2014-07-02_ECP_RFP_MASTER_LIST_OF_INDUSTRY_QUESTIONS_V.11.docx

DOCX document 101 KB Posted

Attached to
IT EQUIPMENT: ENTERPRISE CONVERGED PLATFORM
Solicitation number
SAQMMA14R0308
Issued by

About this file

This file contains industry questions and DOS answers regarding solicitation SAQMMA14R0308.

View the file

Other files

File Type Posted
2014-07-14_ECP_RFP_LCCM_v.3_.xlsx XLSX spreadsheet
2014-07-14_INDUSTRY_QUESTIONS_ _DOS_RESPONSES.docx DOCX document
2014-07-10_ECP_AMEND_002_RFP_SOW.docx DOCX document
2014-07-10_ECP_AMEND_002_SUMMARY_OF_CHANGES_TO_RFP.docx DOCX document
2014-07-11_ECP_RFP_AMEND_002.pdf PDF
2014-07-10_ECP_AMEND_002_RFP_SECTIONS_L_M.docx DOCX document
2014-07-10_ECP_AMEND_002_INDUSTRY_QUESTIONS_DOS_ANSWERS.docx DOCX document
2014-07-10_ECP_AMEND_002_RFP_TCM.docx DOCX document
2014-07-10_ECP_AMEND_002_INDUSTRY_QUESTIONS_DOS_ANSWERS.docx DOCX document
2014-07-02_ECP_RFP_DD254.pdf PDF
2014-07-02_ECP_RFP_SUMMARY_OF_RFP_CHANGES.docx DOCX document
2014-07-02_ECP_RFP_CURRENT_OPERATIONS_OVERVIEW.docx DOCX document
2014-07-02_ECP_RFP_LCCM.xlsx XLSX spreadsheet
2014-07-02_ECP_RFP_SOW.docx DOCX document
2014-07-02_ECP_RFP_MASTER_LIST_OF_INDUSTRY_QUESTIONS_V.11.docx DOCX document
2014-07-02_ECP_RFP_GLOSSARY.docx DOCX document
2014-07-08_ECP_RFP_SF33.pdf PDF
2014-07-02_ECP_RFP_TCM.docx DOCX document
2014-07-07_ECP_RFP_SECTIONS_L_M.docx DOCX document
Current_Operations_Overview.docx DOCX document
Proposal_Compliance_Matrix.docx DOCX document
Bidders_DD_254.pdf PDF
Acronyms.docx DOCX document
Past_Performance_Assessment_Questionnaire.docx DOCX document
Proposal_Instructions_and_Evaluation_Methodology.docx DOCX document
Request_for_Proposals_SAQMMA14R0308.pdf PDF
Life_Cycle_Cost_Model.xlsx XLSX spreadsheet
Statement_of_Work.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MASTER LIST OF INDUSTRY QUESTIONS

RFP SAQMMA14R0308

07/02/14

Please note that “Q” indicates the Offeror’s original question and “A” indicates the DOS answer. Where there are separate responses for the Domestic Data Center and the Remote Offices, “DA” represents the answer for the Domestic Data Center and “RA” represents the answer for the Remote Offices. Where it was unclear if the question was for Domestic Data Centers or Remote Offices, responses for both are provided.

QUESTION / ANSWER #
RFP REF.
INDUSTRY QUESTIONS (Q)

DOS RESPONSES / CLARIFICATIONS (DA, RA, A)

A1

Q: What application(s) do you intend to run on this converged infrastructure?

DA: ECP will be a hosted compute environment, and any application could be hosted on the solution. The Government does not intend to impose application specific requirements, only infrastructure requirements for the Offeror’s solution.

RA: Remote Office requirements are as stated in SOW Section 4.3.4, “Computing.”

A2

Q: What requirements does that (/those) application have? (CPU architecture, #cores, etc.)

DA: ECP will be a hosted compute environment, and any application could be hosted on the solution. The Government does not intend to impose application specific requirements, only infrastructure requirements for the Offeror’s solution.

RA: Remote Office requirements are as stated in SOW Section 4.3.4, “Computing.”

A3

Q: What kind of computing workload(s) are expected to run on the converged infrastructure?

DA: ECP will be a hosted compute environment, and any application could be hosted on the solution. The Government does not intend to impose application specific requirements, only infrastructure requirements for the Offeror’s solution.

RA: Remote Office requirements are as stated in SOW Section 4.3.4, “Computing.”

A4

Q: Approximately how many users do they expect?

DA: User count is not relevant to this RFP.

RA: User count is referenced in the VM Minimum Configuration Table in SOW Section 4.3.4, “Computing.”

A5

Q: How much storage (raw) is required?

DA: DOS has clarified baseline configuration requirements in the table in SOW Section 4.2.10 (new), “Domestic Data Center Baseline Configuration.” See Amendment 001.

RA: User count is referenced in the VM Minimum Configuration Table in SOW Section 4.3.4, “Computing.”

A6

Q: What precisely is meant by “data offshoring solutions for Disaster Recovery (DR)”?

A: It is the capability to conduct a back-up (site-to-site replication and recovery) from a remote location overseas. Reference SOW Sections 4.2.6 and 4.3.6.

A7

Q: We respectfully request that the Department of State grant a two week extension.

A: No extension to the proposal due date is contemplated at this time.

A8

Q: [We] would like to inquire if the Department of State may be interested in hearing about a new technological solution for these requirements.

A: Offerors are encouraged to develop innovative solutions while satisfying all requirements of the RFP per SOW section 4.1.1.

A9

Q: The general requirements make a number of assumptions about storage architectures that are not relevant to alternative approaches to data storage. Would the Department of State entertain solutions that provide the required functionality in a more efficient and less costly way, but do not strictly adhere to the stated requirements?

A: Offerors are encouraged to develop innovative solutions while satisfying all requirements of the RFP per SOW section 4.1.1.

A10
SOW 4.1.4
Q: How will the Department of State evaluate the requirement for "Near-linear performance scalability and linear capacity scalability..."?

A: The Government will review the Offeror’s solution with regard to all requirements stated in the RFP.

A11
SOW 4.1.4
Q: What performance metrics will be used to determine if a proposed solution provides "near-linear" performance?

A: A series of performance counters will be used to determine if a proposed solution provides “near-linear” performance. Offerors are expected to be able to provide performance information as part of their management solution.

A12
SOW 4.1.4
Q: How will "linear capacity" be determined?

A: “Linear capacity” will be determined by the ability to “hot add” the same type of shelves to small, medium, and large storage arrays. The Government requires a standardized solution with interchangeable parts; for example, a shelf for a small array will work on a large array; and vice versa.

A13
SOW 4.1.4
Q: Regarding the requirement "The solution will provide an automated process for expanding volumes or file systems.” please describe the requirements for the "automated process". Does that mean expansion without operator intervention? Or, is the Department of State referring to the implementation of "thin provisioned" file systems that only consume space when data is written?

A: DOS requires the ability to expand volumes or file systems without operator intervention.

A14
SOW 4.1.4
Q: The requirement "The solution will provide the capability to separate storage for production data and point-in-time data with the ability for the production file systems to be placed on differing (Redundant Array of Independent Disks (RAID)) arrays, disk types, and RAID types from the snapshot data" would add significant complexity and management overhead to the overall solution. Would the Department of State be interested in a solution that provided much simpler snapshot management without the limitations imposed by managing snapshot space?

A: DOS requires the capability to separate production data from point-in-time data on differing arrays, disk types, and RAID types from the snapshot data.

A15
SOW 4.1.4
Q: Regarding the requirement, "The solution will provide the ability to expand the snapshot space or production file system independently of the other." Would the Department of State be interested in a solution where snapshot space is not arbitrarily limited?

A: The requirements remain as stated in SOW Section 4.1.4, “Storage.”

A16
SOW 4.2.3
Q: Requirement for 15K RPM drives: Since the disk industry is moving away from 15K RPM drives toward 2.5" 10K RPM drives, would the Department of State accept small form factor (2.5") 10K RPM drives as an acceptable alternative?

A: Yes, a SFF 2.5” 10K RPM drive would be an acceptable alternative. See Amendment 001.

A17
SOW 4.2.6, 4.3.6
Q: What are the Service Level Agreement (SLA) metrics for Recovery Point Objectives and Recovery Time Objectives (RPO/RTO)?

A: DOS has added requirements for RPO/RTO; see SOW Sections 4.2.6 and 4.3.6, “Back-Up, Disaster Recovery/Data Offshoring.” See Amendment 001.

A18
SOW 4.3.6
Q: Paragraph 4.3.6 indicates that data from the backups must be shipped back to the Domestic Data Centers. What volume of data would be required to move from Offshore Data Centers to Domestic Data Centers? Since this is backup data, should this be written to encrypted tapes and shipped through a diplomatic pouch or other State Department established methods of shipment?

A: The Offeror will not be responsible for shipping. However, data will be transported to offsite locations in one of two ways; the first option is physical media, detailed in the Table in SOW Section 4.3.6, “Removable Media Integration,” and the second option is replication, detailed in the same Table under “Replication.”

A19

Q: The architecture of the solution outlined in the Statement of Work, eliminates other potential architectural solutions, which can provide equivalent or superior performance and cost savings (i.e., Space, Energy, and Operational). Is an equivalent architectural solution, which meets the General Systems Requirements as well as meets or exceeds performance requirements going to be downgraded because of not meeting specific minimum requirements? For example, the use of 15K RPM hard drives can be eliminated by using a Dynamic Random Access Memory (DRAM)-centric Hybrid Storage Pool.

A: Offerors are encouraged to develop innovative solutions while satisfying all requirements of the RFP per SOW section 4.1.1.The Offeror’s solution must comply with or exceed the requirements stated in the solicitation. Flexibility is permitted in places where “or equivalent” is stated.

A20
SOW 4.2.6, 4.3.6
Q: Would the Dept of State consider a tape library solution if it meets defined RTO and RPO objectives?

DA: The Domestic Data Center does not use nor intend to use tape media.

RA: A tape solution is acceptable to meet the requirements in SOW Section 4.3.6, “Backup/Disaster Recovery/Data Offshoring” under the Removable Media Integration Section. However, it cannot replace replication or snapshot requirements.

A21
SOW 4.1.2

Q: Can you please clarify the rack requirements: Is the 400lb rack requirement for all deployed solutions, only non-domestic, or mixture of both?

A: The shell of the rack, without any equipment or power distribution installed, must weigh less than 400 lbs., as stated in SOW Section 4.1.2, “General Systems Requirements.” This limitation applies to both the Domestic Data Center and the Remote Offices.

A22
SOW 4.1.2

Q: Can you please clarify the rack requirements: Is the 400lb requirement for the rack including all components installed or the rack without any components installed?

A: The shell of the rack, without any equipment or power distribution installed, must weigh less than 400 lbs., as stated in SOW Section 4.1.2, “General Systems Requirements.”

A23
SOW 4.1.2
Q: Can you please clarify the rack requirements: Must all of the components fit inside a single rack?

A: It is required that all components fit inside a single rack for the Remote Office solution, but not for the Domestic Data Center solution.

A24

Q: Will any Oracle Databases be deployed on the proposed infrastructure?

DA: Yes, but we are not specifying application-level requirements in this RFP.

RA: This is currently not a requirement, but is possible in the future.

A25

Q: Will any instances of Oracle Weblogic be deployed on the proposed infrastructure?

DA: Yes, but we are not specifying application-level requirements in this RFP.

RA: This is currently not a requirement, but is possible in the future.

B1

Q: Is it the desire of the Government to procure these tools (i.e., SRM tools) separate of ECP and through the existing contract vehicles, or is it the intent that these additional management and provisioning tools be included in the offerors’ proposals?

A: We are looking for the potential Offerors to propose this as a separately priced option, to allow potential Offerors to have a fully inclusive solution. We do not want to limit offerors’ ability to create a complete solution based on the existing Department of state enterprise architecture/licenses.

B2

Q: Were these scenarios anticipated (two systems using the same licensing at the same time), and what is the thought process of how DOS would handle these as part of the solution?

A: Yes we did anticipate it; however, we don’t want to prevent or limit vendors from creating a solution(s) that requires licenses/software that the Department does not have currently.

B3

Q: Your clarity here (regarding support of VMWare licenses through OEM and/or VMWare) would be most appreciated.

A: If the Department determines that additional licensing is required, the Department will contact VMWare directly to procure any additional licenses.

C1
SOW 4.3.3
Q: How does this requirement fit into the remote office overall requirement based on the “current environment overview for GITM” as this is 90 times greater than the current maximum storage capacity? We understand the overall mission for scalability of the remote office “Must have the ability to scale to data center levels of storage”, but designing and pricing a solution that has raw capacity up to 1.875 petabytes in the remote office will not be cost competitive between vendors. Can you confirm that the remote offices need to scale to 1.9PB?

A: The Remote Office environment differs in mission and user quantities that require flexibility in performance and capacity. As stated in the SOW Section 4.1.1, “Innovation,” scalability beyond current deployed systems is one of the goals of this solicitation.

C2
SOW 4.3.3
Q: We request this requirement for the remote office be removed in order to allow DOS to realize the greatest cost savings, allow for optimal disaster recovery performance, and not unintentionally limit competition.

A: Requirements remain as stated.

C3
SOW 4.3.4
Q: Does this requirement have to be installed on all computers in the solution or can it only be required for the management computer in the solution? We recommend this specification be only for the management computer in the solution or have the option for an external DVD ROM.

A: Requirements remain as stated in SOW Section 4.3.4, “Computing.”

C4
SOW 4.3.4
Q: Is the local storage addressed in the VM Minimum Configuration Table storage sizing row?

A: No, local storage will not be used to store virtual machines. The Offeror must provide appropriate local storage for the VMware or Windows operating system.

C5
SOW 11
Q: EPEAT does not have a category for servers, storage, and networking equipment. This vendor recommends that this requirement be removed.

A: The Offeror is expected to meet standards where applicable, as listed in SOW Section 11, “Applicable Standards.”

C6
SECTION L 2.5.1
Q: Please clarify the term “one scalable base configuration”.

A: DOS has clarified baseline configuration requirements located in the table in SOW Section 4.2.10 (new), “Domestic Data Center Baseline Configuration.” See Amendment 001.

C7

Q: Can the DOS provide a roll out schedule of the hardware installations?

A: The installation schedule is not known at this time.

DA: For planning purposes only, the Domestic Data Center anticipates replacement of 20% of their infrastructure annually. This does not obligate the Department to meet this schedule. The Domestic Data Centers’ current infrastructure is described in Identifier 4, “Current Operations Overview.”

RA: Estimated production rates for the Remote Offices are provided in RFP Section L.2.3.4.1.4, “Order Fulfillment.”

C8
Life Cycle Cost Model, DDC (Base Year)
Q: It is not clear what technical components should be included in CLINs D1001 ECP DDC Base Configuration and D1001A ECP DDC Component 1. Can the Government please clarify the technical requirements that should be included in each of the referenced CLINs?

A: DOS has clarified baseline configuration requirements located in the table in SOW Section 4.2.10 (new), “Domestic Data Center Baseline Configuration.” In addition, Section L.2.5.1 has been revised. See Amendment 001.

C9
Life Cycle Cost Model, DDC (Base Year)
Q: It is not clear what technical components should be included in CLINs D1001A ECP DDC Component 1 and D1001B ECP DDC Component 2. Can the Government please clarify the technical requirements that should be included in each of the referenced CLINs?

A: DOS has clarified baseline configuration requirements located in the table in SOW Section 4.2.10 (new), “Domestic Data Center Baseline Configuration.” In addition, Section L.2.5.1 has been revised. See Amendment 001.

C10
Life Cycle Cost Model, Remote Office (Base Year) workbook
Q: It is not clear what technical components should be included in CLINs R1001 ECP A Composite Solution and R1001A ECP A Component 1. Can the Government please clarify the technical requirements that should be included in each of the referenced CLINs?

A: Section L.2.5.1 has been revised. See Amendment 001.

C11
Life Cycle Cost Model, Remote Office (Base Year) workbook
Q: It is not clear what technical components should be included in CLINs R1001A ECP A Component 1 Solution and R1001B ECP A Component 2. Can the Government please clarify the technical requirements that should be included in each of the referenced CLINs?

A: Section L.2.5.1 has been revised. See Amendment 001.

C12
Life Cycle Cost Model, Remote Office (Base Year) workbook
Q: The price has to be submitted as a “Unit Price”. Can the Government please define what is meant by Unit Price for this CLIN?

A: The “unit price” is the firm-fixed price for an item proposed to satisfy a CLIN, be it an individual component or fully configured system, in accordance with the instructions at section L.2.5.1.

C13

Q: Does this requirement only apply to mixing of SSD disks and NL disks? If mixing SSD and SAS, what would be the minimum cache requirement?

A: Hybrid disk configurations are acceptable with both SSD/NL and SSD/SAS. There is no minimum cache requirement.

C14

Q: The remote site requirements call for a Keyboard, Video, Mouse (KVM) Console solution – Monitor, keyboard, pointing device. However, there is no mention of a KVM switch. Is a KVM switch required in a multi-server solution?

A: The Offeror shall determine what type of KVM solution will meet the specified requirements. See SOW Section 4.1.9, “Systems Management Suite”, and Sections 4.2.4 and 4.3.4, “Computing.”

C15

Q: Please provide a list of CONUS and OCONUS sites supported. A device count of the legacy platform for each site is also requested.

A: Lists of sites and device counts of the legacy platform are not necessary for the response. Additional information will be provided as task orders are issued under the base contract.

C16

Q: Please define Tier 4 support.

A: See Glossary for definitions of all four Tiers of support.

D1

Q: In which section is the Offeror required to include the Technical Compliance Matrix?

A: The Offeror’s completed Technical Compliance Matrix should be submitted in Volume I, Tab D. The Technical Compliance Matrix is not included in page count limits. See RFP Amendment 0001, section L.2.

D2

Q: Does the Technical Compliance Matrix count against the page limits?

A: The Technical Compliance Matrix does not count against page count limits.

D3
L.2.3.3.1
Q: Implementation and Migration is listed as a subsection of Management Approach and Solution. Sections M.3.2.1.1 and M.3.2.1.2 state that Implementation and Migration will be evaluated as a Technical Approach and Solution Factor. Please clarify in which TAB (TAB A & B or TAB C) should we be providing the Implementation and Migration Plans?

A: Attachment L has been revised; implementation and migration requirements, previously located in Attachment L, Sections L.2.3.3.1, L.2.3.3.1.1, and L.2.3.3.1.2, were relocated to SOW Section 4.3.9. As stated in SOW Sections 4.2.9 and 4.3.9, implementation and migration must be part of the Offeror’s technical solution.

D4
L.2.3.3.1.1
Q: Please elaborate on "Proof of Configuration". What does DOS consider as acceptable "Proof of Configuration”?

A: “Proof of Configuration” is no longer referenced in Attachment L. However, “Proof of Configuration” is now referenced in SOW Section 4.3.9, and is defined as a quality checklist used to validate that components have been installed, configured, and tested; the Offeror shall include this checklist in its Quality Assurance Plan referenced in SOW Section 5.2.1, “Project Deliverables.”

E1
SOW 12
Q: Is it required that the prime hold a TS Facility clearance on the contract award date?

A: Yes, see the revised DD254.

E2
SOW 5.5
Q: Is the vendor required to ship the solution to an international address (OCONUS)?

A: In accordance with SOW section 5.6, all deliveries will be Freight-on-Board (FOB) Origin.

E3
SOW 4.3.4
Q: Can the vendor provide a virtual KVM or does it need to be physical?

A: The Offeror must meet the requirements described in SOW Section 4.3.4.

E4
SOW 4.3.4
Q: Is user sizing based on total users or concurrent users?

A: User sizing is based on total users.

E5
SOW 4.3.4
Q: If sizing is based on concurrent users, what is your % of users at any given time?

A: Not applicable. User sizing is based on total users.

E6
SOW 12
Q: What level of clearance is required for personnel to provide warranty support services for ECP?

A: The required security levels are Secret and Top Secret. See the revised DD254.

E7
SOW 5.7 & 8.8
Q: Base offer includes 3 years of support. Section 8.8 includes 5 optional years. What is the total warranty (years) the vendor is expected to provide?

A: The Offeror is expected to provide a three year base warranty with five optional periods in one year increments, for a maximum of eight years if all options are exercised.

E8
SOW 4.3.9
Q: What applications are to be installed by the vendor?

A: SOW Section 4.3.9, “Implementation and Migration,” has been revised to remove “OS version and configuration” and “Installation of applications as necessary.”

E9
SOW 4.1.9
Q: Is it expected that the ECP contractor will utilize the existing DOS software ELA’s (i.e. VMware)?

A: Yes, it is expected that the ECP Offeror will utilize the existing DOS software ELA’s.

E10
SOW 4.2
Q: DDC provides “scale up to” specifications/requirements for compute, networking, and storage. What are the baseline specifications/requirements for compute, networking, and storage?

A: DOS has clarified baseline configuration requirements located in the table in SOW Section 4.2.10 (new), “Domestic Data Center Baseline Configuration.” See Amendment 001.

E11
SOW 4.2
Q: What percentage of NAS and SAN storage is required for the baseline configuration?

A: The percentages of NAS versus SAN storage shall be scalable.

E12
SOW 4.1.4
Q: Please confirm that the devices deployed at the remote offices as well as the DDC’s must include the necessary hardware and software to replicate across platforms.

A: Yes, the devices deployed at the remote offices as well as the DDC’s must include the necessary hardware and software to replicate across platforms.

E13
SOW 4.2.4
Q: It states that the minimum processor requirement is an E5-2690 or better, it then goes on to state that power consumption must be 95 watts or less. The E5-2690 consumes 135 watts so there seems to be a conflict between these two requirements. Please clarify.

A: There is a new requirement of Intel Xeon Processor E7-2850 or better; the power requirement has been removed. See Amendment 001.

E14
SOW 4.3.5
Q: Is the UPS battery run time 10 or 15 minutes?

A: In accordance with the SOW Section 4.3.5, “UPS,” the minimum UPS battery run time is 10 minutes. The SOW has been updated to reflect this change. See Amendment 001.

E15
SOW 4.3.6
Q: Are we required to provide removable media hardware as part of the backup/off-shoring solution?

A: Yes, the Offeror is required to provide removable media hardware as part of the backup/off-shoring solution.

E16
SOW 4.3.6
Q: Can we integrate with existing removable media devices already deployed at remote offices?

A: No, the ECP solution is considered a life-cycle refresh, which will replace legacy equipment to include removable media devices.

E17
LCCM
Q: Per the Life Cycle Cost Model spreadsheet, will ODC items be factored into the evaluation criteria?

A: All ODCs in the LCCM will be assigned a fixed dollar amount that will be used for evaluation purposes for all Offerors for all years in the LCCM.

F1
F-006
Q: Please clarify if this IDIQ has option periods, or if the period of performance is twelve months.

A: The contract term will be a 1-year base with four 1-year options.

F2
652.228-70
Q: Please advise if this will apply as it was not completed in the solicitation.

A: This will be completed prior to contract award.

F3
L.2.5.2 Tab B
Q: Given that this is an IDIQ Contract, does the Government have historical data that we can use to determine the volume of tasking in the various areas?

A: No useful data is available for this purpose.

F4
SOW 5.7 and 8.8
Q: Please clarify if the total desired warranty and/or support period is five (5) years or eight (8) years as implied by Section 8.8?

A: The Offeror is expected to provide a three year base warranty with five optional periods in one year increments, for a maximum of eight years if all options are exercised.

F5
SOW 4.3.6
Q: Are we required to provide removable media hardware as part of the backup/off-shoring solution or can we integrate with existing removable media devices already deployed at post?

A: Yes, the Offeror is required to provide removable media hardware as part of the backup/off-shoring solution. No, the ECP solution is considered a life-cycle refresh, which will replace legacy equipment to include removable media devices.

F6
SOW 4.2.1
Q: Can the Government please clarify the supported raid levels may be raid 5, 6, or 10 or must all raid 5, 6, and 10 be supported.

A: SOW Section 4.2.3, “Storage,” and Section 4.2.10, “Domestic Data Center Baseline Configuration,” have been revised to delete references to “RAID levels 5/6/10,” and it was replaced with “The storage array/system must be able to support a double disk failure without data loss.” See Amendment 001.

F7
SOW 4.3.1 4.3
Q: Can the Government please clarify the supported raid levels may be raid 5, 6, or 10 or must all raid 5, 6, and 10 be supported.

A: The storage array/system must be able to support a double disk failure without data loss. See Amendment 001.

F8
SOW 4.3.3
Q: Should we consider the requirement for the secondary storage system as “Changed” to consider the primary storage as the location for snapshots?

A: Yes, this statement is correct. However, the Offeror shall develop a solution that meets all requirements in the RFP.

F9
SOW 4.2.6
Q: Please identify all applications that require support.

A: DOS will not require specific application support from the ECP Contractor.

F10
SOW 4.3.6
Q: Define “Will support for multiple OEM hardware solutions.” Please identify the Legacy systems to be supported

A: The legacy solution consists of NetApp storage with a VMware virtual infrastructure. Applications are listed in SOW Section 4.3.4, “Computing.”

F11
SOW.4.1.3
Q: Are there any current or future plans to connect devices that are only capable of 100mb Ethernet?

A: There are no current plans to connect devices that are only capable of 100 mb Ethernet.

F12
SOW.4.1.3
Q: Will there be a requirement to support disjointed layer 2 domains?

A: Requirements are as stated in SOW Sections 4.1.3, 4.2.2, and 4.3.2.

F13
SOW.4.1.3
Q: Is there a requirement for the Layer 2 device to be physically separate from the Layer 3 device?

A: No, there is not a requirement for the Layer 2 device to be physically separate from the Layer 3 device.

F14
SOW.4.1.3
Q: Will custom RBAC need to be configured?

A: Custom RBAC will need to be configurable, but not configured by the ECP Contractor.

F15

Q: Can the Government please clarify which virtualization and cloud management products they management software needs to include plug-ins for?

A: In accordance with SOW Section 4, the ECP solution needs to integrate with VMware.

F16

Q: Can the Government please clarify if the Offeror is expected to perform system pre-shipping work (initial configuration and setup) within a secure facility (SCIF or equal)?

A: No, pre-shipping work, e.g., initial configuration and setup will not be required.

F17

Q: What is the voltage and hertz that is required at each site for CONUS and OCONUS power?

A: Revised requirements are as stated in SOW Sections 4.2.5 and 4.3.5 “UPS.” See Amendment 001.

G1
SOW 4.1.2
Q: Please clarify what certification do you require from the OEMs?

A: Offeror will certify the interoperability of all OEM-integrated components.

G2
SOW 4.1.8
Q: Will Department of State provide the ECP contractor all the necessary VMware licenses in order for pre-installation of ECP solution?

A: No, the licensing is not required in order to preload VMware ESX. The Offeror is only expected to install the software.

G3
SOW 4.1.8
Q: Which VMware vSphere edition (Standard, Enterprise, Enterprise Plus) is the Department of State licensed for?

A: Enterprise Plus.

G4
SOW 4.1.9
Q: What are the Department of State‘s existing network and server management systems? What are the versions?

A: The Offeror can respond to the solicitation without this information.

G5
SOW 4.1.9
Q: Will Department of State provide all QoS configurations or does the Department of State require the ECP contractor to develop and configure a QoS plan for each Domestic data center and remote offices?

A: DOS will apply all WAN QoS configurations.

G6
SOW 4.1.9
Q: What are the power specifications (power input, plug types) required for the ECP cabinet solution to connect to?

A: Revised requirements are as stated in SOW Sections 4.2.5 and 4.3.5 “UPS.” See Amendment 001. The Offeror is expected to propose plugs that will meet U.S. and European standards. Power plug types vary by overseas location and will be specified for each task order. See SOW Section 4.1.2, “General Systems Requirements.” After the award of the ECP contract, the contractor shall provide all cabling interconnecting the ECP solution and it shall be clearly labeled at each end of every cable, identifying component endpoints. The contractor is not required to provide any data cabling external to the ECP solution.

G7
SOW 4.1.9
Q: “The solution will provide physical notification of system status.”? Does that mean flashing lights or something else?

A: Yes, the “physical notification of system status” can mean flashing lights, or it can mean an alternative physical notification, such as audible alerts.

G8
SOW 4.2.3
Q: All disk drive manufacturers are in the middle of a major transition from large-form factor (LFF) 3.5” 15K RPM to small-form factor (SFF) 2.5” 10K RPM hard disk drives. Most storage manufacturers have or will end of sale 15K RPM drives. Will 10K RPM drives be acceptable in the ECP solution?

A: Yes, a SFF 2.5” 10K RPM drives would be an acceptable alternative.

G9
SOW 4.2.3
Q: What are the storage requirements regarding Capacity and Performance (IOPS or access density) for the domestic data centers?

A: DOS has clarified baseline configuration requirements located in the table in SOW Section 4.2.10 (new), “Domestic Data Center Baseline Configuration.” See Amendment 001.

G10
SOW 4.2.3
Q: Please characterize the workloads.

A: Domestic Data Center is a hosted environment and workloads may vary based upon customer base. DOS has clarified baseline configuration requirements located in the table in SOW Section 4.2.10 (new), “Domestic Data Center Baseline Configuration.” See Amendment 001.

G11
SOW 4.2.3
Q: For each workload, what are the read/write percentages and what is the read/write I/O size?

A: The workload read/write percentages and size are variable based on the applications supported.

G12
SOW 4.2.4
Q: What are the computing requirements regarding how many servers are required?

A: DOS has clarified baseline configuration requirements located in the table in SOW Section 4.2.10 (new), “Domestic Data Center Baseline Configuration.” See Amendment 001.

G13
SOW 4.2.4
Q: "The solution will scale to 7000+ physical CPU cores and 100TB+ of RAM." What is the minimum size we should start with and build up to for the compute/network?

A: DOS has clarified baseline configuration requirements located in the table in SOW Section 4.2.10 (new), “Domestic Data Center Baseline Configuration.” See Amendment 001.

G14
SOW 4.2.4
Q: It is stated that the minimum processor requirement is an E5-2690 or better then goes on to state that power consumption must be 95 watts or less. The E5-2690 consumes 135 watts so there seems to be a conflict between these two requirements. Should we target CPUs that are 95 watts or less or more comparable to the E5-2690?

DA: There is a new requirement of Intel Xeon Processor E7-2850 or better; the power requirement has been removed. See Amendment 001.

G15
SOW 4.2.6
Q: When a restore is requested, how quickly does it need to be performed? This is known as your recovery time objective (RTO).

A: DOS has revised the requirements for RPO/RTO. In Amendment 001 see SOW Sections 4.2.6 and 4.3.6, “Back-Up, Disaster Recovery/Data Offshoring.”

G16
SOW 4.2.6
Q: How old is the “most recent backup” allowed to be at any given time? This is known as the recovery point objective (RPO).

A: DOS has revised the requirements for RPO/RTO; see SOW Sections 4.2.6 and 4.3.6, “Back-Up, Disaster Recovery/Data Offshoring.” See Amendment 001.

G17
SOW 4.2.6
Q: How long should data backups be kept?

A: DOS has revised the requirements for RPO/RTO and retention; see SOW Sections 4.2.6 and 4.3.6, “Back-Up, Disaster Recovery/Data Offshoring.” See Amendment 001.

G18
SOW 4.2.9
Q: For migration, How much data are is being migrated? What type of data is being migrated (CIFS shares, NFS shares, iSCSI LUNs, FC LUNs)

A: The amount and type of data that is being migrated is to be determined after award. All types of data referenced above may be migrated.

G19
SOW 4.2.9
Q: Will Department of State provide a list of the locations for the remote sites?

A: A list of the locations for remote sites is not required to respond to this RFP. If optional tasks for training or installation services are required, information will be specified in the task order.

G20
SOW 4.3
Q: For Virtual machine staging, Will Department of State provide each standardized guest operating system build “gold image”? Or will Department of State require ECP contractor to install a new guest operating system build onto each virtual machine?

A: The requirements for “OS version and configuration” and “installation of applications as necessary” has been deleted from the SOW, paragraph 4.3.9, “Implementation and Migration.” See Amendment 001.

G21
SOW 4.3.3
Q: Where will Remote Office replicate data to? If Remote Office is to replicate to domestic data centers, should we account for that data within the solution? How much bandwidth is allocated from RO to DDC?

A: Remote Office replication locations and bandwidth will vary. The Offeror shall specify what equipment will be necessary at the replication target.

G22
SOW 4.3.3
Q: When a restore is requested, how quickly does it need to be performed? This is known as your recovery time objective (RTO).

A: DOS has added requirements for RPO/RTO and restore. In Amendment 001, see SOW Section 4.3.6, “Back-Up, Disaster Recovery/Data Offshoring.”

G23
SOW 4.3.3
Q: How old is the “most recent backup” allowed to be at any given time? This is known as the recovery point objective (RPO).

A: DOS has added requirements for RPO/RTO. In Amendment 001, see SOW Section 4.3.6, “Back-Up, Disaster Recovery/Data Offshoring.”

G24
SOW 4.3.3
Q: How long should data backups be kept?

A: DOS has added requirements for RPO/RTO and restore. In Amendment 001, see SOW Section 4.3.6, “Back-Up, Disaster Recovery/Data Offshoring.”

G25
SOW 4.3.4
Q: Is user sizing based on total users or concurrent users? If total, please provide a ratio of total to concurrent.

A: Not applicable because user sizing is based on total users. The Offeror shall consider the ratio 1:1.

G26
SOW 4.3.4
Q: What are the power, space, cooling constraints in remote offices?

A: This information is contained in SOW Section 4.3.4, “Environmental Parameters.” Space requirements are in SOW Section 4.1.2, “General System Requirements,” under the heading “Rack.”

G27
SOW 4.3.6
Q: Is it a requirement to provide removable media hardware as part of the backup/off-shoring solution, or is integration with existing removable media devices already deployed at post acceptable?

A: Yes, the Offeror must provide removable media hardware as part of the solution. The ECP is considered a life-cycle refresh, which will replace legacy equipment to include removable media devices.

G28
SOW 5.2.1
Q: Can the deliverables documents mentioned in this section be submitted as separate documents, or are they required to be included as part of the page of limitation requirements?

A: The documents from section 5.2.1 that are to be delivered with the proposal as indicated, are not included in the page count limits for proposals.

G29
SOW 5.7 and 8.8
Q: Please clarify if the total desired warranty and/or support period is five (5) years or eight (8) years as implied by Section 8.8?

A: The Offeror is expected to provide a three year base warranty with five optional periods in one year increments, for a maximum of eight years if all options are exercised.

G30
SOW 5.7
Q: Warranties. What is required as warranty coverage?

A: Please reference the Solicitation, page 19 of 37, Section 52.246-19 ALT III “Warranty of Systems and Equipment under Performance Specifications or Design Criteria.”

G31
SOW 7.1
Q: How frequently does the Government anticipate training will be needed to accommodate all personnel that require training, both CONUS and OCONUS?

A: Training will be needed at least annually or anytime there is a major revision of software or hardware.

G32
L.2.3.3.3
Q: Can the Small Business Subcontracting Plan be submitted as a separate document, or is it required to be included as part of the page limitation requirements?

A: Offerors shall submit a Small Business Subcontracting Plan in Volume III, Tab C with no page limit. See Section L-2, Amendment 001.

G33
L.2.3.3.1.1
Q: What are the VMware vCenter current versions?

A: The VMware vCenter current versions are 4.x and 5.x, but we are currently deploying 5.x.

G34
L.2.3.3.1.1
Q: What are the percentages of the domestic data center and the remote offices environment that are virtualized?

DA: This information is not needed to answer the RFP.

RA: Currently, 75% of our posts have been virtualized. DOS plans to complete virtualization by July 2015.

G35
L.2.3.3.1.1
Q: What are the goals on how much the environments will be virtualized?

A: The ultimate goal for the DOS environment is to be 100% virtualized.

G36
L.2.3.3.1.1
Q: Does the Department of State require the provisioning of both physical bare metal servers and virtualized hosts server and virtual machines?

A: Provisioning requirements have been revised. See Amendment 001, SOW Section 4.3.9, “Implementation and Migration.”

G37
L.2.3.3.1.2
Q: What are the current Cisco hardware and IOS versions?

A: DOS will provide this information, as appropriate, when task orders are issued.

G38
M.3.2.4
Q: Is the State Department interested in seeing alternative finance options or payment plans as a form of cost/price proposal?

A: Presently DOS is not soliciting alternative finance options.

G39
L.2.4.2
Q: What is the required or preferred number of past performances from both the prime and subcontractors combined?

A: There is no required or preferred number. Offerors (and its 2 largest subcontractors) may submit as many past performance references as are relevant to this acquisition.

G40
L.2.4.2
Q: Will the State Department use any specific evaluation criteria to stack / rank past performances?

A: Yes, see sections M.3.2.3.1 and M.3.2.3.2.

G41
M.2
Q: How much weight is given specifically to the Technical Approach/Solution, the Corporate Experience/Past Performance and the Management Approach/Solution?

A: The relative weightings of the evaluation factors are defined in section M.2(a).

G42
M.2
Q: How much more weight specifically is given to the technical factors vs. cost/price?

A: The relative weightings of the evaluation factors are defined in section M.2(a).

G43
M.4.2
Q: If our proposal is determined to be in the competitive range and meets all other evaluation criteria listed in Section M, will a BAFO (Best and final price offer) be requested?

A: The determination of the need for a competitive range and call for final proposal revisions will be made by the CO if such actions are In the best interest of the Government.

G44
M.4.2
Q: Small business goals- Where is the State Department today against its small business goals is each set aside category? Please provide specific numbers against set aside goals.

A: This question is not relevant to respond to this solicitation. Any inquiries regarding the accomplishment of the Department’s small and disadvantaged business goals can be made to the DOS Office of Small and Disadvantaged Business Utilization.

G45
N/A
Q: When is the expected award date?

A: 4th quarter of FY14.

G46
N/A
Q: When is the expected first order fulfillment after the award date?

A: No date has been set, but it can be as soon as 30 days after contract award (see section L.2.3.3.2.5), if task order(s) are issued at contract award.

H1

Q: Would the Government supply a list of each Embassies inventory of virtual machines currently running, including provisioned resources?

A: No, the Government has provided workload information in SOW Section 4.3.4, “Computing.”

H2

Q: Would the Government supply a list of the ESXi/vSphere host versions running at all locations within the DOS ecosystem?

DA: For the Domestic Data Center, the current ESXi/vSphere host version is 5.x within the DOS ecosystem.

RA: For the Remote Offices, the current ESXi/vSphere host version is 4.x within the DOS ecosystem. New implementations will be 5.x.

H3

Q: Is there existing Rack Space at the individual Embassies which can be utilized for a hyper-converged deployment? For example, a converged solution only requiring 4U-6U of total rack space.

A: Rack space in existing Remote Offices varies. If a composite solution is ordered, then the Offeror is expected to provide the required space in their rack solution. However, if components are ordered, the DOS will install the components in the existing rack. See SOW Section 4.3.4, “Computing.”

H4

Q: What is the number of vCenter’s running enterprise-wide, and where are they located?

A: This information is not necessary to respond to the RFP.

H5

Q: What is the number of sites being supported per each vCenter?

A: This information is not necessary to respond to the RFP.

H6

Q: Blade server form fact is specifically mentioned in this RFP. Would the Government consider alternative form factor solutions that include features such as power savings, reduced rack consumption, and low heat output?

A: Yes, the Government would consider such alternative form factor solutions.

H7

Q: Does the Government currently have excess switching capacity at the foreign and domestic sites? If so, will the Government provide the availability of the excess switching at each site?

A: The ECP solution must provide all internal switching. The Offeror shall meet all requirements in SOW Sections 4.2.2 and 4.3.2, “Networking.”

I1
F-006
Q: Note Section F does not refer to option periods. Will the Government please certify that the Period of Performance is one-year base period with four one-year option periods as stated in SOW Section 10?

A: Yes, the term of the contract is a 1-year base with four 1-year options.

I2
B-007
Q: FAR places 10% as the amount that would be withheld if a penalty is to be assessed, this is the default percentage provided by the FAR. Does the Government have a specific percentage in place of 10 percent or is this the percentage that shall be used?

A: RFP Section B-007 is “Rate for Indefinite Delivery Contracts.” There is no penalty associated with this clause.

I3
L.2.3.3.2.2
Q: The Government is requesting multiple Project Documents to be included in the proposal response. Please verify that these project documents are excluded from page count limits.

A: The project documents described in the SOW Section 5.2.1 and Attachment L, Section L2.3.3.2.2 are not included in the page count for Volume I.

I4
L.2.3.3.2.2
Q: The Government is requesting multiple Project Documents to be included in the proposal response. Shall these documents be provided as appendices to the Technical Proposal submission?

A: The project documents described in the SOW Section 5.2.1 and Attachment L, Section L2.3.3.2.2 are not included in the page count for Volume I.

I5
L.2.4.1 Tab A
Q: Will the Government please clarify the requirement for required citations? Does the Government require three references each from the Prime and the two largest subcontractors for a total of nine references?

A: Three each corporate experience summaries from the Offeror and its two largest subcontractors (3 ea.) equals nine total.

I6
L.2.4.1 Tab A
Q: Will the Government please clarify the requirement for required citations? Does the Government require three total references – at least one from the Prime contractor?

A: Three each corporate experience summaries from the Offeror and its two largest subcontractors (3 ea.) equals nine total.

I7
L.2.4.1 Tab A
Q: Please define your requirements for “Largest Subcontractor”.

A: DOS has no size definitions for “large” subcontractors. As the prime contractor, your organization determines with whom it subcontracts and the relative size of those subcontracts.

I8
Attachment J-4 Technical Compliance Matrix: L.2.3.3
Q: The Technical Compliance Matrix is 47 pages in length. Please verify that this matrix should be provided as an appendix to the Technical proposal.

A: The Technical Compliance Matrix (TCM) should be included in proposal Volume I as Tab D, which has no page restrictions.

I9
Attachment J-4 Technical Compliance Matrix: L.2.3.3
Q: The Technical Compliance Matrix is 47 pages in length. Please verify that this matrix is excluded from the page limits provided in Section L.2.1.

A: Yes, the TCM should be included in proposal Volume I as Tab D, which has no page restrictions.

I10
Attachment J-4 Technical Compliance Matrix: L.2.3.3
Q: Please clarify the Government’s requirements for completing the matrix. Does the Government expect the Offeror to provide a reference to the section of our proposal in which we respond to each requirement?

A: The Offeror should complete the TCM by inserting for each item in the TCM, a reference to its technical proposal by volume, section, paragraph and page number.

I11
SOW 4.1.5
Q: Will the Government please clarify the section references? Should the section references be 4.2.4 and 4.3.4?

A: Yes, the section references in SOW 4.1.5 (“Computing”) should be 4.2.4 and 4.3.4.

I12
L.2.3
Q: Section L.2, Volume I does not provide for an overview of our technical approach and solution (each Tab of Volume I must address a wide variety of specific requirements). Respectfully request the Government allocate an additional 10 pages for an executive summary and solution overview for Volume I.

A: Section L, Paragraph L.2, Volume I has been revised to allow for an overview of your technical approach and solution. See Amendment 001.

I13
Current Operations Overview / Statement of Work Introduction and Background to the Domestic Data Center Operating Environment
Q: The RFP calls for converged solution that will include intercommunication between the compute and new storage only, accordingly it would seem that consideration for existing infrastructure is moot. In order to provide the best TCO, we recommend reducing the number of protocols and ports on the storage to eliminate unnecessary cost. Compute and Storage have intercommunication that is isolated from the broader network(s) therefore multiple protocols is superfluous. According to Atch J2, DoS is in the process of migrating from traditional fibre attached storage to an IP-based storage infrastructure using NFS/iSCSI, and that future deployments will be on NFS/iSCSI. Based on this we respectfully request removing FCoE, and potentially FC as well, as requirements under 4.1.4 and 4.3.3.

A: The requirement remains as stated.

I14
SOW 4.3.3
Q: As VMWare does not support IPv6 in their implementation of iSCSI (Best Practices for Running VMWare vSphere on iSCSI – v2.0A/July 2013, p.9), nor do many of the leading vendors who could provide storage for this project, we respectfully request that the following be added to 4.3.3 “Must support both IPV4 and IPV6, except for iSCSI which can be IPV4 only.”

A: In the Federal Government, all networking equipment is required to be IPV6 compatible. DOS acknowledges that the current version of VMware cannot support IPV6 for iSCSI.

I15
SOW 4.1.9
Q: Please provide information on these systems to include name, version and how they are used.

A: SOW Section 4.1.9 has been revised. See Amendment 001.

I16
SOW 4.1.2
Q: Please provide a more detailed description of your core infrastructure so that we can design a solution that will fully interoperate.

DA: The Domestic Data Center infrastructure is described in Current Operations Overview Section 2. In addition, we provided baseline configuration requirements in the table in SOW Section 4.2.10 (new), “Domestic Data Center Baseline Configuration.” See Amendment 001.

RA: The Remote Office core infrastructure is described in Current Operations Overview Section 3, “Introduction to the Remote Office Operating Environment.”

I17

Q: The Intel E5-2690 processor is a 135w processor, so there is a discrepancy in the power draw information. Recommend the Government change the statement read "must be 135w or lower processor?

A: There is a new requirement of Intel Xeon Processor E7-2850 or better; the power requirement has been removed. See Amendment 001.

I18
SOW 4.3.4
Q: Please breakdown the workloads for each of the 8 ECPs. Since the Government has identified that Tiered Storage is required, and there are 17 servers, for example at a 60 user small site, how much of the load needs to be in each tier, with IOPS per Tier specified?

A: The Offeror is not required to provide 8 ECP solutions. The Offeror shall provide the quantity of solutions that best meets the defined requirements. Tiered storage is not specifically required for the Remote Offices, but the performance requirements listed in SOW Section 4.3.4, “Computing,” under VM Minimum Configuration, must be met.

I19
SOW 4.3.4
Q: What are the IOPS per user and capacity per user requirements?

A: The requirements are as stated in SOW Section 4.3.4, “Computing,” under VM Minimum Configuration.

I20
SOW 4.3.4
Q: If the IOPS requirements are as low as described, what is the purpose of Tiered storage specified in 4.2.3?

A: There are no tiered storage requirements for the Remote Offices; tiered storage requirements only apply to the Domestic Data Centers. See SOW Section 4.2.3, “Storage.” The Offeror should propose the best solution to meet DOS requirements.

I21
SOW 4.3.4
Q: Can the Government revise its IOPS requirement per site/ECP in 4.3.4? Consider that an Exchange Server alone for 2500 users requires 3125 IOPS (http://technet.microsoft.com/en-us/library/bb125019(v=EXCHG.65).aspx) the specified 3000 IOPS for that user count is insufficient. In order to provide the best solution, rack density, and accurate cost we respectfully request revision to the IOPS specifications.

A: The Offerors should provide its best solution to meet the Department’s requirements.

I22
SOW 4.3.4
Q: Can you provide DPAC’s or equivalent assessments of workloads to anticipate IOPS min as well as peak loads?

A: The information provided in the VM Minimum Configuration Table in Section 4.3.4 is based on the current environment.

I23
SOW 4.3.4

This is the start of the file's text. The full file is on GovTribe.