Final_QAs_SAQMMA16R0712(16DEC16).pdf

PDF 81 KB Posted

Attached to
Radar Tower Candelilla del Mar, Nario, Colombia
Solicitation number
SAQMMA16R0712
Issued by

About this file

Amend 003 Q&As

View the file

Other files

File Type Posted
Generator-Specs.pdf PDF
Signed_SF30_Amend_003_(16DEC16).pdf PDF
ReviewedCharts.xls XLS spreadsheet
SF30_Amend_002_(12DEC16).pdf PDF
Amend001_(16NOV16).pdf PDF
J-1-3FirmT.pdf PDF
J-1-1_Mat_Prod_Substitution_Form.pdf PDF
J-2-5Environmental_Impact_Survey.pdf PDF
J-1-6_IVA_Template.pdf PDF
SF1442_(10NOV16).pdf PDF
J-1-2_PastP.pdf PDF
J-2-1_3A-Architectural_Drawings.pdf PDF
J-3_SOW-Radar_Tower_Candelilla.pdf PDF
J-1-4_Insurance.pdf PDF
J-2-2_3B-Structural_Drawings.pdf PDF
J-1-5_IncidentReports.pdf PDF
Final_Sched_B_M(10NOV16).pdf PDF
J-2-3_3C-Electrical_Drawings.pdf PDF
J-2-6_Bidding_charts.xls XLS spreadsheet
J-2-4_Soil_Study_Candelilla.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tower (1) Candelilla de la Mar, Colombia SAQMMA-16-R-0712 Q&As

Metallic Radar Tower Candelilla de la Mar, Colombia

SAQMMA-16-R-0712

Q & A’s

Q&A

Reference Subject Description Response

RFP

Government Furnished Property

For the subject solicitation can the Government please provide a list of all Government Furnished Property by part number and location of the said property? For example, what model are the generator sets and what will be their location when the contractor connects it?

This solicitation does not include Government Furnished Property. The generator data sheet shall be attached to Amendment #003 of the actual solicitation.

RFP

License

Is there any kind of license that we should contemplate for the project? Or all the licenses necessary for the construction of the tower are provided by the client. (Environmental, construction, Aeronautics for the case of the tower).

Licenses and permits are the responsibility of the Government and they are not part of the scope of the contract.

Constructi on

Material Disposal location

The material product of the excavation of the foundation of the tower, has to give a final disposal or a place that is authorized for this material – can you indicate where is this location.

According to COLNAV, since this material is organic it can be disposed in the areas along the beach side. The material shall be evenly distributed along this area to avoid forming high areas that may reduce the visibility of the COLNAV guards.

SOW

Generators

Are the generators supplied by the customer – GFE ? The scope is only to install and put them into operation?

Refer to answer to Q1. The offeror shall only install and put one of the generators in operation.

Tower (1) Candelilla de la Mar, Colombia SAQMMA-16-R-0712 Q&As

Fuel Tanks

Are two fuel tanks to be supplied? With fuel? And all connections ?

The offeror shall supply and install one of the fuel tanks, including the fuel connection system to the generators as shown in drawing M-001.

Personnel Lodging

For the accommodation of the personnel will we be able to construct a camp of lodging in the COLNAV base?

The offeror may build a temporary camp and facilities inside the COLNAV base perimeter.

There is an area of approx. 300 m2 next to the COLNAV facilities that the offeror may use for this purposes.

Food Access

For the meals of the staff, can we make / cook food within the accommodation camp?

The COLNAV Base does not have the capacity to supply food to offeror’s personnel. The offeror may install its own cooking facilities if the equipment that the offeror uses for this purposes fulfill safety standards. The Temporary utilities for these facilities shall be responsibility of the offeror and they shall be independent in satisfying any utilities needs as necessary

Work Schedule

Schedule of work and / or restrictions to be taken into account by COLNAV?

The COLNAV base does not have schedule restrictions. The offeror may work at night if they comply with the Base’s security and safety standards and if in addition, the offeror uses appropriate illumination. COLNAV recommends that as part of the safety standards that the offeror shall have a plan to satisfy any emergency or evacuation if needed.

Trees

At the time of preparing the area for work we will have to cut vegetation and some trees. Is the permission for this task granted or the offeror should contemplate something additional for this activity?

Refer to the Impact Survey attached to the solicitation Package.

Tower (1) Candelilla de la Mar, Colombia SAQMMA-16-R-0712 Q&As

Storage

Can we have places for the storage of the material.

In the COLNAC base ? other location ?

The offeror may have storage facilities as part of their temporary camp.

Bidding Charts

Transport

In the Bidding Charts, there are 2 options for transporting the material, Bid option 1 and 2, The BO1 contemplates transport of materials by helicopter and the BO2 from Buenaventura to Tumaco. Do we have to offer the two options as alternates - as is indicated? Or can we describe our recommended choice only?

The Options shown in the reviewed Bidding Chart (attached in Amend 003) are transportation options that the offeror shall evaluate for its project implementation strategy. However, the offeor has the autonomy to use the transportation routes he considers best in order to transport all the materials required to complete the total scope for the project.

J-3_SOW-

Radar_To wer_Cand elilla, Paragraph s 2.01.02, 2.01.04.01

2.01.07.02

2.01.07.03

Data Sheets

Please confirm that the Government requires proposers to include datasheets for all proposed materials within our proposal.

The offeror shall refer to section L: Instructions, Conditions, and Notices to Offerors of the solicitation package to confirm the technical and management requirements.

J-2- 6_Bidding _charts.xls

Bid Options

Please clarify if the Government will include bid options in this proposal and if the proposer should include ground or sea transport costs in the Base Bid as an additional item to reflect the logistics approach determined by the proposer.

See Amendment 003, Reviewed Bidding Chart is attached. This solicitation does not include options. The offeror shall ensure and document their selected transportation method in order to show that they will comply with the scope of the project. This needs to be reflected in the bidding charts.

Tower (1) Candelilla de la Mar, Colombia SAQMMA-16-R-0712 Q&As

Radar_To wer_Cand elilla, Paragraph

1.01.03

Storage

Please confirm if we can install temporary facilities for personnel, storage and office in the project area.

Refer to answer to Q6, Q7 and Q10.

Radar_To wer_Cand elilla, 1.01.03

Lodging

Will the Government permit the proposer to provide personnel lodging within the temporary facilities?

Lodging for the offeror personnel is allowed only if the offeor’s staff is inside the COLNAV Base perimeter.

Radar_To wer_Cand elilla, 1.04.01

Security Assuming the installation team receives lodging and meals on-site in Candelilla de la Mar, will this site be secured?

For security reasons, COLNAV recommends that offeror’s personnel has access to meals and lodging inside the Base’s perimeters. This is a security concerns due to previously reported incidents in the area.

Radar_To wer_Cand elilla, 1.02.01

Tower Construction difficulties

Given the difficulties encountered while executing the existing tower’s foundation in the Base, did the Government factor these problems and solutions into the design and recommendations for tower construction presented within the Statement of Work?

Yes. The design and construction processes described in the SOW and the cost estimates considered potential contingencies during the construction process.

Radar_To wer_Cand elilla, 1.01.09

Permits/License

Is the contractor responsible to obtain construction or environmental permits?

Refer to answer to Q2.

Tower (1) Candelilla de la Mar, Colombia SAQMMA-16-R-0712 Q&As

19 Site Visit

Permits/License

There are two trees located in the area adjacent to the Tower. Are either of these trees required to be cut? If so, will the contractor be required to process an environmental permit?

Refer to answer to Q2. Refer to the Environmental Impact Survey attached to the solicitation Package. Trees may be trimmed if they are inside the COLNAV perimeter.

Radar_To wer_Cand elilla, 3.01

Security

Is the alternative route to Candelilla de la Mar (which passes through Imbilí, Rio Mira and Puerto Palma) a secure route?

According to COLNAV information, these routes are NOT secured. Security issues have occurred in the past along these routes.

Site Visit

Mines

Considering that mines with electrical circuits are present in the tower construction area, will COLNAV relocate these prior to the start of tower construction?

If these mines are located along the construction area interfering with the construction process, the COLNAV will directly relocate these mines using the appropriate personnel and equipment for these purposes before the offeor begins work.

Tidal Floods

Does the current design of the tower, foundation, fuel tanks, generators, and shelter take into account the tidal floods that occur every one to four months?

The finished levels for the projected structures of the project shall be considered approx. 1 m above the existing ground level in order to manage these floods. During the Construction Process the offeor shall review these levels as mentioned in the SOW.

Installation

Can COLNAV provide information from the Base regarding the minimum levels for installing temporary facilities?

Refer to answer to Q22. This also applies to the Temporary Facilities.

Attachme nt J-3, SOW 2.01

Generators

Please provide the brand part model and part number for the generators, including control panel.

The generator data sheet is attached in Amendment 003.

Refer to answer to Q22.

Tower (1) Candelilla de la Mar, Colombia SAQMMA-16-R-0712 Q&As

Comment at Site on November 21, 2016

High Tides/Construct ion

At the site survey speakers requested that due to the high tides, we should make the foundation for the tower, shelter and maybe generators about 1 meter above ground level. Page 9 of the SOW 1.02 allows the contractor to determine the adequate height. Further J2-2 does not specify these items be raised to that elevation. If the Government is requesting the tower, shelter, and generators be 1 Meter above ground please state so in the solicitation.

SOW pg.

24: State ment of work 3.01 states transportat ion from Bogota to Buenavent ura shall be provided by the contractor.

Options

The Government then includes -Bid option 1 and bid option 2 :Option 1: Buenaventura –Tumaco and Option 2: Tumaco –Candelilla. It would seem the Government would need both options. If the Government selects only option 2 will the Government handle at its expense the transportation for option 1? Why are there options if in SOW 3.01 the Government states all these elements shall be shipped to Tumaco by the contractor? This seems to be conflicting, please clarify.

Refer to answer to Q13.

Drawings

Dimensions

Please could you confirm the other thank shows in the dwg will be pprovided by local government, could you confirm the dimension, brand?

The second tank that is not included as part of the actual solicitation is identical to the tank shown in the solicitation package.

This is a Construction contract only, not a

Tower (1) Candelilla de la Mar, Colombia SAQMMA-16-R-0712 Q&As

Steel Frames

Steel structure for the tower is calculated with us steel frames, locally you find similar references but will add more weighty to the structure, re evaluate design and site adapt with local frames must be provided with the sub contractor?

Design/Build Contract. The offeror shall submit their proposal following the structural designs attached to the solicitation.

High Tides/Construct ion

During the site visit we confirm where the tower will be located in some days is fully of water by the level of the sea, on drawings is not shown what will be the top level of the electrical tower concrete slab and the slab for the shelter, please could you provide how much must be raise the structure to avoid water specially in shelter?

Bid Option/Transpo rt

During the site visit we discuss about the SOW where is mentioned the transport to Buenaventura to Tumaco and Tumaco -Candelilla de la Mar is a bid option. Please confirm if this bid option is not assigned what will be the logistic of transportation?

Refer to answer to Q13.

Fuel System

Please could you confirm details of the pool that have to be constructive for placement of the fuel system?

Offeror shall refer to drawings A‐001 and A‐002 for details concerning the concrete slab for the fuel system installation. Construction performance drawings or shop drawings which provide more details shall be prepared by the offeror.

Barracks & material storage

Please confirm would be possible to build the barracks and storage of material into the area of the military perimeter.

Refer to answer to Q6, Q7 and Q10.

Tower (1) Candelilla de la Mar, Colombia SAQMMA-16-R-0712 Q&As

Location/Sched ule

Please confirm into the project location could performed work during all days and which schedule we have

Refer to answer to Q8.

Drainage

The SOW indicates that drainage must be designed, it's not only a contract limited just a construct?

On construction contracts minor incidentals designs may be performed by the offeror, as it is the case with this minor item of the project.

Equipment

Please could confirm ATS must be installed and which other equipment as mentioned in the electrical scope? That equipment only will be placed into the shelter or must be installed in other location, if so, please provide details.

The offeror shall refer to drawing E-007 where the electrical items outside the scope of the contract are described.

Analyses

If water for concrete works will be provide from buenaaventura, physical and chemical análisis must be provided?

The offeror must guarantee the quality of the material and the procedures during the construction process. The offeror shall follow the general building regulations mentioned in the SOW where it is mentioned that the materials, the equipment, the tests and supplied work by the offeror shall comply with the requirements of the applicable regulation.

Materials

Prefabricated walks into the SOW mention that the contractor shall be responsible to receive the material on the COLNAV Base, please could you clarify if the material will be provided by the local government and the contractor is just limited to install it?

If the offeror is referring to “Pre-Fabricated Walls”, they must refer to items 1.04.01. 1.04.02 and 1.04.03 where it is mentioned that the offeror shall construct (supply and install) the pre-fabricated system for the shelter. The intent of this paragraph is to clarify that the COLNAV will not transport or handle these pre-fabricated material, this is the offeror’s responsibility.

Tower (1) Candelilla de la Mar, Colombia SAQMMA-16-R-0712 Q&As

High Tides

Due to high tide, sea level could be increased up to 1 meter above the average level around the project site. Is there any contingency for this phenomenon in the tower and buildings structure foundation levels?

File details come from the government source that posted it. Updated .