Answers to Questions submitted on November 10, 2017 SAQMMA17R0344

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions

#CompanyRFP SectionQuestionAnswer/Response
76FribergB· Section B states “at least one Journeyman electrician” this suggests that local labor for electrical work would be acceptable, given Journeyman supervision. Please clarify. If supervision is acceptable, what ratio will be required? If supervision is acceptable and a ratio is in effect, how will this be enforced?Contractor supplied personnel requirements will be described in each task order. At a minimum this will require work performed on-site by at least one Journeyman electrician or Professional Engineer. Enforcement will be as determined by the Contracting Officer and COR. If local labor is allowed then the contractor must follow the USG access policy, and the contractor is responsible for all escort duties. The USG will not provide security escort for local labor. The program office will advise if local labor will be allowed for a specific task order. Sometimes local labor is not allowed.
89FribergBB-7 Unit pricing; Does this mean items are priced individually or per like item. i.e. material lump sum, tools, etc.Unit Price is a FAR requirement, and as shown in the Project Cost Estimate template for fixed-price line items includes the Quantity, Unit of measure, Unit price (for the item), and Total price for Separately Identifiable Items
98AEDBSection B.5 of the RFP clarifies what may be included as Other Direct Costs (ODCs) for the contract vs. what is to be included in the “overhead and G&A burdens to hourly rates for the Labor Categories”. In accordance with the DSSR, it is customary for personnel to be compensated with uplifts to direct compensation for station specific allowances besides Danger Pay. Will the Government allow other location specific allowances besides Danger Pay to be priced as an ODC on task orders issued after awardN0
100AEDBSection B.8.1 appears to instruct offerors to price maximum rates allowable under the contract for United States based personnel performing services in the listed disciplines on the pricing tables for the base year and option years. We note that the listed disciplines for the Sample Task Order includes an additional discipline than what is to be evaluated from Section B.8 pricing. Will offerors be allowed to price additional, optional labor categories on the sample task order or task orders to be priced after award, such as local national or third country national personnel or US based subject matter experts?Labor categories must conform to the Project Cost Estimate template. Contractor personnel proposed to provide the service must be licensed and qualified for that trade. After award of the IDIQ there may be individual task orders requiring additional labor categories. For the future task orders, the contractor must provide firm fixed prices for all labor categories required by the Performance Work Statement.
1AEDCIn determining our team for the subject procurement, I'm seeking clarification on what is meant by a licensed contractor.

Our potential team member is currently an incumbent on the International Maintenance Assistance Program (IMAP) with the requisite licensed personnel and a business license in most of the 50 states. However, their license is to construction. Given their current role and experience with DOS- will their licenses be sufficient to bid this requirement?

Definitions are found in Section C – C.10 TRADESMAN/CRAFTSMAN AND PROFESSIONAL LICENSING REQUIREMENTS, AND MANUFACTURER CERTIFICATIONS” A licensed “Electrical Contractor” is an electrical contracting firm maintaining an active license to perform electrical construction & service work in at least one of the 50 United States, Puerto Rico, or any US Territory and directly employing at least one licensed Master electrician designated as the having signing authority.

2KVA ElectricCThere seems to be conflict regarding the use of Apprentices. C.10.4.4 states that Apprentices are not allowed but in C.10 page 51 under General Requirements - items 9 and 10 seem to anticipate the use of Apprentices with prior written approval from the COR. What is the intent regarding the use of Apprentices?Apprentices cannot be submitted as key personnel for contractor staff for this contract. Individual task orders during the contract may allow apprentices as part of the installation team if there is COR approval.
3KVA ElectricCWhat position or type of worker does C.10.5.9 refer to? There seems to be a missing descriptor.PD/PM Project Director or Project Manager
4KVA ElectriccC.10 Definitions: Note 3 refers to current documentation of NFPA70E training. Can you please provide the definition of what constitutes “current”.2015 edition is the most current
5KVA ElectricCC.10 Definitions: page 48 states “A licensed “Electrical Contractor” is an electrical contracting firm maintaining an active license to perform electrical construction & service work ………………..and directly employing at least one licensed Master electrician designated as having signing authority.” Our state licensing authority has experience and exam requirements for an Electrical Administer and recognizes the designation of electrical administrator as the individual having the signing authority and is the required supervisory employee a contractor has to have to become a licensed Electrical Contractor . Will an electrical administrator be considered pari passu with the masters electrician for this section.Yes, Some states have different description but the signing authority for permits is what we are looking for.
38AecomCC.9.3.3 Will the government confirm partial payments will be allowed as long as they are approved by the Government Project Manager?We do partial payments on a case by case basis but not as a general rule. FAR Part 32 applies to the contract and there are provisions for partial payments.
39AecomCC.10.5.9 The position title is not listed. Please provide the title of the position this section describes.PD/PM Project Director or Project Manager
40AecomCC.11.4 This section references sections 11.3.2 and C.11.3.1 which are not found in the RFP. Can the Government please clarify this reference?Refer to C.11.4.1 and C.11.4.2
41AECOMCC.11.4.1 This section requires the contractor to submit a plan to operate a contractor provided consolidated receiving point (CRP). Is it acceptable to use a subcontractor to provide/operate the CRP that is approved by Diplomatic Security?Yes
56AecomCParagraph numbering skips from C.3.4 to C.3.5.1, should C.3.5.1 be C.3.4.1?No, Refer to C.3.5.1
57AecomCThere is no C.5.10.see page 24
58AecomCThere is no C.5.12.Understood
59AecomCThere is no C.7.1.20.Understood
60AecomCParagraph C.5.12.11 refers to paragraph C.5.3.5., Closeout and Final Invoice, should it be paragraph C.9.3.5?C.9.3.5 to C.9.3.5.5
61AecomCParagraph C.6.5 says INTENTIONALLY LEFT BLANK. The preceding paragraph is numbered C.6.2.4. Were C.6.3 and C.6.4 not intentionally left blank?Intentionally left blank
62AecomCParagraph C.6.9. says, “See paragraph C.2.2.3.3., Planned Facility Shutdown.” There is no paragraph with this number. Should it be C.5.11.5?C.5.11.5
63AecomCParagraph C.8.1.6 refers to “codes listed in J.2.2.3 OBO Standard Specifications.” Should it be paragraph J.2.3?J.2.3
64AecomCParagraph C.9.1 refers to paragraph C.2.4.3., Site Survey. There is no C.2.4.3. Should it be paragraph C.3, PHASE I – SITE SURVEY SERVICES?C.3.1
65AecomCParagraph C.9.2 refers to paragraph C.2.3.2 Execution proposal . Should it be C.9.2.2?C.5
66AecomCParagraph C.9.2.3 refers to paragraph C.2.2.3.4., Project Schedule. Should it refer to paragraph C.5.11.6?C.5
67AecomCParagraph C.9.3 Project Execution, refers to paragraph “C.2.3.3., Execution.” Paragraph C.2.3.3 is actually titled “Phase III – Construction/Execution Services.” Phase III is covered in paragraph C.5., but it’s titled “PHASE III – CONSTRUCTION SERVICES.”C.5
77FribergC· Section C suggests the intent of this IDIQ is to provide an estimate for the surveys. Please confirm. If so, are the “stipend” surveys being eliminated for this IDIQ contract? How many contractors will be selected to survey per project/task order?The number of companies selected to perform a site survey depends on how many IDIQ contracts awarded. The program office will advise the contracting office if stipends will be provided and how much. Sometimes stipends are not awarded.
78FribergC· C.3.1 States “after the task order” contractor will survey. Historically, these task orders have come much later than the surveys have taken place. In some cases they are not provided until the project is awarded to the winning contractor. Please clarify if the contractor is delay survey until the task order is provided?Contractors must attend surveys on the dates determined by the contracting officer.
79FribergC· Section C5.12.12 Requires 24-month warranty for all work and services. The industry standard is 12-months. Is the intent of this IDIQ to increase costs by requiring an extended warranty beyond standard?Yes
80FribergC· Warranties that are required are based on equipment or system failures based on the contractor installation. With local staff responsible for daily operations and maintenance of these facilities, how is the contractor protected from site alterations via local staff in terms of warranty?If local staff makes alterations it is not a warranty issue.
81FribergC· C.1.2 Please clarify the wording of the FACT class requirement as it pertains to contractor’s employees. Also, please provide the approved provider of the class.Please see FAR Clause 52.225-19. All Contractor Personnel working in high threat, high risk areas must obtain security training which the Government provides electronically. Please see revised C.1.2
82FribergC· Section C #8 states use of non-licensed tradesman, laborers, helpers, etc. is not allowed under this task order. How will this be enforced?Contractors will need to provide physical copies of individual licenses, certifications, and resumes with each task order.
90FribergC· Sec. C 11-4 Where is paragraph C 11.3.2 & C 11.3.1 (referencing CRP)?Refer to C.11.4.1 and C.11.4.2
103AEDC1. The RFP makes references to certain subsections that do not exist or appear to be incorrect. These includeN/A
104AEDCC.6.9 reference to C.2.2.3.3Refer to C.5.11.5
105AEDCC.9.1 reference to C.2.4.3Refer to C.3.1
106AEDCC.9.2 reference to C.2.3.2 and C.7 (sections exists, but does not appear to be correct cross-reference)Refer to C.5
107AEDCC.9.2.3 references C.2.2.3.4Refer to C.5
108AEDCC.9.3 references C.2.3.3Refer to C.5
109AEDCC.11.4 references 11.3.2 and C.11.3.1Refer to C.11.4.1 and C.11.4.2
119AEDC1. RFP section C.10.4 states that all personnel performing work on the contract require a SECRET clearance. Can the Government please confirm this is an absolute requirement for all personnel? It would appear that personnel that perform supporting tasks that do not require access to secure networks or facilities could perform their work without a clearance.C.10 .4 requires all personnel performing work on the contract possess a current SECRET Clearance PRIOR to contract award. In general , a TOP Secret Clearance is required for all field work under this contract. However, there may be certain task orders that would only require a Secret clearance. For those occasions, the task orders will include such language. All labor categories shall be TOP SECRET cleared unless noted on the task order. Escort duties must follow USG access polices and Post special requirements.
121AEDC1. Are physical copies of individual licenses and certifications required to be submitted with proposed key personnel resumes?Yes
122AEDC1. Will international business licenses be required for subsequent work?See page 97: H.16.1. The Contractor shall, without additional expense to the Government, be responsible for complying with all laws, codes, ordinances, and regulations applicable to the performance of the work, including those of the host country, etc.
68AecomFSection F.6: C.5.12.3 Weekly Report should be C.5.12.4. C.5. 12-11 Project close out should be C.5.12.11.Correct
83FribergG· G.1 (b) States no progress or partial payments will be made. The duration of these projects forces the contractor to carry costs for months on end. Will gov’t consider payment for materials shipped to site after contractor provides a bill of lading?We do partial payments by request but not as a general rule. FAR Part 32 applies to the contract and there are provisions for partial payments.
84FribergG· Stipend calculationStipends if available will be determined by the Contracting Officer and COR.
85FribergG· G.4.6. States that issuance of Task order for survey does not imply obligate the Gov’t to issue additional Task Order for any design or execution. Will feedback on award or non-award be provided to all contractors? If so, what mechanism will be utilized and how often?Request for award status must be submitted in writing to the Contracting Officer.
86FribergG· Use of local labor and enforcement of SOW requirementsIf local labor is allowed then the contractor must follow the USG access policy, and the contractor is responsible for all escort duties. The USG will not provide security escort for local labor. The program office will advise if local labor will be allowed for a specific task order. Sometimes local labor is not allowed.
87FribergG· Feedback on awards and timelineRequest for award status must be submitted in writing to the Contracting Officer.
99AEDGSection G.4 of the RFP contains slightly different instructions for Task Order Proposals than the guidance listed in RFP Section L.14.4.1.2 and the instructions on the first page of Attachment J.1.3. Please confirm that the instructions listed in Section G.4 apply only to task orders issued after award?G.4 is for Contract Task Orders after Award. L.14.4.1.2 and J.1.3 only apply to the Case Scenario Sample Task Order that is part of this RFP.
69AecomHWhere is the “IT CCB list” referred to in H.4.16.2 and H.4.17?This list will be provided to companies who are awarded contracts.
70AecomHSection H.9 refers to H.4.16. Approval of subcontractors is covered in H.4.15.Noted. Please see H.4.15
71AecomHParagraph H.11.1.1 refers to Section/Paragraph I.43. There is no Section/Paragraph with this number in the RFP.Disregard Section/Paragraph I.43
72AecomHSection H.10 refers to “J 3.4., Division 1, Section 01141” There is no section J.3.4 in the RFP.Refer to J.1.4
73AecomHThere is no H.18.1.1.Disregard
74AecomHParagraph H.28.4 refers to itself as paragraph (d).Correct
91FribergH· Sec. H.5.1 – Does this meeting have to take place, face to face?It is possible that this meeting may have to be in person at a location designated by the Contracting Officer and COR.
92FribergH· Sec. H.22.6.1 – Material shall remain property of the gov’t, does this basically cover any material that was purchased for the project?Except those items furnished by the Contractor, the cost of which is not included in the contract price.
93FribergH· Sec. H.23.1.1 – The contractor is responsible for paying all charges, does this include crane charges to ground the container onsite?Yes
13ALLCOMJDD FORM254 Is the offeror required to have a DSS accredited Information System at the time of the proposal submission or can this be obtained after contract award?This can be obtained after the award.
15SpectrumJJ.1.3 -Are there any existing floor plans?No
16SpectrumjJ.1.3 -Is there a more detailed electrical one-line diagram?No
17SpectrumJJ.1.3- Does the existing 11 kV “PDSG-PDSGU-PDSGE” have the proper Main-Tie-Main breakers?No. There is no tie breaker. For PDSG there is a common bus for the generators. For PDSGU & E, there are interlocked breakers (NO and NC) for the transformer and generator sources, and a circuit breaker for outgoing feeder.
18SpectrumJJ.1.3 -What is the make and model/serial # for the existing breakers in the “PDSG-PDSGU-PDSGE” switchgear?Assume equipment ratings meet electrical code requirements
19SpectrumJJ.1.3 As they are not shown on this single line diagram, are there disconnecting means on either side of all of the transformers?No
20SpectrumJJ.1.3 What are the types of disconnecting means (fused or breakers), and sizes of the transformer disconnecting means if currently installed?There are none.
21SpectrumjJ.1.3 Since there is not a legend, are we to assume all existing feeders are sized to the existing equipment ratings as shown?Yes
22SpectrumjJ.1.3- It appears that the “500 meters” dimension shown is the distance between the overhead utility and the existing 22kV transformers. Please confirm.Yes
23SpectrumjJ.1.3 What is the estimated distance between the 60 Hz power plant and the 50 Hz power plant?500 meters
24SpectrumJJ.1.3 Are the ampacities shown actual load, or the rating of equipment?Rating
25SpectrumJJ.1.3 If the ampacities shown are the rating of equipment, can you provide actual loads?Assume equipment ratings meet electrical code requirements
26SpectrumJJ.1.3 Is all existing and new equipment to be NEMA 1 rated?Indoor equipment yes.
27SpectrumJJ.1.3 Are we to assume that there is adequate space where equipment will be replaced or installed new?Yes. Space available will meet code requirements for Working Space.
28SpectrumJJ.1.3 Are there any site plans and/or architectural drawings?No
29SpectrumJJ.1.3 For the option price for optional generator, are we to assume that there is existing fuel supply, existing structural is sufficient (louvers-equipment pad, ventilation), optional generator is to be located adjacent to the existing generators, existing 11 kV gear can accommodate or has an existing spare breaker for an additional generator?State your assumptions in your response
30SpectrumJJ.1.3 For the option price for optional generator, are we to connect to existing fuel piping only, or is a new day tank required?State your assumptions in your response
31SpectrumJJ.1.3 If a day tank is required, what is the required run time for the optional generator (this would be to size the day tank correctly)?Utility Reliability: 30 – 40 power outages per year, typically 30-90 minutes. Rolling black-outs during dry season, 4-6 hours per day.
32SpectrumJJ.1.3 Is the power monitoring requirement to monitor total load or individual loads?Use industry standards
33SpectrumJJ.1.3 Are the two remote alarm panels to be located within the 50 Hz power plant, or at a more remote location?One in the power plant one in facility manager office
34SpectrumJJ.1.3 What is the estimated distance for the remote alarm panels?In power plant is 50 feet. In facility manager office is 1500 feet
35SpectrumJJ.1.3 It states that the nominal utility power is 22 kV 50 HZ, however, the power quality readings from this report states that the frequency only fluctuates between 59-61 Hz. Please clarify/confirm 50 Hz is the what the nominal utility frequency is supposed to be, and that all equipment on the “50 Hz” system is rated for 50 Hz.49-51Hz
36SpectrumJJ.1.3 Is it preferable to the Customer to install medium voltage regulators, or low voltage regulators to correct voltage fluctuations?Make your proposal based on the information in the scenario.
37SpectrumJJ.1.3 Will the Customer have the capacity to maintain a medium voltage regulator?For this scenario equipment maintenance after acceptance will be managed by others.
46AecomJJ. 1.2 Typical entries such as Contract/Program Title, Contracting Agency, Evaluator Position, and Evaluator Signature seem to be missing. In addition, there are blank lines after each of the scoring criteria, but the instructions do not suggest that comments are required, although “comments” are typical on other forms. Could the Government please clarify the format for this form?Nothing is missing. Comments are not required. Enclosed is a word format.
47AecomJJ. 1.2 Should this form be completed electronically or by hand? If electronically, could the Government please provide a Word version of the form?can complete electronically or by hand. Will provide Word format.
49AecomJJ.1.3 If there are fused cutouts (for overhead to underground transition) on the overhead pole? Who owns them? Specifically, where is the demark point between the local utility and the post?There are none. Normal demarcation point is the cable terminations on the load side of the disconnect for the feeder for the transformer.
50AecomJJ.1.3 For new 22kv-11kv substations, does the client object to an oil air (less flammable) type?New equipment should be UL Listed and Labeled
51AecomJJ.1.3 Does client prefer a redundant converter for the 60Hz system?State your assumptions in your response
52AecomJJ.1.3 Please provide direction on the size of 11kV generator belly tank bid option. Should it be 2 hour, 4 hour or 8 hour?State your assumptions in your response
53AecomJJ.1.3 Sample Task Order Existing SLD - Does the 22kV lines transition from overhead to underground?Yes
54AecomJJ.1.3 Sample Task Order Existing SLD - Are the existing incoming transformers oil air type without a fan kit?Yes
55AecomJSample Task Order Existing SLD - Are the secondary 11kV conductors from PDSG-U and PDSG-E in a conditioned space?Yes
88FribergJ· Attachment J.1.3 (sample task order): Copy of electrical contractor license Please confirm if this license is the business or electrician license.Both
94AEDJ1. Is the Project Cost Estimate Template excel file, issued with the RFP, to be submitted with offerors proposals or will this be used for subsequent task orders after award. If this is meant to be submitted, is it to be used for the Sample Task Order pricing or Section B pricing, or something else?used for subsequent task orders
95AEDJInstructions for the Sample Task Case Scenario, page 159 of 169 instructs offers to submit for item k. an “itemized proposal”. Can the Government please clarify what the itemized proposal should include beyond what is already listed in Section L.14.4.1.2 and the instructions on the first page of Attachment J.1.3Refer to the Sample Task Order Worksheet
96AEDJPlease confirm or clarify the instructions on the first page of Attachment J.1.3 which refer to submission of a project narrative of 500 words or more. Is this guidance intended for all items listed in subsections a through l on the first page or only the three items associated with item a., or something else?Three items associated with item a
102AEDJThe Attachment J.1.3 Sample Task Order Worksheet for pricing on page 3 of 4 refers to a location of Windhoek, Namibia. This appears to an administrative error. Please confirm that the location for this worksheet is Asuncion, ParaguayLocation is Asuncion, Paraguay
110AEDJJ.1.3 The 60 Hz Power System with equipment will be replaced by 50 Hz power Systems. Will all 60 Hz loads and equipment be eliminated?State your assumptions in your response
111AEDJJ.1.3 The 60 Hz power plant can be replaced with a separate feed from 22,000 V/400V, 3 phase transformers. Is this approach desirable or the feed should come from existing 11,000 V switchboard stepped down to 400V/230V?State your assumptions in your response
112AEDJJ.1.3 What is the distance between the existing 60 Hz power plant and the 50 Hz system? Should the connection between 60 Hz power plant and 50 Hz system be underground or above ground?500 meters. No overhead utilities are allowed within USG property line.
113AEDJJ.1.3 Are the 2000 KVA transformers, and 1500 KVA transformers, and switchboards (PDSY-U, PDSY-E and PDSG) outdoor units?11kV equipment is indoors
114AEDJJ.1.3 Can the Government please provide the approximate size of the utility space physical dimension and potential capacity for expansion (new Transformer, Switchboard panel, …etc.) for the project?Space available will meet code requirements for Working Space.
115AEDJJ.1.3 Can the Government please provide ventilation requirements for the project?State your assumptions in your response
116AEDjJ.1.3 Can the Government please provide details of loads for MCC-1, MCC-2, LDP1, LDP2, LDP3 and LDP5?Assume equipment ratings meet electrical code requirements
117AEDJJ.1.3 Are we correct to assume that there will not be a site survey for this sample task order?Correct
118AEDJJ.1.3 Can the Government please provide any requirements for the mechanical, civil/structural and pluming support for the electrical upgrade?State your assumptions in your response.
120AEDJ1. Section J of the RFP references a DD 254, however it does not appear that one was provided with the RFP. Can the Government please clarify this?SEE Bidders 0344 Attachment
123KAVjThe Case Scenario - Sample Task Order Description regarding Utility Power states “…and the frequency shifts from 59- 61 Hz.” Should this have been stated as 49 – 51 Hz?49-51Hz
124KAVJThe Case Scenario - Sample Task Order – Tasks regarding the 50Hz system are limited to replacing a failed UPS and an option for possible generator replacement. The Requirements specify “Improve System Design.” Should the proposal include specific costs and activities to improve the system design of the 50Hz system also?State your assumptions in your response.
45AecomJJ.1.2 Past Performance The form appears to be missing some information. Items #7 and #9 appear to be missing and the last 4 items aren’t numbered. Can the Government please clarify whether information is missing or just misnumbered.Misnumbered- not missing Please see revised form.
48AecomJThe sample task includes a sample price worksheet but the instructions in Section L for Tab B, Section 3 regarding the Sample Task response, do not address pricing the sample task. Is the offeror required to price the sample task? If yes, where in the written response of Volume 1 should the cost table be included? Or should it be provided as part of Volume 2?The sample task order should be priced. The cost table should be in Tab B in Volume 1. The IDIQ pricing should be Volume 2 Price proposal. Please see the word document of the Sample Task Order.
75AecomKSection K.10 refers to Section H.51 Labor Relations & Actions. There is no section with this number in the RFP.Disregard Section H.51
8ALLCOMLSince Tab A, Relevant Experience has a page count of 10 pages. Is there a page count for this section?no
9ALLCOMLWill the government please define “licensed contractor

definitions are found in Section C – C.10 TRADESMAN/CRAFTSMAN AND PROFESSIONAL LICENSING REQUIREMENTS, AND MANUFACTURER CERTIFICATIONS” A licensed “Electrical Contractor” is an electrical contracting firm maintaining an active license to perform electrical construction & service work in at least one of the 50 United States, Puerto Rico, or any US Territory and directly employing at least one licensed Master electrician designated as the having signing authority.

10ALLCOMLWill the government please provide the additional requirements and guidelines for L-015 Resumes 11/01/2008?Please review Tab C L.14.4.1.3 for additional requirements and guidelines.
11ALLCOMLIf supplied, will a Glossary and RFP Compliance Matrix be included in the 85 page count?Yes
42AecomLCan the Government please indicate if the Contract List discussed on Page 162, Item 3, is included in the 85-page limit for Volume 1? Given the volume of information required for each contract/program this could be a significant number of pages.Yes contract list is included in the 85 page limit.
43AecomLCan the Government please confirm that the 10 page limit referenced in this paragraph is for the Offeror’s response to Tab A?Yes
44AecomLDoes the Government want copies of the Past Performance Surveys in Volume 1, Volume 2, or both?Volume 1
101AEDLSection L.1.4.3.d states that resumes, Past Performance Evaluations, Pricing, and the Table of Contents is excluded from the 85 page limit for Volume I Technical Proposal. Will the Government allow a cover page, lists of tables and figures, and a Glossary of Acronyms to be excluded from the 85 page limit as well? Also, please confirm that the pricing referred to in this section of the instructions relates to the fully burdened labor rates and BOM listing related to the Attachment J.1.3 Sample Task Order only, and not the pricing that is included in Volume II Price ProposalThe Government will not allow cover page, lists of tables and figures, and glossary of Acronyms to be excluded. Pricing listed in this section refers to Volume II price proposal.
7ALLCOMMPlease verify that the only key personnel that the offeror must provide resumes for are:

1. Program Manager

2. Master Electrician

3. Senior Electrical Engineer

Resumes must include all key staff assigned to this contract.
14ALLCOMMSection M 3.3 technical factorn3 - refers to key personnel as relates to the area of Logistics Planning and Management. Will the government please provide direction as to whether or not Logistics is a key personnel position?See page 57. C.11.1.1. The Contractor shall furnish all labor, supervision, tools, equipment, and management necessary to perform all logistics services related to this contract etc. Also, see page 29 C.6.1. Logistics Planning. The Contractor shall be responsible for coordinating all overseas logistics associated with the shipment of tools, materials, and equipment to and from the project site. etc. Also refer to page 157 and 158. L.14.4.1.3 Tab C-Key Personnel. 2. Logistics Planning and management including, but not limited to, providing or coordinating staff, tools, material, equipment, and transportation in both routine and urgent situations.
97AEDMAs Section M is currently written, pricing for the Bill of Materials list is not required for proposal submission, and it does not appear that Pricing for the Sample Task will be evaluated as part of price evaluation. Is this correct? If correct, how will the pricing for the Sample Task be evaluated?The itemized proposal in the Sample Task Work Sheet will be evaluated with respect to the USG independent assessment for the Sample Task.

SAQMMA17R0344--Power Systems Engineering - Questions and Answers -11-29-2017

&P http://irm.m.state.sbu/sites/bmp/grp/sm/ITCCBHome/default.aspx Sheet2

Sheet3

File details come from the government source that posted it.