J-1-4_Insurance.pdf
PDF 62 KB Posted
- Attached to
- Radar Tower Candelilla del Mar, Nario, Colombia
- Solicitation number
- SAQMMA16R0712
About this file
J-1-4 Insurance Policies List
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Generator-Specs.pdf | ||
| Signed_SF30_Amend_003_(16DEC16).pdf | ||
| Final_QAs_SAQMMA16R0712(16DEC16).pdf | ||
| ReviewedCharts.xls | XLS spreadsheet | |
| SF30_Amend_002_(12DEC16).pdf | ||
| Amend001_(16NOV16).pdf | ||
| J-1-3FirmT.pdf | ||
| J-1-1_Mat_Prod_Substitution_Form.pdf | ||
| J-2-5Environmental_Impact_Survey.pdf | ||
| J-1-6_IVA_Template.pdf | ||
| SF1442_(10NOV16).pdf | ||
| J-1-2_PastP.pdf | ||
| J-2-1_3A-Architectural_Drawings.pdf | ||
| J-3_SOW-Radar_Tower_Candelilla.pdf | ||
| J-2-2_3B-Structural_Drawings.pdf | ||
| J-1-5_IncidentReports.pdf | ||
| Final_Sched_B_M(10NOV16).pdf | ||
| J-2-3_3C-Electrical_Drawings.pdf | ||
| J-2-6_Bidding_charts.xls | XLS spreadsheet | |
| J-2-4_Soil_Study_Candelilla.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-1-4 INSURANCE POLICIES
SOLICITATION No. SAQMMA-16-R-0712
TOWER (1) IN CANDELILLA DEL MAR, COLOMBIA
Performance Policy (Póliza de Cumplimiento): Submitted after the contractor is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract and valid for the duration of the contract and a further two months, Payment Policy (Póliza de Pago de Salarios y Prestaciones Sociales): Submitted after the contract is signed and prior to the notice to proceed in a sum equal to 20% of the value of the contract, and valid for the duration of the contract and a further three years for the salaries and social benefits of the workers.
Liability Policy ( Póliza de Responsabilidad Civil Contractual): submitted after the contract is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract, and valid for the duration of the contract and a further two months covering contractual and Third Party Civil Liability, Stability Policy (Póliza de Estabilidad): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for three years from the date of the handover of the work/ substantial completion.
Elements Quality Policy ( Póliza de Calidad de Elementos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion.
Correct Equipment Functioning Policy (Póliza de correcto funcionamiento de los equipos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion