provisions establish requirements for contractors bidding on City of Tucson projects to include certified small business enterprises in their contracting plans. The provisions define eligible contracts as those with estimated values of $100,000 or greater, excluding contracts requiring federal Disadvantaged Business Enterprise goals or those procured through sole source, emergency, or special procurement methods. Contractors must submit a completed Statement of Proposed SBE Plan identifying all SBE subcontractors and suppliers by name, scope of work, and dollar value. If the established SBE project goal cannot be met, contractors must submit an Affidavit of Good Faith Efforts documenting their comprehensive outreach to certified SBE firms, including written solicitations, negotiation attempts, technical assistance requests from the City, and explanations for rejecting SBE proposals. The contract term is not specified in these provisions, as they serve as standard requirements applicable across multiple City projects.

Pricing and participation requirements are structured to ensure meaningful SBE involvement through commercially useful functions. Prime contractors may count their own participation if SBE-certified, with credit limited to actual work performed by their workforce. Subcontractor participation receives full credit for the contract value if performing a distinct element of work; however, if subcontracting occurs within standard industry practices, SBE subcontractors remain eligible. SBE suppliers manufacturing goods receive 100 percent credit toward goals, while wholesalers and manufacturer representatives receive credit only up to 25 percent of total project SBE goals. The City may waive or reduce established project goals if SBE availability is insufficient or if all qualified SBE quotes exceed the lowest non-SBE quote by the lesser of 15 percent or $250,000. Contractors must ensure SBE subcontractors receive prompt payment in compliance with Arizona Revised Statutes Title 32-1129 and Tucson Code Section 11-38, with the City authorized to withhold prime contractor payments to enforce compliance. Non-compliance with SBE provisions constitutes material breach, subject to remedies including payment withholding, contract termination, or disqualification from future bidding.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised July 2016 1

SBE PROGRAM PROVISIONS FOR PROFESSIONAL DESIGN SERVICES

APPENDIX A

PROJECT GOAL

The City of Tucson’s Small Business Enterprise Participation goal for this project is as follows:

% SBE

In consideration of the SBE goal on this project, the City identified the following trade areas as potential subcontracting opportunities to meet the goal, however, the Contractor may elect to meet the goal utilizing any subcontracting opportunity they deem appropriate.

List trade categories

I. SMALL BUSINESS ENTERPRISE REQUIREMENTS

A. DEFINITIONS

Commercially Useful Function - Is defined as the performance of real and actual services in the discharge of any contractual endeavor. An SBE subcontractor is performing a commercially useful function when it is responsible for execution of a distinct element of a contract and carries out its responsibilities by actually performing, managing and supervising the work involved.

Contractor - The individual, partnership, or corporation who, as a result of the competitive solicitation process, is awarded a contract by the City. For the purposes of SBE plan evaluation, any Offeror in negotiations with the City of Tucson pursuant to a Request for Qualifications is also subject to the contractor SBE program compliance requirements.

Eligible Contract - Any contract undertaken by the City, unless otherwise precluded by law, provided the estimate meets or exceeds one hundred thousand dollars ($100,000). An Eligible Contract does not include any project in which the estimated contract value is below one hundred thousand dollars ($100,000); contracts which require a disadvantaged business enterprise goal pursuant to federal law; contracts awarded under sections 28-21 (sole source procurement), 28-22 (emergency procurement) or 28-23 (special procurement) of the City Procurement Code.

Joint Venture – An association of two (2) or more persons, partnerships, corporations, business enterprises, or any combination of these entities established to form a single business enterprise but limited in scope and duration for the purpose of carrying out a business activity. The agreement establishing the Joint Venture shall be in writing. The SBE partner(s) must be responsible for a clearly defined portion of the work performed which is set forth in detail and separately from the work to be performed by the non-SBE partner and is assigned a commercially reasonable dollar value. Furthermore, the SBE’s interest shall be based on sharing real economic interest in the venture, include proportionate control over management, and interest in capital acquired by the Joint Venture and interest in earnings. Only the portion of work, supplies, and/or services attributed to the SBE, as a member of the Joint Venture, may be counted towards relevant SBE participation goals.

Small Business Enterprise (SBE) – A local small business that is an independent and continuing enterprise for profit, performing a Commercially Useful Function, that has completed the application

Revised July 2016 2 process for certification with the City of Tucson, and has met the requirements set forth in Title 49, Code of Federal Regulations, (49 CFR Part 26).

Subcontractor and Subconsultant – A person or entity that contracts to perform work or render service to a Contractor or to another Subcontractor as part of a contract with the City.

B. APPLICABILITY

The SBE program and policies are codified in Chapter 28, Article XIII of the City Procurement Code.

It is the responsibility of all contractors, subcontractors, vendors, suppliers and others who are interested in contracting with the City of Tucson to read and become familiar with this section of the City Code.

Only firms that are certified by the City of Tucson under Chapter 28, Article XIII of the City Code, at time of SBE Plan submittal, are eligible to fulfill SBE goals for City of Tucson projects.

In addition to subcontractors, contractors may use their own participation towards fulfillment of the SBE participation goal if they are certified through the City of Tucson SBE program.

The City of Tucson’s most recent SBE Directory contains the complete listing of those firms which are currently certified with the City, and therefore eligible to participate as an SBE on a project.

The most recent SBE Directory can be found at:

http://www.tucsonprocurement.com/assets/SBEDirectory.pdf. If the name of an SBE firm does not appear in the directory, it shall be the contractor’s responsibility to ascertain the certification status of the SBE and determine the eligibility of the firm to meet the established goal. The contractor may accomplish this by calling the City’s Department of Procurement at (520) 837-4000 for assistance.

ALL CONTRACTORS, INCLUDING SBEs, MUST COMPLY. Contractors who are SBEs must also comply with all requirements stated herein. By submitting to the City of Tucson, contractors bind themselves to make every good faith effort to meet the City’s SBE goal and comply with all aspects of the SBE Program requirements.

C. SBE PARTICIPATION

An SBE may participate as a prime contractor, subcontractor, second-tier subcontractor, joint venture partner with either a prime contractor or a subcontractor, or as a vendor of materials or supplies. An SBE shall be responsible for a clearly defined portion of the work to be performed.

D. SBE GOALS

To satisfy SBE goals, a certified SBE must perform a commercially useful function, i.e., must be responsible for a clearly defined portion of the work and must carry out its responsibility by actually performing, managing and supervising the work. Contractors may meet the SBE project goals through the following methods:

Prime Contractor Participation – SBE prime contractors may use their own participation towards fulfillment of the SBE participation goals. Credit will only be given for the dollar value of actual work performed by the prime contractor’s work force.

Subcontractor Participation - Contractors may utilize one or more certified SBE subcontractors to satisfy its SBE participation commitment and may claim the value of the commercially useful http://www.tucsonprocurement.com/assets/SBEDirectory.pdf

Revised July 2016 3 function to be performed by such subcontractor(s) to obtain credit toward the satisfaction of the applicable goal.

1. Contractors who utilize certified SBE firms whose participation is included in Force Account items, Allowances or in a Cost Reimbursement type contract, shall establish a signed contract value with the SBE firm and may only take credit for the dollar value of that contract towards satisfying its SBE commitment in their proposed SBE plan. The dollar value must be a specific amount based on anticipated work calculated by the subcontractor and is not reliant on any estimated values and cannot be specified as a range.

2. If a certified SBE subcontractor enters into second tier subcontracts consistent with the standard industry practices, such SBE subcontractor is performing a commercially useful function. If an SBE subcontractor subcontracts a significantly greater portion of its work to a non-SBE than would be expected by standard industry practices, it shall be presumed that the SBE is not performing a commercially useful function. Therefore, contractors are required to identify and report the use of any second tier subcontractors on the project on the Statement of Proposed SBE Plan form.

3. Credit will be given when a SBE subcontracts part of the work of its contract to another firm only if the SBE’s subcontractor is itself a SBE.

Supplier Participation - The contractor may contract with one or more certified SBE suppliers, provided that the supplier is a regular dealer of the materials supplied, to obtain credit toward SBE goals. The value of the commercially useful function to be performed by such SBE’s and credited toward satisfaction of the applicable SBE goals is as follows:

1. If an SBE supplier manufactures the goods supplied, one hundred percent (100%) of the contract amount is credited towards the applicable SBE participation goal.

2. If an SBE supplier is a wholesaler warehousing the goods supplied or is a manufacturer’s representative, the total contract amount is credited toward the established SBE goal; however, only twenty-five percent (25%) of the total SBE project goal may be met in this manner.

3. If an extraordinarily large proportion of a contract price is for equipment or supplies, a lower project goal may be set than otherwise would be required, or the twenty-five percent (25%) limit for suppliers may be increased, or a combination of these two methods may be utilized.

Joint Venture - Where a contractor engages in a joint venture to satisfy its SBE commitment, the SBE joint venture partner must be responsible for a clearly defined portion of the work to be performed in addition to satisfying the requirements of ownership and control. The SBE joint venture partner mut submit information for determining joint venture eligibility. The SBE joint venture must be approved as a SBE joint venture prior to SBE Plan submittal. The Department of Procurement shall determine the degree of SBE participation resulting from the joint venture which may be credited toward the applicable SBE goal of the project.

Revised July 2016 4

II. SUBMITTAL REQUIREMENTS

A. SUBMISSION OF AN SBE PLAN

The SBE Plan and/or Affidavit of Good Faith Efforts must be submitted with the project proposal.

The SBE Plan must include:

1. The name of the SBE subcontractors/suppliers;

2. The type and scope of work or service each SBE will perform;

3. The dollar value of each SBE’s subcontract;

4. Identify the prime contractor as an SBE, if applicable;

5. The dollar value of the prime contractor’s self-performed work if claiming SBE credit;

6. The total dollar value of SBE work performed and percentage of the contract value.

7. If the contract goal is not met, evidence of good faith efforts.

B. REVIEW OF SBE PLANS

The Procurement Director may determine that the contractor is nonresponsive where the contractor: (1) failed to provide a completed Statement of Proposed SBE Plan; (2) failed to identify SBEs by name, the scope of work and value of work as a percent of the total project amount sufficient to meet the applicable SBE goal for that project; (3) failed to achieve the dollar value of credible participation by certified SBEs necessary to meet the project goals; or (4) failed to meet the requirements for a waiver of the SBE goal.

III. GOOD FAITH EFFORT

If the SBE plan does not meet the project goals, the contractor may seek a waiver. The application for a waiver shall be in writing and must be completed and submitted with the project proposal.

The request must indicate whether a complete or partial waiver is sought. If a partial waiver is being sought the scope of such waiver must be indicated and an SBE plan must also be submitted.

The contractor must provide documented evidence including a narrative statement with supporting affidavits and/or exhibits verifying the good faith efforts to meet the goals. Evidence of the good faith efforts shall include, but is not limited to the following:

a. Documentation of communication with the Procurement Director seeking technical/professional assistance identifying available SBE’s.

b. Copies of written notification to Certified SBE’s regarding subcontracting opportunities on a project.

c. Documentation of efforts made to select portions of work for SBE subcontracting in order to increase the likelihood of meeting the SBE goals, including where appropriate breaking down subcontracts into economically feasible units in order to facilitate SBE participation.

d. Documentation of efforts to assist and negotiate with SBE’s for specific sub-proposals and reasons for rejection of any such offer, including the names, addresses, and telephone numbers of SBE’s who were contacted and reason for the rejection.

e. As to each SBE contacted which was considered not to be qualified, a written statement of the reasons for the conclusion.

f. Written quotes or records of verbal quotes solicited from all SBE’s seeking subcontract work at the time of the proposal submittal.

g. Verification that the offeror rejected available SBE’s because they submitted proposals which were unreasonably high, or they were not qualified. Such verification shall include

Revised July 2016 5 a statement of the amounts of all proposals received from potential Subcontractors and all relevant dates.

The City’s Procurement Director shall review the waiver and approve the waiver where the contractor has demonstrated good faith efforts or deem the contractor nonresponsive where they failed to meet the good faith efforts and shall recommend that the Project Manager reject the proposal.

Right to Appeal Good Faith Effort Waiver or Plan Decision An aggrieved party has a right to protest a good faith waiver request or plan decision made by the Procurement Director as follows:

1. An aggrieved party may submit a protest in writing to the Procurement Director within five (5) days from the date of notice of the adverse decision notice. The protest must include the legal and factual basis for the protest along with any supporting documents.

2. Within five (5) days of receipt of the protest, the Procurement Director shall review the protest and all relevant supporting documents and render a decision notice in writing which includes the basis for the decision.

3. The decision of the director is final and not appealable.

General Waiver or Reduction of SBE Goals If, after consultation with appropriate City departments, the Procurement Director determines that SBE availability is less than projected, the Procurement Director may waive or reduce established project goals. In such circumstances, the Procurement Director shall certify that SBE’s are not in fact available or that the amount of work, which occurred under the contract, was insufficient to support the established goals.

The City shall waive a project goal, at least in part, if the contractor requesting a waiver receives from all qualified SBE’s, in one trade or industry, quotes or proposal that exceeds the lowest quote or proposal of a qualified non-SBE competing for the same work by the lesser of fifteen percent (15%) or two hundred and fifty thousand dollars ($250,000). In such circumstances, the Procurement Director shall certify that SBE’s are not available to provide the needed labor and materials at competitive prices.

A contractor may not compare self-performed costs against an SBE subcontractor proposal as justification for the rejection of a proposal.

The procurement director may verify and / or clarify information as it relates to the affidavit of good faith efforts, and / or the statement of proposed SBE plan.

IV. MISCELLANEOUS PROVISIONS

A. CONTRACT PERFORMANCE & SUBSTITUTION REQUESTS

The contractor’s distinct contract items of work to be awarded to SBE’s shall be performed by the designated SBE. The SBE must perform a commercially useful function, that is, the SBE must manage, perform, and supervise a distinct element of work.

All subcontractor modifications (addition, substitution, deletion) pursuant to the Tucson Procurement Code Section 28-48(2), may only be allowed at the sole discretion of the Procurement Director. Approval must be obtained prior to the subcontractor beginning the work.

In the event that an SBE is unable or unwilling to fulfill its agreement with the contractor, the contractor shall immediately notify the Procurement Department’s Business Enterprise & Compliance Program, the Contract Officer and the Project Manager. The SBE firm can only be

Revised July 2016 6 terminated for good cause. The contractor shall immediately take reasonable good faith efforts to obtain another certified SBE firm to perform an equal or greater dollar value of the work. The contractor shall provide all pertinent information regarding the SBE substitution request including but not limited to:

1. The name of the original SBE firm, the description of work, the dollar value, the reason for the substitution request and a statement from the original SBE firm explaining why they can’t perform the work.;

2. The name of the proposed substitute SBE’s, description of proposed work and estimated dollar value of the work and any relevant information such as a written quote, etc.

SBE contract work items shall not be performed by the contractor in lieu of subcontracting, without obtaining prior approval as outlined above.

Contract items eliminated from the project, with the approval of the Project Manager, may not reduce the contractor’s obligation for SBE participation.

B. SBE PROGRAM COMPLIANCE

The contractor and all SBE subcontractors must comply with all aspects of the SBE Program. By submitting a bid to the City of Tucson; bidders bind themselves to make every good faith effort to meet the City’s SBE goal. The contractor must also include a copy of the SBE contract provisions in every subcontract. An executed subcontract with all SBE subcontractors shall be completed prior to the Notice To Proceed, and available to the City of Tucson upon request.

Failure by the contractor to comply with the SBE provisions is a material breach of the contract which may result in remedies as deemed appropriate by the City, including but not limited to the following:

(1) Withholding monthly progress or final payments;

(2) Withholding 10% of future payments;

(3) Contract termination;

(4) Disqualifying the contractor from future bidding as non-responsible.

The contractor must comply with applicable Prompt Payment regulations, Tucson Code Section 11-38 and Arizona Revised Statutes Title 32-1129. The City of Tucson may withhold payment from the prime contractor for work performed by subcontractors unless and until the prime contractor ensures that the subcontractors are promptly paid for the work they have performed.

The prime contractors must provide notice to all subcontractors that complaints of violations of the prompt payment provision may be submitted in writing to the City of Tucson, Department of Procurement, 255 W. Alameda, 6th floor Tucson, Arizona 85701 – PO Box 27210, Tucson, Arizona 85726. The complaint shall set forth the facts and identify the prime contractor and the construction project. Subcontractors will be assisted by the Department of Procurement, Business Enterprise & Compliance Program with the complaint process as detailed in the City of Tucson Construction Fairness Ordinance comprised of Chapter 28, Tucson Procurement Code Section 28-101, Tucson Code Chapter 11-38 and Tucson Code, Chapter 8-2.2.

C. CONTRACTOR PERFORMANCE EVALUATION

At the conclusion of every City of Tucson construction project, the prime contractor is required to complete the Prime Contractor Report of Subcontractor Utilization form. In addition to identifying all subcontractors utilized on a project, the report will include a section to rate the performance of project subcontractors from 1 – 5, based on industry standards. The performance rating section

Revised July 2016 7 shall be completed. A score of 3 is considered average. A score of 4 or 5 is considered above average. A score of 1 or 2 is considered as poor performance. A rating of 1 or 2 of a subcontractor will require the prime contractor to complete a Substandard Performance Report documenting the cause for the substandard performance rating. The City of Tucson Project Manager must concur with all poor performance ratings.

Revised June 2016 8

CITY OF TUCSON

DEPARTMENT OF PROCUREMENT BUSINESS ENTERPRISE & COMPLIANCE PROGRAM

SUBCONTRACTORS LIST AND STATEMENT OF PROPOSED SBE PLAN

IFB No. 161485 Project Name: Road Recovery FY 2016 Fog Seal Package 5

Bidder must complete the table below listing all SBE subcontractors and all first tier subcontractors with a contract value at or above $5,000* If the SBE participation is below the established project goal, the bidder must submit a SBE good faith effort waiver.

Subcontractor’s Name

SBE?

Yes No

Trade/Industry Dollar Value of Contract

(SBE Only)

*There is no requirement to list non-SBE Subcontractors with contract values less than $5,000

Bidder’s Base Bid Amount $

Total Claimed SBE Participation $_______________________ _______%

I hereby certify by signing below that the foregoing SBE firms shall be contracted to work on the trades identified above and/or supply material and/or equipment for this project. The information shown above is a true reflection of the proposed subcontracts expressed as a percentage of the base bid.

Company Name: __________________________________________

Signature: ____________________________________________ Phone No. ____________

Date: _________________ Name & Title: __________________________________________

Revised June 2016 9

City of Tucson Department of Procurement, Business Enterprise & Compliance Program

AFFIDAVIT OF GOOD FAITH EFFORTS

IFB NO: _________ PROJECT NAME:____________________________________________________________

COMPANY NAME: ____________________________________________________________________

CONTACT NAME: PHONE NUMBER: ____________________ FAX NUMBER:

WHERE A BIDDER FAILS TO EXERCISE “GOOD FAITH” EFFORTS TO MEET SBE GOALS, AS REQUIRED BY THE CITY OF TUCSON, THE

BIDDER WILL BE DEEMED NONRESPONSIVE.

The intent of this certification is to document the good faith efforts implemented by the apparent low bidder in soliciting and utilizing SBE firms to meet the City of Tucson’s SBE goal. This certificate will assist the City of Tucson’s Department of Procurement, Business Enterprise & Compliance Program in determining whether the apparent low bidder has implemented comprehensive good faith efforts. The burden of proof rests with the bidder.

1. Is a partial or complete waiver being sought? Please explain. Note: If a partial waiver is being sought the scope of such waiver must be indicated and a SBE Plan must also be submitted.

2. Provide a brief summary of why the SBE goal on this project has not been met. Attach supporting documentation.

Revised June 2016 10

Name of Company Contacted Contact Person Dates of Contact Telephone #

Yes ____ No _____ Date of Contact Contact Person

3. Which portions of the contract proposal, in terms of the nature of the work, were selected to be subcontracted to SBE firms? Attach supporting documentation (e.g. memo, proposal, project breakdown, etc.).

4. Which portion of the contract proposal, in terms of suppliers was identified for SBE firms? Attach supporting documentation (e.g. memo, proposal, project material breakdown etc.).

5. Which SBE firms were solicited in writing for subcontract or supplier quotes/bids? Also, in the appropriate space identify when the firms received subsequent telephone solicitations. Attach supporting documentation (e.g. copy of written solicitation to SBE firms, along with copies of telephone logs documenting follow-up communications, etc.).

6. Was the City of Tucson’s Department of Procurement, Business Enterprise & Compliance Program technical or professional staff contacted for assistance? (Note that it is the policy of the Department of Procurement to offer technical support to respondents to ensure that all avenues have been exhausted in meeting the SBE goal.) Attach necessary documentation.

Revised June 2016 11

Name of SBE Firm Explanation for Rejecting Quotes

10. Were any bids from SBE Subcontractors that were no more than 15% or $250,000 greater than the accepted Non-SBE Subcontractor rejected? If so, describe in detail

7. Describe any efforts undertaken to provide SBE firms with information about the project plans, specifications and requirements of the contract.

8. Describe any additional efforts undertaken to assist SBE firms (e.g. bonding assistance, lines of credit, etc. ).

9. Indicate which SBE firms submitted quotes on the contract proposal and provide a brief explanation of the reasons why these quotes were rejected. If price was a factor provide documentation to show quotes received from non-certified firms.

11. Describe in detail any supplemental items or efforts which you wish to have the department consider as part of your Good Faith Effort. Attach additional documentation or sheets for this item.

Revised June 2016 12

City of Tucson

Department of Procurement

Business Enterprise & Compliance Program

Prime Contractor Report of Subcontractor Utilization

Date: Prime Contractor:

Contract #:

Contract Name:

Estimated Contract Amount/Base Bid: Final Amount:

Estimated Project Completion Date: Project Completion Date:

Please list the subcontractor firm name and dollar amount of the subcontract for all subcontractor work performed or in progress on the above construction contract. Please check the box to indicate if the firm is a small business enterprise (SBE) or Non-SBE.

Send the completed form to: City of Tucson, Department of Procurement, attention Margot Grossmann, 255 W. Alameda, 6th floor, Tucson, AZ 85701, fax (520) 791-4735 or email Margot.Grossmann@tucsonaz.gov

Subcontractor Firm Name Contract Amount*

Indicate firm type Rating

SBE Non-SBE

**Performance

Rating 1-5

* At award, enter dollar amount of estimated contract. At project completion, enter final contract amount and subcontractor performance ratings.

**Prime contractors must rate the subcontractor performance on this project. The rating scale is 1-5, with 3 being average, 4 & 5 above average and 1 or 2 indicating substandard performance. A rating of 1 or 2 will require the completion of the Subcontractor Substandard

Performance Report.

Signature: Date:

Print Name: Title:

Phone Number: Email:

File details come from the government source that posted it. Updated .