DOS responses to additional industry questions received 07/14/14.

View the file

Other files for this federal contract opportunity

Other files attached to IT EQUIPMENT: ENTERPRISE CONVERGED PLATFORM, newest first.
File Type Posted
2014-07-14_ECP_RFP_LCCM_v.3_.xlsx XLSX spreadsheet
2014-07-11_ECP_RFP_AMEND_002.pdf PDF
2014-07-10_ECP_AMEND_002_RFP_SOW.docx DOCX document
2014-07-10_ECP_AMEND_002_RFP_TCM.docx DOCX document
2014-07-10_ECP_AMEND_002_SUMMARY_OF_CHANGES_TO_RFP.docx DOCX document
2014-07-10_ECP_AMEND_002_INDUSTRY_QUESTIONS_DOS_ANSWERS.docx DOCX document
2014-07-10_ECP_AMEND_002_RFP_SECTIONS_L_M.docx DOCX document
2014-07-10_ECP_AMEND_002_INDUSTRY_QUESTIONS_DOS_ANSWERS.docx DOCX document
2014-07-02_ECP_RFP_SUMMARY_OF_RFP_CHANGES.docx DOCX document
2014-07-07_ECP_RFP_SECTIONS_L_M.docx DOCX document
2014-07-02_ECP_RFP_CURRENT_OPERATIONS_OVERVIEW.docx DOCX document
2014-07-02_ECP_RFP_LCCM.xlsx XLSX spreadsheet
2014-07-02_ECP_RFP_TCM.docx DOCX document
2014-07-02_ECP_RFP_SOW.docx DOCX document
2014-07-02_ECP_RFP_MASTER_LIST_OF_INDUSTRY_QUESTIONS_V.11.docx DOCX document
2014-07-02_ECP_RFP_GLOSSARY.docx DOCX document
2014-07-08_ECP_RFP_SF33.pdf PDF
2014-07-02_ECP_RFP_DD254.pdf PDF
2014-07-02_ECP_RFP_MASTER_LIST_OF_INDUSTRY_QUESTIONS_V.11.docx DOCX document
Proposal_Compliance_Matrix.docx DOCX document
Acronyms.docx DOCX document
Request_for_Proposals_SAQMMA14R0308.pdf PDF
Life_Cycle_Cost_Model.xlsx XLSX spreadsheet
Statement_of_Work.docx DOCX document
Bidders_DD_254.pdf PDF
Current_Operations_Overview.docx DOCX document
Past_Performance_Assessment_Questionnaire.docx DOCX document
Proposal_Instructions_and_Evaluation_Methodology.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDUSTRY QUESTIONS

07/14/14

Q: Within the LCCM, for both the DDC and Remote Office Tabs for all contract years there is a CLIN for Extended Equipment Warranty – OPTIONAL (SOW Section 8.8). This CLIN is listed as a 'Cost Reimbursable' contract type. However, this CLIN is to proposing the cost of a single year (fixed unit) of extended equipment warranty. Would the government consider revising this Contract Type from 'Cost Reimbursable' to 'Unit Priced.'

A: Yes, CLIN 8.8 Extended Equipment Warranty - OPTIONAL should be proposed as a firm, fixed Unit Priced. See revised LCCM.

Reference LCCM - There seems to be some inconsistencies within the LCCM across the base and option years. For example: a) Remote Site Base Year Tab and Remote Site OY1 Tabs require pricing on Section 7.2 (Conduct [Worldwide] Installation, Maintenance and Systems Administrator Training for Installers) but do not request pricing for Section 8.4 (Conduct On-site [OCONUS] Familiarization Training for Remote Offices – OPTIONAL) of the SOW. b) Remote Site OY2, OY3, and OY4 Tabs require pricing on Section 8.4 but do not request pricing for Section 7.2 of the SOW. Please provide clarification.

A: LCCM is revised to align with the language in the SOW. See revised LCCM.