J-2-1_Bidding_charts.pdf

PDF 81 KB Posted

Attached to
Pier (1) for COLNAV in Gorgona Island, Colombia
Solicitation number
SAQMMA16R0507
Issued by

About this file

Solicitation Bidding Charts

View the file

Other files

File Type Posted
2nd_set_QandAs-final_(26OCT16).pdf PDF
Updated-Environmental_Data_Sheets_(25OCT16).pdf PDF
A-3B.pdf PDF
Specs-Electrical_gerator_and_fuel_Tank.pdf PDF
SF30_Amend_003_(26OCT16)_Approved.pdf PDF
Amend_002_SF30_Approved_14OCT16.pdf PDF
S-03A.pdf PDF
16R0507_Q As_Pier_in_Gorgona-Final.pdf PDF
Amend_002-LICENCIA_AMBIENTAL_GORGONA.pdf PDF
E-01.pdf PDF
A-3A.pdf PDF
S-06A.pdf PDF
Amend_001-Sched_B-M(28SE).pdf PDF
SF30A001-Approved_(28SEP16).pdf PDF
Colombian_Tax_Exemption_Certificate.pdf PDF
Soil-Geo_Study.pdf PDF
J-1-1_Mat_Prod_Substitution_Form.pdf PDF
J-1-3FirmT.pdf PDF
FinalSched_B-M_16R0507(1SEP16).pdf PDF
J-1-4_Insurance.pdf PDF
SF1442_(01SEP16).pdf PDF
J-1-5_IncidentsF.pdf PDF
J-2-3_Impact_Survey.pdf PDF
J-1-2_PastP.pdf PDF
Final_SOW_(01SEP16).pdf PDF
J-2-2_Drawings_(25aug16).pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DETAILED BIDDING CHART - GUIDE

PROJECT: CONSTRUCTION OF PIER

Place: NATIONAL NATURAL PARK IN GORGONA ISLAND, CAUCA, COLOMBIA

Date:

DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL COST

TOTAL COST BY

CHAPTER

01 General Requirements $ 0.00

01 32 16 00 20 Construction progress documentation LS 1.00 $ 0.00 $ 0.00

01 50 00 Temporary Facilities and Controls (Include enclousere H=2.1 m.) LS 1.00 $ 0.00 $ 0.00

01 50 02 Replanting and location LS 1.00 $ 0.00 $ 0.00

01 80 00 Performance Requirements

Bonding Requirements (Polizas please price individually) LS 1.00 $ 0.00 $ 0.00

01 57 19 Temporary Environmental Controls (Implantacion PMA) LS 1.00 $ 0.00 $ 0.00

03 Concrete $ 0.00

03 11 13. 00 10 Structural cast-in-place concrete forming LS 1.00 $ 0.00 $ 0.00

03 20 00. 00 10 Concrete Reinforcing. LS 1.00 $ 0.00 $ 0.00

03 20 00. 00 10 Electrowelded mesh for concrete slab. LS 1.00 $ 0.00 $ 0.00

03 30 00. 00 10 Cast-in-place structural concrete

03 30 00. 00 10 01 Cast-in-place structural concrete for beams f'c=28 Mpa. LS 1.00 $ 0.00 $ 0.00

03 30 00. 00 10 02 Cast-in-place structural concrete for slab T= 11 cm., f'c=28 Mpa. LS 1.00 $ 0.00 $ 0.00

03 30 00. 00 10 03 Cast-in-place structural concrete for stairway f'c=28 Mpa with accessories. LS 1.00 $ 0.00 $ 0.00

03 30 00. 00 10 04 Cast-in-place structural concrete for piles f'c=28 Mpa type TREMIE. LS 1.00 $ 0.00 $ 0.00

03 30 00. 00 10 05 Dock utilities cabinet in reinforced concrete. Include sleeves for pipes. LS 1.00 $ 0.00 $ 0.00

03 30 00. 00 10 06 Cast-in-place structural concrete for concrete ditch f'c=21 Mpa LS 1.00 $ 0.00 $ 0.00

03 30 00. 00 10 07 Supply and installation of epoxy SIKAGUARD 62 or equivalent according to specs. LS 1.00 $ 0.00 $ 0.00

03 30 00. 00 10 08 Supply and installation of reinforced concrete hexapod for Coastal protection LS 1.00 $ 0.00 $ 0.00

05 Metals $ 0.00

05 05 23 16 Structural welding LS 1.00 $ 0.00 $ 0.00

05 50 14 Structural metal fabrications

05 50 14 01 Supply and installation of horizontal metallic bracings, Carbon steel SCH40, including cutting and welding.

LS 1.00 $ 0.00 $ 0.00

05 50 14 02 Supply and installation of horizontal metallic bracings R, D= 8", including cutting and welding.

LS 1.00 $ 0.00 $ 0.00

05 50 14 03 Supply and installation of Handrail, manufactured in 2" galvanized pipe, Include primer and finish paint

LS 1.00 $ 0.00 $ 0.00

07 Thermal and Moisture Protection $ 0.00

07 92 00 Joint sealants LS 1.00 $ 0.00 $ 0.00

09 Finishes $ 0.00

09 96 00 High-performance coating for piles, metallic bracings and Handrail LS 1.00 $ 0.00 $ 0.00

26 Electrical $ 0.00

26 41 00.00 40 Lightinng Protectiom System - Ground system (metallic structure) LS 1.00 $ 0.00 $ 0.00

26 56 00 Exterior Lighting LS 1.00 $ 0.00 $ 0.00

31 Earthwork $ 0.00

BASE CONTRACT

Department of State- INL Construction of one pier at Gorogona Island 1 of 2

DETAILED BIDDING CHART - GUIDE

PROJECT: CONSTRUCTION OF PIER

Place: NATIONAL NATURAL PARK IN GORGONA ISLAND, CAUCA, COLOMBIA

Date:

DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL COST

TOTAL COST BY

CHAPTER

BASE CONTRACT31 11 00 Clearing and Grubbing LS 1.00 $ 0.00 $ 0.00

31 00 00. 01 General excavation LS 1.00 $ 0.00 $ 0.00

31 62 23. 13 Cast-in-place concrete piles, steel casing LS 1.00 $ 0.00 $ 0.00

31 62 23. 13 01 Transport of Piles driving equipmet LS 1.00 $ 0.00 $ 0.00

31 62 23. 13 02 Supply and installation of Piles D=18" Carbon steel SCH40 LS 1.00 $ 0.00 $ 0.00

31 62 23. 13 03 Supply and installation of Piles D=20" Carbon steel SCH40 LS 1.00 $ 0.00 $ 0.00

31 62 23. 13 04 Cut off the top of piles. Include pipe cut and concrete demolition in order to uncover the reinforcement

LS 1.00 $ 0.00 $ 0.00

35 Waterway and marine construction $ 0.00

35 00 01 Dock fender, type pile protection, maritime model 153, T=250 mm. length= 4000 mm.

Diameter=500 mm.

LS 1.00 $ 0.00 $ 0.00

35 00 02 Supply and installation of Mooring Bollards Capacity =10 tons. LS 1.00 $ 0.00 $ 0.00

TOTAL DIRECT COSTS $ 0.00

Administration % $ 0.00

Unforenseens % $ 0.00

Profit % $ 0.00

VAT(Over the profit value) % $ 0.00

TOTAL COSTS $ 0.00

PERFORMANCE TIME (in calendar days)

Department of State- INL Construction of one pier at Gorogona Island 2 of 2

1 2 3 4 5 6

DIVISION/DESCRIPTION LABOR MATERIALS OVERHEAD PROFIT TOTAL

01 - General Requirements

03 - Concrete

05 - Metals

07 - Thermal and Moisture Protection

09 - Finishes

26 - Electrical

31 - Earthwork

35 - Waterway and marine construction

TOTAL

Colombian Pesos

Allowance Items:

PROPOSAL PRICE TOTAL:

Alternates (list separately do not total)

Offeror: Date

UNITED STATES DEPARTMENT OF STATE

BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS

Department of State - INL Constrction of one pier at Gorgona island 1 of 1

Attachment 2 - Bidding charts
Bidding Chart1